Beruflich Dokumente
Kultur Dokumente
| 简体中文
Login / Register
Each mode can use multiple UBBP boards. How to select UBBP boards for each mode at a site?
The principles for configuring UBBP boards are as follows:
First, select UBBP boards according to the mode in which the UBBP boards work in. For example, if the
select any of the following UBBP boards: UBBPd1, UBBPd2, UBBPd3, UBBPd4, UBBPd5, and UBBPd
Second, select UBBP boards according to specifications required by each mode. For example, if the GSM
more than 24 2R carriers are required, only the UBBPd5 and UBBPd6 boards can be used.
Third, select UBBP boards according to the mode to which the current mode is to be evolved. For exampl
now works in GSM mode and needs to work in GUL mode in the future, only the UBBPd6 board can be u
UBBPd5 board does not support GUL baseband concurrency.
For details, see section "BBU Board Configuration" in 3900 Series Base Station Configuration Principle
When configured in a BBU3900, UBBP boards in different slots provide different capabilities.
In UMTS mode, only the UBBP board in slot 2 or 3 can provide CPRI ports.
In GSM mode, the UBBP board in any of slots 0 to 3 can provide CPRI ports.
In LTE mode, the UBBP board in any of slots 0 to 5 can provide CPRI ports.
When configured in a BBU3910, UBBP boards in different slots provide the same capabilities, that is, the UB
can provide CPRI ports.
For details, see section "UBBP" in BBU Hardware Description.
For details, see BBU Interconnection Feature Parameter Description and section "Inter-BBU Signal Cabl
chapter "Cable Connections" in 3900 Series Base Station Cables.
What impact can be brought on services carried by a base station when a UBBP board is replaced, or remo
again?
Replacing, or removing and inserting again a UBBP board has the following impact on services carried by a b
When the UBBP serving as the converging party in a base station using the CPRI MUX feature is reset ab
and inserted again, data and voice services of the converged party will be interrupted.
When the UBBP serving as the converged party in a base station using the CPRI MUX feature is reset abn
and inserted again, data service rate of the converging party will decrease. However, voice services of the
will not be affected.
For more information, you can visit Wireless Network Information Center
faz Platinum
3 years 4 months ago
2F
View The Author
c.deiana Senior
3 years 2 months ago
3F
View The Author
moataz_alsbak Jackeroo
3 years 2 months ago
4F
View The Author
PG Junior
3 years 2 months ago
5F
View The Author
keep sharing
Comment| Reply
|Report
m7g Diamond
3 years 2 months ago
6F
View The Author
I think in the future it would be better to show the real picture equipment and to show them a description.Sch
but better photos :)
Comment| Reply
|Report
Wanchay Jackeroo
2 years 10 months ago
7F
View The Author
greate
Comment| Reply
|Report
faijaz Junior
2 years 10 months ago
8F
View The Author
Good sharing
Comment| Reply
|Report
ADON Junior
2 years 9 months ago
9F
View The Author
Please show in the UBBP table the maximum capacity of each UBBP board together with the application mo
have links for replacing the WBBP with a UBBP board etc.
Comment| Reply
|Report
Hocine Junior
2 years 9 months ago
10F
View The Author
1 2>
1/2Page
Reply
ReturnNew postShare
Hot Group
Information For
Consumers
Enterprises
Carriers
Journalist
Suppliers
Job Seekers
About HUAWEI
Corporate Information
Corporate Governance
Executives
Bond Investor Relations
Sustainability
Cyber Security
Publications
Annual Report
News & Events
Latest News
Media Kit
Media Contact
Security Bulletins
Events
Huawei| Huawei Connect| Support| Privacy| Terms of Use
Contact Us:hworld@huawei.com
Follow Huawei Connect :
Copyright © Huawei Technologies Co., Ltd. 1998-2019. All rights reserved
CommunityGroupsRewardsJDC
| 简体中文
Login / Register
Each mode can use multiple UBBP boards. How to select UBBP boards for each mode at a site?
The principles for configuring UBBP boards are as follows:
First, select UBBP boards according to the mode in which the UBBP boards work in. For example, if the
select any of the following UBBP boards: UBBPd1, UBBPd2, UBBPd3, UBBPd4, UBBPd5, and UBBPd
Second, select UBBP boards according to specifications required by each mode. For example, if the GSM
more than 24 2R carriers are required, only the UBBPd5 and UBBPd6 boards can be used.
Third, select UBBP boards according to the mode to which the current mode is to be evolved. For exampl
now works in GSM mode and needs to work in GUL mode in the future, only the UBBPd6 board can be u
UBBPd5 board does not support GUL baseband concurrency.
For details, see section "BBU Board Configuration" in 3900 Series Base Station Configuration Principle
When configured in a BBU3900, UBBP boards in different slots provide different capabilities.
In UMTS mode, only the UBBP board in slot 2 or 3 can provide CPRI ports.
In GSM mode, the UBBP board in any of slots 0 to 3 can provide CPRI ports.
In LTE mode, the UBBP board in any of slots 0 to 5 can provide CPRI ports.
When configured in a BBU3910, UBBP boards in different slots provide the same capabilities, that is, the UB
can provide CPRI ports.
For details, see section "UBBP" in BBU Hardware Description.
For details, see BBU Interconnection Feature Parameter Description and section "Inter-BBU Signal Cabl
chapter "Cable Connections" in 3900 Series Base Station Cables.
What impact can be brought on services carried by a base station when a UBBP board is replaced, or remo
again?
Replacing, or removing and inserting again a UBBP board has the following impact on services carried by a b
When the UBBP serving as the converging party in a base station using the CPRI MUX feature is reset ab
and inserted again, data and voice services of the converged party will be interrupted.
When the UBBP serving as the converged party in a base station using the CPRI MUX feature is reset abn
and inserted again, data service rate of the converging party will decrease. However, voice services of the
will not be affected.
For more information, you can visit Wireless Network Information Center
faz Platinum
3 years 4 months ago
2F
View The Author
c.deiana Senior
3 years 2 months ago
3F
View The Author
moataz_alsbak Jackeroo
3 years 2 months ago
4F
View The Author
PG Junior
3 years 2 months ago
5F
View The Author
keep sharing
Comment| Reply
|Report
m7g Diamond
3 years 2 months ago
6F
View The Author
I think in the future it would be better to show the real picture equipment and to show them a description.Sch
but better photos :)
Comment| Reply
|Report
Wanchay Jackeroo
2 years 10 months ago
7F
View The Author
greate
Comment| Reply
|Report
faijaz Junior
2 years 10 months ago
8F
View The Author
Good sharing
Comment| Reply
|Report
ADON Junior
2 years 9 months ago
9F
View The Author
Please show in the UBBP table the maximum capacity of each UBBP board together with the application mo
have links for replacing the WBBP with a UBBP board etc.
Comment| Reply
|Report
Hocine Junior
2 years 9 months ago
10F
View The Author
1 2>
1/2Page
Reply
ReturnNew postShare
Hot Group
Information For
Consumers
Enterprises
Carriers
Journalist
Suppliers
Job Seekers
About HUAWEI
Corporate Information
Corporate Governance
Executives
Bond Investor Relations
Sustainability
Cyber Security
Publications
Annual Report
News & Events
Latest News
Media Kit
Media Contact
Security Bulletins
Events
Huawei| Huawei Connect| Support| Privacy| Terms of Use
Contact Us:hworld@huawei.com
Follow Huawei Connect :
Copyright © Huawei Technologies Co., Ltd. 1998-2019. All rights reserved