General Notes shall be compacted to the same distribution of fill types over the whole fill

specification as adopted for the thickness.


Any site won materials must be validated subsequent compaction works.
PLATE BEARING TESTS UNDERTAKEN ON A MAXIMUM 25x25m to confirm the absence of any The Contractor shall take all necessary
GRID AT THREE LEVELS TEST 1, TEST 2 & TEST 3. contamination. Disposition of Fill steps to ensure that the fill is placed at
the moisture content necessary to
TESTS TO BE UNDERTAKEN UTILSING A 600dia PLATE LOADED Preparation of Site. Where construction is required upon fill
achieve the specified level of compaction
UPTO 300kN PER SQ.M. TEST TO BE UNDERTAKEN IN placed over sloping natural ground, and
and shall, where necessary, add water to
Drainage grips or trenches shall be where fill thickness is less than 5m, the
ACCORDANCE WITH DIN 1813 TO DETERMIME VALUES OF Ev1 & or dry the fill, in order to obtain this value.
excavated, as necessary, uphill of the adjacent ground shall be benched, with
Ev2 A AND CALCULATE A VALUE OF Ev1/Ev2 WHICH SHOULD BE area to be filled to prevent the area being
Where it is necessary to add water, this
the maximum vertical height of each
LIMITED TO 2.0. shall be done as a fine spray and in such
flooded. Drainage shall be effected bench not exceeding 500mm and
a way that there is time for the water to be
without causing siltation or erosion and providing that the fill depth below any
absorbed into the fill before being rolled
water shall be disposed of in a manner to building does not vary by more than
2000 min PLATEAU BEYOND COLUMN CENTRELINE by the plant.
be agreed with all parties. 15%.
TO ENSURE FILL MATERIAL IS RESTRAINED
SITE WON NATURAL NON-COHESIVE FILL FINISHED The area to be filled, whether an existing
Cobbles, boulders, rock or waste
Where, because of the current method of
+142.200 FFL PROFILE fragments, the largest dimension of which
MATERIAL FILL COMPACTED IN MAXIMUM excavation or otherwise undisturbed working, previously engineered fill placed
is greater than two thirds of the
250mm THICK LAYERS UNDER 8No PASSES ground, shall be graded to falls, and during the current works has to be
TEST 3 compacted layer thickness, shall not be
sump pumping or other suitable benched as in Section 8.1 to allow new fill
OF A VIBRATORY ROLLER WITH A MASS OF +141.750 incorporated into the fill.
dewatering facilities shall be provided as to be placed adjacent to it, then the
3000kg PER LIN METRE OF ROLL necessary by the Contractor to keep the benches only require to be 0.5m high by No fill shall be placed and left
base of the excavation dry at all times. 1.0m wide, even where these occur uncompacted at the end of the working
+141.150 TEST 2 beneath the plots providing that the fill is day. Compacted fill shall be graded to
Where the area to be filled comprises an
the same material throughout the plot. falls to ensure free run-off of rainwater
existing excavation, the excavation shall
without ponding.
be inspected and subsequently monitored Placing and Compacting Fill
by the Contractor, to ensure that there is Compaction plant and compaction
TEST 1 no danger of collapse during the works Clause 612 of MCJW Volume applies.
method shall be selected having regard to
with consequences for safety, for existing However, where there is conflict with the
the proximity of existing trenches,
buildings or for the construction adjoining. clauses below or notes on contract
excavations, retaining walls or other
drawings, Clauses from this specification
structures and all work shall be performed
All topsoil shall be stripped and, where and contract drawings shall take
in such a way as to ensure that their
required for further use, stockpiled in an precedence over Clause 612.
existing stability is not impaired.
area provided by the Contractor and
agreed by the Engineer. Fill shall be placed and compacted in the
EXISTING GROUND PROFILE REDUCED LEVEL EXCAVTION near-horizontal layers of the thickness
If weather conditions are such that the
specified moisture content and density
All soft and compressible soils or existing required to achieve the specified end
values cannot be achieved, the
fill shall be removed and run to topsoil product or in accordance with the
Contractor shall cease work until such
dumps provided by the Contractor and approved method specification, and shall,
time as the fill can be placed and
agreed by the Engineer. The works shall as far as practicable, be brought up at a
compacted to meet specification
be accomplished in such a way that there uniform rate so that all parts of the site or
requirements.
is no undercutting of the sides of existing particular sections of the site reach
excavations. finished (formation) level at the same If the result of control tests indicate that
time. the fill is being placed and compacted in
Existing foundations or ledges of hard
such a way that the desired level of
rock, roots of trees or former pipelines or The compaction plant selected, the
compaction is not being achieved, the
services at the base of the area to be number of passes made and the fill layer
Contractor shall further compact or, if
filled shall be excavated and replaced thickness and moisture content used shall
necessary, shall excavate the affected
with compacted general fill which shall be have regard either to the specified end
work and replace with new fill, compacted
compacted to the same specification as product and the means and manner of
to meet the specification requirements.
adopted for subsequent compaction control testing or the specified method
works. and the means and manner of control If the results of control tests indicate that
testing. antecedent weather conditions (such as
Note: No tree roots greater than 5mm
frost or heavy rain) have caused the
diameter, no roots balls and no masses Where several different types of fill
deterioration of finished work such that
of fibrous roots shall remain at the base material (all meeting the requirements of
the work no longer meets with the
of the excavation. Section 2 of this specification) are to be
specification, the Contractor shall, at his
employed, they shall be deposited in such
The base of the area to be filled shall be or her own cost, take such steps as are
a way that all parts or particular sections
proof rolled with a vibrating roller and all necessary to bring the fill to specification
of the site receive roughly equal amounts
soft materials replaced with compacted requirements.
of a given material, in roughly the same
fill. Where unsuitable material has been
sequence, thus ensuring a uniform
excavated, the underlying natural ground