Sie sind auf Seite 1von 1

PT.

PUJA PERKASA
PENGAJUAN ANGGARAN UPAH PROYEK

Proyek : All
PERIODE : 10 Oktober 2017
BELUM
NO URAIAN JUMLAH REALISASI KETERANGAN
TERBAYAR
D Proyek Manado
a. Upah Tenaga Kayu Mandor H.Ali (10 Otober 2017) 125,703,500 125,703,500
b. Upah Tenaga Besi Mandor Isun (10 Otober 2017) 47,840,000 47,840,000
c. Upah Tenaga Besi Mandor Wandi (10 Otober 2017) 12,740,000 12,740,000
d. Upah Harian Gudang Wiwid (10 Otober 2017) 6,670,000 6,670,000
e. Warung Pak Nyaman 10,000,000 10,000,000
f. Upah Tenaga Kayu Mandor Taslim (10 Otober 2017) 72,317,000 72,317,000
g. Upah Tenaga Kayu Mandor Yani (10 Otober 2017) 58,440,000 58,440,000
h. Upah Tenaga Finishing Priyanto (10 Otober 2017) 2,700,000 2,700,000
i. Sarana (Pelaksanan,Consultan, CP, dll) 3,652,000 3,652,000
-
TOTAL 340,062,500 - 340,062,500
J Proyek TOL Pejagan
a. Upah Tenaga Rigid Pejagan (10 Otober 2017) 65,617,000 65,617,000
b. Sarana Rigid (10 Otober 2017) 9,500,000 9,500,000
-
TOTAL 75,117,000 - 75,117,000
L Proyek Lampung
a. Upah Tenaga Mandor Shodikin (10 Otober 2017) 109,048,347 109,048,347
b. Upah Tenaga Mandor Toni (10 Otober 2017) 99,637,300 99,637,300
c. Upah Tenaga Mandor Sugeng (10 Otober 2017) 37,590,229 37,590,229
d. Upah Tenaga Mandor Kurnia (10 Otober 2017) 37,297,500 37,297,500
e. Upah Tenaga Yudi bekesting (10 Otober 2017) 107,221,400 107,221,400
f. Upah Tenaga Parmin barrier (10 Otober 2017) 87,845,000 87,845,000
g. Upah Tenaga Ali Oncom Finishing (10 Otober 2017) 42,224,000 42,224,000
h. Upah Tenaga Heri gudang mekanik (10 Otober 2017) 11,355,000 11,355,000
i. Upah Tenaga Paidi tukang las (10 Otober 2017) 23,419,000 23,419,000
j. Upah Tenaga Amin & Adam rigid pabrikasi besi (10 Otober 2017) 64,060,000 64,060,000
k. Upah Tenaga Imay (10 Otober 2017) 21,854,000 21,854,000
l. Sarana Sopir Staff kantor dan lapangan (10 Otober 2017) 10,000,000 10,000,000
m. Keamanan / Jaga Malam 21,600,000 21,600,000
l. Sarana Rigid (10 Otober 2017) 13,664,000 13,664,000
-
TOTAL 686,815,776 - 686,815,776
M Proyek Palembang
a. Upah Tenaga Besi Mandor Ambon (10 Otober 2017) 35,000,000 35,000,000
b. Upah Tenaga Kayu Mandor Doni (10 Otober 2017) 42,917,400 42,917,400
c. Upah Tenaga Finishing Mandor Sarwo (10 Otober 2017) 16,905,000 16,905,000
d. Upah Tenaga Kayu Mandor Lokal (10 Otober 2017) 11,472,000 11,472,000
e. Upah Harian Gudang dan Las (10 Otober 2017) 15,502,000 15,502,000
f. Sarana (10 Otober 2017) 1,150,000 1,150,000
g. Tiket+Transport Tenaga 1,800,000 1,800,000
h. Uang Makan Staff 5,450,000 5,450,000
-
TOTAL 130,196,400 - 130,196,400
R Gudang Godong
a. Upah Harian Mekanik (10 Otober 2017) 1,840,000 1,840,000
-
TOTAL 1,840,000 - 1,840,000
JUMLAH KESELURUHAN 1,234,031,676 - 1,234,031,676

Das könnte Ihnen auch gefallen