MATERIAL TAKE-OFF LIST

Saudi Aramco 6228-ENG (11/2010)


SAMS
REV. PER DWG.
DESCRIPTION SAP # QTY I/U STATUS REMARKS
CODE STOCK NUMBER REQ. CODE

EXCAVATION: EXCAVATION IN DENSE SOIL CONTRACTOR


30 CM
AS PER SAUDI ARAMCO STANDARD SAES-A- SUPPLY
114
REINFORCED CEMENT CONCRETE: MIN. 28
DAYS COMPRESSIVE STRENGTH 42MPa, CONTRACTOR
CONFORMING TO SAUDI ARAMCO STANDARD 35 CM
SUPPLY
09-SAMSS-097, SAES-Q-001
CONCRETE REINFORCEMENT BARS: 20MM
DIA,STEEL HOT ROLLED,DEFORMED EPOXY CONTRACTOR
2.95 MT
COATED, 420 MPa MIN. YIELD STRENGTH SUPPLY
,ASTM A615/A615M,09-SAMSS-106 ROUND
CONCRETE REINFORCEMENT BARS: 10MM
DIA,STEEL HOT ROLLED,DEFORMED EPOXY
CONTRACTOR
COATED, 420 MPa MIN. YIELD STRENGTH 0.8 MT
SUPPLY
,ASTM A615/A615M,09-SAMSS-106 ROUND

CONCRETE COATING: ABOVE GRADE


PROTECTIVE COATING: TWO COATS, APCS- CONTRACTOR
46 SM
1B AS PER SAES-H-101V SUPPLY

CONCRETE COATING: BELOW GRADE


PROTECTIVE COATING: TWO COATS, APCS-3 CONTRACTOR
206 SM
AS PER SAES-H-101V SUPPLY

NON-SHRINK GROUT, COMPRESSIVE CONTRACTOR


0.62 CM
STRENGTH 34.5MPa, AS PER SAES-Q-010 SUPPLY

ROCK RIPRAP: BACKFILLING UNDER CONTRACTOR


FOUNDATIONS, COMPACTED PER SAES-A-114 7 CM
SUPPLY
STEEL ANCHOR BOLTS: AB2-M20-125-400-(2), CONTRACTOR
GALVANIZED, AS PER SASD AA-036322-001 198 EA
SUPPLY
0.15MM THICK, POLYETHYLENE SHEET,
CONTRACTOR
UNDER FOUNDATIONS 30 SM
SUPPLY

ISSUED FOR CONSTRUCTION


NOTES:
1. UNIT ABBREVIATIONS: CM=CUBIC METER;MT=METRIC TON; LT= LITER; MPa=MEGA PASCAL; EA=EACH; SM=SQUARE METER
2. ABOVE QUANTITIES ARE NOT FOR PROCUREMENT BUT FOR ESTIMATION PURPOSE ONLY.

APPROVAL
COMPILED BY REV.
REFERENCE DRAWING
CHECKED DATE PROJECT ENGR DATE
ARSHAD 00 MUHAMMAD JAMIL 03/22/18 MUZAFFAR ALI 03/22/18
XA-103204-001
B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REVISION
10-01327 - 200 STRUCTURAL RT 02/16/2018 FINAL X REVISION 00
INDEX Materials for SHEET 1 OF 1
Q INSTRUMENT JUNCTION BOXES-FOUNDATIONS
PLANT TERMINAL WEST PIER MTO-ST010
056 RAS TANURA SAUDI ARABIA