CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI SALIENT FEATURES
Name of State Uttarakhand

Name of Project SWM Project Haldwani & Cluster Towns

Name of Scheme UIDSSMT-JnNURM

Name of Cluster Cities Haldwani, Rudrapur, Kichha, Lalkuan,


Bhimtal.
Total Cluster Population 2011 324733
(Haldwani,Rudrapur,Kichha,
Lalkuan,Bhimtal)
Base Year Population & 357354 & 71471
Households 2014
No. of Wards 72

Total waste generation in all 5 192


cities. (MT/Day)ABC\summary analysis.xlsx

Distance from State Capital 280 KM


Dehradun
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Collection
Chamber
Historical Background
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Organizational Structure of NNH
Mayor

MNA

MOH SNA

Establishment Engineering Health Finance and Accounts Street Property Tax


Lighting

Tax
Health Accountant
Head Clerks Junior Engineer Incharge Inspector
Inspector
s

Clerks Clerks Asst


Clerks Accountant Linemen
Clerks

Safai Nayaks
Accounts
Clerks
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Deficiencies in Existing SWM System

 Inadequate door to door collection system. Door to door collection is taking place
in some wards with the help of an NGO.
 No segregation : Presently waste is not segregated at source and instead waste
is being dumped in mixed form.
 Single Bin system (mixed waste collection) is being practiced to a large extent in
the city
 Community bins are placed on unsurfaced platforms. Some of them not in good
condition.
 Street sweepers are not provided with proper tools
 Manual collection and transportation is being practiced.
 Poor practice in markets waste dumped at open spaces on ground.
 Storage System and Collection system are not synchronized leading to
overflowing bins
 Poor handling of plastic bags.
 Lack of public awareness
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Deficiencies in Existing SWM System

 Machineries and equipments are in poor condition


 Improper infrastructure is available at existing land fill site.
 Unscientific Dumping of Waste at dumping Site

Other
 Lack of technical staff and assistance.
 Lack of fund for implementation of plans.
 Growing population
 Lack of law enforcement.
 Low tax collection.
 Low Coverage of revenue collection
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI


CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Plan for The Waste Management

• Plan A- Management
by Available Sources

• Plan B-
Implementation of
systematic SWM Plan
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Sources
by Available
•Management
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Awareness generation
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Door to door collection


CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

of Long-
•Planning

term Plan
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Preparation of Integrated Solid Waste


Management DPR by SUDA.

DPR Submission to GOI under JnNURM-


UIDSSMT after SLNA approval.

DPR Appraised by GOI.


Key features of SWM DPR Haldwani-Cluster
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

 Collection
 Storage
 Transportation
 Process & Disposal
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Primary Collection of waste at Source


 Segregation of waste at source - 15 litre twin bins
 Commercial Area (Institutions/Restaurants)- 1100 litre twin bins
 Schools and other Institutions (govt. places and court) waste will be collected
from only one storage point where all the waste will be collected.
 For schools, 2 bins of 100 ltr each will be placed at this storage point.
 Waste from Other areas
 Bus stand Area and other common areas -1100 ltr bins at strategic
locations
 Most of the wards area of the city will be covered by Utility vehicles
 Waste will be transferred by compactor vehicle.
Transportation of Waste
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

 Based on topography entire Haldwani-Cluster the waste transportation


system is divided into 2 parts :

(i) Door to Door Collection. Through Small hydraulic tipper vehicles in the
residential areas and through 1100 ltr bins with compacter vehicles in
market area.

(ii) Transfer of Waste to site – Compactor vehicle of 8 cum capacity


carrying waste directly to compost/landfill site.
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
TRANSPORTATION OF WASTE

Refuse Compactors-Garbage Hopper/utility


CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Waste Transportation Plan for Clusters
Process & Disposal of Waste
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

 Aerobic- Compost Plant of 200 TPD Waste


treatment capacity

Construction of Sanitary Landfill facility of 28 TPD.


Summary of Project Cost Proposed (Rs in Lacs)
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Name of Towns Haldwani Rudrpur Kichha Lalkuan Bhimtal
SNo Components Proposed Proposed Proposed Proposed Proposed Total Proposed
Cost Cost Cost Cost Cost Cost for 5 towns

1 Collection & 436.51 290.36 90.88 29.82 33.11 880.68


storage system
2 Transportation 130.9 184.9 101.9 65.9 54 537.6
system
3 Transfer stations 0 256.23 246.64 246.64 137.97 887.48
4 Workshop 39.41 17.00 39.41 27.41 27.41 150.64
Facility
5 Plant , 340.81 0 0 0 0 340.81
Machinery &
civil work for
composting
6 Construction of 709.32 379.16 379.16 17.06 17.06 1501.76
SLF & Closure of
existing dump
site
7 GIS & GPS based 10 10.00 10 5 5 40
MIS System
8 Project Staff 2425.8 1660.35 312.24 525.74 198.1 5122.23
9 Safety wear 18.86 18.86 5.3 3.71 4.1 50.83
Sub Total 4111.61 2816.86 1185.53 921.28 476.75 9512.03
Contingencies 123.3483 84.5058 35.5659 27.6384 14.3025 285.3609
3.00%
Grand Total 4234.958 2901.366 1221.096 948.9184 491.0525 9797.391
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Summary of Project Cost Appraised (Rs in Lacs)

Name of Towns Haldwani Rudrpur Kichha Lalkuan Bhimtal


SNo Components
Total
Appraised
Appraised Appraised Appraised Appraised Appraised Cost* for 5
Cost* Cost* Cost* Cost* Cost* towns
1 Collection & storage system
321.37 289.71 135.42 38.17 47.31 831.98
2 Transportation system
137.56 183.38 130.57 76.25 88.77 616.53
3 Workshop Facility
15.85 15.85 0 0 0 31.7
4 Plant , Machinery & civil
work for composting 340.81 0 0 0 0 340.81
5 Construction of SLF &
Closure of existing dump
site 709.32 379.16 379.16 17.06 17.06 1501.76
6 GIS & GPS based MIS
System 10 10 10 5 5 40
7 Safety wear
9.95 8.76 2.79 1.17 1.33 24
Sub Total
1544.86 886.86 657.94 137.65 159.47 3386.78
Contingencies 3.00%
46.3458 26.6058 19.7382 4.1295 4.7841 101.6034
Grand Total
1591.2058 913.4658 677.6782 141.7795 164.2541 3488.3834
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Total Cost for Project

Project implementation cost (Appraised Cost)-


3488.00 Lacs

DPR Preparation cost(1.5% of Appraised cost) –


52.32 Lacs

Total Project Cost Required – 3540.32 Lacs


CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Summarized Cost -Haldwani
Cost Sheet of SWM Project Haldwani

Qty As per
S.No Description of Itoms Rate Amount
design
Part - One
A Collection
Twin Bin System (15 lts) for
1 43741 250 10935367.1
D2D (Green and white)
Utility Vehicles with hydraulic
2 33 600000 19946744.49
system
3 Uniform Raincoat 175 2500 437500
4 Uniform-Worker 150 1700 255000
5 Uniform- Supervisor 25 800 20000
6 Uniform Sweater/Jacket 175 700 122500
7 Gloves 175 85 14875
8 Boots 175 285 49875
9 Shovels 175 225 39375
10 Broom 175 150 26250
11 Dust Pan 175 100 17500
12 Safety Mask 175 70 12250
Collection Total 45350 31877236.54
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Summarized Cost
B Storage

1 1100 Cum Metal Bins 18 33,000 605550

50 litre bins (for small


2 100 6500 650000
institutions)

Storage Total 118 1255550

C Transportation

8 cum rear end loader


1 Compactors with universal 5 2025000 9406204
bin lifter

2 Dead Animal Pick-up Van 1 1550000 1550000

Transportation Total 7 0 13756203.6


CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI Summarized Cost
Part - Two
D Processing
Compost plant of including
concrete yard,leachate tank,
1 office building, weigh bridge, 34081592
godown, machinery and
equipments etc 1 34081592
Construction and closure of
Sanitary Landfill siteof 40
MT/Day capacity (cost includes
construction of leachate
2 70932809
collection tank, landfill and fire
fighting equipment,
weighbridge, plantation, roads,
office building, laboratory, etc) 1 70932809
Processing Total 105014401

E Workshop
1 Service Vehicle 1 1585000 1585000
Workshop Total 1585000
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
F GIS - GPS Based MIS System 1 1000000 1000000

1 GPS system

Web Server for receiving GPS


2
Data

3 Computer Systems
4 Airconditioners

Installation & Confugurations 1


5
of Software in Systems

6 Development of GIS Map


7 Surveillance Cameras
8 Hand Held Devices
9 GIS - GPS Based MIS System
Sub-Total 45475.70782 154488391.1
H Contingency (3% of Capital Costs in DPR) 4634651.734
Grand Total 159123042.9
Say 159123000
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI User Charge Proposed
S.No Category Rate/Month
1 Households 40
2 Dhaba 350
3 Restaurants 1500
4 Pan Shop/ Tea Shop 75
Hotels/Guest Houses/ Dharamshala up to
10 Rooms 1000
5 Hotels/Guest Houses/ Dharamshala 11 to 1500
20 Rooms
Hotels/Guest Houses/ Dharamshala 21 to
30 Rooms 2000
Hotels/Guest Houses/ Dharamshala above 2500
30 Rooms
Offices (2 rooms) 100
6 Offices (3-5 rooms) Offices (6-10 rooms) 250
Offices (11-20 rooms) 1000
2000
7 Factories/ Workshops 1000
8 Shops 75
9 Cinema Hall 1200
10 Bakeries/ Food Joints & Bakery Out Lets 500
11 Hostels up to 50 Rooms 500
Hostels with more than 50 Rooms 500
12 Banks 250
13 Fast Food 500
14 Sweet shop 350
15 Vegetable/fruit shop 200
Schools (Government) 200
16 Schools (Private) 1000
Colleges (Government) Colleges 1000
(Private) 1500
17 All other Establishments Rs. 500/-
Public participation
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Public participation is the key to success in these efforts. Information, Education and
Communication (I.E.C.) mechanism will be used to ensure effective public
cooperation.

• Public Information, Education Communication &Awareness Programs


• Involvement of Professional Communication
• Use of Hoardings
• Use of Public Transport
• Use of Cable T.V. and Cable Channels
• Use of Newspapers
• Use of other Media
• NGO involvement
• Use of Schools and Colleges
• Use of Ward Committees
• Use of NCC, NSS, Scouts and Guides
• Street Committee and Resident Associations
• Involving Commercial Sponsors
PPP for O&M
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

It is a Partnership between the Private & Public Sector


Private Party – O&M Operator
Public Party is ULB
Ownership of Assets remains with ULB
Day to day operations of assets is with the O&M Operator
ULB monitors the overall performance on a day to day basis
Payments/penalties are linked to performance
Key decision making is done jointly but final decision is of
ULBs
PPP has been emphasized by JnNURM, UIDSSMT,TFC
Transparency in partnership
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Activities proposed to be done by ULBs


•Door to Door Collection of Waste & Bulk Collection of Waste
•Transportation of Waste / Construction Debris
•Street Sweepings – Proposed to be continued by ULBs
•Drain Silt Cleaning - Proposed to be continued by ULBs

Components of Integrated MSWH proposed to be brought under


PPP in Haldwani-Clusters
•Construction and O&M of Compost Plant
•Constuction and O&M of Landfill Site
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Road Map for Operation & Implementation

• Law to prevent littering


• SPV formation for O&M of project.
• Identify Low Lying Areas for waste disposal
• Focus on Information Education Training (IEC): Due to lack of
awareness of MSW rules & importance of Segregation is low.
PPP advantages are not understood by community, employees
etc. & there is a mindset barrier to oppose PPP. Solution lies in
IEC and Training
• Social Issues of Rag pickers /Community
• Disposal of non usable assets for generating funds
• Methodology of execution with contractors
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI
Project Implementation Schedule
Quarter Month (24 Months)
ACTIVITY
1 2 3 4 5 6 7 8

Preparation of tender documents, invitation of


EoIs, shortlisting of parties

IEC activities, Training and capacity building of


staff, NGOs, RWAs

Negotiation of terms, finalisation of contracts,


and awarding of contracts

Procurement of equipments, site development,


etc.

Construction of Compost Plant and sanitary


landfill site

Commissioning of treatment and disposal


facilities
OUTCOMES
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

 Perceptible cleanliness in Haldwani, Rudrapur, Kichha,


Bhimtal, Lalkuan.
 Improvement in overall hygienic condition /environment of
cluster towns.
 Compliance of MSW Rules 2000, brought out by MoEF
 Compliance of Pollution Control Board norms
 Compliance of guidelines of Ministry of Urban Development
 Environmental cell will be formed to regularly monitor the
compliance
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Present View

Future View
CLEAN & GREEN HALDWANI NAGAR NIGAM HALDWANI

Das könnte Ihnen auch gefallen