CL
30.00
10.00 10.00
0.73 0.67 1.90 3.35 3.35 3.35 3.35 1.90 0.67 0.73
CONC. CURB & CONC. ROAD WIDENING EXISTING ROAD EXISTING ROAD ROAD WIDENING CONC. CURB & CONC.
SIDEWALK GUTTER SHOULDER SHOULDER GUTTER SIDEWALK
0.20
0.20
SLOPE 1.50 % SLOPE 1.50 % SLOPE SLOPE
MINIMUM
0.87
H = VARIABLE
0.30
H = VARIABLE
0.91m.Ø
RCPC
SECTION SHOWING PROPOSED ROAD WIDENING, CONCRETE SHOULDER, CONCRETE CURB 0.91m.Ø
RCPC
0.10
AND GUTTER, SIDEWALK, PLANTING STRIP @ BOTH SIDES AND GABIONS @ RIGHT SIDE 0.30
0.27 0.27
GRAVEL FILL
K0083+ -520 - K0083+ -480.00, L=40.00 m.
1.64
K0083+ -290.50 - K0083+ -120.00, L=170.50 m.
K0083+ 000.00 - K0083+ 020.00, L=20.00 m.
PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
TYPICAL ROADWAY SECTION "B" PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + DETAIL "A", "B" AND "C"
PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156
REGIONAL OFFICE IV-A VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 3 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION
DRAINAGE STANDARD AND DETAIL
0.00
0.73 0.91
910 MM.Ø RCPC
0.175 0.56 0.175
0.26
0.22
C
E MANHOLE MANHOLE
8 % SLOP
0.05
COVER COVER
0.175
MANHOLE MANHOLE
COVER COVER
Ø12 @
0.78
0.25 M.O.C.
A
0.175
1.80
1.70
1.00
1.22
MANHOLE COVER INLET
GENERAL LAYOUT PLAN NOT TO SCALE
VERIFY
2.50
Ø12 @ 0.25 M.O.C.
E.W. E.F.
VARIABLE
0.175
0.05
3 Ø12 @
D 0.25 M.O.C.
0.40m.
1.00m.
B
0.05m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.05m. 0.25m
.
0.05m.
0.17m.
0.17m.
0.075m.
0.05m.
0.37 0.37 5m.
GRAVEL BEDDING 2 Ø12 @ 0.2
0.10
0.25 M.O.C.
12mm. Ø BAR
0.73 0.17 0.50 0.175 1.29 0.175 16mm. Ø BAR
MANHOLE COVER CURB & GUTTER OPENING SECTION
ISOMETRIC
1.64
SCALE 1:20 M.
0.73 0.91
1.73m. x 1.20m. x 0.15m. thk. CONCRETE
MANHOLE COVER W/ 2 - 12mm. Ø RSB 1.73m. x 1.20m. x 0.15m. thk. CONCRETE
0.365 0.365 0.175 0.56 0.175 1.80 CURB & GUTTER
@ 0.15m. O.C. B.W. & W/ 2" x 2" x 1/4" MANHOLE COVER W/ 2 - 12mm. Ø RSB
0.73 (SEE DETAIL)
thk. ANGULAR FRAME, TOP & BOTTOM. @ 0.15m. O.C. B.W. & W/ 2" x 2" x 1/4"
CURB & GUTTER thk. ANGULAR FRAME, TOP & BOTTOM.
1
2" x 2" x thk. ANGULAR 1.70
4" (SEE DETAIL)
FRAME ( TOP AND BOTOM ) TOP OF TOP OF
MANHOLE COVER
MANHOLE INLET SIDEWALK SIDEWALK
0.15
8 % SLOP
E (SEE DETAIL)
0.15
E
8 % SLOP
5 Ø12 @
0.78
6 Ø12 @ Ø12 @
0.25 M.O.C.
0.78
1 Ø12 @ 1 Ø12 @ 0.25 M.O.C.
0.25 M.O.C. 0.25 M.O.C.
0.25 M.O.C. Ø12 @ 0.25 M.O.C.
E.W. E.F.
STEEL RUNG
(SEE DET.)
STEEL RUNG
4 (SEE DET.)
PIPE OUTSIDE DIAMETER
Ø12 @ Ø 12 Ø 12
VERIFY
VERIFY
0.25 M.O.C.
2.50
VERIFY
0.40
2.50
1 Ø12 @
Ø12 @ 0.25 M.O.C.
VARIABLE
VARIABLE
RCPC 0.91m.Ø
RCPC
RCPC
3 Ø12 @
0.09 0.09 0.25 M.O.C. 3 Ø12 @
0.25 M.O.C.
0.20
MIN.
0.20 0.20
0.20
0.20
1 Ø12 @
0.20
0.25 M.O.C.
GRAVEL BEDDING
0.10
7 Ø12 @ 0.25 M.O.C.
0.175 1.29 0.175 0.25 M.O.C.
PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + GENERAL LAYOUT PLAN & PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156 DETAIL OF MANHOLE
REGIONAL OFFICE IV-A VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 4 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION
0.67m.
0.15m.
CONC.
0.22m.
CURB
CONC. GUTTER
PROPOSED CONCRETE PAVEMENT
DROP CURB SHALL BE USE
IN DRIVEWAYS AND ENTRANCE
GRANULAR BEDDING
DETAIL OF DROP CURB & GUTTER
50mm. thk. SCALE 1:10 M.
2
0
0.5
CONCRETE GURB
CONCRETE GUTTER
0.36
1 4
7
8%
Slo
pe 3
0 .10
0.
1 7
0
0.3
0
0 0.5
0.1
0.
5 6
50
0.
67
0.50
CONC. CURB
0.50
SCHEDULE OF CURB AND GUTTER
CONC. GUTTER
0.21
0.21
0.36
0.36
0.15
0.15
NOTES:
0.17
1. MATERIAL AND CONSTRUCTION REQUIREMENTS SHALL
CONCRETE CURB CONFORM TO DPWH STANDARD SPECIFICATIONS FOR
HIGHWAYS AND BRIDGES 2004.
CONCRETE MIX.
8% Slope
0.36
PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
DETAIL OF PRE-CAST CURB AND GUTTER PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + DETAIL OF DROP CURB AND GUTTER
PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156 SCHEDULE OF DROP CURB, CURB AND GUTTER
REGIONAL OFFICE IV-A BAR BENDING DIAGRAM VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 5 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION