Beruflich Dokumente
Kultur Dokumente
PERT - CPM
B.7
OCCUPATIONAL SAFETY AND HEALTH PROGRAM
167 days
403(7)
103(3) 1002 1101 1103 Structural Steel, Furnished, 1003(1)a1
Foundation Fill B Plumbing Works Wires & Wiring Devices Lighting Fixtures Fabricated & Erected Ceiling
7 37
7 days 20 days 10 days 6 days 50 days 2 days
1046(2)a1 1018.2.1
803 804 CHB Non Load bearing (including 1027(a) 1018.2.1.2 Glazed Tiles 1032(a)
A MOVE IN B Structure Excavation B Embankment B reinforcing steel), 150mm B Cement Plaster Finish B Unglazed Tiles B and Trims (Granite) B Doors B Windows B Painting Works B MOVE OUT B
0 180 2 76 17180 37180 47180 62180 2 180 112180 2 2 139180 169180 172172
3 days 15 days 15 days 10 days 15 days 5 days 2 days 2 days 2 days 30 days 2 days
1046(2)a1
B.5 900 1100 CHB Non Load bearing (including 1046(3) 1102 1014(a)
Project Billboard Reinforced Concrete Conduits, Boxes & Fittings reinforcing steel), 150mm Louver Blocks Panel Boards Pre-painted Metal Sheets
1 day 20 days 6 days 15 days 1 day 1 day 27 days
DELIVERY OF MATERIALS