Sie sind auf Seite 1von 1

MERAAS DEVELOPMENT LLC

MARSA ALSEEF
INFRASTRUCTURE WORKS
PROPOSED 1-WAY MILITARY DUCT AND PROTECTION OF EXISTING 100 DIA 2-WAY MILITARY DUCT AT PHASE 4 (CCN 328; VOR 54)
DBB SUBMISSION MLC ASSESSMENT
ITEM
SOR REF DESCRIPTION UNIT QUANTITY RATE TOTAL QUANTITY RATE TOTAL
NO
PROPOSED 1-WAY MILITARY DUCT AND PROTECTION OF EXISTING 100 DIA 2-
WAY MILITARY DUCT AT PHASE 4 (CCN 328; VOR 54)

MISCELLANEOUS WORK

PIPE WORK - MANHOLES AND PIPEWORK ANCILLARIES

Military Duct / Sleeve

Supply uPVC cable ducts to BS 3506 class C laid and jointed in trench including
excavation, backfilling, end caps, warning tape, draw ropes, markers, disposal of
surplus excavated material, etc.; complete all in accordance with the
drawings and specifications

A 2.12 / Pg. 11
1-way, 100mm dia Depth not exceeding 1.5m m 161.35 47.75 7,704.46 161.00 47.75 7,687.75
/ item C

Beds and surrounds

Sand bedding and surrounds to cable ducts including warning tape; complete all
in accordance with the drawings and specifications

B 2.12 / Pg. 11
1x3 way, 100mm dia Depth not exceeding 1.5m m 13.00 16.16 210.08
/ item H

Mass concrete surrounds

Mass concrete surround to duct, SRC class C25/20; including formwork, polythene
sheet and bituminous paint; complete all in accordance with the drawings and
Specifications

C New Rate 1x3 way, 100mm dia Depth not exceeding 1.5m m 161.35 252.97 40,816.71 148.00 250.19 37,028.12

REINSTATEMENT WORK

D 2.12 / Pg. 11 Breaking of existing main road pavement including saw cutting and reinstatement for
m 11.38 770.47 8,767.95 11.38 770.47 8,767.95
/ item J laying ducts; 1 way to 3 way ducts.

E 2.12 / Pg. 13 Carefully remove existing 60mm thick interlock tile paving including under layers, tiles
m2 9.34 46.72 436.36 9.34 46.72 436.36
/ item E set aside for reuse, sand bed and subbase cart to tip.

F 1.2 / Pg. 2 /
Installation of previously set aside concrete block pavers; thickness 60 mm on 30 mm
Item P (Pro- m2 9.34 39.31 367.16 9.34 34.78 324.85
thick sand bed
rated)

VOR Summary AED 58,092.64 AED 54,455.11


PROPOSED 1-WAY MILITARY DUCT AND PROTECTION OF EXISTING 100 DIA 2-WAY MILITARY DUCT AT PHASE 4 (CCN 328; VOR 54)

INFRASTRUCTURE WORKS
- 1/1 - PART II SECTION 1

Das könnte Ihnen auch gefallen