Beruflich Dokumente
Kultur Dokumente
Year (2018)
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Machin
Date of Type of
e name/ Engineering
Department doing the preventive Performed
No. Identifi department
name/Section preventive maintenan by
cation signature
maintenance ce
number
Injectable line
1 Injectable machine IN100 M
Generator
57 Diesel Power GEN100 Q
Generator
UPS
58 Uninterruptible power UPS100 _____
supply injectable line
59 Uninterruptible power UPS110 _____
supply laboratory
Elevators
60 1000KG ELEVATOR EL100 _____
1
61 1000KG ELEVATOR EL110 _____
2
62 500KG ELEVATOR 1 EL120 _____
Solar system
63 Solar system SO100 _____
Stacker
64 Stacker ST100 _____
Designed by :
Date: Approved by: Date:
Eng.mohammad sokker