TYPICAL ROADWAY SECTION

CL

30.00

10.00 10.00

0.73 0.67 1.90 3.35 3.35 3.35 3.35 1.90 0.67 0.73
CONC. CURB & CONC. ROAD WIDENING EXISTING ROAD EXISTING ROAD ROAD WIDENING CONC. CURB & CONC.
SIDEWALK GUTTER SHOULDER SHOULDER GUTTER SIDEWALK

  PROVIDE 0.75M, 16MM DIA. RSB TIE BAR    


SPACED @ 0.75M ON CENTER DRILLED AND
SEE BONDED WITH CONCRETE EPOXY SEE
SEE SEE
SEE DETAIL "A" DETAIL "A" SEE
DETAIL "C" DETAIL "C"
PLANTING STRIP DETAIL "B" DETAIL "B" 8% PLANTING STRIP
8% 1.50 % SLOPE 1.50 % SLOPE

0.20

0.20
SLOPE 1.50 % SLOPE 1.50 % SLOPE SLOPE

MINIMUM
0.87
H = VARIABLE
0.30

H = VARIABLE
0.91m.Ø
RCPC
SECTION SHOWING PROPOSED ROAD WIDENING, CONCRETE SHOULDER, CONCRETE CURB 0.91m.Ø
RCPC
0.10

AND GUTTER, SIDEWALK, PLANTING STRIP @ BOTH SIDES AND GABIONS @ RIGHT SIDE 0.30
0.27 0.27

GRAVEL FILL
K0083+ -520 - K0083+ -480.00, L=40.00 m.
1.64
K0083+ -290.50 - K0083+ -120.00, L=170.50 m.
K0083+ 000.00 - K0083+ 020.00, L=20.00 m.

TOTAL LENGTH = 230.50 m.


SCALE 1:40 MTS.

DETAIL "A" DETAIL "B" DETAIL "C"

ITEM 311(1)a : PORTLAND CEMENT CONCRETE PAVEMENT


ITEM 311 (1) e1 : PORTLAND CEMENT CONCRETE 0.15M. THK. (14 DAYS CONCRETE) CONCRETE SIDEWALK, 0.10M. THK
PAVEMENT 0.28M. THK. (14 DAYS CONCRETE)
ITEM 200 (1) : AGGREGATE SUBBASE
ITEM 200 (1) : AGGREGATE SUBBASE ITEM 200 (1) : AGGREGATE SUBBASE COURSE
COURSE (0.20M. THK)
COURSE (0.25M. THK) (0.10M. THK)

PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
TYPICAL ROADWAY SECTION "B" PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + DETAIL "A", "B" AND "C"
PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156
REGIONAL OFFICE IV-A VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 3 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION
DRAINAGE STANDARD AND DETAIL

CURB & GUTTER


(SEE DETAIL)

0.00
0.73 0.91
910 MM.Ø RCPC
0.175 0.56 0.175

0.26
0.22
C
E MANHOLE MANHOLE
8 % SLOP

0.05
COVER COVER

0.175
MANHOLE MANHOLE
COVER COVER

Ø12 @

0.78
0.25 M.O.C.
A

0.175
1.80

1.70

1.00
1.22
MANHOLE COVER INLET
GENERAL LAYOUT PLAN NOT TO SCALE

VERIFY
2.50
Ø12 @ 0.25 M.O.C.
E.W. E.F.

VARIABLE
0.175
0.05

3 Ø12 @
D 0.25 M.O.C.

0.40m.
1.00m.
B
0.05m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.10m. 0.05m. 0.25m
.

0.025m. 0.070m. 0.025m.


0.20
FULL WELD

0.05m.
0.17m.

0.17m.

0.075m.
0.05m.
0.37 0.37 5m.
GRAVEL BEDDING 2 Ø12 @ 0.2

0.10
0.25 M.O.C.
12mm. Ø BAR
0.73 0.17 0.50 0.175 1.29 0.175 16mm. Ø BAR
MANHOLE COVER CURB & GUTTER OPENING SECTION
ISOMETRIC
1.64

MANHOLE PLAN DETAIL OF MANHOLE INLET DETAIL OF STEEL RUNG


SCALE 1:20 M. SECTION D SCALE 1:10 M. SCALE 1:10 M.

SCALE 1:20 M.

0.73 0.91
1.73m. x 1.20m. x 0.15m. thk. CONCRETE
MANHOLE COVER W/ 2 - 12mm. Ø RSB 1.73m. x 1.20m. x 0.15m. thk. CONCRETE
0.365 0.365 0.175 0.56 0.175 1.80 CURB & GUTTER
@ 0.15m. O.C. B.W. & W/ 2" x 2" x 1/4" MANHOLE COVER W/ 2 - 12mm. Ø RSB
0.73 (SEE DETAIL)
thk. ANGULAR FRAME, TOP & BOTTOM. @ 0.15m. O.C. B.W. & W/ 2" x 2" x 1/4"
CURB & GUTTER thk. ANGULAR FRAME, TOP & BOTTOM.
1
2" x 2" x thk. ANGULAR 1.70
4" (SEE DETAIL)
FRAME ( TOP AND BOTOM ) TOP OF TOP OF
MANHOLE COVER
MANHOLE INLET SIDEWALK SIDEWALK
0.15

8 % SLOP
E (SEE DETAIL)

0.15
E
8 % SLOP

5 Ø12 @
0.78

6 Ø12 @ Ø12 @
0.25 M.O.C.

0.78
1 Ø12 @ 1 Ø12 @ 0.25 M.O.C.
0.25 M.O.C. 0.25 M.O.C.
0.25 M.O.C. Ø12 @ 0.25 M.O.C.
E.W. E.F.

STEEL RUNG
(SEE DET.)
STEEL RUNG
4 (SEE DET.)
PIPE OUTSIDE DIAMETER

Ø12 @ Ø 12 Ø 12
VERIFY
VERIFY

0.25 M.O.C.

PIPE OUTSIDE DIAMETER


TRIMMER BAR TRIMMER BAR
2.50

2.50

VERIFY
0.40

2.50
1 Ø12 @
Ø12 @ 0.25 M.O.C.
VARIABLE

0.91m.Ø 0.25 M.O.C.


0.91m.Ø E.W. E.F.

VARIABLE
RCPC 0.91m.Ø
RCPC
RCPC

3 Ø12 @
0.09 0.09 0.25 M.O.C. 3 Ø12 @
0.25 M.O.C.
0.20

MIN.
0.20 0.20

0.20
0.20

1 Ø12 @

0.20
0.25 M.O.C.

GRAVEL BEDDING 2 Ø12 @


0.10

0.25 M.O.C. GRAVEL BEDDING 2 Ø12 @


0.10

GRAVEL BEDDING

0.10
7 Ø12 @ 0.25 M.O.C.
0.175 1.29 0.175 0.25 M.O.C.

0.175 1.45 0.175 0.175 1.29 0.175


1.64
1.64
1.80

SECTION A SECTION B SECTION C


SCALE 1:20 M. SCALE 1:20 M. SCALE 1:20 M.

PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + GENERAL LAYOUT PLAN & PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156 DETAIL OF MANHOLE
REGIONAL OFFICE IV-A VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 4 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION
0.67m.

SIDEWALK LEVEL 0.17m. 0.50m.

1.5 % Slope 8% slope


8% Slope

0.15m.
CONC.

0.22m.
CURB
CONC. GUTTER
PROPOSED CONCRETE PAVEMENT
DROP CURB SHALL BE USE
IN DRIVEWAYS AND ENTRANCE

GRANULAR BEDDING
DETAIL OF DROP CURB & GUTTER
50mm. thk. SCALE 1:10 M.

10mm. PREFORMED JOINT FILLER


SCHEDULE OF DROP CURB AND GUTTER
TYPICAL SECTION
SCALE 1:10 MTS.

2
0
0.5
CONCRETE GURB

CONCRETE GUTTER
0.36

1 4
7

8%
Slo
pe 3
0 .10
0.
1 7

0
0.3
0
0 0.5
0.1
0.

5 6
50
0.
67

ISOMETRIC BAR BENDING DIAGRAM


NOT TO SCALE
NOT TO SCALE

0.50

CONC. CURB
0.50
SCHEDULE OF CURB AND GUTTER
CONC. GUTTER 
0.21

0.21
0.36

0.36
0.15

0.15

0.10 0.30 0.10 0.10 0.30 0.10

REAR ELEV. OF CURB REAR ELEV. OF GUTTER


SCALE 1:10 MTS. SCALE 1:10 MTS.

NOTES:
0.17
1. MATERIAL AND CONSTRUCTION REQUIREMENTS SHALL
CONCRETE CURB CONFORM TO DPWH STANDARD SPECIFICATIONS FOR
HIGHWAYS AND BRIDGES 2004.

2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC


CONCRETE GUTTER
FIBERS (D.O. 95, SERIES 2005) AS ADDITIVE TO
0.21

CONCRETE MIX.
8% Slope
0.36

3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED


0.15

IN THE DESIGN OF PAVED ROADS IF THE FUNCTION IS


TO FACILITATE THE CHANNELING OF SURFACE WATER
RUN-OFF THUS PREVENTING THE EROSION OF THE
SHOULDERS AND SLOPE.

0.67 4. MINIMUM CURB INLET INTERVAL ("D") 10.00 METERS IN


FLOODED AREAS.

5. MINIMUM CURB INLET INTERVAL ("D") 20.00 METERS IN


OTHER AREAS.
PRE-CAST
CONCRETE CURB & GUTTER DETAIL
SCALE 1:10 MTS.

PROJECT TITLE/ LOCATION: SHEET CONTENTS: DRAWN BY: CHECKED/REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable
National Road System, Network Development, Road Widening,
DETAIL OF PRE-CAST CURB AND GUTTER PEPE L. QUIATCHON
BATANGAS III DISTRICT ENGINEERING OFFICE Tertiary Roads, Lipa City - Alaminos Rd - K0083 + -678 - K0083 + DETAIL OF DROP CURB AND GUTTER
PREPARED BY:
ENGINEERING ASSISTANT (DRAFTSMAN II)
R
156 SCHEDULE OF DROP CURB, CURB AND GUTTER
REGIONAL OFFICE IV-A BAR BENDING DIAGRAM VINCENT JOSEPH L. ALDAY GIL B. AGGARI PRESCILA R. RAMOS 5 19
J. Gonzales St., Barangay 4, Tanauan City JERIC BRENT M. GERVACIO ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I CONCURRENT-CHIEF, PLANNING & DESIGN SECTION

Das könnte Ihnen auch gefallen