Tubemove
6.0 TUBEMOVE
6.1
Predicting Packer
Performance (Part 1)
Module 1: Basics
– Theory
– Definitions
– Components
Module 2: Program
– Definitions
– Assumptions
– Procedure
– Analysis
– Resources
Tubing
P re s s ure
Tubing
P re s s ure
Incre a s e d
Definition:
Study of how tubing strings
are affected by pressure,
temperature, and mechanical
changes.
6,000'
Dependent on well
7,500'
9-5/8" 53.50 lb/ft Casing
conditions, tubing to packer
8.9 lb/gal Brine
to casing configurations, and
2-7/8" 6.5 lb/ft Tubing tubing restraint.
7,600'
7,650'
2-7/8" 7.9 lb/ft Tubing
Well Conditions:
7,800' Tubing properties
Casing properties
G-22 Locator Seal Assembly
10,000'
DB Packer with 3.250" ID Seal Bore
Liner properties
7" 35 lb/ft Liner Fluid properties
Pressures
11,000'
Temperatures
© 1996 Baker Hughes Incorporated. J.211-pkr.man.tubemove.tmov1oh.ppt
All rights reserved. Slide 4 04/25/00 (mw)
Tubing to Packer to Casing Constraints Baker Oil Tools
Retrievable Packers:
Free Movement
– No Grip
Limited Movement
– Single Grip
– Double Grip w/ body lock ring
No Movement
– Double Grip w/ body lock ring
Double Grip w\o Double Grip
No Grip Single Grip Body Lock Ring w\Body Lock
Ring
Permanent Packers:
Free Movement
– Seal Nipple
Limited Movement
– Locator Seal Assembly
No Movement
– Anchor Seal Assembly
Mechanical
– Tension
– Slack-Off
Piston
Pressure Buckling
Ballooning
Temperature
Tension:
Defined by Hooke’s Law:
∆L= LxF
E x As
Where
∆L = Length Change (in)
L = Length of tubing (in)
F = Force (lbs)
E = Modulus of Elasticity (psi)
As = Cross-Sectional Area of
Tubing (sq. in.)
Tension:
Stretch Constant Method:
∆L= L x F x Sc
Where
∆L = Length Change (in)
L = Length of tubing (1000 ft)
F = Force (1000 lbs)
Sc = Stretch Constant (in per
1000 lbs per 1000 ft) or
= .4 / As
© 1996 Baker Hughes Incorporated. J.211-pkr.man.tubemove.tmov1oh.ppt
All rights reserved. Slide 10 04/25/00 (mw)
Stretch Chart Baker Oil Tools
S T R E T C H C H A R T ( in c h e s ) : 3 1 /2 " O . D . 1 5 . 5 0 P P F D R IL L P IP E
60000
8 30 60
55
50000 28 50
26
45
6 24
40000 22 40
Pull on Drill Pipe - Pounds
5 20 35
18
30
30000 16
4
14
12
3
20000 10
2
8
10000
1
0
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
10500
11000
11500
12000
D e p th - F e e t
Slack-Off:
Defined by combination of Hooke’s Law +
Mechanical Buckling:
∆L= LxF + r2 x F2
E x As 8xExIxW
Where
∆L = Length Change (in)
r = Radial Clearance between casing
and tubing (in)
F = Force (lbs)
I = Moment of Inertia (in4)
W = Weight of tubing in fluid (lb/in)
© 1996 Baker Hughes Incorporated. J.211-pkr.man.tubemove.tmov1oh.ppt
All rights reserved. Slide 12 04/25/00 (mw)
Slack-Off Chart Baker Oil Tools
100
20,000 ft200
fee
BUCKLING
90
18,000 ft
180
INCHES OF SLACKOFF
80
16,000 ft160
70
14,000 ft140
60
12,000 ft120
STEEL COMPRESSION
50
10,000 ft100
40 13-3/8” 13
8,000 ft 800
30 6,000 ft 600
20 4,000 ft
400
9-5/8”
8-5/8” 89 55
10
2,000 ft 200
7” 7"
0
10 20 30 40 50
36000 7"
7”
7”
32000
8 58-5/8”
FORCE ON PACKER (lbs)
28000 9 59-5/8””
10
10-3/4”
24000
1313-3/8”
20000
16000
12000
8000
4000
0
0
4000
8000
12000
16000
20000
24000
28000
32000
36000
40000
44000
48000
52000
S LACK-OFF FORCE (lbs)
Critical Parameters:
Pressure Change:
Pressure change at the
packer.
Area:
Tubing to Packer Seal
Bore Configuration.
Note:
Local effect occuring at
the piston area location.
Formulas:
Force defined as follows, length change by substitution into Hooke’s Law:
OD
OD PSB
ID ID
PSB
ID
OD
PSB
PSB > Tubing OD PSB < Tubing OD Tubing OD > PSB > Tubing ID
Formulas:
Force defined as follows, length change by substitution into Buckling Law:
F = Ap x (∆Pi - ∆Po )
∆L = r2 x [ Ap x (∆Pi - ∆Po )] 2
8xExIxW
Where
Ap = Area of Packer Seal Bore (sq. in)
r = Radial Clearance between casing and tubing (in)
∆Pi = Change in Tubing Pressure at the Packer (psi)
∆Po = Change in Annulus Pressure at the Packer (psi)
Formulas:
Force defined as follows, length change by substitution into Hooke’s Law:
F = -2 x υ x [(PiaxAi) - (PoaxAo) ]
∆L = -2 x L x υ x (Pia- R2 x Poa)
E R2 - 1
Where
υ = Poisson’s ratio (.3 for steel)
R = Ratio of Tubing OD to Tubing ID (-)
∆Pi = Change in Tubing Pressure at the Packer (psi)
∆Po = Change in Annulus Pressure at the Packer (psi)
Formulas:
Force defined as follows, length change by substitution into Hooke’s Law:
F = 207 x As x ∆t
∆L = L x B x ∆t
Where
As = Crosssectional Area of the Tubing (sq. in.)
∆t = Average Temperature Change (deg. F)
L = Original Length of Tubing (in.)
B = Coeficient of Thermal Expansion (in./ in./ deg. F)
Module 1: Basics
– Theory
– Definitions
– Components
Module 2: Program
– Definitions
– Assumptions
– Procedure
– Analysis
– Resources
Definitions:
Definitions:
Initial Conditions:
Well conditions at the time of space-out. Reference condition for the life of the
completion.
Final Conditions:
Well conditions that deviate from initial conditions (what has changed since spaceout?).
Definitions:
Reference Initial Conditions:
Initial well condition used for all future calculations that is derived from multiple tubing
movement runs, e.g., setting of hydraulic set packer.
SECTION 2
A portion of the well in which
6,000'
9-5/8" 53.50 lb/ft Casing
7,500'
all parameters, tubular, fluids,
8.9 lb/gal Brine
SECTION 3
pressures, remain constant.
Thus a new section is defined
2-7/8" 6.5 lb/ft Tubing
7,600'
2-7/8" 7.9 lb/ft Tubing SECTION 4
by a change in these well
7,650' parameters.
7,800' SECTION 5
G-22 Locator Seal Assembly
10,000'
11,000'
ZONE 1
3-1/2" 10.3 lb/ft Tubing
5,000'
6,000'
9-5/8" 53.50 lb/ft Casing
SECTION 2 A portion of the well where
7,500' the tubing is constrained
8.9 lb/gal Brine from tubing movement
SECTION 3
2-7/8" 6.5 lb/ft Tubing
(usually between two
7,600' packers).
SECTION 1
ZONE 2
2-7/8" 7.9 lb/ft Tubing
7,650'
11,000'
6,000'
9-5/8" 53.50 lb/ft Casing
1) Understand the Program
2) Understand Tubing Movement
7,500'
7,800'
5) Identify the Problem(s)
6) Design for Worst Case
G-22 Locator Seal Assembly
10,000'
7) Draw a Picture
DB Packer with 3.250" ID Seal Bore
11,000'
TU B EM O VE™
SAM PLE LO A D SH EET
paper ...
if d e v ia te d )
S T U B IN G A N C H O R E D (0 = N O , 1 = Y E S ) 1
P A C K E R B O R E (in ) 3 . 2 5
S L A C K O F F (+ lb s ) o r T E N S IO N (-lb s ) 0
C R A M A T E R IA L ? (0 = N O , 1 = Y E S ) ‡ 0
H IG H S P A C E O U T (in ) 0
N U M B E R O F S E C T IO N S 2
M A X W IR E L IN E T O O L O D (in ) 0
T B G /C S G C O N F IG U R A T IO N
T U B IN G O .D . (in ) s e c t. 1 2 . 8 7 5
T U B IN G O .D . (in ) s e c t. 2 2 . 8 7 5
T U B IN G O .D . (in ) s e c t. 3
T U B IN G O .D . (in ) s e c t. 4
T U B IN G O .D . (in ) s e c t. 5
T U B IN G W T . (lb s /ft) s e c t. 1 6 . 5
T U B IN G W T . (lb s /ft) s e c t. 2 6 . 5
T U B IN G W T . (lb s /ft) s e c t. 3
C A S IN G I.D . (in ) s e c t. 1 6 . 8 7 5
C A S IN G I.D . (in ) s e c t. 2 6 . 8 7 5
C A S IN G I.D . (in ) s e c t. 3
C A S IN G I.D . (in ) s e c t. 4
C A S IN G I.D . (in ) s e c t. 5
D E P T H (ft) s e c t. 1 2 0 0 0
T U B IN G Y IE L D S T R E N G T H (p s i) s e c t. 1 * 8 0 0 0 0
C O N D I T I O N S ( S h u t- in , f r a c tu r e , a c id , e tc .)
RUN 1
TUBEM OVE™
SA M PLE LO A D SH EET
F ra c in g
RUN 2 RUN 3 RUN 4
4) Outline the Job Procedure
IN IT IA L C O N D IT IO N S
7) Draw a Picture
F IN A L S U R F A C E T E M P (d eg F ) 60
F IN A L B O T T O M H O L E T E M P (d e g F ) 75
F IN A L S U R F . P R E S S U R E - tu b in g ( p s i) 9000
F IN A L S U R F . P R E S S U R E - a n n u lu s ( p s i) 1000
F IN A L FLU ID W T. - tu b in g (lb s/g a l) se c t. 1 13
F IN A L FLU ID W T. - tu b in g (lb s/g a l) se c t. 2 13
F IN A L FLU ID W T. - tu b in g (lb s/g a l) se c t. 3
F IN A L FLU ID W T. - tu b in g (lb s/g a l) se c t. 4
F IN A L F L U ID W T . - a n n u lu s (lb s/g a l) se c t. 13
F IN A L F L U ID W T . - a n n u lu s (lb s/g a l) se c t.
F IN A L F L U ID W T . - a n n u lu s (lb s/g a l) se c t.
F IN A L F L U ID W T . - a n n u lu s (lb s/g a l) se c t.
* T U B E M O V E d o e s n o t a s s u m e s a f e ty f a c to r s f o r tu b in g y ie ld s tr e n g th .
‡ F o r C R A m a te r ia l s e e A p p e n d ix B o f th e u s e r ’ s g u id e .
T h is p r o g r a m is b a s e d o n S .P .E . p a p e r # 5 1 4 3 ( E n title d , “ M o v e m e n ts , F o r c e s , a n d S tr e s s e s
A s s o c ia te d w ith C o m b in a tio n T u b in g S tr in g s S e a le d in P a c k e r s ” ) , a n d , a s s u c h is s u b je c t to th e
paper ...
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Top Section 2.875 2.441 6.500 6.875 2000 80000
Bottom Section 2.875 2.441 6.500 6.875 10000 80000
INITIAL CONDITIONS
TEMPERATURE Surface Bottomhole SURF. PRES. Tubing Annulus
(deg F) 70 250 (psi) 0 0
7) Draw a Picture
Top Section -13.43 -9.22 -8.96 -4.39 -36.01
Bottom Section -53.72 -88.44 -35.76 -72.20 -250.12
TOTAL -67.15 -97.66 -44.72 -76.59 -286.12
Initial Conditions:
© 1993 - BAKER HUGHES INC.
REL.3.0
CUSTOMER: Tubing Movement
WELL NAME: Example RUN NUMBER: 1
Packer Depth (ft) 10000 Packer/Tubing (Anchor=1, Locator=0) 1
Packer Bore (in) 3.250 Slack-off (+lb) [Tension (-lb)] 0
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG
CONFIGURATION
Top Section
Bottom Section
Tubing O.D.
(in)
2.875
2.875
Tubing I.D.
(in)
2.441
2.441
Tubing Wt
(lbs/ft)
6.500
6.500
Casing I.D.
(in)
6.875
6.875
Depth (ft)
2000
10000
Tubing Yield
(MD @ Btm of S e ct) Strength (psi)
80000
80000
Available Hookload
Initial Length Change
INITIAL CONDITIONS
TEMPERATURE Surface Bottomhole SURF. PRES. Tubing Annulus
(deg F) 70 250 (psi) 0 0
Force/Stress Analysis
Bottom Section 16.00 16.00
TEMPERATURE
(deg F)
Tubing
75
Annulus
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000
Final Differential at the Packer
Top Section 13.00 13.00
Bottom Section 13.00 13.00
PRESSURES
Surface
(psi) Tubing
0
Initial
Annulus
0
Tubing
Final
9000
Annulus
1000
Final
Diff. Pres.
8000
Total Length Change
Bottom of Top Section 0 0 10351 2351 8000
At Packer 6649 6649 15753 7753 8000
LGTH. CHANGE(in)
Top Section
Bottom Section
Piston
-13.43
-53.72
Buckling
-9.22
-88.44
Ballooning
-8.96
-35.76
Temperature
-4.39
-72.20
TOTAL
-36.01
-250.12
Movement if Permitted
TOTAL -67.15 -97.66 -44.72 -76.59 -286.12
Force/Stress Analysis
Bottom -95822 60494
Bottom Section Top -95822 60494
Bottom -43822 50907
Packer - Tubing -86799
Negative movement is up
Negative force is tensile
This program is based on S.P.E. paper #5143 (Entitled "Movements, Forces, and Stresses Associated With Combination Tubing Strings
Sealed In Packers"), and, as such, is subject to the same assumptions and limitations as said paper. Baker Oil Tools does not warrant that
the functions contained in this program will meet customers' requirements or will operate in the combinations selected for use. This program
and the results produced by it are not warranted to be error free.
Initial Conditions:
Packer Depth (ft) 10000 Packer/Tubing (Anchor=1, Locator=0) 1
Packer Bore (in) 3.250 Slack-off (+lb) [Tension (-lb)] 0
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Top Section 2.875 2.441 6.500 6.875 2000 80000
Bottom Section 2.875 2.441 6.500 6.875 10000 80000
Available Hookload =
INITIAL CONDITIONS
FLUID WEIGHTS (lbs/gal) Tubing Annulus initial hookload is the “top of the
Top Section
Bottom Section
0.00
16.00
0.00
16.00
top section force”.
INITIAL LENGTH CHANGE COMRESSION/ BUCKLING
(in) TENSION
Top Section 0.00 0.00
Bottom Section 0.00 0.00 INITIAL HELIX ANGLE
0 TOTAL 0.00 Helix Angle
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top -52951 29222
Bottom -39951 22048
Bottom Section Top -39951 22048
Bottom 12049 0
Packer - Tubing 0
Initial Conditions:
Packer Depth (ft) 10000 Packer/Tubing (Anchor=1, Locator=0) 1
Packer Bore (in) 3.250 Slack-off (+lb) [Tension (-lb)] 0
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Top Section 2.875 2.441 6.500 6.875 2000 80000
Bottom Section 2.875 2.441 6.500 6.875 10000 80000
Initial Length Change =
INITIAL CONDITIONS
Initial Conditions:
Packer Depth (ft) 10000 Packer/Tubing (Anchor=1, Locator=0) 1
Packer Bore (in) 3.250 Slack-off (+lb) [Tension (-lb)] 0
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Force/Stress Analysis
Top Section 2.875 2.441 6.500 6.875 2000 80000
Bottom Section 2.875 2.441 6.500 6.875 10000 80000
INITIAL CONDITIONS
TEMPERATURE
(deg F)
Surface
70
Bottomhole
250
SURF. PRES.
(psi)
Tubing
0
Annulus
0 When running non-upset pipe, it
FLUID WEIGHTS (lbs/gal) Tubing Annulus
is critical that you compare the
Top Section
Bottom Section
0.00
16.00
0.00
16.00
highest force displayed in the
output against the maximum
INITIAL LENGTH CHANGE COMRESSION/ BUCKLING
(in) TENSION allowable force as given in the
Top Section
Bottom Section
0.00
0.00
0.00
0.00 INITIAL HELIX ANGLE BOT Tech Fact Book Section 5.
0 TOTAL 0.00 Helix Angle
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top -52951 29222
Bottom -39951 22048
Bottom Section Top -39951 22048
Bottom 12049 0
Packer - Tubing 0
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
Force/Stress Analysis
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Top Section
Bottom Section
2.875
2.875
2.441
2.441
6.500
6.500
6.875
6.875
2000
10000
80000
80000
Maximum tri-axial stress
INITIAL CONDITIONS
calculated is compared against
TEMPERATURE
(deg F)
Surface
70
Bottomhole
250
SURF. PRES.
(psi)
Tubing
0
Annulus
0
inputted tubing yield strength.
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 0.00 0.00
Bottom Section 16.00 16.00
Hint: when inputting tubing yield
INITIAL LENGTH CHANGE
(in)
COMRESSION/ BUCKLING
TENSION
strength include a safety factor,
Top Section
Bottom Section
0.00
0.00
0.00
0.00 INITIAL HELIX ANGLE
thus when the SAFE limit is
0 TOTAL 0.00 Helix Angle exceeded a warning message will
appear in the output.
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top -52951 29222
Bottom -39951 22048
Bottom Section Top -39951 22048
Bottom 12049 0
Packer - Tubing 0
Initial Conditions:
Packer Depth (ft) 10000 Packer/Tubing (Anchor=1, Locator=0) 1
Packer Bore (in) 3.250 Slack-off (+lb) [Tension (-lb)] 0
CRA Tubing NO High Space-out [Locator ONLY] (in) 0
Number Sections 2 Max Wireline Tool OD (in) 0.000
TBG/CSG Tubing O.D. Tubing I.D. Tubing Wt Casing I.D. Depth (ft) Tubing Yield
CONFIGURATION (in) (in) (lbs/ft) (in) (MD @ Btm of S e ct) Strength (psi)
Top Section 2.875 2.441 6.500 6.875 2000 80000
Bottom Section 2.875 2.441 6.500 6.875 10000 80000 Force/Stress Analysis
INITIAL CONDITIONS
TEMPERATURE
(deg F)
Surface
70
Bottomhole
250
SURF. PRES.
(psi)
Tubing
0
Annulus
0 Packer to tubing force displayed
FLUID WEIGHTS (lbs/gal) Tubing Annulus
is NOT the force reaching the
Top Section
Bottom Section
0.00
16.00
0.00
16.00
packer, rather it is equal to the
INITIAL LENGTH CHANGE COMRESSION/ BUCKLING
inputted slack-off or tension.
(in) TENSION The program doesn’t account for
Top Section
Bottom Section
0.00
0.00
0.00
0.00 INITIAL HELIX ANGLE friction.
0 TOTAL 0.00 Helix Angle
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top -52951 29222
Bottom -39951 22048
Bottom Section Top -39951 22048
Bottom 12049 0
Packer - Tubing 0
TEMPERATURE
(deg F)
Surface
60
Bottomhole
75
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000
Final Conditions:
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 13.00 13.00
Bottom Section 13.00 13.00
PRESSURES
(psi) Tubing
Initial
Annulus Tubing
Final
Annulus
Final
Diff. Pres.
Differential Pressure at the
Surface
Bottom of Top Section
0
0
0
0
9000
10351
1000
2351
8000
8000
Packer
At Packer 6649 6649 15753 7753 8000
TEMPERATURE
(deg F)
Surface
60
Bottomhole
75
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000
Final Conditions:
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 13.00 13.00
Bottom Section 13.00 13.00
PRESSURES
(psi) Tubing
Initial
Annulus Tubing
Final
Annulus
Final
Diff. Pres.
Length Changes
Surface 0 0 9000 1000 8000
Bottom of Top Section
At Packer
0
6649
0
6649
10351
15753
2351
7753
8000
8000
Total Length Change=
LGTH. CHANGE(in)
Top Section
Piston
-13.43
Buckling
-9.22
Ballooning
-8.96
Temperature
-4.39
TOTAL
-36.01
Total of all the length changes
Bottom Section -53.72 -88.44 -35.76 -72.20 -250.12 due to pressure and temperature
TOTAL -67.15 -97.66 -44.72 -76.59 -286.12
changes.
FINAL HELIX ANGLE
MOVEMENT IF PERMITED (in) -286.12 Helix Angle
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top -108822 64000
Bottom -95822 60494
Bottom Section Top -95822 60494
Bottom -43822 50907
Packer - Tubing -86799
Negative movement is up
Negative force is tensile
This program is based on S.P.E. paper #5143 (Entitled "Movements, Forces, and Stresses Associated With Combination Tubing Strings
Sealed In Packers"), and, as such, is subject to the same assumptions and limitations as said paper. Baker Oil Tools does not warrant that
the functions contained in this program will meet customers' requirements or will operate in the combinations selected for use. This program
and the results produced by it are not warranted to be error free.
TEMPERATURE
(deg F)
Surface
60
Bottomhole
75
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000 Final Conditions:
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 13.00 13.00
Bottom Section 13.00 13.00
PRESSURES
(psi) Tubing
Initial
Annulus Tubing
Final
Annulus
Final
Diff. Pres. Length Changes
Surface 0 0 9000 1000 8000
Bottom of Top Section 0 0 10351 2351 8000
At Packer 6649 6649 15753 7753 8000 Movement if Permitted=
LGTH. CHANGE(in) Piston Buckling Ballooning Temperature TOTAL
Top Section -13.43 -9.22 -8.96 -4.39 -36.01 Assuming the tubing is free to
Bottom Section
TOTAL
-53.72
-67.15
-88.44
-97.66
-35.76
-44.72
-72.20
-76.59
-250.12
-286.12
move, the total of all length
FINAL HELIX ANGLE
changes including the initial
MOVEMENT IF PERMITED (in) -286.12 Helix Angle applied slack-off or tension
length change.
0.0 Deg/100'
FORCES and STRESSES FORCE STRESS Maximum Tool Length
(lbs) (psi) Unlimited Feet
Top Section Top
Bottom
-108822
-95822
64000
60494
With a locator seal assembly, the
Bottom Section Top
Bottom
-95822
-43822
60494
50907
minimum length of seals/seal
Packer - Tubing -86799 bore required.
Negative movement is up
Negative force is tensile
This program is based on S.P.E. paper #5143 (Entitled "Movements, Forces, and Stresses Associated With Combination Tubing Strings
Sealed In Packers"), and, as such, is subject to the same assumptions and limitations as said paper. Baker Oil Tools does not warrant that
the functions contained in this program will meet customers' requirements or will operate in the combinations selected for use. This program
and the results produced by it are not warranted to be error free.
TEMPERATURE
(deg F)
Surface
60
Bottomhole
75
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000 Final Conditions:
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 13.00 13.00
Bottom Section 13.00 13.00
TEMPERATURE
(deg F)
Surface
60
Bottomhole
75
SURF. PRES.
(psi)
Tubing
9000
Annulus
1000 Final Conditions:
FLUID WEIGHTS (lbs/gal) Tubing Annulus
Top Section 13.00 13.00
Bottom Section 13.00 13.00
Force/Stress Analysis
PRESSURES Initial Final Final
(psi) Tubing Annulus Tubing Annulus Diff. Pres.
Surface 0 0 9000 1000 8000
Bottom of Top Section 0 0 10351 2351 8000
At Packer 6649 6649 15753 7753 8000
The same analysis as conducted
LGTH. CHANGE(in)
Top Section
Piston
-13.43
Buckling
-9.22
Ballooning
-8.96
Temperature
-4.39
TOTAL
-36.01
for the initial conditions should
Bottom Section -53.72 -88.44 -35.76 -72.20 -250.12 be done for the final conditions:
1) force comparison if using non-
TOTAL -67.15 -97.66 -44.72 -76.59 -286.12
Packer Calculation
Handbook
BOT’s Worldwide
Support Network
End of Section