Sie sind auf Seite 1von 48

GE Healthcare

Technical
Publications
Direction 2165154−100
Revision 7

AMX−4 Installation of Panasonic Batteries

Copyrighte 1996 By General Electric Co.


All Rights Reserved
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

THIS PAGE INTENTIONALLY LEFT BLANK.

ii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

iii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

iv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

v
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

vi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

vii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

viii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ix
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

x
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

xi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

THIS PAGE INTENTIONALLY LEFT BLANK.

xii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

IMPORTANT! . . . X-RAY PROTECTION


X-ray equipment if not properly used may cause injury. Accordingly, the instructions herein contained
should be thoroughly read and understood by everyone who will use the equipment before you attempt to
place this equipment in operation. The General Electric Company, Medical Systems Group, will be glad to
assist and cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x-radiation other than the useful beam, no
practical design of equipment can provide complete protection. Nor can any practical design compel the operator to
take adequate precautions to prevent the possibility of any persons carelessly exposing themselves or others to
radiation.
It is important that everyone having anything to do with x-radiation be properly trained and fully acquainted with the
recommendations of the National Council on Radiation Protection and Measurements as published in NCRP Reports
available from NCRP Publications, 7910 Woodmont Avenue, Room 1016, Bethesda, Maryland 20814, and of the
International Commission on Radiation Protection, and take adequate steps to protect against injury.
The equipment is sold with the understanding that the General Electric Company, GE Healthcare Group, its agents,
and representatives have no responsibility for injury or damage which may result from improper use of the equipment.
Various protective material and devices are available. It is urged that such materials or devices be used.

CERTIFIED ELECTRICAL CONTRACTOR STATEMENT


All electrical installations that are preliminary to positioning of the equipment at the site prepared for the equipment shall be
performed by licensed electrical contractors. In addition, electrical feeds into the Power Distribution Unit shall be performed
by licensed electrical contractors. Other connections between pieces of electrical equipment, calibrations, and testing shall
be performed by qualified GE Healthcare personnel. The products involved (and the accompanying electrical installations)
are highly sophisticated, and special engineering competence is required. In performing all electrical work on these
products, GE will use its own specially trained field engineers. All of GE’s electrical work on these products will comply with
the requirements of the applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers, personnel of third-party
service companies with equivalent training, or licensed electricians) to perform electrical servicing on the equipment.

DAMAGE IN TRANSPORTATION
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation “Damage in
Shipment” written on all copies of the freight or express bill before delivery is accepted or “signed for” by a General
Electric representative or a hospital receiving agent. Whether noted or concealed, damage MUST be reported to the
carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held
for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested
within this 14−day period.
To file a report:

· Call 1−800−548−3366 and use option 8.


· Fill out a report on http://egems.med.ge.com/edq/home.jsp
· Contact your local service coordinator for more information on this process.
Rev. June 13, 2006

xiii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

LITHIUM BATTERY CAUTIONARY STATEMENTS


Danger of explosion if battery is incorrectly replaced. Replace only with the
same or equivalent type recommended by the manufacturer. Discard used
batteries according to the manufacturer’s instructions.

Il y a danger d’explosion s’il y a replacement incorrect de la batterie. Rem-


placer uniquement avec une batterie du même type ou d’un type recommandé
par le constructeur. Mettre au rébut les batteries usagées conformément aux
instructions du fab

xiv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

REVISION HISTORY

REV DATE REASON FOR CHANGE


A June 27, 1996 Preliminary release.
0 July 1, 1996 Initial release. Was 46−017552.
1 October 18, 1996 Sectionalized; Added reference to CPU/charger board replacement.
2 December 10, 1997 General update; Added HAWKER return box for batteries.
3 May 8, 2001 Added Panasonic batteries.
4 September 16, 2002 Clarified procedure to install Panasonic batteries.
5 June 10, 2003 Added CPU board 46−264974G4, G5, G6.
6 March 26, 2008 Removed Genesis battery information.
7 June 23, 2008 Added battery cable leads note above Section 3−2−1. Resolves PQR 13148025.

LIST OF EFFECTIVE PAGES

PAGE REVISION PAGE REVISION PAGE REVISION


NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER

Title Page 7

i thru viii 7

1 thru 42 7

Back Page −

xv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

THIS PAGE INTENTIONALLY LEFT BLANK.

xvi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

TABLE OF CONTENTS

SECTION 1
Materials and tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1-1 Battery Kits Available . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1-2 Field Supplied Materials, Special Tools, Supplies, and Test Equipment . . 2

SECTION 2
Check CPU and charger boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2-1 Check CPU Firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2-2 Check Central Processor Unit (CPU) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2-2-1 Set for French or English Operator Messages . . . . . . . . . . . . . . . . . . . . . . . 5
2-2-2 JP1 Jumper Position Possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2-3 Check Battery Charger Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

SECTION 3
Remove Old Batteries and Wiring ............................................................ 8
3-1 Remove Trim Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3-2 Remove Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3-2-1 Remove Battery Compartment Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3-2-2 Disconnect and Remove Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

SECTION 4
Dispose of Old Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4-1 Hawker Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4-2 Gates Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4-2-1 Build Cardboard Fillers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4-3 Panasonic Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4-4 Return Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4-4-1 USA Pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4-4-2 Non−US . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

SECTION 5
Install panasonic Batteries with sense board 2334738−2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

SECTION 6
Load Defaults and Recalibrate System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

SECTION 7
Final Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

xvii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

THIS PAGE INTENTIONALLY LEFT BLANK.

xviii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 1
MATERIALS AND TOOLS
1-1 Battery Kits Available
1. 46−329314G5: Upgrade Panasonic with RTV Sense Board (see Table 1)

2. 46−329098G3: 9 Panasonic Batteries Only (see Table 2)

3. 46−329098G5: Panasonic Kit with RTV Sense Board [No Batteries] (see Table 3)

4. 2172339−2: 1 Panasonic Battery

TABLE 1
Kit Contents: Upgrade Panasonic with RTV Sense Board
ITEM PART NO. DESCRIPTION QTY.

1 2278932 BATTERY 12.0 VOLTS 28 AH/KG_− INCLUDING TWO M5 NUTS 9

2 2391994 INDIVIDUAL BATTERY RETURN BOX 9

9 2100969 BATTERY SEPARATOR PAD 4

10 46−328432P3 WASHER LOCK − SPRING 6.1 MM 11.8 MM ZINC PLATED, SPRING 18


STEEL

11 2334738−2 BATTERY SENSE CIRCUIT BOARD 1

12 46−329061P1 AMX4 BATTERY SPACER 3

13 46−329061P2 AMX4 BATTERY SPACER 1


14 46−329062P1 AMX4 BATTERY SPACER 1

15 46−329063P1 AMX4 BATTERY SPACER 1

16 46−329064P1 AMX4 BATTERY SPACER 1

17 46−329065P1 AMX4 BATTERY SPACER 3

18 2337803 BATTERY SPACER FOR AMX 4 1

19 2337894 BATTERY CABLE LEAD # 1 5

20 2337894−2 BATTERY CABLE LEAD # 2 2

21 2337894−3 BATTERY CABLE LEAD # 3 2

22 2337894−4 BATTERY CABLE LEAD # 4 1

23 2337871 BATTERY SENSE CABLE HARNESS 1

28 46−316915G2 BATTERY TEST HARNESS CABLE WITH A PWA INTERFACE CONNECTOR ON ONE 1
END AND A TERMINAL STRIP BLOCK AT THE OTHER END.

29 46−208560P13 SCREW SCREW OLD F70B5A ZINC PL 2

30 46−170012P34 4−40, 1/4~ HEX, 3/32 THICK KEPS NUT O~ALL HT 7/64 WASH OD 9/32 WASH MAT 2
THK 13 CAD PL KEPS

31 46−208758P2 5.5~ X .140~ SELF−LOCKING CABLE TIE. 1/16~ TO 1−1/4~ WIRE BUNDLE 4
RANGE. 30LB TENSILE STRENGTH, NYLON MATR~L.

1
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

TABLE 1 (CONT.)
Kit Contents: Upgrade Panasonic with RTV Sense Board

ITEM PART NO. DESCRIPTION QTY.

32 46−329183P1 LABEL OLD FRENCH/ENGLISH 1

33 2165154−100 AMX−4 INSTALLATION OF GENESIS BATTERIES 1

34 46−303747P1 SHIPPING LABEL 9

35 46−303755P1 LABEL 18

36 46−303768P1 NO AIR SHIPMENT LABEL 9

37 2206971 BOX SEALING TAPE CLEAR 48MM X 50M 3M 111−1−371C 2

38 2355355 UPDATE BATTERY PACKAGING KIT 1

TABLE 2
Kit Contents: 9 Panasonic Batteries Only
ITEM PART NO. DESCRIPTION QTY.

1 2278932 BATTERY 12.0 VOLTS 28 AH/KG_− INCLUDING TWO M5 NUTS 9

2 2100969 BATTERY SEPARATOR PAD 4

3 46−303747P1 SHIPPING LABEL 9

4 46−303755P1 LABEL 18

5 46−303768P1 NO AIR SHIPMENT LABEL 9

6 2391994 INDIVIDUAL BATTERY RETURN BOX 9

10 2165154−100 AMX−4 INSTALLATION OF GENESIS BATTERIES 1

11 2355354 SERVICE BATTERY PACKAGING KIT 1

TABLE 3
Kit Contents: Panasonic Kit with RTV Sense Board [No Batteries]
ITEM PART NO. DESCRIPTION QTY.

1 2337803 BATTERY SPACER FOR AMX 4 1

2 2337871 BATTERY SENSE CABLE HARNESS 1

3 2337894 BATTERY CABLE LEAD # 1 5

4 2337894−2 BATTERY CABLE LEAD # 2 2

5 2337894−3 BATTERY CABLE LEAD # 3 2

6 2337894−4 BATTERY CABLE LEAD # 45 1

7 2334738−2 BATTERY SENSE CIRCUIT BOARD 1

8 2165154−100 AMX−4 INSTALLATION OF GENESIS BATTERIES 1

1-2 Field Supplied Materials, Special Tools, Supplies,


and Test Equipment

D Digital voltmeter with 200 milliampere scale

2
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

Note: Required accuracy for the digital voltmeter for AMX Charger Calibration is + 0.3
VDC at 120 VDC.

D Storage oscilloscope

D HV divider (C1515A) with:

− Five foot (1.5 meter) HV cables


− 17.5 foot (5.3 meter) Belden 8422 cable (46−219921G2)

D Torque wrench set (46−268445G1)

D Drill and 9/64 inch drill bit

3
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 2
CHECK CPU AND CHARGER BOARDS

ILLUSTRATION 1
FLOW CHART

Start

Section 2
Check CPU &
Charger Board

Is CPU Y
46−264974G2,
G4,G5 or G6?

Is CPU Y Is CPU Firmware Y Order Firmware Kit


46−264974G1? Reg G or Later? 46−329225G1*

N N
*While the firmware kit can be used,
it is recommended that the CPU be
replaced with a 46−264974G5 version
board.
Order CPU Several changes have been incorpo-
46−264974G5 rated into the G5 to improve quality.

Is Charger Board N Order


46−288786G1/G2? 46−288786G1/G2

End Section 2

4
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

2-1 Check CPU Firmware

Newer firmware (version 46−329187G1/46−329188G1 and after) limits the charge cycle
time. CPU and firmware should be upgraded to the latest revision to upgrade the battery
charging algorithm. Verify revision of current CPU board or replace CPU board in accor-
dance with Section 2-2 and Table 4.

TABLE 4
CPU FIRMWARE

CPU BOARD PART # AND REV. CHECK/VERIFY ORDER


46−264974G1 REV. G OR LATER EPROMS ARE 46−329187G1 (U104) /46−329188G1 (U51) 46−329225G1
FIRMWARE KIT
46−264974G2, G4, G5, G6 N/A N/A
46−264974G1−F OR EARLIER REV N/A 46−264974G5
OR
ANY PRIOR VINTAGE CPU BOARD
NOTE: FOR 46−264974G1−G VERIFY JP1 JUMPER IN B" AND THAT DIP SWITCH S75
OR 46−264974G2, G4, G5, G6 POSITIONS 5 AND 7 ARE IN ACCORDANCE WITH SECTION
2-2-1.

Note: U51 contains calibration routines. U104 contains applications and diagnostic rou-
tines.

2-2 Check Central Processor Unit (CPU)

Order replacement CPU board 46−264974G5 or later if not already present. Older firmware
(before version 46−329187G1/46−329188G1) does not limit the time of the charge cycle.
This can cause excessive overheating while charging if a battery is failed.

2-2-1 Set for French or English Operator Messages

Selection of French or English operator messages is determined by position 6 of DIP switch


S75 on the AMX Controller (CPU) Board.

1. Look at the operator messages displayed to determine if they are in the desired lan-
guage.

2. To change the language of the operator messages, set Position 6 of DIP switch S75
on the CPU Board in accordance with Illustrations 2 and 3.

Note: The other positions of S75 are shown for reference, but should not require chang-
ing.

5
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ILLUSTRATION 2
S75 ROCKER SWITCH SETTINGS
1 2 3 4 5 6 7 8
CLOSED (ON) POSITIONS 5, 6 & 7 CLOSED (ON),
WITH ROCKERS DEPRESSED THIS SIDE
FRENCH
OPEN (OFF) POSITIONS 1, 2, 3, 4 & 8 OPEN (OFF),
WITH ROCKERS DEPRESSED THIS SIDE

1 2 3 4 5 6 7 8
POSITIONS 5 & 7 CLOSED (ON),
CLOSED (ON) WITH ROCKERS DEPRESSED THIS SIDE
ENGLISH
POSITIONS 1, 2, 3, 4, 6 & 8 OPEN (OFF)
OPEN (OFF)
WITH ROCKERS DEPRESSED THIS SIDE

ILLUSTRATION 3
S75 SLIDE SWITCH POSITIONS
1 2 3 4 5 6 7 8
POSITIONS 5, 6 & 7 CLOSED (ON),
CLOSED (ON) WITH LEVERS THIS SIDE
FRENCH
OPEN (OFF) POSITIONS 1, 2, 3, 4 & 8 OPEN (OFF),
WITH LEVERS THIS SIDE

1 2 3 4 5 6 7 8
POSITIONS 5 & 7 CLOSED (ON),
CLOSED (ON) WITH LEVERS THIS SIDE
ENGLISH
OPEN (OFF) POSITIONS 1, 2, 3, 4, 6 & 8 OPEN (OFF)
WITH LEVERS THIS SIDE

TABLE 5
CPU DIP SWITCH POSITIONS

PORT
SW NORMAL SW ADDR&
# POSITiON NAME FUNCTION BIT # COMMENTS

1 OFF − (NONE) −

2 OFF − (NONE) −

3 OFF OPT ENABLES POWER 1100H OFF (PORT LOGIC 1) = ENABLES +24, +15 TESTS
SW 1 SUPPLY4 TESTS BIT 6 ON (PORT LOGIC 0) = DISABLES +24, +15 TESTS

4 OFF BAUD SELECTS BAUD RATE 1100H OFF (PORT LOGIC 1) = 375K BAUD RATE
RATE BIT 5 ON (PORT LOGIC 0) = 187.5K BAUD RATE

5 ON OPT (NOT USED) 1000H


SW 4 BIT 2

6 OFF−ENG OPT SELECTS LANGUAGE 1000H OFF (PORT LOGIC 1) = ENGLISH


ON−FREN SW 3 OF MESSAGE BIT 1 ON (PORT LOGIC 0) = FRENCH

7 ON OPT CYCLES CPU 1400H OFF (PORT LOGIC 1) = CYCLE CPU AT POWER UP
SW 2 BIT 2 (SEE NOTE 1 BELOW)
ON (PORT LOGIC 0) = NORMAL RUN MODE

8 OFF − (NONE) −

6
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

2-2-2 JP1 Jumper Position Possibilities

D A — No write protect; the CPU has control when data is written

D B — Data may be written only in RAM 1 when service switch is in the service mode

D C — Data is write protected all the time and cannot be written into. RAM 1 (U107)
stores cal data; RAM 2 (U54) stores auto cal data and data log

2-3 Check Battery Charger Board

The minimum battery charger board is a 46−288786G2 or newer. It is fully backward com-
patible and is recommended for all units. The 46−288786G1 board is the non−EMC com-
pliant version of the G2 board.

7
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 3
REMOVE OLD BATTERIES AND WIRING

Before starting to remove batteries, be sure that the AMX key switch is OFF, the cir-
cuit breaker is OFF, and the charger cord is unplugged.

PERSONAL INJURY!
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING BATTERIES
WARNING
OR REACHING IN BATTERY COMPARTMENT. USE EXTREME CAU-
TION; HIGH AMPERAGE AND VOLTAGE IS PRESENT. USE INSU-
LATED TOOLS FOR WORKING ON BATTERIES.

3-1 Remove Trim Covers

1. Pull corners of front cover from ball stud retainer sockets on frame. See Illustration
4.

ILLUSTRATION 4
SIDE COVERS

HAND SWITCH

4−40 x 3/8
SCREWS

RIGHT COVER
6−32 X 1/2
BLACK OXIDE
SCREW
BALL STUDS

BATTERY COMPART-
FRONT COVER MENT COVER
SCREWS TOP AND
BOTTOM
BALL STUDS
4−40 x 3/8
SCREWS

LEFT COVER
6−32 X 1/2 BLACK OXIDE
SCREW

2. Remove two screws retaining rear cover on base assembly. Remove rear cover.

3. Disconnect hand switch on right side trim cover.

4. Remove two 4−40 x 3/8 binding head screws and one 6−32 x 1/2 black oxide binding
head screw holding each cover to base and frame assemblies.

5. Pull covers off ball stud retaining sockets and carefully remove from unit.

8
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

3-2 Remove Batteries

PERSONAL INJURY !
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING THE
WARNING BATTERIES OR REACHING IN THE BATTERY COMPARTMENT. USE
EXTREME CAUTION, HIGH AMPERAGE AND VOLTAGE IS
PRESENT. USE INSULATED TOOLS FOR WORKING ON BATTERIES.

Note: During removal:

D References to the right and left sides of battery compartment are relative to the view
shown in Illustration 6.

D Cable numbers (#s) indicated in Illustration 6 and in this instruction are marked on
the parts.

D Disconnect cables only in the order instructed, and only when instructed.

D Don’t remove paper backing from any insulating separator pad.

D All battery lead connectors must be insulated to prevent electrical contact with the
frame or other battery terminals.

D Save all connecting hardware.

Note: Some battery cable leads may not have boots as referred to in the following procedure.

3-2-1 Remove Battery Compartment Cover

1. Verify that AMX key switch is OFF, circuit breaker is OFF, and charger cord is discon-
nected.

2. Remove and tape battery ground cable marked #2 to ensure that this cable will not
short out to any other wiring. SEPARATE THIS CABLE FROM ALL OTHERS. See
Illustration 5.

ILLUSTRATION 5
BATTERY COMPARTMENT ACCESS

CIRCUIT BATTERY
BREAKER
CABLE MARKED #4 GROUND STUD

CABLE MARKED #2

PLATES BASE ASSEMBLY


46−286167P1 BATTERY
(IF PRESENT: SEE TEXT) COMPARTMENT

COVER CAPSCREWS

9
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

3. Remove and tape cable marked #5 separately from ALL other cables.

4. Remove all remaining battery cables from battery ground stud. Tape ALL cables sep-
arately.

5. Remove battery lead cable marked #4 from terminal on Circuit Breaker in AMX1 A3
Module. Be certain boot covers the connector and it cannot short out. Tape connector
to ensure it will not short.

6. Remove hex head cap screws securing battery compartment cover. Remove cover.

Note: Plates 46−286167P1 correct units where capscrews do not properly secure the
cover to the compartment opening.

7. Remove insulator board from compartment entrance.

3-2-2 Disconnect and Remove Batteries

1. Disconnect cable marked #4 from the battery. Cover the connector with boot and re-
move cable. Refer to Illustration 6.

ILLUSTRATION 6
HAWKER BATTERY CONNECTIONS
CABLE # 1

CABL CABLE CABLE #2(−)


E #3
INSULATOR # 3

CABLE #2(−) TO
GROUND STUD

CABLE
#1 CABLE #4(+) TO
CIRCUIT BREAKER
CABLE
#1
CABLE
#3
BATTERY
INSULATOR CABLE
#1 INSULATOR
2. Remove cable marked #1. Cover connectors with boots.

3. Disconnect cable marked #3. Cover connector with boot.

4. Remove two batteries and remove insulator board.

5. Remove lower cable marked #3. Cover connector with boot.

6. Remove cable marked #1. Cover connectors with boots.

7. Disconnect upper cable marked #3. Cover connector with boot.

10
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

8. Remove two batteries and remove insulator board.

9. Remove lower cable marked #3. Cover connector with boot.

10. Remove cable marked #1. Cover connectors with boots.

11. Disconnect upper cable marked #3. Cover connector with boot.

12. Remove two batteries and remove insulator boards on left side and at rear of compart-
ment.

13. Remove insulator board covering three remaining batteries recessed in right side of
compartment.

14. Remove cable marked #2. Cover cable connector end with boot.

15. Remove cable marked #3. Cover cable connector end with boot.

16. Remove two remaining cables marked #1. Cover cable connector ends with boots.

17. Remove remaining three batteries and two insulator boards.

18. Leave the battery compartment top and bottom insulation in place in the AMX unit.
Set the remainder of the old battery insulators aside.

19. Set old battery cables aside. This includes the old wires between batteries, from bat-
tery (−) to ground stud, and from battery (+) to circuit breaker.

11
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 4
DISPOSE OF OLD BATTERIES

4-1 Hawker Battery

Return the removed Hawker batteries using the battery return box (part number
46−329315P1) and the foam block fillers in the kit.

1. Position battery in box (see Illustration 7).

2. Position fillers A and B in box in accordance with Illustration 7.

3. Place Filler C on top of the battery.

ILLUSTRATION 7
RETURN BOX FILLERS (HAWKER)

FILLER C

FILLER B

FILLER A FILLER A
BATTERY

FILLER B

TABLE 6
FILLER DIMENSIONS (HAWKER BLOCKING)

FILLER A DIMENSIONS (INCHES) FILLER B DIMENSIONS (INCHES) FILLER C DIMENSIONS (INCHES)


A B THICK A B THICK A B THICK
6 5.5 1 9.75 6 0.9 11.7 5.6 1.6

DIMENSIONS A

12
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

4-2 Gates Battery

If a new battery does not function correctly, use the battery return box (part number
46−329315P1) to return individual failed cells.

4-2-1 Build Cardboard Fillers

1. Lay the 33 inch long filler sheets flat, oriented as shown in Illustration 8.

ILLUSTRATION 8
33 INCH FILLER BEFORE FOLDING

A B C D E F G H I 5−7/8 INCHES

33 INCHES

SLIT SCORED OTHER SIDE

SLIT SCORED THIS SIDE

2. Fold the 33 inch long filler sheet in accordance with Table 7.

TABLE 7
33 INCH FILLER FOLDING GUIDE (GATES BATTERY)

DIMENSIONS
FILLER A FILLER B (INCHES)
SEGMENT ORIENT NEXT TO AND SEGMENT ORIENT NEXT TO AND A B
A VERT D A HORIZ D 5−7/8 3−7/16
B HORIZ C B HORIZ C 5−3/16
C HORIZ B F C HORIZ B F 5
D VERT A E D HORIZ A E 3−14
E VERT D E HORIZ D 3
F HORIZ C F HORIZ C 4−1/4
G VERT H G VERT H 2−5/16
H VERT G I H VERT G I 3
I VERT H I VERT H 2−15/16

DIMENSIONS A

13
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

3. Fold both filler strips so that they look like the filler assemblies in Illustration 9.

4. Insert the Filler A and B around the battery. Install the Filler K to create tension. See
Illustration 9.

5. Insert second Filler J in top of box.

ILLUSTRATION 9
RETURN BOX FILLERS (GATES BATTERY)
A
D
E

F B
C

G
H FILLER J
I FILLER K 2 PIECES:
1 IN BOTTOM OF BOX
1 ON TOP AFTER FILLERS IN PLACE
FILLER A ASSEMBLY

H
G I
BATTERY
RETURN BOX
E F
D C
A B
FILLER B ASSEMBLY

6. Insert a Filler J in the bottom of the return box. Place the battery in the box.

TABLE 8
FILLERS J/K DIMENSIONS

FILLER A B
J 11−5/8 16−1/2
K 4 7

14
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

4-3 Panasonic Battery

Return the removed Panasonic batteries using the battery return box (part number
46−329315P1) and the foam block fillers in the kit.

1. Position battery in box (see Illustration 7).

2. Position fillers A and B in box in accordance with Illustration 7.

3. Place Filler C on top of the battery.

ILLUSTRATION 10
RETURN BOX FILLERS (PANASONIC)

FILLER C

FILLER B

FILLER A FILLER A
BATTERY

FILLER B

TABLE 9
FILLER DIMENSIONS (PANASONIC BLOCKING)

FILLER A DIMENSIONS (INCHES) FILLER B DIMENSIONS (INCHES) FILLER C DIMENSIONS (INCHES)


A B THICK A B THICK A B THICK
6 5.5 1 9.75 6 0.9 11.7 5.6 1.6

DIMENSIONS A

15
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

4-4 Return Battery

1. Tape the box securely. See Illustration 11.

2. Fill out shipped from portions of shipping labels.

ILLUSTRATION 11
TAPING THE RETURN BOX

4-4-1 USA Pole

Affix labels to boxes as shown in Illustration 12.

ILLUSTRATION 12
LABEL LOCATION

SHIP TO: GE RECYCLING CENTER


2200 EAST COLLEGE AVE.
CUDAHY, WI 53110

4G/Z22/S/**
U.S.A./+AI0455

** LAST TWO DIGITS OF YEAR


PACKAGE WAS MANUFACTURED

4-4-2 Non−US

In Canada, in Latin America, in the Europe pole, and in the Asia pole, contact your local
FMI coordinator for disposal instructions.

16
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 5
INSTALL PANASONIC BATTERIES WITH SENSE BOARD 2334738−2

Before starting to install batteries, be sure that the AMX key switch is OFF, that the circuit
breaker is OFF, and the charger cord is unplugged.

PERSONAL INJURY!
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING BATTERIES
WARNING
OR REACHING IN BATTERY COMPARTMENT. USE EXTREME CAU-
TION; HIGH AMPERAGE AND VOLTAGE IS PRESENT. USE INSU-
LATED TOOLS FOR WORKING ON BATTERIES.

EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.

Note: During installation:

D Make all battery connections as shown in Illustration 14 using the hard-


ware shown.

D Reference to the right and left sides of battery compartment are relative
to the view shown in Illustration 14.

D Cable numbers (#s) indicated in Illustration 14 and in this instruction are


marked on the parts.

D Insulator numbers are shown for convenience in description, but are not
marked on the parts.

D There are no Insulators #3 and #7.

D Battery #s are not marked on batteries.

D Be sure that battery compartment top and bottom insulation from the
previous set of batteries is in place.

D Connect cables only in the order instructed, and only when instructed.

D Apply 45−50 pound−inches (5.1−5.6 N−m) torque to ALL battery con-


nections.

D Place insulation boots over ends of each cable that has a boot.

D Don’t remove paper backing from any insulating separator pad. Orient
insulator pads with paper backing facing up.

17
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

1. Do not install install terminal plates on each battery. See Illustration 13.

EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.

EQUIPMENT DAMAGE!
MAKE SURE TO INSTALL BATTERIES AS PICTURED WITH THE
WARNING
POSTS ON THE BOTTOM. THIS ENSURES THAT THE BATTERY PO-
LARITY IS CORRECT.

2. Position Batteries #2 & #3 (see Illustration 14) in the battery compartment stacked
one on top of the other, with a battery separator pad between them.

3. Install Label #1 between Battery #2 (−) and Batery #3 (+) and route as shown in Il-
lustration 14. Connect Brown sense wire under Lead #1 and connect to Battery #2 (−)
as shown.

4. Install Lead #1 to Battery #2 (+) and tighten with Lead pointing UP.

5. Install another Lead #1 to Battery #3 (−) and tighten with Lead pointing DOWN.

MAKE SURE LEAD #1 TO BATTERY #2 (+) AND LEAD #1 TO BATTERY


#3 (−) DO NOT TOUCH.
WARNING

ILLUSTRATION 13
INSTALLATION OF TERMINALS
ON PANASONIC BATTERIES (2278932)
WARNING: EQUIPMENT DAMAGE! MAKE SURE TO
INSTALL
BATTERIES AS PICTURED WITH THE POSTS ON THE BOT-
TOM. THIS ENSURES THAT THE BATTERY POLARITY IS
CORRECT.

NOTE: TORQUE TO 45−50


IN−LBS
(5.1−5.6 N-m) ON ALL
BATTERY CONNECTIONS.

M5 HEX NUT
(FURNISHED WITH M6 LOCKWASHER
BATTERY) (FURNISHED WITH
KIT)

18
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ILLUSTRATION 14
INSTALLATION OF BATTERIES IN BATTERY COMPARTMENT WITH SENSE BOARD 2334738−2

156 SEE
NOTE 2.

SEE
BATTERY NOTE 2.
SEPARATOR
PAD, P276
TYPICAL
(4 PLACES) SEE
SEE NOTE 3. NOTE 4.

SEE
NOTE 2.

SEE
NOTE 2.

NOTE 1: THERE ARE NO INSULATORS #3 & #7


NOTE 2: DON’T CONFUSE INSULATOR #4 WITH THE INSULATOR #1’S.
INSULATOR #4 HAS TWO NON-FUNCTIONAL HOLES. INSULATOR #1’S EACH HAVE
TWO FULL CUP−SHAPED BUMPS WITH NO HOLES. THE INSULATOR #1’S MUST BE
ORIENTED WITH BUMPS POINTING AWAY FROM YOU.
NOTE 3: ADD BATTERY SEPARATOR PADS BETWEEN BATTERIES 1 & 3, 2 & 4, 5 & 6,
AND 7 & 8 with rubber side down and paper side up. DO NOT remove paper.
NOTE 4: CABLE #5 STAYS BEHIND SPACER 1 AND GETS ROUTED ALONG THE SIDE OF
PLASTIC SPACER TO BATTERY #9 (+) TERMINAL.
Mark# Part# Lead# Qty. Length
263 2337894 1 5 7 inches
267 2337894−2 2 2 12 inches
264 2337894−3 3 2 14.5 inches
266 2337894−4 4 1 22 inches

19
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ILLUSTRATION 15
INSTALLATION OF BATTERIES IN BATTERY COMPARTMENT WITH SENSE BOARD 2334738−2

20
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

6. Put both batteries into position in back right side of compartment.

7. Position Batteries #1 & #4 in the compartment stacked one on top of the other, with
a separator pad between them (see Illustration 14). Push both batteries into position
alongside Batteries #2 & #3.

EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING
BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.

Note: Don’t confuse Insulator #4 with the Insulator #1. Insulator #4 has two non-func-
tional holes. Insulator #1s have two full cup−shaped bumps with no holes.

8. Install Insulator #4 between Batteries #2 & #3 and Batteries #1 & #4. Install an Insula-
tor #2 next to Batteries #1 & #4, and another Insulator #2 next to Batteries #2 & #3.

9. Connect sense harness wires to batteries #1 and #4 as follows:


Color Battery Polarity
Black 1 −
Yellow 4 +
Red 1 +
Green 4 −
Route sense harness in channel between top and bottom batteries.

10. Connect end of Lead #1 Battery #2 (+) to Battery #1 (−). Tighten hardware.

11. Connect end of Lead # 1 Battery #3 (−) to Battery #4 (+). Tighten hardware.

12. Connect end of Cable #4 Battery #1 (+), and slide a boot over this terminal. Route
Cable #4 through grommet in hole in top of battery compartment, connect it to the
top terminal (LINE) on circuit breaker in AMX1 A3, and slide boot over terminal.

13. Install Insulator #5, Insulator #6, and the remaining Insulator #2.

14. Position Batteries #5 & #6 in compartment, one on top of the other with a separator
pad between them.

15. Connect one Cable #1 end to Battery #6 (+), and other end to Battery #5 (−). Tighten
Battery #6 (+). Leave nut off of Battery #5 (−) for now.

16. Connect Lead #3 to Battery #6 (−).

17. Connect Lead #2 to Battery #5 (+).

CAUTION Do not touch Lead #2 adn Lead #3. Tape ends for safety.

18. Push Batteries #5 & #6 to rear of battery compartment. Dress sense harness up and
out of the way.

19. Connect free end of Cable #2 to Battery #4 (−) and tighten hardware. Slide boots over
each terminal.

21
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

Note: Cable #2 must route in channel between top and bottom batteries #1, 2, 3, 4, along
with sense harness.

20. Connect white harness under cable #1 to Battery #5 (−) and tighten hardware.

21. Place the plastic spacer board into battery compartment as shown in Illustration 14.
Make sure bumpers on board touch batteries without pinching wires. Wires should be
routed in channel between top and bottom batteries #1, 2, 3, 4.

22. Install an Insulator #1 in front of Batteries #5 & #6 as shown in Illustration 14, with
cup−shaped bumps pointing away from you. Route free end of Cable #3 and sense
harness between center channel of plastic spacer.

Note: Taping cables helps keep cables in channel.

23. Position Batteries #7 & #8 in compartment stacked one on top of the other with a sepa-
rator pad between them.

EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.

24. Connect one end of Cable #1 to Battery #8 (+) and tighten. Connect other end to Bat-
tery #7 (−) leaving nut off or loose. Connect end of Cable #2 Battery #8 (−), and slide
a boot over terminal.

25. Push Batteries #7 & #8 back into position, as shown, while holding Cable #3 and har-
ness between center channel of plastic spacer.

26. Connect free end of Cable #3 from Battery #6 [−] to Battery #7 (+) along with sense
wire Orange #7 (+), tighten and slide a boot over terminal.

27. Connect sense wire Blue #7 (−) to Battery #7 (−) and tighten nut.

28. Install another Insulator #1 between Batteries #7 & #8 and Battery #9, with cup−
shaped bumps pointing away from you. Route free end of Cable #2 and harness to bat-
tery #9 between channel of plastic spacer.

29. Install Insulator #8 as shown.

30. Position Battery #9 on top of Insulator #8.

EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING
BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.

31. Connect free end of Cable #2 from Battery #8 [−] to Battery #9 (+), connect sense wire
#9 (+) Purple, tighten nut and slide a boot over terminal. Route cable behind Insulator
#1 and along plastic spacer.

22
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

32. Connect one end of Cable #3 to Battery #9 (−), and connect sense wire #9 (−) Gray,
tighten nut and slide a boot over cable terminal. Route other end of Cable #3 through
grommet in hole in top of battery compartment. Tape other end of Cable #3.

Note: Do NOT connect Cable #3 to ground stud yet.

33. Connect AMX harness to J11 (output) and new battery harness to J1−10 (input) at Bat-
tery Sense board connectors. Remove adhesive tape from feet of Sense circuit board
and place board on top of battery #9.

34. Measure the battery voltage between top circuit breaker terminal (LINE) with Cable
#4 connected (battery positive) and the unconnected end of Cable #3 (battery nega-
tive). It should measure between 111 and 118 volts DC, depending on state of charge
of the batteries.

35. (Applicable to Kit 46−329314G5 ONLY.)

Route the terminal block cable through the unit and mount the terminal block as fol-
lows:

a. Open top cover of AMX−4.

b. Route connector end of furnished terminal block cable through grommets in


chassis as shown in Illustration 16.

c. Drill two holes 0.140 inches (9/64 inch) diameter, 2.65 inches apart, and attach
terminal block using hardware as shown in Illustration 16.

d. Secure terminal block cable to existing harness using furnished Ty−rap straps.
Connect other end of cable to the test terminal board connector J11.

Note: The terminal block is a test point, and is only connected to the harness.

e. Measure the individual battery voltages across terminals of terminal block. Posi-
tion 1 to Position 2 of terminal block measures Battery #1, Position 2 to Position
3 measures Battery #2, and so forth. Voltage of each battery should be greater
than 12.0 Volts. The actual value will depend upon battery state of charge.

23
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ILLUSTRATION 16
INSTALLATION OF BATTERY TEST HARNESS IN AMX−4 UNIT
(APPLICABLE TO KIT 46−329314G5 ONLY.)

VIEW A"
(2) 4−40 KEPS NUTS
46−170012P34

HARNESS CONNECTS TO
OPPOSITE SIDE OF AMX
(SEE VIEW “A”)

(2) 4−40 SCREWS


46−208560P13

CABLE
46−316915G2

CONNECT TO BATTERY SENSE


BOARD (SEE ILLUSTRATION 17)

24
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

ILLUSTRATION 17
BATTERY SENSE BOARD, 2334738−2

25
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

36. Place the unit on a level floor. Extend the horizontal arm and rotate it to the front end
of the AMX (vertical−column end). Distribution of weight is necessary in installing
the battery−compartment cover. See Illustration 18.

ILLUSTRATION 18
AMX BATTERY COMPARTMENT
COVER INSTALLATION

ARM EXTENDED

LEVEL FLOOR

BOLTS TORQUED TO
75 IN. LBS. (8.4 N-m)

37. Place the remaining Insulator #1 in the compartment opening with cup−shaped bumps
pointing away from you, as shown is Illustration 14.

38. Install battery compartment cover. Torque six capscrews to 75 inch pounds (8.4 New-
ton-meters), as shown in Illustration 18. Install the two metal plates (if applicable)
that correct over−size mounting holes.

The battery compartment cover is an integral part of the Base Assembly. All
CAUTION six bolts must be in place and torqued to 75 pound inches (8.4 Newton-meters)
or the Base Assembly can be warped or cracked.

39. Remove tape from free end of Cable #3.

40. Connect Cable #3 to ground stud using flat washer and nut.

26
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 6
LOAD DEFAULTS AND RECALIBRATE SYSTEM

Do the following sections, in sequence indicated below, from AMX−4 Calibration Di-
rection.

Note: To save time, you should install high voltage bleeder and set up oscilloscope for
proper triggering before you enter calibration mode.

CAUTION Observe proper radiation safety when making x−ray exposures!

1. Section 3−6: “Load Default Values”

Note: Section 3−6 must be done before calibration of any item. DO NOT LOAD DE-
FAULTS FOR ROUTINE CALIBRATION.

Note: After loading defaults, checksum errors will be displayed if you transition to top
menu level. Until AMX−4 is totally calibrated, these checksum errors will be dis-
played as a reminder that system is not fully calibrated. Simply push the mAs Y
switch to continue past each checksum message, then mAs B to enter calibration.

2. Section 3−1: “Calibrate Drive Handle”

3. Section 3−2: “Calibrate Voltmeter”

4. Section 3−3: “Calibrate Generator”

Note: To ensure exposure accuracy at high technique and low battery voltage, DO NOT
calibrate generator when battery voltage is 115 volts or greater.
Note: If there are TUBE SPITS at high kVp’s during “Calibrate Taps,” try to slow the
pace of calibration when the kVp is greater than 115 kVp. That is, wait approxi-
mately 45 seconds between exposures, and keep the unit in prep longer by allow-
ing the message “READY FOR X−RAY” to be displayed for 5 seconds before
pressing expose switch.
5. Section 3−4: “Calibrate Charger”

6. Section 3−5: “Adjust Field Light On Time”

7. Section 3−7, steps 1 through 6: “End Calibration”

Note: Step 6 of Section 3−7 of AMX−4 calibration direction requires functional


checks of calibrated items in order to ensure proper operation.

27
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100

SECTION 7
FINAL STEPS

1. Attach the furnished battery label 46−329183P3 as shown in Illustration 19. Place it
over old battery polarity label (if present).
2. Be sure that the circuit breaker is still OFF, and reinstall all covers.
3. Perform a complete functional check of the AMX unit, including making exposures.
4. Put the AMX unit on charge for an least one hour before using.
ILLUSTRATION 19
INSTALLATION OF FURNISHED BATTERY POLARITY LABEL 46−329183P1

− + PANASONIC
BATTERY

INSTALL FURNISHED
BATTERY POLARITY LABEL
AS SHOWN.
PLACE IT OVER OLD BATTERY
POLARITY LABEL (IF
PRESENT).
GENESIS
BATTERY

28
GE Healthcare

GE Healthcare: Telex 3797371


P.O. Box 414, Milwaukee, Wisconsin 53201 U.S.A.
(Asia, Pacific, Latin America, North America)
GE Healthcare — Europe: Telex 698626
283, rue de la Miniére, B.P. 34, 78533 Buc Cedex
France

Das könnte Ihnen auch gefallen