Beruflich Dokumente
Kultur Dokumente
Technical
Publications
Direction 2165154−100
Revision 7
ii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
iii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
iv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
v
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
vi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
vii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
viii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ix
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
x
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
xi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
xii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
DAMAGE IN TRANSPORTATION
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation “Damage in
Shipment” written on all copies of the freight or express bill before delivery is accepted or “signed for” by a General
Electric representative or a hospital receiving agent. Whether noted or concealed, damage MUST be reported to the
carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held
for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested
within this 14−day period.
To file a report:
xiii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
xiv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
REVISION HISTORY
Title Page 7
i thru viii 7
1 thru 42 7
Back Page −
xv
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
xvi
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
TABLE OF CONTENTS
SECTION 1
Materials and tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1-1 Battery Kits Available . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1-2 Field Supplied Materials, Special Tools, Supplies, and Test Equipment . . 2
SECTION 2
Check CPU and charger boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2-1 Check CPU Firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2-2 Check Central Processor Unit (CPU) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2-2-1 Set for French or English Operator Messages . . . . . . . . . . . . . . . . . . . . . . . 5
2-2-2 JP1 Jumper Position Possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2-3 Check Battery Charger Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
SECTION 3
Remove Old Batteries and Wiring ............................................................ 8
3-1 Remove Trim Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3-2 Remove Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3-2-1 Remove Battery Compartment Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3-2-2 Disconnect and Remove Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
SECTION 4
Dispose of Old Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4-1 Hawker Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4-2 Gates Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4-2-1 Build Cardboard Fillers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4-3 Panasonic Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4-4 Return Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4-4-1 USA Pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4-4-2 Non−US . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
SECTION 5
Install panasonic Batteries with sense board 2334738−2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
SECTION 6
Load Defaults and Recalibrate System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
SECTION 7
Final Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
xvii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
xviii
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 1
MATERIALS AND TOOLS
1-1 Battery Kits Available
1. 46−329314G5: Upgrade Panasonic with RTV Sense Board (see Table 1)
3. 46−329098G5: Panasonic Kit with RTV Sense Board [No Batteries] (see Table 3)
TABLE 1
Kit Contents: Upgrade Panasonic with RTV Sense Board
ITEM PART NO. DESCRIPTION QTY.
28 46−316915G2 BATTERY TEST HARNESS CABLE WITH A PWA INTERFACE CONNECTOR ON ONE 1
END AND A TERMINAL STRIP BLOCK AT THE OTHER END.
30 46−170012P34 4−40, 1/4~ HEX, 3/32 THICK KEPS NUT O~ALL HT 7/64 WASH OD 9/32 WASH MAT 2
THK 13 CAD PL KEPS
31 46−208758P2 5.5~ X .140~ SELF−LOCKING CABLE TIE. 1/16~ TO 1−1/4~ WIRE BUNDLE 4
RANGE. 30LB TENSILE STRENGTH, NYLON MATR~L.
1
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
TABLE 1 (CONT.)
Kit Contents: Upgrade Panasonic with RTV Sense Board
35 46−303755P1 LABEL 18
TABLE 2
Kit Contents: 9 Panasonic Batteries Only
ITEM PART NO. DESCRIPTION QTY.
4 46−303755P1 LABEL 18
TABLE 3
Kit Contents: Panasonic Kit with RTV Sense Board [No Batteries]
ITEM PART NO. DESCRIPTION QTY.
2
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
Note: Required accuracy for the digital voltmeter for AMX Charger Calibration is + 0.3
VDC at 120 VDC.
D Storage oscilloscope
3
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 2
CHECK CPU AND CHARGER BOARDS
ILLUSTRATION 1
FLOW CHART
Start
Section 2
Check CPU &
Charger Board
Is CPU Y
46−264974G2,
G4,G5 or G6?
N N
*While the firmware kit can be used,
it is recommended that the CPU be
replaced with a 46−264974G5 version
board.
Order CPU Several changes have been incorpo-
46−264974G5 rated into the G5 to improve quality.
End Section 2
4
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
Newer firmware (version 46−329187G1/46−329188G1 and after) limits the charge cycle
time. CPU and firmware should be upgraded to the latest revision to upgrade the battery
charging algorithm. Verify revision of current CPU board or replace CPU board in accor-
dance with Section 2-2 and Table 4.
TABLE 4
CPU FIRMWARE
Note: U51 contains calibration routines. U104 contains applications and diagnostic rou-
tines.
Order replacement CPU board 46−264974G5 or later if not already present. Older firmware
(before version 46−329187G1/46−329188G1) does not limit the time of the charge cycle.
This can cause excessive overheating while charging if a battery is failed.
1. Look at the operator messages displayed to determine if they are in the desired lan-
guage.
2. To change the language of the operator messages, set Position 6 of DIP switch S75
on the CPU Board in accordance with Illustrations 2 and 3.
Note: The other positions of S75 are shown for reference, but should not require chang-
ing.
5
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 2
S75 ROCKER SWITCH SETTINGS
1 2 3 4 5 6 7 8
CLOSED (ON) POSITIONS 5, 6 & 7 CLOSED (ON),
WITH ROCKERS DEPRESSED THIS SIDE
FRENCH
OPEN (OFF) POSITIONS 1, 2, 3, 4 & 8 OPEN (OFF),
WITH ROCKERS DEPRESSED THIS SIDE
1 2 3 4 5 6 7 8
POSITIONS 5 & 7 CLOSED (ON),
CLOSED (ON) WITH ROCKERS DEPRESSED THIS SIDE
ENGLISH
POSITIONS 1, 2, 3, 4, 6 & 8 OPEN (OFF)
OPEN (OFF)
WITH ROCKERS DEPRESSED THIS SIDE
ILLUSTRATION 3
S75 SLIDE SWITCH POSITIONS
1 2 3 4 5 6 7 8
POSITIONS 5, 6 & 7 CLOSED (ON),
CLOSED (ON) WITH LEVERS THIS SIDE
FRENCH
OPEN (OFF) POSITIONS 1, 2, 3, 4 & 8 OPEN (OFF),
WITH LEVERS THIS SIDE
1 2 3 4 5 6 7 8
POSITIONS 5 & 7 CLOSED (ON),
CLOSED (ON) WITH LEVERS THIS SIDE
ENGLISH
OPEN (OFF) POSITIONS 1, 2, 3, 4, 6 & 8 OPEN (OFF)
WITH LEVERS THIS SIDE
TABLE 5
CPU DIP SWITCH POSITIONS
PORT
SW NORMAL SW ADDR&
# POSITiON NAME FUNCTION BIT # COMMENTS
1 OFF − (NONE) −
2 OFF − (NONE) −
3 OFF OPT ENABLES POWER 1100H OFF (PORT LOGIC 1) = ENABLES +24, +15 TESTS
SW 1 SUPPLY4 TESTS BIT 6 ON (PORT LOGIC 0) = DISABLES +24, +15 TESTS
4 OFF BAUD SELECTS BAUD RATE 1100H OFF (PORT LOGIC 1) = 375K BAUD RATE
RATE BIT 5 ON (PORT LOGIC 0) = 187.5K BAUD RATE
7 ON OPT CYCLES CPU 1400H OFF (PORT LOGIC 1) = CYCLE CPU AT POWER UP
SW 2 BIT 2 (SEE NOTE 1 BELOW)
ON (PORT LOGIC 0) = NORMAL RUN MODE
8 OFF − (NONE) −
6
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
D B — Data may be written only in RAM 1 when service switch is in the service mode
D C — Data is write protected all the time and cannot be written into. RAM 1 (U107)
stores cal data; RAM 2 (U54) stores auto cal data and data log
The minimum battery charger board is a 46−288786G2 or newer. It is fully backward com-
patible and is recommended for all units. The 46−288786G1 board is the non−EMC com-
pliant version of the G2 board.
7
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 3
REMOVE OLD BATTERIES AND WIRING
Before starting to remove batteries, be sure that the AMX key switch is OFF, the cir-
cuit breaker is OFF, and the charger cord is unplugged.
PERSONAL INJURY!
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING BATTERIES
WARNING
OR REACHING IN BATTERY COMPARTMENT. USE EXTREME CAU-
TION; HIGH AMPERAGE AND VOLTAGE IS PRESENT. USE INSU-
LATED TOOLS FOR WORKING ON BATTERIES.
1. Pull corners of front cover from ball stud retainer sockets on frame. See Illustration
4.
ILLUSTRATION 4
SIDE COVERS
HAND SWITCH
4−40 x 3/8
SCREWS
RIGHT COVER
6−32 X 1/2
BLACK OXIDE
SCREW
BALL STUDS
BATTERY COMPART-
FRONT COVER MENT COVER
SCREWS TOP AND
BOTTOM
BALL STUDS
4−40 x 3/8
SCREWS
LEFT COVER
6−32 X 1/2 BLACK OXIDE
SCREW
2. Remove two screws retaining rear cover on base assembly. Remove rear cover.
4. Remove two 4−40 x 3/8 binding head screws and one 6−32 x 1/2 black oxide binding
head screw holding each cover to base and frame assemblies.
5. Pull covers off ball stud retaining sockets and carefully remove from unit.
8
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
PERSONAL INJURY !
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING THE
WARNING BATTERIES OR REACHING IN THE BATTERY COMPARTMENT. USE
EXTREME CAUTION, HIGH AMPERAGE AND VOLTAGE IS
PRESENT. USE INSULATED TOOLS FOR WORKING ON BATTERIES.
D References to the right and left sides of battery compartment are relative to the view
shown in Illustration 6.
D Cable numbers (#s) indicated in Illustration 6 and in this instruction are marked on
the parts.
D Disconnect cables only in the order instructed, and only when instructed.
D All battery lead connectors must be insulated to prevent electrical contact with the
frame or other battery terminals.
Note: Some battery cable leads may not have boots as referred to in the following procedure.
1. Verify that AMX key switch is OFF, circuit breaker is OFF, and charger cord is discon-
nected.
2. Remove and tape battery ground cable marked #2 to ensure that this cable will not
short out to any other wiring. SEPARATE THIS CABLE FROM ALL OTHERS. See
Illustration 5.
ILLUSTRATION 5
BATTERY COMPARTMENT ACCESS
CIRCUIT BATTERY
BREAKER
CABLE MARKED #4 GROUND STUD
CABLE MARKED #2
COVER CAPSCREWS
9
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
3. Remove and tape cable marked #5 separately from ALL other cables.
4. Remove all remaining battery cables from battery ground stud. Tape ALL cables sep-
arately.
5. Remove battery lead cable marked #4 from terminal on Circuit Breaker in AMX1 A3
Module. Be certain boot covers the connector and it cannot short out. Tape connector
to ensure it will not short.
6. Remove hex head cap screws securing battery compartment cover. Remove cover.
Note: Plates 46−286167P1 correct units where capscrews do not properly secure the
cover to the compartment opening.
1. Disconnect cable marked #4 from the battery. Cover the connector with boot and re-
move cable. Refer to Illustration 6.
ILLUSTRATION 6
HAWKER BATTERY CONNECTIONS
CABLE # 1
CABLE #2(−) TO
GROUND STUD
CABLE
#1 CABLE #4(+) TO
CIRCUIT BREAKER
CABLE
#1
CABLE
#3
BATTERY
INSULATOR CABLE
#1 INSULATOR
2. Remove cable marked #1. Cover connectors with boots.
10
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
11. Disconnect upper cable marked #3. Cover connector with boot.
12. Remove two batteries and remove insulator boards on left side and at rear of compart-
ment.
13. Remove insulator board covering three remaining batteries recessed in right side of
compartment.
14. Remove cable marked #2. Cover cable connector end with boot.
15. Remove cable marked #3. Cover cable connector end with boot.
16. Remove two remaining cables marked #1. Cover cable connector ends with boots.
18. Leave the battery compartment top and bottom insulation in place in the AMX unit.
Set the remainder of the old battery insulators aside.
19. Set old battery cables aside. This includes the old wires between batteries, from bat-
tery (−) to ground stud, and from battery (+) to circuit breaker.
11
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 4
DISPOSE OF OLD BATTERIES
Return the removed Hawker batteries using the battery return box (part number
46−329315P1) and the foam block fillers in the kit.
ILLUSTRATION 7
RETURN BOX FILLERS (HAWKER)
FILLER C
FILLER B
FILLER A FILLER A
BATTERY
FILLER B
TABLE 6
FILLER DIMENSIONS (HAWKER BLOCKING)
DIMENSIONS A
12
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
If a new battery does not function correctly, use the battery return box (part number
46−329315P1) to return individual failed cells.
1. Lay the 33 inch long filler sheets flat, oriented as shown in Illustration 8.
ILLUSTRATION 8
33 INCH FILLER BEFORE FOLDING
A B C D E F G H I 5−7/8 INCHES
33 INCHES
TABLE 7
33 INCH FILLER FOLDING GUIDE (GATES BATTERY)
DIMENSIONS
FILLER A FILLER B (INCHES)
SEGMENT ORIENT NEXT TO AND SEGMENT ORIENT NEXT TO AND A B
A VERT D A HORIZ D 5−7/8 3−7/16
B HORIZ C B HORIZ C 5−3/16
C HORIZ B F C HORIZ B F 5
D VERT A E D HORIZ A E 3−14
E VERT D E HORIZ D 3
F HORIZ C F HORIZ C 4−1/4
G VERT H G VERT H 2−5/16
H VERT G I H VERT G I 3
I VERT H I VERT H 2−15/16
DIMENSIONS A
13
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
3. Fold both filler strips so that they look like the filler assemblies in Illustration 9.
4. Insert the Filler A and B around the battery. Install the Filler K to create tension. See
Illustration 9.
ILLUSTRATION 9
RETURN BOX FILLERS (GATES BATTERY)
A
D
E
F B
C
G
H FILLER J
I FILLER K 2 PIECES:
1 IN BOTTOM OF BOX
1 ON TOP AFTER FILLERS IN PLACE
FILLER A ASSEMBLY
H
G I
BATTERY
RETURN BOX
E F
D C
A B
FILLER B ASSEMBLY
6. Insert a Filler J in the bottom of the return box. Place the battery in the box.
TABLE 8
FILLERS J/K DIMENSIONS
FILLER A B
J 11−5/8 16−1/2
K 4 7
14
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
Return the removed Panasonic batteries using the battery return box (part number
46−329315P1) and the foam block fillers in the kit.
ILLUSTRATION 10
RETURN BOX FILLERS (PANASONIC)
FILLER C
FILLER B
FILLER A FILLER A
BATTERY
FILLER B
TABLE 9
FILLER DIMENSIONS (PANASONIC BLOCKING)
DIMENSIONS A
15
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 11
TAPING THE RETURN BOX
ILLUSTRATION 12
LABEL LOCATION
4G/Z22/S/**
U.S.A./+AI0455
4-4-2 Non−US
In Canada, in Latin America, in the Europe pole, and in the Asia pole, contact your local
FMI coordinator for disposal instructions.
16
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 5
INSTALL PANASONIC BATTERIES WITH SENSE BOARD 2334738−2
Before starting to install batteries, be sure that the AMX key switch is OFF, that the circuit
breaker is OFF, and the charger cord is unplugged.
PERSONAL INJURY!
REMOVE ALL JEWELRY AND RINGS WHEN HANDLING BATTERIES
WARNING
OR REACHING IN BATTERY COMPARTMENT. USE EXTREME CAU-
TION; HIGH AMPERAGE AND VOLTAGE IS PRESENT. USE INSU-
LATED TOOLS FOR WORKING ON BATTERIES.
EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.
D Reference to the right and left sides of battery compartment are relative
to the view shown in Illustration 14.
D Insulator numbers are shown for convenience in description, but are not
marked on the parts.
D Be sure that battery compartment top and bottom insulation from the
previous set of batteries is in place.
D Connect cables only in the order instructed, and only when instructed.
D Place insulation boots over ends of each cable that has a boot.
D Don’t remove paper backing from any insulating separator pad. Orient
insulator pads with paper backing facing up.
17
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
1. Do not install install terminal plates on each battery. See Illustration 13.
EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.
EQUIPMENT DAMAGE!
MAKE SURE TO INSTALL BATTERIES AS PICTURED WITH THE
WARNING
POSTS ON THE BOTTOM. THIS ENSURES THAT THE BATTERY PO-
LARITY IS CORRECT.
2. Position Batteries #2 & #3 (see Illustration 14) in the battery compartment stacked
one on top of the other, with a battery separator pad between them.
3. Install Label #1 between Battery #2 (−) and Batery #3 (+) and route as shown in Il-
lustration 14. Connect Brown sense wire under Lead #1 and connect to Battery #2 (−)
as shown.
4. Install Lead #1 to Battery #2 (+) and tighten with Lead pointing UP.
5. Install another Lead #1 to Battery #3 (−) and tighten with Lead pointing DOWN.
ILLUSTRATION 13
INSTALLATION OF TERMINALS
ON PANASONIC BATTERIES (2278932)
WARNING: EQUIPMENT DAMAGE! MAKE SURE TO
INSTALL
BATTERIES AS PICTURED WITH THE POSTS ON THE BOT-
TOM. THIS ENSURES THAT THE BATTERY POLARITY IS
CORRECT.
M5 HEX NUT
(FURNISHED WITH M6 LOCKWASHER
BATTERY) (FURNISHED WITH
KIT)
18
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 14
INSTALLATION OF BATTERIES IN BATTERY COMPARTMENT WITH SENSE BOARD 2334738−2
156 SEE
NOTE 2.
SEE
BATTERY NOTE 2.
SEPARATOR
PAD, P276
TYPICAL
(4 PLACES) SEE
SEE NOTE 3. NOTE 4.
SEE
NOTE 2.
SEE
NOTE 2.
19
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 15
INSTALLATION OF BATTERIES IN BATTERY COMPARTMENT WITH SENSE BOARD 2334738−2
20
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
7. Position Batteries #1 & #4 in the compartment stacked one on top of the other, with
a separator pad between them (see Illustration 14). Push both batteries into position
alongside Batteries #2 & #3.
EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING
BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.
Note: Don’t confuse Insulator #4 with the Insulator #1. Insulator #4 has two non-func-
tional holes. Insulator #1s have two full cup−shaped bumps with no holes.
8. Install Insulator #4 between Batteries #2 & #3 and Batteries #1 & #4. Install an Insula-
tor #2 next to Batteries #1 & #4, and another Insulator #2 next to Batteries #2 & #3.
10. Connect end of Lead #1 Battery #2 (+) to Battery #1 (−). Tighten hardware.
11. Connect end of Lead # 1 Battery #3 (−) to Battery #4 (+). Tighten hardware.
12. Connect end of Cable #4 Battery #1 (+), and slide a boot over this terminal. Route
Cable #4 through grommet in hole in top of battery compartment, connect it to the
top terminal (LINE) on circuit breaker in AMX1 A3, and slide boot over terminal.
13. Install Insulator #5, Insulator #6, and the remaining Insulator #2.
14. Position Batteries #5 & #6 in compartment, one on top of the other with a separator
pad between them.
15. Connect one Cable #1 end to Battery #6 (+), and other end to Battery #5 (−). Tighten
Battery #6 (+). Leave nut off of Battery #5 (−) for now.
CAUTION Do not touch Lead #2 adn Lead #3. Tape ends for safety.
18. Push Batteries #5 & #6 to rear of battery compartment. Dress sense harness up and
out of the way.
19. Connect free end of Cable #2 to Battery #4 (−) and tighten hardware. Slide boots over
each terminal.
21
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
Note: Cable #2 must route in channel between top and bottom batteries #1, 2, 3, 4, along
with sense harness.
20. Connect white harness under cable #1 to Battery #5 (−) and tighten hardware.
21. Place the plastic spacer board into battery compartment as shown in Illustration 14.
Make sure bumpers on board touch batteries without pinching wires. Wires should be
routed in channel between top and bottom batteries #1, 2, 3, 4.
22. Install an Insulator #1 in front of Batteries #5 & #6 as shown in Illustration 14, with
cup−shaped bumps pointing away from you. Route free end of Cable #3 and sense
harness between center channel of plastic spacer.
23. Position Batteries #7 & #8 in compartment stacked one on top of the other with a sepa-
rator pad between them.
EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.
24. Connect one end of Cable #1 to Battery #8 (+) and tighten. Connect other end to Bat-
tery #7 (−) leaving nut off or loose. Connect end of Cable #2 Battery #8 (−), and slide
a boot over terminal.
25. Push Batteries #7 & #8 back into position, as shown, while holding Cable #3 and har-
ness between center channel of plastic spacer.
26. Connect free end of Cable #3 from Battery #6 [−] to Battery #7 (+) along with sense
wire Orange #7 (+), tighten and slide a boot over terminal.
27. Connect sense wire Blue #7 (−) to Battery #7 (−) and tighten nut.
28. Install another Insulator #1 between Batteries #7 & #8 and Battery #9, with cup−
shaped bumps pointing away from you. Route free end of Cable #2 and harness to bat-
tery #9 between channel of plastic spacer.
EQUIPMENT DAMAGE!
DO NOT MIX AND MATCH HAWKER AND PANASONIC BATTERIES
WARNING
BECAUSE OF IMPEDANCE DIFFERENCES BETWEEN THE TWO DIF-
FERENT TYPES OF BATTERIES.
31. Connect free end of Cable #2 from Battery #8 [−] to Battery #9 (+), connect sense wire
#9 (+) Purple, tighten nut and slide a boot over terminal. Route cable behind Insulator
#1 and along plastic spacer.
22
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
32. Connect one end of Cable #3 to Battery #9 (−), and connect sense wire #9 (−) Gray,
tighten nut and slide a boot over cable terminal. Route other end of Cable #3 through
grommet in hole in top of battery compartment. Tape other end of Cable #3.
33. Connect AMX harness to J11 (output) and new battery harness to J1−10 (input) at Bat-
tery Sense board connectors. Remove adhesive tape from feet of Sense circuit board
and place board on top of battery #9.
34. Measure the battery voltage between top circuit breaker terminal (LINE) with Cable
#4 connected (battery positive) and the unconnected end of Cable #3 (battery nega-
tive). It should measure between 111 and 118 volts DC, depending on state of charge
of the batteries.
Route the terminal block cable through the unit and mount the terminal block as fol-
lows:
c. Drill two holes 0.140 inches (9/64 inch) diameter, 2.65 inches apart, and attach
terminal block using hardware as shown in Illustration 16.
d. Secure terminal block cable to existing harness using furnished Ty−rap straps.
Connect other end of cable to the test terminal board connector J11.
Note: The terminal block is a test point, and is only connected to the harness.
e. Measure the individual battery voltages across terminals of terminal block. Posi-
tion 1 to Position 2 of terminal block measures Battery #1, Position 2 to Position
3 measures Battery #2, and so forth. Voltage of each battery should be greater
than 12.0 Volts. The actual value will depend upon battery state of charge.
23
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 16
INSTALLATION OF BATTERY TEST HARNESS IN AMX−4 UNIT
(APPLICABLE TO KIT 46−329314G5 ONLY.)
VIEW A"
(2) 4−40 KEPS NUTS
46−170012P34
HARNESS CONNECTS TO
OPPOSITE SIDE OF AMX
(SEE VIEW “A”)
CABLE
46−316915G2
24
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
ILLUSTRATION 17
BATTERY SENSE BOARD, 2334738−2
25
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
36. Place the unit on a level floor. Extend the horizontal arm and rotate it to the front end
of the AMX (vertical−column end). Distribution of weight is necessary in installing
the battery−compartment cover. See Illustration 18.
ILLUSTRATION 18
AMX BATTERY COMPARTMENT
COVER INSTALLATION
ARM EXTENDED
LEVEL FLOOR
BOLTS TORQUED TO
75 IN. LBS. (8.4 N-m)
37. Place the remaining Insulator #1 in the compartment opening with cup−shaped bumps
pointing away from you, as shown is Illustration 14.
38. Install battery compartment cover. Torque six capscrews to 75 inch pounds (8.4 New-
ton-meters), as shown in Illustration 18. Install the two metal plates (if applicable)
that correct over−size mounting holes.
The battery compartment cover is an integral part of the Base Assembly. All
CAUTION six bolts must be in place and torqued to 75 pound inches (8.4 Newton-meters)
or the Base Assembly can be warped or cracked.
40. Connect Cable #3 to ground stud using flat washer and nut.
26
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 6
LOAD DEFAULTS AND RECALIBRATE SYSTEM
Do the following sections, in sequence indicated below, from AMX−4 Calibration Di-
rection.
Note: To save time, you should install high voltage bleeder and set up oscilloscope for
proper triggering before you enter calibration mode.
Note: Section 3−6 must be done before calibration of any item. DO NOT LOAD DE-
FAULTS FOR ROUTINE CALIBRATION.
Note: After loading defaults, checksum errors will be displayed if you transition to top
menu level. Until AMX−4 is totally calibrated, these checksum errors will be dis-
played as a reminder that system is not fully calibrated. Simply push the mAs Y
switch to continue past each checksum message, then mAs B to enter calibration.
Note: To ensure exposure accuracy at high technique and low battery voltage, DO NOT
calibrate generator when battery voltage is 115 volts or greater.
Note: If there are TUBE SPITS at high kVp’s during “Calibrate Taps,” try to slow the
pace of calibration when the kVp is greater than 115 kVp. That is, wait approxi-
mately 45 seconds between exposures, and keep the unit in prep longer by allow-
ing the message “READY FOR X−RAY” to be displayed for 5 seconds before
pressing expose switch.
5. Section 3−4: “Calibrate Charger”
27
GE HEALTHCARE AMX−4 INSTALLATION OF PANASONIC BATTERIES
REV 7 DIRECTION 2165154−100
SECTION 7
FINAL STEPS
1. Attach the furnished battery label 46−329183P3 as shown in Illustration 19. Place it
over old battery polarity label (if present).
2. Be sure that the circuit breaker is still OFF, and reinstall all covers.
3. Perform a complete functional check of the AMX unit, including making exposures.
4. Put the AMX unit on charge for an least one hour before using.
ILLUSTRATION 19
INSTALLATION OF FURNISHED BATTERY POLARITY LABEL 46−329183P1
− + PANASONIC
BATTERY
INSTALL FURNISHED
BATTERY POLARITY LABEL
AS SHOWN.
PLACE IT OVER OLD BATTERY
POLARITY LABEL (IF
PRESENT).
GENESIS
BATTERY
28
GE Healthcare