2. Survey Control Point Name : Terminal Name 3. Take First Point in North Direction. 4. Create the Mark-up Drawing with features name and Tag No. in the Site 5. Start Survey point from Boundary and Fencing point. 6. Measurements take From Survey Machine. Description Name Coding 1. Boundary Point BW 2. Fencing Point FNC 3. Main Gate Point MGT 4. Path Way Point (Foot Path) PW 5. Civil Base Point CB 6. Building Point BD 7. Building Roof Point BDR 8. Door Point DOR 9. Window Point WIN 10.Separator Diameter point SPD 11.SeparatorDimension Point (Length) SPL 12.Separator Nozzle Point SPN 13.Separator Flange Point SPFL 14.Separatorsupport Point SPSU 15.SeparatorElevation Point SPEL 16.Filter Diameter point FLD 17.FilterDimension Point (Length) FLL 18.FilterNozzle Point FLN 19.Filter Flange Point FLFL 20.Filter Elevation Point FLEL 21.Pig Launcher Diameter point PGLD 22.Pig LauncherDimension Point (Length) PGLL 23.Pig Launchersupport Point PGLSU 24.Pig Launcher Nozzle Point PGLN 25.Pig Launcher Elevation Point PGLEL 26.Pig Receiver Diameter point PGRD 27.Pig ReceiverDimension Point (Length) PGRL 28.Pig Receiver Nozzle Point PGRN 29.Pig Receiver support Point PGRSU 30. Scrubber Diameter point SCD 31.Scrubber Dimension Point (Length) SCL 32.Scrubber Nozzle Point SCN 33.Scrubber Flange Point SCRFL 34.Scrubber support Point SCSU 35.Cross Over CR 36.Material Handling MH 37.Fire Hydrant FRH 38.Mono Rail MR 39.Road RD 40.Control Room CNR 41.Skid Point SKD 42.Earth Pit Point EP 43.Drain Pit Point DP 44.Pipe Support Point PSU 45.Electrical Unit Point ELU 46.Flag Point FG 47.Pipe Inlet PLIN 48.Outlet Point PLOT 49.Pipe Line 10" Point PL10 50.Pipe Line 12" Point PL12 51.Pipe Line 14" Point PL14 52.Pipe Line 16" Point PL16 53.Quick Closer Point QC 54.PSV Point PSV 55.Control Valve Point CNV 56.Cage Ladder Point CGL 57.Terminal Shed Point TRSH 58.Security Room Point SR 59.Shed Area Point SH 60.Covered Shed Point CSH
7. Measurements take From Tape.
a) Skid Dimension b) Equipment Base Plate Dimension c) Pipe Support Dimension d) Instrument Box Dimension e) Boundary Thickness Dimension f) Pit Dimension g) Wall Thickness Dimension h) Electrical unit Dimension 8. Show Grass Area, Concrete Area, Clay area in Mark-up Drawing 9. Cad Activity: a) Rotate the Point in cad with reference to North Direction b) Create Objects in cad by Using the Points and mention Dimensions. 10.Prepare Final Mark-up With Dimension in Red Pen. 11. Scan and Send the Final Mark-up and Cad Native File to Hyderabad Office.