Sie sind auf Seite 1von 43

CONSULTORÍA Y CONSTRUCCIÓN

MEMORIAS DE DISEÑO Y CÁLCULO ESTRUCTURAL

PROYECTO: “CONJUNTO RESIDENCIAL CPI LTDA”


INGENIERO CIVIL: ALEX G. ALARCÓN C.

TENA, FEBRERO 2019

1
CONSULTORÍA Y CONSTRUCCIÓN

ÍNDICE
1.- INTRODUCCIÓN.................................................................................................................. 3
2.- OBJETIVO ........................................................................................................................... 3
3.- UBICACIÓN DEL PROYECTO ................................................................................................ 3
4.- DESCRIPCIÓN DEL PROYECTO ESTRUCTURAL..................................................................... 3
5.- ANTECEDENTES .................................................................................................................. 4
DISEÑO ESTRUCTURAL ............................................................................................................ 5
6.- DEFINICIÓN DEL MATERIAL ................................................................................................ 5
7.- SECCIONES ESTRUCTURALES .............................................................................................. 5
8.- CARGAS ............................................................................................................................ 11
9.- CARGA SÍSMICA REACTIVA ............................................................................................... 14
10. MODOS DE VIBRACIÓN ................................................................................................... 15
11. CORTANTE BASAL ............................................................................................................ 17
12. CONTROL DE DERIVAS ..................................................................................................... 19
RESULTADOS EN ETABS ......................................................................................................... 21
13. DIAGRAMA DE MOMENTOS ............................................................................................ 22
14.- DIAGRAMA DE CORTE .................................................................................................... 23
15. VERIFICACIÓN DE NERVIOS ............................................................................................. 24
16. VERIFICACIÓN DE LAS COLUMNAS .................................................................................. 25
17. VERIFICACIÓN DE LAS VIGAS ........................................................................................... 26
18. VERIFICACIÓN POR PÓRTICOS DE VIGAS Y COLUMNAS .................................................. 27
20. CIMENTACIONES ............................................................................................................. 30
21. PROPIEDADES DE LA CIMENTACIÓN ............................................................................... 31
22. CARGAS QUE ACTÚAN A LA CIMENTACIÓN .................................................................... 31
24. VERIFICACIÓN DEL PUNZONAMIENTO ............................................................................ 41
25. ACOTAMIENTO DE LA CIMENTACIÓN ............................................................................. 41
26. DIAGRAMA DE MOMENTO.............................................................................................. 42
27. CUANTÍAS DE ACERO DE REFUERZO ................................................................................ 42
28.- CONCLUSIONES Y RECOMENDACIONES ......................................................................... 43
29.- BIBLIOGRAFÍA................................................................................................................. 43

2
CONSULTORÍA Y CONSTRUCCIÓN

1.- INTRODUCCIÓN

En el cantón Tena, se ha proyectado la construcción de una edificación llamada


“CONJUNTO RESIDENCIAL CPI LTDA” para uso de viviendas. La planificación
arquitectónica que se ha realizado para el efecto, ha servido de base para los estudios
estructurales.
El proyecto se va a ejecutar en un solo bloque destinado para viviendas, además esta
memoria de análisis y diseño estructural, reúne los criterios y métodos de cálculo que se
han aplicado para la determinación de las acciones y efectos de las cargas, solicitaciones
que actuarán sobre la edificación para el dimensionamiento de sus elementos constitutivos.
Los diseños correspondientes se presentan en los planos estructurales.

2.- OBJETIVO

Dimensionar y verificar los elementos estructurales y la cimentación de la edificación


“CONJUNTO RESIDENCIAL CPI LTDA” haciendo uso de la Norma Ecuatoriana de la
Construcción vigente (NEC15).

3.- UBICACIÓN DEL PROYECTO

Lote: 9
Calle “E” y Calle los Yutzos

4.- DESCRIPCIÓN DEL PROYECTO ESTRUCTURAL

La geometría de las casas es regular, todas las plantas de las edificaciones son de hormigón
armado, tanto en columnas, vigas y losa. Se han diseñado columnas de sección constante
en toda la altura con la finalidad de mantener su rigidez y conseguir un control adecuado de
los desplazamientos horizontales.
La cubierta es una losa de características similares a las de entrepiso.
La cimentación se encuentra conformada por zapatas aisladas y cadenas de amarre que
toman las cargas provenientes de superestructura y permiten transmitirlas al suelo de
cimentación con esfuerzos menores al valor admisible adoptado de 10t/m2.

3
CONSULTORÍA Y CONSTRUCCIÓN

5.- ANTECEDENTES

ANÁLISIS DE CARGAS
Para el análisis y diseño estructural de esta residencia se han considerado cargas unitarias:

3
Cargas muertas Peso kg/m

Mampostería de ladrillo hueco 1500

Hormigón simple 2200

Hormigón armado 2400

Mortero cemento - arena 1800

Parquet 1500

Tejuelo 1500

.
2
Cargas vivas Peso kg/m

Cubierta 200

Gradas y áreas de circulación 480

Pisos intermedios 200

2
La carga considerada para paredes se estimó en 200 Kg/m .

MATERIALES
a. Propiedades mecánicas del hormigón

U: Coeficiente de poisson
E: módulo de elasticidad
G: módulo de corte
b.- hormigón

F`c (kg/cm2) uso


140 Replantillo
240 Hormigón estructural en cimentaciones
240 Hormigón estructural en gradas y losas

c.- Armadura de refuerzo

fy (kg/cm2) uso
4200 Cimentaciones

4
CONSULTORÍA Y CONSTRUCCIÓN

DISEÑO ESTRUCTURAL

6.- DEFINICIÓN DEL MATERIAL

Figura 1. Datos de propiedades del hormigón (kg/cm2)

Datos introducidos en ETABS

7.- SECCIONES ESTRUCTURALES

Figura 2. Sección columna 35x35

5
CONSULTORÍA Y CONSTRUCCIÓN

Figura 3. Sección col 30x30

Figura 4.Sección vigas 25x30

6
CONSULTORÍA Y CONSTRUCCIÓN

Figura 5. Sección vigas de borde

Figura 61.- nervios de losa

Secciones correspondientes a las que se van a dibujar en los planos estructurales

7
CONSULTORÍA Y CONSTRUCCIÓN

Figura 72. Planta y elevación secciones en ETABS

8
CONSULTORÍA Y CONSTRUCCIÓN

Figura 8. Planta y 3d de los elementos en ETABS

9
CONSULTORÍA Y CONSTRUCCIÓN

Figura 9 . Elevación ETABS

10
CONSULTORÍA Y CONSTRUCCIÓN

8.- CARGAS

Cargas aproximadas sobreimpuestas despreciando peso propio de los materiales para introducir en ETABS

mampostería 0.2 kg/m2


alisado 0.025 T/m2
pisos baldosa 0.035 T/m2
cielo raso 0.015 T/m2

Cargas agregadas en ETABS

CM ETABS CV
NIVEL T/m2 T/m2
2 0.28 0.20
1 0.28 0.20

11
CONSULTORÍA Y CONSTRUCCIÓN

Carga
sobreimpuesta Carga
0.28t/m2 viva 0.20
t/m2

Figura 10. Cargas vivas y sobreimpuestas

12
CONSULTORÍA Y CONSTRUCCIÓN

Figura 31. Combinaciones de carga en ETABS

Figura 12. Datos de combinaciones de carga NEC SE CG

13
CONSULTORÍA Y CONSTRUCCIÓN

Figura 13. Combinaciones de carga ultima resistencia NEC SE CG

9.- CARGA SÍSMICA REACTIVA

Caso general
W=D
100% de la carga muerta
Dónde:
D carga muerta total de la estructura
w. carga sísmica reactiva
Datos obtenidos de la NEC SE DS (peligro sísmico)

14
CONSULTORÍA Y CONSTRUCCIÓN

Figura 14. Participación de masa ETABS

Figura 15. Diafragmas en cada piso

Punto donde va a actuar la fuerza de cortante basal

10. MODOS DE VIBRACIÓN

 1º modo de vibración. Presento traslación en el sentido X.


 2º modo de vibración. Presento traslación en el sentido Y.
 3º modo de vibración. Presento torsión alrededor del centro de masas de la
estructura

15
CONSULTORÍA Y CONSTRUCCIÓN
RESULTADOS

Modal Results

Modal Periods and Frequencies

Circular
Period Frequency Eigenvalue
Case Mode Frequency
sec cyc/sec rad²/sec²
rad/sec
Modal 1 0.357 2.651 16.6537 277.3473
Modal 2 0.348 2.873 18.0547 325.9709
Modal 3 0.343 2.918 18.3335 336.119
Modal 4 0.104 9.593 60.277 3633.312
Modal 5 0.102 9.794 61.5361 3786.6966
Modal 6 0.101 9.928 62.3802 3891.2917

Modal Participating Mass Ratios (Part 1 of 2)

Period
Case Mode UX UY UZ Sum UX Sum UY Sum UZ
sec
Modal 1 0.357 0 0.8821 0 0 0.8821 0
Modal 2 0.348 0.8171 4.078E-05 0 0.8171 0.8821 0
Modal 3 0.343 0.0753 0.0004 0 0.8924 0.8825 0
Modal 4 0.104 7.548E-06 0.1172 0 0.8924 0.9997 0
Modal 5 0.102 0.0962 0.0001 0 0.9887 0.9998 0
Modal 6 0.101 0.0113 0.0002 0 1 1 0

- Modal Participating Mass Ratios (Part 2 of 2)

Case Mode RX RY RZ Sum RX Sum RY Sum RZ

Modal 1 0.226 0 0.0004 0.226 0 0.0004


Modal 2 9.555E-06 0.1954 0.0755 0.2261 0.1954 0.0759
Modal 3 0.0001 0.0178 0.8143 0.2261 0.2131 0.8902
Modal 4 0.7719 0.0001 0.0003 0.998 0.2132 0.8905
Modal 5 0.0004 0.7043 0.0114 0.9985 0.9174 0.9019
Modal 6 0.0015 0.0826 0.0981 1 1 1

16
CONSULTORÍA Y CONSTRUCCIÓN

11. CORTANTE BASAL

Para el diseño del cortante basal se obtuvo datos de la NEC15 representados en la siguiente
tabla:

ESPECTRO ELÁSTICO DE DISEÑO EN ACELERACIONES (NEC-SE)


Parámetro Variable Valor Unidades Referencia
Factor de importancia I 1.00 s.u Tabla 6, Sec.4.1 pg 39

Factor de reducción de respuesta R 8.00 s.u Tabla 15, Sec.6.3.4 pg 64


Zonificación Sísmica V Tabla 1, Sec.3.1.1 pg 27
Región del Ecuador oriente Sec.3.3.1 pg 34
Factor de aceleración de la zona sísmica Z 0.35 s.u Tabla 1, Sec.3.1.1 pg 27
Relación de amplificación espectral n 2.60 s.u Sec.3.3.1 pg 34
Coeficiente Ct Ct 0.073 s.u Sec.6.3.3 pg 62
Altura total del elemento hn 6.00 m Planos
Coeficiente para Calculo de Periodo α 0.75 s.u Sec.6.3.3 pg 62
Tipo de Suelo D Estudio de suelo
factor de sitio Fa Fa 1.25 s.u Tabla 3, Sec.3.2.2 pg 31
factor de sitio Fd Fd 1.28 s.u Tabla 4, Sec.3.2.2 pg 31
Factor de comportam. inelástico suelo Fs 1.19 s.u Tabla 5, Sec.3.2.2 pg 32
Factor asociado al periodo de retorno r 1.00 s.u Sec 3.3.1 pg 34
Factor de irregularidad en planta Øp 1.00 s.u Tabla 13, Sec.5.2.3 pg 50
Factor de irregularidad en elevación Øe 0.90 s.u Tabla 14, Sec.5.2.3 pg 51

Aceleración de la gravedad g 9.81 m/s2

Período teórico método 1 T1 0.280 seg. Sec.6.3.3 pg 62


Período teórico método 1 mayorado T2 0.364 seg. Sec.6.3.3 pg 63
Período fundamental dirección x Tx 0.363 seg. ETABS 16.2
Período fundamental dirección y Ty 0.344 seg. ETABS 16.2
TO 0.12 seg.
Periodo Límite en T=To Sec.3.3.1 pg 34
TC 0.67 seg.
Periodo Límite en T=Tc Sec.3.3.1 pg 34
TL 3.07 seg.
Periodo Límite en T=TL Sec.3.3.1 pg 34
Aceleración en T=0 Sa 0.44 g Sec.3.3.1 pg 34
Sao 1.14 g
Aceleración en T=To Sec.3.3.1 pg 34

CORTE BASAL
DIRECCION X DIRECCION Y
Ta 0.357 Ta 0.348
Sa(Ta) 1.14 Sa(Ta) 1.14
I 1.00 I 1.00
Øp 1.00 Øp 1.00
Øe 0.90 Øe 0.90
R 8.00 R 8.00
V 0.158 V 0.158

17
CONSULTORÍA Y CONSTRUCCIÓN

PESO PROPIO DE LOS ELEMENTOS OBTENIDOS DE ETABS

Total Weight
Story Element Type Material
tonf
STORY2 Column FC240 12.61287
STORY2 Beam FC240 40.02244
STORY2 Floor FC240 20.64036
STORY1 Column FC240 12.61287
STORY1 Beam FC240 25.49241
STORY1 Floor FC240 20.64036
SUM Column FC240 25.22574
SUM Beam FC240 65.51485
SUM Floor FC240 41.28072
TOTAL ALL ALL 132.02131

PESOS ADICIONALES

DATOS
CM 0.28 T/M2 ENTREPISOS
CV 0.2 T/M2 ENTREPISOS
CM 0.28 T/M2 TERRAZA
CV 0.2 T/M2 TERRAZA

PESOS POR PISO

PISO PESO (T) area (m2) WM (T) W (T)


2 76.414 175.46 49.13 125.543
1 76.414 175.46 49.13 125.543

DISTRIBUCIÓN DE FUERZAS

PISO Z h w (t) Wx hx^k


2 5.76 2.880 126.093 726.295
1 2.88 2.880 126.093 363.147
Ʃ 252.186 1089.442
v 39.929

18
CONSULTORÍA Y CONSTRUCCIÓN
FUERZAS DE ETABS

Figura 16. FUERZAS VERTICALES

12. CONTROL DE DERIVAS

Max Drift
Story Load Case/Combo Direction
mm
STORY2 SISMOX X 3.392
STORY2 SISMOY Y 4.747
STORY1 SISMOX X 3.08
STORY1 SISMOY Y 3.968

SENTIDO XX

CONTROL DE LIMITES PERMISIBLES DE LAS DERIVAS DE PISO

SENTIDO X X

PISO NIVEL Hi [m] ∆i [mm] ∆sup - ∆inf ∆E ∆M MAX 0.02

2 5.76 2.88 3.390 0.310 0.0001 0.0006 OK


1 2.88 2.88 3.080 3.080 0.0011 0.0064 OK

19
CONSULTORÍA Y CONSTRUCCIÓN
SENTIDO YY

CONTROL DE LIMITES PERMISIBLES DE LAS DERIVAS DE PISO

SENTIDO Y Y

PISO NIVEL Hi [m] ∆i [mm] ∆sup - ∆inf ∆E ∆M MAX 0.02

2 6 3.00 4.747 0.779 0.00025967 0.001558 OK


1 3 3.00 3.968 3.968 0.00132267 0.007936 OK

FORMULAS UTILIZADAS

∆𝑀 𝑚á𝑥𝑖𝑚𝑎 = 0.02

∆𝑀 = 𝑑𝑒𝑟𝑖𝑣𝑎 𝑚á𝑥𝑖𝑚𝑎 𝑖𝑛𝑒𝑙á𝑠𝑡𝑖𝑐𝑎

∆𝑀 = 0.75𝑅∆𝐸

∆𝑠𝑢𝑝𝑒𝑟𝑖𝑜𝑟 − ∆𝑖𝑛𝑓𝑒𝑟𝑖𝑜𝑟
∆𝐸 =
𝐻𝑖

20
CONSULTORÍA Y CONSTRUCCIÓN

RESULTADOS EN ETABS

21
CONSULTORÍA Y CONSTRUCCIÓN

13. DIAGRAMA DE MOMENTOS

Figura 174. Diagrama de momentos (CV-CM)

22
CONSULTORÍA Y CONSTRUCCIÓN

14.- DIAGRAMA DE CORTE

Figura 185. Diagrama de corte (CM-CV)

23
CONSULTORÍA Y CONSTRUCCIÓN

15. VERIFICACIÓN DE NERVIOS

Figura 19. VERIFICACIÓN DE NERVIOS

24
CONSULTORÍA Y CONSTRUCCIÓN

16. VERIFICACIÓN DE LAS COLUMNAS

Figura 20. Verificación de columnas

Las columnas pasan la verificación

25
CONSULTORÍA Y CONSTRUCCIÓN

17. VERIFICACIÓN DE LAS VIGAS

Figura 21. Verificación de las vigas

Las vigas pasan la verificación

26
CONSULTORÍA Y CONSTRUCCIÓN

18. VERIFICACIÓN POR PÓRTICOS DE VIGAS Y COLUMNAS

Figura 6. Ejes 3 y 4

27
CONSULTORÍA Y CONSTRUCCIÓN

Figura 73. Ejes 5 y volado

28
CONSULTORÍA Y CONSTRUCCIÓN

Figura 248. Ejes B y C

29
CONSULTORÍA Y CONSTRUCCIÓN

20. CIMENTACIONES

INTRODUCCIÓN
Para las cimentaciones se utilizó la capacidad portante del suelo de 10. t/m2, a una
profundidad de -2.00 m, SE DEBERÁ CONSTATAR CON UN ESTUDIO DE SUELOS PARA
VERIFICAR SI EL VALOR ESTIMADO ES CORRECTO.
Se va a utilizar ZAPATAS AISLADA con cadenas de cimentación en el programa SAFE 2016,
se recomienda un mejoramiento de suelo clase III de 40cm de espesor compactado a 95%
según pretor modificado.

Figura 25. Esquema de zapata aislada

30
CONSULTORÍA Y CONSTRUCCIÓN

21. PROPIEDADES DE LA CIMENTACIÓN

Figura 269. Propiedades de la cimentación

Los materiales para la cimentación es de hormigón F`c =240 kg/cm2 los mismos que se
definieron para el ETABS
Para el replantillo se usará un hormigón de f`c de 140kg/cm2
El espesor de la zapata es de 25 cm los detalles se encuentra en los planos estructurales
Las combinaciones de carga se importaron del programa ETABS

22. CARGAS QUE ACTÚAN A LA CIMENTACIÓN


Tabla de reacciones que pasan a la cimentación

Story Point Load FX FY FZ MX MY MZ


BASE 1 DEAD -0.3 -0.3 21.29 13.497 -11.803 0.065
BASE 1 LIVE -0.08 -0.15 5.41 6.485 -3.198 0.017
BASE 1 SISMOX -2.07 -0.23 -4.09 16.683 -156.798 0.99
BASE 1 SISMOY -0.21 -2.5 4.45 195.333 -13.588 1.866
BASE 1 UDCON1 -0.42 -0.43 29.81 18.896 -16.524 0.09
BASE 1 UDCON2 -0.49 -0.61 34.2 26.572 -19.28 0.105
BASE 1 UDCON3 -2.58 -0.81 31.13 42.064 -176.52 1.098
BASE 1 UDCON4 1.57 -0.35 39.31 8.697 137.077 -0.883
BASE 1 UDCON5 -0.72 -3.08 39.67 220.714 -33.31 1.974
BASE 1 UDCON6 -0.29 1.92 30.76 -169.952 -6.133 -1.758
BASE 1 UDCON7 -2.5 -0.66 25.72 35.579 -173.322 1.081
BASE 1 UDCON8 -2.5 -0.66 25.72 35.579 -173.322 1.081
BASE 1 UDCON9 -0.64 -2.93 34.26 214.229 -30.112 1.957
BASE 1 UDCON10 -0.21 2.07 25.35 -176.437 -2.936 -1.776
BASE 1 UDCON11 -2.28 -0.45 10.81 26.131 -165.06 1.036

31
CONSULTORÍA Y CONSTRUCCIÓN

BASE 1 UDCON12 1.86 0.02 19 -7.236 148.536 -0.945


BASE 1 UDCON13 -0.43 -2.71 19.36 204.781 -21.85 1.911
BASE 1 UDCON14 0 2.29 10.45 -185.885 5.326 -1.821
BASE 1 ENV MAX 1.86 2.29 39.67 220.714 148.536 1.974
BASE 1 ENV MIN -2.58 -3.08 -4.09 -185.885 -176.52 -1.821
BASE 2 DEAD 0.11 -0.62 27.88 25.504 4.322 0.065
BASE 2 LIVE 0.05 -0.29 8.18 11.753 1.783 0.017
BASE 2 SISMOX -2.62 -0.14 1.75 10.78 -178.122 0.99
BASE 2 SISMOY -0.18 -2.07 1.8 174.392 -12.162 1.866
BASE 2 UDCON1 0.16 -0.86 39.03 35.705 6.051 0.09
BASE 2 UDCON2 0.21 -1.21 46.55 49.409 8.04 0.105
BASE 2 UDCON3 -2.42 -1.29 48.96 58.239 -170.288 1.098
BASE 2 UDCON4 2.82 -1.02 45.46 36.678 185.956 -0.883
BASE 2 UDCON5 0.03 -3.23 49.01 221.85 -4.328 1.974
BASE 2 UDCON6 0.38 0.92 45.41 -126.933 19.996 -1.758
BASE 2 UDCON7 -2.46 -1 40.78 46.486 -172.071 1.081
BASE 2 UDCON8 -2.46 -1 40.78 46.486 -172.071 1.081
BASE 2 UDCON9 -0.02 -2.94 40.83 210.097 -6.111 1.957
BASE 2 UDCON10 0.33 1.21 37.23 -138.686 18.212 -1.776
BASE 2 UDCON11 -2.54 -0.57 21.26 28.633 -175.097 1.036
BASE 2 UDCON12 2.7 -0.29 17.77 7.072 181.147 -0.945
BASE 2 UDCON13 -0.1 -2.51 21.31 192.245 -9.136 1.911
BASE 2 UDCON14 0.25 1.64 17.72 -156.539 15.187 -1.821
BASE 2 ENV MAX 2.82 1.64 49.01 221.85 185.956 1.974
BASE 2 ENV MIN -2.62 -3.23 1.75 -156.539 -178.122 -1.821
BASE 3 DEAD 0.04 -0.14 27.4 6.644 1.556 0.065
BASE 3 LIVE 0.02 -0.08 7.89 3.684 0.595 0.017
BASE 3 SISMOX -2.4 -0.07 0.38 5.379 -169.487 0.99
BASE 3 SISMOY -0.17 -2.16 3.96 172.967 -12.068 1.866
BASE 3 UDCON1 0.06 -0.19 38.36 9.302 2.179 0.09
BASE 3 UDCON2 0.07 -0.3 45.5 13.867 2.819 0.105
BASE 3 UDCON3 -2.33 -0.34 46.62 18.365 -166.713 1.098
BASE 3 UDCON4 2.47 -0.21 45.87 7.606 172.26 -0.883
BASE 3 UDCON5 -0.1 -2.44 50.2 185.953 -9.294 1.974
BASE 3 UDCON6 0.25 1.89 42.29 -159.982 14.841 -1.758
BASE 3 UDCON7 -2.34 -0.26 38.74 14.681 -167.308 1.081
BASE 3 UDCON8 -2.34 -0.26 38.74 14.681 -167.308 1.081
BASE 3 UDCON9 -0.12 -2.36 42.32 182.269 -9.889 1.957
BASE 3 UDCON10 0.23 1.97 34.4 -163.666 14.246 -1.776
BASE 3 UDCON11 -2.37 -0.16 19.56 10.03 -168.398 1.036
BASE 3 UDCON12 2.43 -0.03 18.8 -0.729 170.576 -0.945
BASE 3 UDCON13 -0.15 -2.26 23.14 177.618 -10.978 1.911
BASE 3 UDCON14 0.2 2.07 15.22 -168.317 13.157 -1.821
BASE 3 ENV MAX 2.47 2.07 50.2 185.953 172.26 1.974

32
CONSULTORÍA Y CONSTRUCCIÓN

BASE 3 ENV MIN -2.4 -2.44 0.38 -168.317 -169.487 -1.821


BASE 4 DEAD -0.07 -0.73 32.21 29.648 -2.848 0.065
BASE 4 LIVE -0.03 -0.34 9.77 13.403 -1.253 0.017
BASE 4 SISMOX -2.51 0 -0.48 -0.288 -173.933 0.99
BASE 4 SISMOY -0.17 -1.82 1.54 154.271 -12.113 1.866
BASE 4 UDCON1 -0.1 -1.03 45.09 41.508 -3.987 0.09
BASE 4 UDCON2 -0.14 -1.42 54.28 57.022 -5.423 0.105
BASE 4 UDCON3 -2.65 -1.36 54.39 54.623 -179.173 1.098
BASE 4 UDCON4 2.38 -1.37 55.34 55.198 168.693 -0.883
BASE 4 UDCON5 -0.31 -3.19 56.41 209.181 -17.353 1.974
BASE 4 UDCON6 0.04 0.46 53.32 -99.36 6.872 -1.758
BASE 4 UDCON7 -2.61 -1.02 44.62 41.22 -177.92 1.081
BASE 4 UDCON8 -2.61 -1.02 44.62 41.22 -177.92 1.081
BASE 4 UDCON9 -0.28 -2.85 46.64 195.778 -16.1 1.957
BASE 4 UDCON10 0.07 0.8 43.55 -112.763 8.125 -1.776
BASE 4 UDCON11 -2.56 -0.51 22.07 20.466 -175.927 1.036
BASE 4 UDCON12 2.46 -0.52 23.02 21.042 171.939 -0.945
BASE 4 UDCON13 -0.23 -2.34 24.09 175.024 -14.106 1.911
BASE 4 UDCON14 0.12 1.31 21 -133.517 10.119 -1.821
BASE 4 ENV MAX 2.46 1.31 56.41 209.181 171.939 1.974
BASE 4 ENV MIN -2.65 -3.19 -0.48 -133.517 -179.173 -1.821
BASE 5 DEAD 0.02 -0.14 25.69 6.555 0.822 0.065
BASE 5 LIVE 0.01 -0.09 7.37 3.875 0.372 0.017
BASE 5 SISMOX -2.44 0.08 0.04 -5.647 -170.981 0.99
BASE 5 SISMOY -0.18 -1.9 3.5 152.578 -12.151 1.866
BASE 5 UDCON1 0.03 -0.2 35.97 9.177 1.15 0.09
BASE 5 UDCON2 0.04 -0.32 42.62 14.066 1.582 0.105
BASE 5 UDCON3 -2.4 -0.22 43.38 7.405 -169.458 1.098
BASE 5 UDCON4 2.48 -0.37 43.3 18.699 172.503 -0.883
BASE 5 UDCON5 -0.14 -2.2 46.84 165.629 -10.628 1.974
BASE 5 UDCON6 0.22 1.61 39.84 -139.526 13.674 -1.758
BASE 5 UDCON7 -2.41 -0.13 36.01 3.53 -169.83 1.081
BASE 5 UDCON8 -2.41 -0.13 36.01 3.53 -169.83 1.081
BASE 5 UDCON9 -0.15 -2.11 39.46 161.755 -11.001 1.957
BASE 5 UDCON10 0.21 1.7 32.47 -143.4 13.301 -1.776
BASE 5 UDCON11 -2.42 -0.02 18.02 -1.059 -170.405 1.036
BASE 5 UDCON12 2.45 -0.18 17.94 10.236 171.556 -0.945
BASE 5 UDCON13 -0.16 -2 21.48 157.166 -11.576 1.911
BASE 5 UDCON14 0.19 1.8 14.49 -147.989 12.726 -1.821
BASE 5 ENV MAX 2.48 1.8 46.84 165.629 172.503 1.974
BASE 5 ENV MIN -2.44 -2.2 0.04 -147.989 -170.981 -1.821
BASE 6 DEAD -0.11 -0.6 28.06 24.264 -4.224 0.065
BASE 6 LIVE -0.05 -0.29 8.24 11.411 -1.908 0.017
BASE 6 SISMOX -2.62 0.14 -1.74 -10.752 -177.945 0.99

33
CONSULTORÍA Y CONSTRUCCIÓN

BASE 6 SISMOY -0.18 -1.61 1.27 136.069 -12.488 1.866


BASE 6 UDCON1 -0.15 -0.85 39.29 33.97 -5.914 0.09
BASE 6 UDCON2 -0.21 -1.18 46.86 47.374 -8.122 0.105
BASE 6 UDCON3 -2.82 -0.99 45.79 34.628 -185.767 1.098
BASE 6 UDCON4 2.42 -1.27 49.27 56.133 170.123 -0.883
BASE 6 UDCON5 -0.38 -2.74 48.8 181.449 -20.31 1.974
BASE 6 UDCON6 -0.02 0.48 46.25 -90.688 4.666 -1.758
BASE 6 UDCON7 -2.77 -0.71 37.55 23.218 -183.859 1.081
BASE 6 UDCON8 -2.77 -0.71 37.55 23.218 -183.859 1.081
BASE 6 UDCON9 -0.34 -2.45 40.56 170.038 -18.402 1.957
BASE 6 UDCON10 0.03 0.76 38.02 -102.099 6.574 -1.776
BASE 6 UDCON11 -2.69 -0.28 17.91 6.233 -180.902 1.036
BASE 6 UDCON12 2.54 -0.56 21.38 27.737 174.988 -0.945
BASE 6 UDCON13 -0.26 -2.03 20.92 153.054 -15.445 1.911
BASE 6 UDCON14 0.11 1.19 18.37 -119.084 9.531 -1.821
BASE 6 ENV MAX 2.54 1.19 49.27 181.449 174.988 1.974
BASE 6 ENV MIN -2.82 -2.74 -1.74 -119.084 -185.767 -1.821
BASE 7 DEAD 0.28 -0.31 20.86 12.751 10.677 0.065
BASE 7 LIVE 0.08 -0.15 5.37 6.024 3.16 0.017
BASE 7 SISMOX -2.07 0.23 4.09 -16.593 -156.755 0.99
BASE 7 SISMOY -0.11 -1.73 3.71 136.323 -9.619 1.866
BASE 7 UDCON1 0.39 -0.44 29.21 17.851 14.948 0.09
BASE 7 UDCON2 0.46 -0.61 33.63 24.94 17.869 0.105
BASE 7 UDCON3 -1.6 -0.35 38.67 7.283 -138.646 1.098
BASE 7 UDCON4 2.54 -0.82 30.5 40.468 174.863 -0.883
BASE 7 UDCON5 0.36 -2.31 38.29 160.199 8.49 1.974
BASE 7 UDCON6 0.58 1.14 30.87 -112.447 27.727 -1.758
BASE 7 UDCON7 -1.69 -0.21 33.29 1.259 -141.806 1.081
BASE 7 UDCON8 -1.69 -0.21 33.29 1.259 -141.806 1.081
BASE 7 UDCON9 0.27 -2.16 32.92 154.174 5.33 1.957
BASE 7 UDCON10 0.5 1.29 25.5 -118.472 24.567 -1.776
BASE 7 UDCON11 -1.88 0.01 18.69 -7.667 -149.28 1.036
BASE 7 UDCON12 2.26 -0.45 10.52 25.518 164.229 -0.945
BASE 7 UDCON13 0.08 -1.94 18.31 145.249 -2.144 1.911
BASE 7 UDCON14 0.3 1.51 10.89 -127.397 17.093 -1.821
BASE 7 ENV MAX 2.54 1.51 38.67 160.199 174.863 1.974
BASE 7 ENV MIN -2.07 -2.31 3.71 -127.397 -156.755 -1.821
BASE 8 DEAD -0.11 0 36.99 1.366 -4.066 0.12
BASE 8 LIVE -0.11 -0.01 11.34 0.666 -4.149 0.032
BASE 8 SISMOX -2.82 0.39 1.63 -29.174 -245.109 1.835
BASE 8 SISMOY 0 -3.4 0 259.818 0.032 3.457
BASE 8 UDCON1 -0.16 -0.01 51.78 1.912 -5.693 0.167
BASE 8 UDCON2 -0.31 -0.02 62.53 2.705 -11.518 0.195
BASE 8 UDCON3 -3.09 0.38 64.75 -26.596 -254.951 2.035

34
CONSULTORÍA Y CONSTRUCCIÓN

BASE 8 UDCON4 2.55 -0.4 61.49 31.752 235.268 -1.635


BASE 8 UDCON5 -0.27 -3.41 63.12 262.396 -9.81 3.657
BASE 8 UDCON6 -0.27 3.39 63.12 -257.239 -9.874 -3.257
BASE 8 UDCON7 -2.98 0.38 53.41 -27.262 -250.802 2.002
BASE 8 UDCON8 -2.98 0.38 53.41 -27.262 -250.802 2.002
BASE 8 UDCON9 -0.16 -3.4 51.78 261.73 -5.66 3.625
BASE 8 UDCON10 -0.16 3.39 51.78 -257.906 -5.725 -3.29
BASE 8 UDCON11 -2.9 0.39 27.52 -28.218 -247.956 1.919
BASE 8 UDCON12 2.74 -0.39 24.26 30.13 242.263 -1.751
BASE 8 UDCON13 -0.08 -3.4 25.89 260.774 -2.814 3.541
BASE 8 UDCON14 -0.08 3.4 25.89 -258.862 -2.878 -3.374
BASE 8 ENV MAX 2.74 3.4 64.75 262.396 242.263 3.657
BASE 8 ENV MIN -3.09 -3.41 0 -258.862 -254.951 -3.374
BASE 9 DEAD -0.11 0.61 26.16 -23.059 -3.968 0.065
BASE 9 LIVE -0.04 0.3 7.5 -11.418 -1.356 0.017
BASE 9 SISMOX -2.43 0.13 -1.74 -10.321 -164.886 0.99
BASE 9 SISMOY 0.19 -1.61 -1.27 136.059 12.573 1.866
BASE 9 UDCON1 -0.16 0.86 36.62 -32.283 -5.555 0.09
BASE 9 UDCON2 -0.19 1.22 43.39 -45.94 -6.931 0.105
BASE 9 UDCON3 -2.62 1.29 42.38 -54.022 -171.797 1.098
BASE 9 UDCON4 2.23 1.03 45.86 -33.38 157.975 -0.883
BASE 9 UDCON5 -0.01 -0.45 42.85 92.358 5.662 1.974
BASE 9 UDCON6 -0.38 2.77 45.39 -179.76 -19.484 -1.758
BASE 9 UDCON7 -2.58 0.99 34.88 -42.604 -170.441 1.081
BASE 9 UDCON8 -2.58 0.99 34.88 -42.604 -170.441 1.081
BASE 9 UDCON9 0.03 -0.75 35.35 103.776 7.018 1.957
BASE 9 UDCON10 -0.34 2.47 37.89 -168.342 -18.128 -1.776
BASE 9 UDCON11 -2.5 0.56 16.57 -26.463 -167.664 1.036
BASE 9 UDCON12 2.35 0.3 20.05 -5.821 162.109 -0.945
BASE 9 UDCON13 0.11 -1.18 17.04 119.918 9.796 1.911
BASE 9 UDCON14 -0.26 2.04 19.58 -152.201 -15.35 -1.821
BASE 9 ENV MAX 2.35 2.77 45.86 136.059 162.109 1.974
BASE 9 ENV MIN -2.62 -1.61 -1.74 -179.76 -171.797 -1.821
BASE 10 DEAD 0.32 0.3 21.12 -10.853 12.768 0.065
BASE 10 LIVE 0.09 0.14 5.48 -5.208 3.673 0.017
BASE 10 SISMOX -1.9 0.18 4.54 -14.501 -144.494 0.99
BASE 10 SISMOY 0.11 -1.73 -3.71 136.368 9.67 1.866
BASE 10 UDCON1 0.45 0.41 29.57 -15.194 17.875 0.09
BASE 10 UDCON2 0.53 0.58 34.11 -21.356 21.197 0.105
BASE 10 UDCON3 -1.36 0.73 39.59 -34.903 -122.946 1.098
BASE 10 UDCON4 2.44 0.38 30.51 -5.9 166.041 -0.883
BASE 10 UDCON5 0.65 -1.17 31.34 115.967 31.217 1.974
BASE 10 UDCON6 0.43 2.28 38.76 -156.77 11.877 -1.758
BASE 10 UDCON7 -1.45 0.59 34.11 -29.695 -126.619 1.081

35
CONSULTORÍA Y CONSTRUCCIÓN

BASE 10 UDCON8 -1.45 0.59 34.11 -29.695 -126.619 1.081


BASE 10 UDCON9 0.56 -1.31 25.86 121.175 27.544 1.957
BASE 10 UDCON10 0.34 2.14 33.28 -151.562 8.205 -1.776
BASE 10 UDCON11 -1.68 0.38 19.33 -22.098 -135.556 1.036
BASE 10 UDCON12 2.13 0.03 10.24 6.904 153.431 -0.945
BASE 10 UDCON13 0.34 -1.52 11.07 128.771 18.607 1.911
BASE 10 UDCON14 0.11 1.93 18.5 -143.965 -0.732 -1.821
BASE 10 ENV MAX 2.44 2.28 39.59 136.368 166.041 1.974
BASE 10 ENV MIN -1.9 -1.73 -3.71 -156.77 -144.494 -1.821
BASE 11 DEAD -0.04 0.15 23 -4.956 -1.102 0.065
BASE 11 LIVE -0.02 0.1 6.48 -3.553 -0.879 0.017
BASE 11 SISMOX -2.23 0.04 0.57 -4.256 -157.234 0.99
BASE 11 SISMOY 0.18 -1.9 -3.5 152.503 12.184 1.866
BASE 11 UDCON1 -0.05 0.21 32.2 -6.939 -1.543 0.09
BASE 11 UDCON2 -0.08 0.34 37.96 -11.633 -2.729 0.105
BASE 11 UDCON3 -2.31 0.35 39.25 -14.748 -159.655 1.098
BASE 11 UDCON4 2.15 0.27 38.11 -6.237 154.812 -0.883
BASE 11 UDCON5 0.1 -1.59 35.17 142.011 9.762 1.974
BASE 11 UDCON6 -0.25 2.22 42.18 -162.995 -14.605 -1.758
BASE 11 UDCON7 -2.28 0.25 32.77 -11.195 -158.777 1.081
BASE 11 UDCON8 -2.28 0.25 32.77 -11.195 -158.777 1.081
BASE 11 UDCON9 0.12 -1.69 28.69 145.564 10.641 1.957
BASE 11 UDCON10 -0.23 2.12 35.7 -159.442 -13.726 -1.776
BASE 11 UDCON11 -2.26 0.15 16.67 -7.725 -158.005 1.036
BASE 11 UDCON12 2.2 0.07 15.53 0.786 156.463 -0.945
BASE 11 UDCON13 0.15 -1.8 12.6 149.033 11.412 1.911
BASE 11 UDCON14 -0.2 2.01 19.6 -155.973 -12.955 -1.821
BASE 11 ENV MAX 2.2 2.22 42.18 152.503 156.463 1.974
BASE 11 ENV MIN -2.31 -1.9 -3.5 -162.995 -159.655 -1.821
BASE 13 DEAD -0.03 0.62 31.95 -22.954 -0.777 0.065
BASE 13 LIVE 0 0.31 9.78 -11.516 -0.004 0.017
BASE 13 SISMOX -2.32 0.02 -0.7 -1.028 -160.664 0.99
BASE 13 SISMOY 0.18 -1.82 -1.54 154.348 12.17 1.866
BASE 13 UDCON1 -0.04 0.87 44.73 -32.135 -1.087 0.09
BASE 13 UDCON2 -0.04 1.23 53.99 -45.97 -0.938 0.105
BASE 13 UDCON3 -2.36 1.2 53.81 -44.68 -161.755 1.098
BASE 13 UDCON4 2.28 1.15 55.21 -42.623 159.573 -0.883
BASE 13 UDCON5 0.13 -0.65 52.96 110.696 11.079 1.974
BASE 13 UDCON6 -0.22 3 56.05 -197.999 -13.261 -1.758
BASE 13 UDCON7 -2.36 0.89 44.03 -33.164 -161.752 1.081
BASE 13 UDCON8 -2.36 0.89 44.03 -33.164 -161.752 1.081
BASE 13 UDCON9 0.14 -0.96 43.18 122.212 11.083 1.957
BASE 13 UDCON10 -0.22 2.69 46.27 -186.483 -13.258 -1.776
BASE 13 UDCON11 -2.34 0.46 21.67 -17.096 -161.208 1.036

36
CONSULTORÍA Y CONSTRUCCIÓN

BASE 13 UDCON12 2.3 0.41 23.06 -15.039 160.121 -0.945


BASE 13 UDCON13 0.16 -1.39 20.82 138.28 11.627 1.911
BASE 13 UDCON14 -0.2 2.26 23.91 -170.415 -12.714 -1.821
BASE 13 ENV MAX 2.3 3 56.05 154.348 160.121 1.974
BASE 13 ENV MIN -2.36 -1.82 -1.54 -197.999 -161.755 -1.821
BASE 14 DEAD 0.03 0.35 18.61 -12.262 1.549 0.065
BASE 14 LIVE 0.01 0.16 5.17 -5.843 0.487 0.017
BASE 14 SISMOX -2.16 -0.07 0.14 5.435 -154.594 0.99
BASE 14 SISMOY 0.17 -2.17 -3.9 173.107 11.876 1.866
BASE 14 UDCON1 0.04 0.49 26.05 -17.166 2.168 0.09
BASE 14 UDCON2 0.05 0.68 30.59 -24.063 2.637 0.105
BASE 14 UDCON3 -2.11 0.58 31.35 -17.574 -151.939 1.098
BASE 14 UDCON4 2.22 0.72 31.08 -28.444 157.249 -0.883
BASE 14 UDCON5 0.22 -1.52 27.32 150.098 14.531 1.974
BASE 14 UDCON6 -0.11 2.82 35.11 -196.117 -9.221 -1.758
BASE 14 UDCON7 -2.12 0.42 26.18 -11.731 -152.425 1.081
BASE 14 UDCON8 -2.12 0.42 26.18 -11.731 -152.425 1.081
BASE 14 UDCON9 0.21 -1.68 22.15 155.941 14.044 1.957
BASE 14 UDCON10 -0.12 2.66 29.95 -190.274 -9.707 -1.776
BASE 14 UDCON11 -2.14 0.18 13.16 -3.148 -153.51 1.036
BASE 14 UDCON12 2.18 0.31 12.89 -14.018 155.678 -0.945
BASE 14 UDCON13 0.19 -1.92 9.13 164.524 12.96 1.911
BASE 14 UDCON14 -0.15 2.41 16.92 -181.69 -10.791 -1.821
BASE 14 ENV MAX 2.22 2.82 35.11 173.107 157.249 1.974
BASE 14 ENV MIN -2.16 -2.17 -3.9 -196.117 -154.594 -1.821
BASE 15 DEAD 0.13 0.61 26.1 -22.285 5.228 0.065
BASE 15 LIVE 0.04 0.3 7.49 -11.219 1.656 0.017
BASE 15 SISMOX -2.43 -0.13 1.67 10.451 -165.083 0.99
BASE 15 SISMOY 0.18 -2.07 -1.87 174.11 12.167 1.866
BASE 15 UDCON1 0.18 0.86 36.53 -31.2 7.319 0.09
BASE 15 UDCON2 0.22 1.22 43.3 -44.694 8.923 0.105
BASE 15 UDCON3 -2.21 1.03 45.7 -31.968 -156.108 1.098
BASE 15 UDCON4 2.65 1.29 42.36 -52.87 174.059 -0.883
BASE 15 UDCON5 0.39 -0.91 42.15 131.691 21.142 1.974
BASE 15 UDCON6 0.04 3.22 45.9 -216.529 -3.191 -1.758
BASE 15 UDCON7 -2.25 0.73 38.2 -20.749 -157.764 1.081
BASE 15 UDCON8 -2.25 0.73 38.2 -20.749 -157.764 1.081
BASE 15 UDCON9 0.35 -1.21 34.66 142.911 19.486 1.957
BASE 15 UDCON10 0 2.92 38.41 -205.31 -4.847 -1.776
BASE 15 UDCON11 -2.34 0.3 19.94 -5.149 -161.424 1.036
BASE 15 UDCON12 2.52 0.56 16.59 -26.051 168.743 -0.945
BASE 15 UDCON13 0.26 -1.64 16.39 158.511 15.826 1.911
BASE 15 UDCON14 -0.09 2.49 20.14 -189.71 -8.507 -1.821
BASE 15 ENV MAX 2.65 3.22 45.9 174.11 174.059 1.974

37
CONSULTORÍA Y CONSTRUCCIÓN

BASE 15 ENV MIN -2.43 -2.07 -1.87 -216.529 -165.083 -1.821


BASE 16 DEAD -0.31 0.28 21.11 -9.246 -11.526 0.065
BASE 16 LIVE -0.09 0.14 5.47 -4.76 -3.398 0.017
BASE 16 SISMOX -1.9 -0.18 -4.54 14.587 -144.475 0.99
BASE 16 SISMOY 0.21 -2.5 -4.42 195.259 13.604 1.866
BASE 16 UDCON1 -0.43 0.39 29.56 -12.945 -16.137 0.09
BASE 16 UDCON2 -0.51 0.55 34.09 -18.712 -19.269 0.105
BASE 16 UDCON3 -2.42 0.35 30.49 -3.118 -164.01 1.098
BASE 16 UDCON4 1.38 0.71 39.57 -32.292 124.939 -0.883
BASE 16 UDCON5 -0.3 -1.97 30.61 177.553 -5.932 1.974
BASE 16 UDCON6 -0.73 3.03 39.45 -212.964 -33.14 -1.758
BASE 16 UDCON7 -2.33 0.21 25.02 1.642 -160.612 1.081
BASE 16 UDCON8 -2.33 0.21 25.02 1.642 -160.612 1.081
BASE 16 UDCON9 -0.21 -2.11 25.13 182.314 -2.533 1.957
BASE 16 UDCON10 -0.64 2.89 33.98 -208.204 -29.741 -1.776
BASE 16 UDCON11 -2.11 0.02 10.24 8.115 -152.543 1.036
BASE 16 UDCON12 1.69 0.37 19.32 -21.059 136.406 -0.945
BASE 16 UDCON13 0 -2.3 10.36 188.786 5.535 1.911
BASE 16 UDCON14 -0.43 2.7 19.2 -201.731 -21.673 -1.821
BASE 16 ENV MAX 1.69 3.03 39.57 195.259 136.406 1.974
BASE 16 ENV MIN -2.42 -2.5 -4.54 -212.964 -164.01 -1.821
BASE 17 DEAD 0.13 -0.04 36.98 4.58 5.172 0.12
BASE 17 LIVE 0.11 -0.02 11.34 1.554 4.403 0.032
BASE 17 SISMOX -2.82 -0.39 -1.63 29.292 -245.197 1.835
BASE 17 SISMOY 0 -4.86 0 369.912 0.155 3.457
BASE 17 UDCON1 0.18 -0.06 51.77 6.412 7.241 0.167
BASE 17 UDCON2 0.33 -0.07 62.51 7.982 13.25 0.195
BASE 17 UDCON3 -2.53 -0.46 61.48 37.258 -233.554 2.035
BASE 17 UDCON4 3.11 0.32 64.73 -21.327 256.84 -1.635
BASE 17 UDCON5 0.29 -4.94 63.1 377.877 11.798 3.657
BASE 17 UDCON6 0.29 4.79 63.11 -361.946 11.488 -3.257
BASE 17 UDCON7 -2.65 -0.44 50.14 35.704 -237.956 2.002
BASE 17 UDCON8 -2.65 -0.44 50.14 35.704 -237.956 2.002
BASE 17 UDCON9 0.18 -4.92 51.77 376.324 7.396 3.625
BASE 17 UDCON10 0.17 4.81 51.78 -363.5 7.085 -3.29
BASE 17 UDCON11 -2.73 -0.42 24.26 32.498 -241.577 1.919
BASE 17 UDCON12 2.91 0.36 27.51 -26.086 248.817 -1.751
BASE 17 UDCON13 0.09 -4.89 25.88 373.118 3.776 3.541
BASE 17 UDCON14 0.08 4.84 25.89 -366.706 3.465 -3.374
BASE 17 ENV MAX 3.11 4.84 64.73 377.877 256.84 3.657
BASE 17 ENV MIN -2.82 -4.94 -1.63 -366.706 -245.197 -3.374
BASE 18 DEAD 0.13 -0.02 44.6 3.301 5.271 0.12
BASE 18 LIVE 0.05 -0.02 14.78 1.377 2.119 0.032
BASE 18 SISMOX -3.17 -0.14 0.24 10.449 -258.512 1.835

38
CONSULTORÍA Y CONSTRUCCIÓN

BASE 18 SISMOY 0 -4.37 -0.01 333.611 0.02 3.457


BASE 18 UDCON1 0.18 -0.03 62.44 4.622 7.38 0.167
BASE 18 UDCON2 0.24 -0.05 77.17 6.165 9.716 0.195
BASE 18 UDCON3 -2.93 -0.19 77.46 16.448 -249.013 2.035
BASE 18 UDCON4 3.4 0.09 76.98 -4.45 268.011 -1.635
BASE 18 UDCON5 0.23 -4.42 77.22 339.61 9.518 3.657
BASE 18 UDCON6 0.23 4.32 77.23 -327.611 9.479 -3.257
BASE 18 UDCON7 -2.99 -0.17 62.69 15.071 -251.132 2.002
BASE 18 UDCON8 -2.99 -0.17 62.69 15.071 -251.132 2.002
BASE 18 UDCON9 0.18 -4.4 62.44 338.233 7.4 3.625
BASE 18 UDCON10 0.18 4.34 62.45 -328.989 7.36 -3.29
BASE 18 UDCON11 -3.08 -0.15 31.47 12.76 -254.822 1.919
BASE 18 UDCON12 3.26 0.12 30.98 -8.138 262.202 -1.751
BASE 18 UDCON13 0.09 -4.39 31.22 335.922 3.71 3.541
BASE 18 UDCON14 0.09 4.36 31.23 -331.3 3.67 -3.374
BASE 18 ENV MAX 3.4 4.36 77.46 339.61 268.011 3.657
BASE 18 ENV MIN -3.17 -4.42 -0.01 -331.3 -258.512 -3.374
BASE 19 DEAD -0.1 -0.01 44.03 2.103 -3.687 0.12
BASE 19 LIVE -0.04 -0.01 14.47 0.953 -1.593 0.032
BASE 19 SISMOX -3.19 0.14 -0.13 -10.334 -259.265 1.835
BASE 19 SISMOY 0 -3.86 0 295.021 0.037 3.457
BASE 19 UDCON1 -0.14 -0.01 61.65 2.945 -5.162 0.167
BASE 19 UDCON2 -0.19 -0.02 76 4.049 -6.974 0.195
BASE 19 UDCON3 -3.37 0.12 75.99 -6.436 -266.021 2.035
BASE 19 UDCON4 3 -0.16 76.25 14.231 252.51 -1.635
BASE 19 UDCON5 -0.19 -3.88 76.12 298.918 -6.719 3.657
BASE 19 UDCON6 -0.19 3.84 76.12 -291.123 -6.792 -3.257
BASE 19 UDCON7 -3.33 0.13 61.51 -7.389 -264.428 2.002
BASE 19 UDCON8 -3.33 0.13 61.51 -7.389 -264.428 2.002
BASE 19 UDCON9 -0.14 -3.87 61.65 297.966 -5.126 3.625
BASE 19 UDCON10 -0.14 3.85 61.65 -292.076 -5.199 -3.29
BASE 19 UDCON11 -3.26 0.13 30.69 -8.861 -261.847 1.919
BASE 19 UDCON12 3.11 -0.14 30.96 11.806 256.684 -1.751
BASE 19 UDCON13 -0.07 -3.87 30.82 296.493 -2.545 3.541
BASE 19 UDCON14 -0.07 3.86 30.82 -293.548 -2.618 -3.374
BASE 19 ENV MAX 3.11 3.86 76.25 298.918 256.684 3.657
BASE 19 ENV MIN -3.37 -3.88 -0.13 -293.548 -266.021 -3.374

39
CONSULTORÍA Y CONSTRUCCIÓN
23. PRESIÓN ADMISIBLE DEL SUELO

Figura 2710. Capacidad máxima del suelo

Este diseño se lo realizo con la carga de combinación básica 1.2CM+1.6CV esto debido a
que.
La presión máxima de programa SAFE dio 10.5 t/m2 ACEPTABLE

40
CONSULTORÍA Y CONSTRUCCIÓN

24. VERIFICACIÓN DEL PUNZONAMIENTO

Figura 28. Punzonamiento

 El punzonamiento es 0.5< a 1 ACEPTABLE

25. ACOTAMIENTO DE LA CIMENTACIÓN

Figura 2911. Acotamiento de la cementación

41
CONSULTORÍA Y CONSTRUCCIÓN

26. DIAGRAMA DE MOMENTO

Figura 3012. Diagrama de momentos

27. CUANTÍAS DE ACERO DE REFUERZO

42
CONSULTORÍA Y CONSTRUCCIÓN

Figura 3113. Acero de refuerzo

Los diseños se encuentran en planos estructurales

28.- CONCLUSIONES Y RECOMENDACIONES


 Los planos arquitectónicos se utilizaron de guía para realizar el presente diseño
estructural

 Los elementos estructurales corresponden a especificación AISC 360-10

 Los elementos estructuras son de hormigón armado con una resistencia de 240
kg/cm2 que se verificaran con la rotura de cilindras a la compresión a los 28 días.

 Los diseños a flexo-compresión de la columna se realizó utilizando programas de


computación especialmente elaborados para el efecto.

 El diseño estructural está basado en la Norma Ecuatoriana de la Construcción


vigente (NEC SE 2015)

29.- BIBLIOGRAFÍA
NEC-SE. (2015). NORMA ECUATORIANA DE LA CONSTRUCCION
AISC. (360-10). AMERICAN INSTITUTE OF STEEL CONSTRUCTION. CHICAGO

Tena febrero 2019

Ing. Alex G. Alarcón C.


SENESCYT 1034-2016-1747954

43