Checklist for Piping Isometrics: P&ID, Layout, Chennai to Pollachi

Drafting Related INR 555


VIEW NOW
 4 Comments

Here is a checklist for Piping Isometrics Pollachi to Chennai

INR 450

t How to Secure a Correct Filling VIEW NOW

Weight to eliminate the risk of …


Ad Download case study to help you secure Chennai to Palani
a correct lling – 100% guaranteed.
ChemicalQualityExchange INR 555
VIEW NOW
Learn more

Chennai to Tirupur

Sr. INR 575


Check Points
No. VIEW NOW

P&ID RELATED
Chennai to Tenkasi
1 Following items are checked with the P&ID (IFD or later issue):

a)    Line number and pipe class. INR 600


VIEW NOW
b)    Tag nos. of equipment, instruments, special items, actuated and manual valves (if applicable).

c)    Flow direction (including ow direction of check valve)

d)    Slope/no pocket/free draining requirement, if any.


to search type and hit enter
e)    Min/max distances, straight lengths, etc. as speci ed in P&ID.

f)     Close/open position for spectacle blind or spacer & blind. FOLLOW US ON GOOGLE+
g)    Removable spool requirement, if any.
 
h)    Sequence of branch connections (as agreed with Process in case of any changes).
Piping engineering

i)     Piping spec break, if any (preferably be at ange joints/valves, each iso to contain only one spec). Follow

j)     Special feature of valves (e.g. LO, LC, etc.)

k)    Insulation symbol for insulated lines.

l)     Equipment nozzle/TP numbers and tie-in numbers.


SUBSCRIBE UPDATES. IT'S FREE!
m)  Insulating gaskets are selected as shown in P&IDs

n)    Speci c requirements mentioned in applicable P&ID notes (if any) are complied Your email:
Enter email address...
LAYOUT RELATED

http://www.piping-engineering.com/checklist-for-piping-isometrics-p-id-layout-drafting-related.html# 1/5
12/29/2017 Checklist for Piping Isometrics: P&ID, Layout, Drafting Related
2 High point vents and low point drains are provided, as per project requirements, for lines that will be Subscribe
hydro-tested.

3 Drains are provided wherever liquid stagnation can occur in the lines e.g. downstream of a check
valve.
Popular Recent Comments 
4 Adequate pipe spool lengths are provided for wafer type butter y and check valves to prevent the
interference of the valve disc with adjacent piping items. Piping Layout Drawings Abbreviations and
Legends
5 The platform/grade/building wall/dyke or bund wall/ oor penetrations and limits of road crossings
 July 12, 2017
are properly shown wherever applicable.

6 The insulation limits are speci ed appropriately (esp. for personal protection) Nozzle Orientation Drawing
 July 12, 2017
7 The electrical tracing requirement and its limits are speci ed appropriately.
Centrifugal Pump Piping Design Layout
 July 12, 2017

Chennai to Pollachi Tank farm: Types, Design Considerations,


Plot Plan Arrangement, Dyke Enclosure-
INR 555 VIEW NOW Part 1
 July 12, 2017

8 The wrapping and coating requirement and its limits are speci ed appropriately for u/g lines. 7 Excel Functions You Must
Know to Work Smarter
9 Minimum distance between welds is 50mm or ve times the wall thickness whichever is greater,
 July 12, 2017
unless otherwise indicated in Project speci cations.

10 Unions are provided in galvanized piping where threaded in-line items need to be removed for
maintenance. Also, unions are provided at regular intervals (e.g. 24m) in straight pipe runs.

11 Full couplings are provided where applicable for small bore piping.

12 For piping below 2”, WN anges are not directly welded to SW ttings. Also, PE pipes are not directly
Piping-engineering
welded with swaged reducers (couplings are used in between). 12,082 likes
13 Appropriate break-up anges are provided in piping with internal lining and hot-dip galvanized
piping (based on tub size). Spool con guration is made with one elbow or one tee only to ensure
proper galvanizing.
Liked Share
14 Lifting lugs are provided for removable spools wherever required as per project requirements.

15 There is adequate clearance between pipe support and the adjacent piping component (e.g. ange, You and 7 other friends like this
drain valve) to allow for ange bolt removal, valve operation, etc.

16 The valve stem orientation angle is indicated wherever the stem is not in the vertical and horizontal
planes.
Or reach me on aj@piping-
17 The piping interfaces with equipment/package nozzles/terminal points are checked (w.r.t. size, rating,
engineering.com
ange face type and nozzle/TP nos.).

18 The straight length requirement for suction & discharge piping for compressors and certain pumps is
as required by Vendor/project specs.

19 Straight lengths and branch con guration of upstream/downstream lines for anti-surge valves is as Google+
per Compressor Vendor’s recommendation.

20 The F/F dimensions of all valves, special items and in-line instrument items are as per approved
vendor drawings.

21 The instrument connections are checked with Piping-Instrument interface drawings/Instrument


hook-up drawings.

22 The rotameters are installed in vertical run with ow in upward direction.

23 The ori ce tapping orientation is done considering liquid or gas ow as applicable and the BOM is as
per the piping-instrument interface diagram.

24 The straight length requirement (u/s & d/s) has been provided for ow meters (e.g. ow ori ces, ow
nozzles, venture meters) and is as per Project standards/Vendor requirements.

25 The line con guration for lines containing magnetic owmeters or vortex type owmeters is such
that they are always ooded.

26 Line con guration allows easy removal of spectacle blinds/spacers & blinds and valves in case of RTJ
ange joints.

27 Flanged spools are provided in the case of conical strainers to enable removal.

28 Orientation of valve handwheel / lever is checked in model for proper access and commented
accordingly

29 Line routing is visually checked in model for general requirement like access to in line items,
supporting, clearances, obstructions, consistency and aesthetic requirement, etc.

30 Branches like drains, drip legs, etc. are located with su cient clearance from the supports, steel or
other obstructions so that they do not clash during expansion/contraction.

http://www.piping-engineering.com/checklist-for-piping-isometrics-p-id-layout-drafting-related.html# 2/5
12/29/2017 Checklist for Piping Isometrics: P&ID, Layout, Drafting Related
31 Drip leg size and dimension is checked with Standard drawing for steam lines.

32 Requirement of Weep holes for atm vent lines is indicated.

DRAFTING RELATED
33 The drawing border conforms to the Project speci cations or Company standards, as applicable.

34 The isometric numbering is as per the approved project format and the line number matches with
isometric number.

35 The correct isometric revision number is mentioned in the title block.

36 Pipe class printed at the bottom of the drawing matches with that in the line number.

37 Line data (e.g. process parameters, P&ID no., PWHT & testing requirements, insulation & painting
specs, etc.) match with the Line List, if given in the isometric

38 Applicable reference documents (e.g. Line List, Isometric Index, Pipe Supports Spec, etc.) are
mentioned.

39 Data such as inch-dia, etc. appear at the bottom of the isometric.

40 The “Cont. on …” description correctly appears at each end of the line isometric which is continued in
another sheet.

41 The isometric print is readable (if required, the isometric should be split into more sheets).

42 Isometric number change is made preferably at a ange joint/valve (not at a weld joint).

43 Dimensions and elevations are adequately given. At least one elevation is mentioned and WP
elevations for sloped lines are marked.

44 There are no HOLDs in the isometric (issue of any isometrics with HOLD requires approval by
HOD/PEM).

Notes:

The following documents are to be used for checking isometrics:

1. Issued For Design (or later issue) P&IDs and Line Lists (and any Process DCNs
issued thereafter)
2. Approved Vendor drawings review of equipment & package mechanical drawings
3. Issued For Design Instrument-Piping Interface drawings
4. Approved vendor drawings of in-line instrument items including control valves,
Pressure safety relief valve, motor operated valves and emergency shutdown
valves
5. Approved vendor drawings for manual valves and SP items.
6. Approved Pipe Support speci cation and Piping Material speci cation
7. Issued For Construction Civil and Structural drawings wherever applicable

In case approved drawings are not available at the time of isometrics issue, it should be
brought to the notice of the Lead engineer and the isometrics shall not be issued.

Share this on WhatsApp

1 Pipeline Repair Services. Innovative Solutions for Pipelines. More than 20 years of Expertise 3xeng.com

Convert doc to pdf and pdf to doc


2 Download This to PDF - View PDF free.fromdoctopdf.com/PDF/Converter

MORE READ

O shore Engineering Piping Checklist for 90% Piping Checklist for 60%
Checklist- Nozzle 3D Model Review 3D Model Review
Orientation  July 16, 2017  July 13, 2017

 February 22, 2015

http://www.piping-engineering.com/checklist-for-piping-isometrics-p-id-layout-drafting-related.html# 3/5
12/29/2017 Checklist for Piping Isometrics: P&ID, Layout, Drafting Related

4 COMMENTS

aryanengineering
January 27, 2016 at 10:27 am

Very Useful Information.


Reply

Bernardo Gaute
March 5, 2016 at 11:27 am

Es excelente el listado, de suma utilidad.


Gracias
Reply

Afsar Alam
April 5, 2016 at 8:51 am

Very genuine & usefull information.


Reply

P S Binish
September 1, 2016 at 11:04 am

Very very useful information


Reply

LEAVE A REPLY

Your email address will not be published. Required elds are marked *

Name *

Email *

Check here to Subscribe to noti cations for new


posts

Post Comment

Con rm you are NOT a spammer

1 Pipeline Maintenance. Ask for our Engineering Experts Teams Everywhere in the World. 3xeng.com

Sleeve And Coupling Thread Surface Is


2 EU Tubing Coupling - Factory Price & High Quality Very Smooth. Buy Now! hnd m.com

http://www.piping-engineering.com/checklist-for-piping-isometrics-p-id-layout-drafting-related.html# 4/5
12/29/2017 Checklist for Piping Isometrics: P&ID, Layout, Drafting Related

© copyright Piping-engineering 2017 All Rights Reserved. Privacy Policy | About Us

http://www.piping-engineering.com/checklist-for-piping-isometrics-p-id-layout-drafting-related.html# 5/5

Das könnte Ihnen auch gefallen