Beruflich Dokumente
Kultur Dokumente
1. Definitions
2. Attachments:
3. Goals
The purpose of this document is to provide precise guidance on how to handle any situation where
rescue from a confined space arises.
It gives a detailed account on the personnel required for any work requiring a confined space entry, the
roles and responsibilities of each, as well as the sequence of steps required when carrying out a
confined space rescue operation.
4. Personnel Required:
- Stretcher
- Life-line
- Air Horn
- VHF Devices
7. Communication
8. Terminal’s CCSRP:
1. CCSRP #1
2. CCSRP #2
3. CCSRP #3
4. CCSRP #4
9. General Guidelines:
- Work area must allow for clear and constant verbal and visual communication among workers
inside the confined space and the safety watch at all times.
- Rescue equipment must be inspected and tested before starting work.
- For each person entering the confined space, there must be at least 2 CCSRPs present.
- Access routes, egress points, and safe area must be clearly identified and documented on the
terminal’s layout accompanying the WCP documents.
1. Safety watch activates air horn and communicates with TS regarding the event, who in turn
notifies paramedics or emergency teams (as needed).
2. All uninvolved personnel evacuate the area.
3. CCSRPs enter the confined space to aid and remove the person requiring rescue.
4. CCSRPs carry the person requiring rescue towards the designated safe area.
5. TS ensures the rescued person receives the required aid as needed.
1. Safety watch activates air horn and communicates with TS regarding the event, who in turn
notifies paramedics or emergency teams (as needed).
2. All uninvolved personnel evacuate the area.
3. CCSRPs (wearing full breathing apparatus) enter the confined space to tend to the persons
requiring the rescue, 2 CCSRPs for each person.
4. CCSRPs transport their respective rescued persons towards the designated safe area.
5. TS ensures all rescued persons receive the required aid as needed.
In case a person is present in a confined space and requires rescue while an ESD situation arises in
the terminal:
- Site evacuation takes place as per ERP, but TS ensures CCSRPs are present at the confined space
to initiate rescue plan.
- CCRPs transport the person requiring rescue towards the terminal’s assembly point.
- Attachment 1: Confined Space Rescue Verification Checklist
Job Details:
……………………………………………………………………………………………………………………......
Job Location: ………………………… Date: ……………………….. Time:
……………………………….
Work Permit Type (Hot/Cold) and Number: …………………………….......
Confined Space Entry Permit Number: ………………………………………
Are there any potential emergencies that might occur during the rescue operation?
Fire Explosion Spill Fall Other: ……………………..
Specify the different equipment that will be used for rescue process:
First Aid Kit Stretcher Life-line Breathing Apparatus
Fire Extinguisher Ladder Rope Eye wash equipment
Other:
………………………………………………………………………………………………………………………….
Have the equipment defined been tested before starting work? (Y/N)