FACULTY OF CIVIL AND ENVIROMENTAL ENGINEERING

BFC32102

REINFORCED CONCRETE DESIGN 1

SECTION 3

PROJECT: MODERN HOUSE DESIGN

LECTURERS’ NAME:
DR SHAHIRON BIN SHAHIDAN
PROF. MADYA DR HILTON @ MOHD HILTON BIN AHMAD
PUAN ZALIPAH BINTI JAMELLODIN

NAME MATRIC NO.


MOHAMAD FAEIZ BIN MOHAMAD SHUKRI DF150009
MOHAMAD SYAFIK BIN ADNAN DF150048
AKASHAH BIN RIDZUAN DF150058
MUHAMMAD IQBAL HAKEEM BIN HASHIM DF150057
MUHAMMAD RIDHWAN BIN MOHD RASID DF150077
Content

No. Title Pages


1.0 Introduction 1

2.0 Company Profile 2

3.0 Description of house 10

4.0 House Model 12

5.0 Architecture Plan 15

6.0 Beam Design 18

7.0 Engineering Layout 19

8.0 Conclusion 23

9.0 Attachments 24
1.0 Introduction

This project required us in group of 5 with the company named Maddthelin Land to design a
double-storey modern house in a land size 30m × 25m. The model of the house needs to be
present in Google Sketch Up. The house consists of four bedrooms, three bathrooms, one
kitchen, one dining room, two lounges and one porch. The architecture of the house presented
in AutoCad. The beams designing are calculated manually. Staad Pro only used for checking
the value of the shear force and bending moment. The engineering layout presented in
AutoCAD. The students need to design a beam and slab of that modern house. The
specification of the beam and slab need to be provided.

1
2.0 Company Profile

MADDTHELIN LAND established since 2001 this work of construction contractors,


civil engineering works as well as service contractors and suppliers. This business has been
registered with the Contractor Service Center (PKK) as Class F contractors since 09.25.2001.
Also registered in the Construction Industry Development Board CIDB Grade G1 and the
Ministry of Finance.

Starting on a small scale with an initial capital which is simple, the company
MADDTHELIN House when it was starting to get the trust of the owners of the project such
as Muar District Office, Public Works Department, Majlis Agama Islam Negeri Johor,
Department of Irrigation and Drainage, Muar Hospital, Mara And School.

With a vision to be among the best contractors in the area and also in Muar, Johor,
MADDTHELIN LAND company is determined to carry out the work entrusted to the best
level.

2
Vision and Mission

VISION
Desiring to become a successful construction company and is active globally in Malaysia

MISSION
Committed to develop and become a successful organization and high potential in the
construction industry in line with the government's vision of a dynamic

3
Organization Chart

BOARD OF
DIRECTORS

PROF. MADYA DR.


HILTON @ MOHD
HILTON BIN
AHMAD

PROJECT
MANAGER
AKASHAH BIN
RIDZUAN

QUANTITY
ARCHITECH CIVIL ENGINEER
SURVEYOR CONTRACTOR
MOHAMMAD MOHAMAD FAEIZ
MUHAMMAD MOHAMAD SYAFIK
RIDHWAN BIN BIN MOHAMAD
IQBAL HAKEEM BIN ADNAN
MOHD RASID SHUKRI
BIN HASHIM

4
Registration List

1. Ministry of Finance (MoF)


No. Registration : 357-02057743

Registration Period : 21/01/2009 ~ 20/01/2012

Status : Bumiputera

Start Register : 02/01/2006

BIL CODE TITLE SUB TITLE


1 010100 Reading material Reading material`
2 010201 Stationery Stationery
3 020101 Furniture & Equipment Furniture
4 020102 Carpets / amber
5 020201 Machine Machine office
6 020400 Kitchen tools Kitchen tools
7 050300 Material tarpaulin / canvas Material tarpaulin / canvas
8 070100 Sports equipment Sports equipment
9 080200 Raw wet food Raw wet food
10 080501 Hot meals Hot meals

5
2. Contractor Service Center (PKK)

No Certificate of Registration: 0106 J 2002 0469

Registration period : 06/09/2010 ~ 26/08/2013

Start of Registration : 8/27/2002

Registration Status : Bumiputera

Grade :F

HEAD SUB DESCRIPTION

I 1 General works of civil engineering

(General works of civil 7a Irrigation works - Hydraulic Structures


engineering 7b Irrigation works - Earthworks
1 Construction work did not include the reinforced
concrete frame structure
2a Reinforced concrete frame buildings of not more than
II
(4) four levels
(The work of building)
8a Maintenance work - maintenance system
8b Maintenance work - Painting re-building and general
repairs

III 1 Earthworks

(Other works of civil 3b Work on bitumen road surface


engineering specialist) 3c The work made a gesture and Painting road

6
3. The Construction Industry Development Board Malaysia (CIDB)

No registration : 01200208170-JH073904

Registration period : 16/08/2008 ~ 15/08/2011

Grade : G1 (not more than RM200,000.00)

Kod Kategori Maksud

B Building Construction B04 General building works


CE Civil Engineering CE21 General works of civil
Construction engineering

WORK RECORD

No Title Work Amount Name Finish date


. Work Department
(RM)
1. Moving pipe 400mm Di Sekolah 16,500.00 JKR 14 August 2002
Kebangsaan Parit Jawa, Muar, Johor.
2. Painting of Muar bank building. 5380.00 Bank Rakyat 16 October 2002
Muar
3. Landscaping work at the institute 108,000.00 JKR 20 August 2002
pagoh, Muar
4. Removing the pipe in Parit Bunga, 16,500.00 Ranhill 02 November 2002
Muar, Johor.
5. Road resurfacing project in Parit 78,678.00 Infra Desa Johor 7 December 2002
Tegak, Batu Pahat
Growing grass in Sek Keb Cina in 2,370.00 Sek Keb Cina 06 January 2003
6. Belemang Serom, Muar, Johor. Belemang

7. Widening project (widening) in Drain 120,350.00 Infra Desa Johor 12 February 2003
Continues, Sri Medan
8. Modifying the damage and repaint 49,900.00 JKR 17 Mac 2003
buildings Muar Johor Information
Office.
9. The work of constructing and 7,840.00 SAJH 13 April 2003
repairing valves in the town of Bekasi
route to Pt Unas, Muar, Johor.
10. Proposal replaces the security fence 18,474.00 SAJH 21 July 2003
for Bukit Serampang intake, Muar,
Johor.

7
11. Painting outbuildings and fence 5,605.00 SAJH 27 August 2003
stores Tangkak Muar Network.
12. Smallholders Cooperative Housing 607246.92 Cooperative 2 September 2003
Project Muar, Johor in 2002. Muar
13. Painting on Hospital Muar Johor. 10,500.00 Hospital Muar 29 September 2004
14. Dispose of tank panels and related 33,141.00 SAJH 17 October 2004
materials at Bkt Perah Bukit Mor
Muar Johor.
15. Painting the water tank in Segamat, 23,322.26 SAJH 10 December 2005
Johor. (Phase 2).
16. Painting water tanks in Segamat, 12,151.00 SAJH 7 December 2005
Johor. (Phase 1)
17. The work makes gabion wall and 15,783.00 SAJH 19 December 2005
fence at Bkt Siput Segamat Johor
18. Painting water tank Muar Johor. 16,445.00 SAJH 28 December 2005
(Phase 1)
19. The work of making chamber in 19,540.00 SAJH 20 February 2006
Pekan Pagoh, Pt Bukit Dinding Unas,
Parit Bakar, Parit Jawa, Muar Johor
Bank and rafting.
20. Painting water tanks Muar District. 23,763.00 SAJH 18 January 2007
(Phase 2)
21. Painting water tanks Muar District. 23,166.00 SAJH 26 August 2008
(Phase 3)
22. The work of grading and leveling the 6704.00 JKR 29 November 2008
road shoulder of TNB to KS 4 Tmn
Sri Ledang Muar Muar Johor.

8
Current Work

No Title work Amount Work Name Department


. (RM)
1. Road widening in Parit Besar Darat Batu RM 371,584.26 Infra Desa Johor
Pahat
2. Construction of a new road in Sri Medan RM 252,384.75 Infra Desa Johor
Batu Pahat
3. Construction of a new road in Parit RM 302,169.50 Infra Desa Johor
Gantong, Batu Pahat
4. Resurfacing the road in Sungai Kluang, Batu RM 145,710.00 Jabatan Kerja Raya
Pahat
5. Construction of bunglow in Kg Dato Abdul RM 700,00.00 -
Rahman Yassin, Kluang Johor

List Of Machinery and Equipment

NO. MACHINE YEAR TYPE UNIT NO.


REGISTRATION
1. Agogo Compactor 2001 Robin 1
2. Compactor 2000 Robin 2
3. Drill 2000 Makita 1
4. Drill 2001 Black Decker 1
5. Circular Saw 14” 2000 Black Decker 1
6 Circular Saw 10” 2001 Makita 1
7. Circular Saw 10” 2000 Black Decker 1
8. Circular Saw 6” 2002 Makita 1
9. Cement Mixture 2001 4
10. Cement Lift 2001 2
11. Weigh Troli 2001 1
12. Lori 1 Tan 2001 1 JDK 2841

9
3.0 Description of house

The Living Room

The room filled with natural daylight that pour in through the full-height windows and sliding
patio doors, while careful orientation and sun shading ensure that heat and glare are
eliminated. The practical space devoid of awkward corners presents the perfect canvas for
owners to imprint their individual personalities through customization and interior design.

The Dining Room

The spacious dining area allows for larger dinner parties without sacrificing its intimate
ambience. The sliding patio doors open up fully to extend the space into the lush garden. The
wet and dry kitchens are thoughtfully and discreetly located next the dining area to facilitate
serving and clearing up.

The Master Bedroom

The master bedroom was envisioned as a self-contained sanctuary where the master and
mistress of the house can retreat for rest and recuperation after a busy day. The generous yet
elegant proportions of the room ensure maximum ease and comfort

The Guest Room

This cheerful, day-lit room with attached bathroom is ideal for guests or an elderly relative
who requires a room on the ground floor. It is also spacious enough to be converted into a
study or TV room.

Bathroom

The bathroom is provided aesthetics value that can give the calm and peaceful to the user and
householder. This aesthetics value equipped with ceramic wall tiles up to 1500mm high.
Then the bathroom features with the latest and economic technology for bath equipment.

Wall

This house’s masonry walls are used brickwork as a common masonry wall. Then for the
house wall the engineer suggested to use reinforced concrete to give the strong and rigid wall.
Furthermore, the wall finisher is plaster and emulsion paint to

10
Garage

Modern garage door openers are available with various features and facilities to provide you
with more convenience. Although automatic garage door openers can be highly advanced and
technical, do not need a lot of power to work. After that, safety standards apply to the
manufacturing and installation of garage doors to ensure safe operation by the user and avoid
tragic malfunctioning and improper use. A modern automatic garage door opener is
engineered for the safest operation

Specification

Structure Reinforced Concrete


Wall Brickwork / Reinforced Concrete
Roofing Material Clay roof tiles
Roofing Framing Metal truss
Ceiling Concrete Slab / Plaster Ceiling / Asbestos Free Ceiling
Windows Aluminium Framed Glass Casement / Fixed Glass / Adjustable Louvres /
Overlapping Glass / Sliding / M.S. Grille
Doors Main Entrance Timber Door
Side Entrance Aluminium Framed Glass Sliding Door (Corner & End
Unit)
Back Entrance Timber Door
Others Flush Door / Louvres Door
Floor Finishes Living & Dining Ceramic Tiles
Master Bedroom Laminated Timber
Bedrooms Laminated Timber
Guest room Ceramic Tiles
Kitchen Ceramic Tiles
Staircase Laminated Timber
Master Bathroom Ceramic Tiles
Bathroom Ceramic Tiles
Garage Homogenous Tiles
Wall Finishes Kitchen 1500mm High Ceramic Wall Tiles
Bath Ceramic Wall Tiles Up To 2000mm
High
Others Plaster and Paint
Fencing Brick Wall and M.S. Grille / Cement Plank Fencing with M.S. Gate,
Refuse Chamber and Letter Box
Painting Emulsion Paint
Sanitary & 3 WCs, 3 Wash Basins, 3 Showers, 1 Kitchen Sink
Plumbing Fittings

11
4.0 House Model

The model of the modern house presented in the Google Sketch Up.

Figure 4.1: Model of the Modern House

Figure 4.2: Front view in Google Sketch Up

12
Figure 4.3: Rear view in Google Sketch Up

Figure 4.4: Right view in Google Sketch Up

Figure 4.5: Left view in Google Sketch Up

13
Figure 4.6: Plan view in Google Sketch Up

14
5.0 Architecture Plan

Figure 5.1: Front view in AutoCAD

Figure 5.2: Rear view in AutoCAD

15
Figure 5.3: Right view in AutoCAD

Figure 5.4: Right view in AutoCAD

16
Figure 5.5: Plan view in AutoCAD

17
6.0 Beam Design

The design process of the beam referred to the Eurocode 2: Design of Concrete Structures

18
7.0 Engineering Layout

The engineering layout presented in AutoCAD.

7.1 Simply Supported Beam (H/9-10)

7.2 Continuous Critical Beam (B/1-8)

19
7.3 Continuous Critical Beam (5/A-E)

7.4 Continuous Critical Beam (C/2-8)

20
7.5 Slab A-B/2-5

7.6 Slab A-B/5-8

21
7.7 Slab B-C/2-5

22
8.0 Conclusion

This project needs students to design a beams and slabs of the modern house. that modern
house need to be designed by the students. The students have built their own modern house
using Google Sketch Up. After that, that modern house in the Google Sketch Up transferred
into AutoCAD. Students also need to provides the layout of the beam.

Based on the layout generated, the students need to design the beam. These design
processes really teach the students about how to make the proper design. Students also can
learn how to think logically which reinforcement should be used for the economical purpose
and the distance between the reinforcement. This process is really important in the industries
because it is about money. How much money that needs to spend on the construction.

After this project, the students know how to relate the design on the paper and the
design on site. It really need to consider the site situation when designing the structures. This
is really important for the smooth of the project.

23
9.0 Attachments

24