Sie sind auf Seite 1von 2

PLB/HDBE 3 cable laying 4 splicing of OF cable

LFRC PCCT pulling/blowing


pipe
2.1 2.4 2.6 3.1 4.1 4.2
SI. NO. District Block Name of GP Approx Approx OFC Approved Open trench HDD Length Open trench HDD Total costing Laying of Laying of full providing Laying of OF No of Splicing of fibers in Splicing of all the
distance in length in through Rate Length in in meters calculation in calculation open PLB/HDBE round RCC cement cable by joints existing /New joint fibers of 24 F OF
meters Meters meters Rs. in Rs. trenching+HDD pipe @ Rs.4.5 pipe @ Rs.15 concrete pulling/blowing (joint+1 chambers for cable in the fiber
pm pm @4704 pcm method for FPOI) making Termination Box at
including straight/Branch the gram panchayats
opening of joints on new and testing all the
Manhole routes or at FPOI fibers for continuty.
sealing of and end to end This will also include
PLB/HDPE Pipes testing of all fibers installation/mountin
by@ 4 per M after slicing. g of the FTB as
Including specified @ Rs. 3500
installation cost@ per FTB
Rs 3000 per joint

1 Sehore Icchawer NAGLI 1 1.1 0 1000 0 0 0 4500 4000 5 13500 3500


2 Sehore Icchawer TORNIA 1.7 1.87 0 1700 0 0 0 0 7650 6800 5 14550 3500
3 Sehore Icchawer BERKHEDA KURMI 4.2 4.62 0 4200 0 0 0 0 18900 16800 6 18300 3500
4 Sehore Icchawer BISENKHEDI 2.5 2.75 0 2500 0 0 0 11250 10000 5 15750 3500
5 Sehore Icchawer GOLUKHEDI 6.1 6.71 0 6100 0 0 0 27450 24400 7 21150 3500
6 Sehore Icchawer RAMNAGAR 5 5.5 0 5000 0 0 0 0 22500 20000 7 19500 3500
7 Sehore Icchawer SAATPIPALIA 2.6 2.86 0 2600 0 0 0 11700 10400 5 15900 3500
8 Sehore Icchawer MOLGA 4.6 5.06 0 4600 0 0 0 20700 18400 6 18900 3500
9 Sehore Icchawer HALIYAKHEDI 1.2 1.32 0 1200 0 0 0 5400 4800 5 13800 3500
10 Sehore Icchawer PANGRAKHATI 1.8 1.98 0 1800 0 0 0 0 8100 7200 5 14700 3500
11 Sehore Icchawer KALAPIPEL 4.7 5.17 0 4700 0 0 0 21150 18800 6 19050 3500
12 Sehore Icchawer GAJIKHEDI 1.9 2.09 0 1900 0 0 0 8550 7600 5 14850 3500
13 Sehore Icchawer BORDIKALAN 0.6 0.66 0 600 0 0 0 0 2700 2400 4 12900 3500
14 Sehore Icchawer BRIJISNAGAR 1.5 1.65 0 1500 0 0 0 6750 6000 5 14250 3500
15 Sehore Icchawer FANGIYA 2.3 2.53 0 2300 0 0 0 10350 9200 5 15450 3500
16 Sehore Icchawer NADAN 4.9 5.39 0 4900 0 0 0 22050 19600 6 19350 3500
17 Sehore Icchawer GURADI 1.3 1.43 0 1300 0 0 0 5850 5200 5 13950 3500
18 Sehore Icchawer MUWADA 2.7 2.97 0 2700 0 0 0 12150 10800 5 16050 3500
19 Sehore Icchawer SEMLIJADID 4.5 4.95 0 4500 0 0 0 20250 18000 6 18750 3500
20 Sehore Icchawer ITKHEDA 2.3 2.53 0 2300 0 0 0 0 10350 9200 5 15450 3500
21 Sehore Icchawer JAMUNIAHATESINGH 1.6 1.76 0 1600 0 0 0 7200 6400 5 14400 3500
22 Sehore Icchawer KANKADD KEDA 2.8 3.08 0 2800 0 0 0 12600 11200 5 16200 3500
23 Sehore Icchawer LASUDIA KANGER 1.9 2.09 0 1900 0 0 0 0 8550 7600 5 14850 3500
24 Sehore Icchawer ALIPUR 1.5 1.65 0 1500 0 0 0 0 6750 6000 5 14250 3500
65.2 71.72 65200 5868 0 1736928 0 293400 15000 470400 260800 129 385800 84000
Gross Total 1961514
TOTAL GPs 24
approx KMs 65.2
Total of additianal work 1961514
Running meter of additianal work = TOTAL
AMOUNT /TOTAL KM 30.08
JCRC

5.2 6.1 8.1 8.2 10.2 9.1 11.1


Construction Supply and Supply of Videograp SUPPLY Laying of OF Recovery
of pre fixing of route index hy of the OF ABD Cable in of empty
fabricated RCC RCC/Stone diagram in route on diagram corridor/riser 24 F cable
Joint route/joint hard as well which @500per s/exchange Drum@2
chambers @ indicator by the as soft copy cable is KM premises 00/- PER
2200/-per contractor.@Rs on CD for laid @300 (leading in DRUM
joint 315 per complete Pkm work)@10
indicator Block@100 Pmtr
PKm

9900 1575
10670 2677.5
13420 6615
11550 3937.5
15510 9607.5
14300 7875
11660 4095
13860 7245
10120 1890
10780 2835
13970 7402.5
10890 2992.5
9460 945
10450 2362.5
11330 3622.5
14190 7717.5
10230 2047.5
11770 4252.5
13750 7087.5
11330 3622.5
10560 2520
11880 4410
10890 2992.5
10450 2362.5
282920 102690 6520 19560 32600 652 7172