EQUIPMENT MAINTENANCE SCHEDULE

EQUIPMENT TYPE Ice Crusher


EQUIPMENT CODE HRMT-IC-001
LOCATION Bar Laboratory
Schedule for the Month of March
MANPO Daily/e Ever Weekly Every Monthly Remarks
ACTIVITIES WER very y 15th
usage Othe Day
r Day

1. Check power cable Trainees The activity


is done
 Clean and kept dry Trainer before and
 Properly attached after using
 Inspect for damages, the
cuts and splices and equipment
replace if necessary

2. Check the blade Trainees Activity is


done before
 Free from rust and chip Trainer using the
equipment

3. Check the nuts and bolts Trainees Activity is


done before
Trainer using the
equipment

4. Check the ice pan Trainees Activity is


done before
 Free from rust and dirt Trainer using the
equipment

5. Check the lever/handle Trainees Activity is


done before
Trainer using the
equipment

6. Check the main motor Trainees Activity is


done during
Trainer using the
equipment

7. Check the quality of the Trainees Activity is


finish crushed ice done after
Trainer using the
equipment

Prepared by: Reviewed by: Approved by:

LORENZO G. ROJO JESSICA B. ESQUILLO MARIA ANNA LISSA A. RUBA


Trainer HRMT Program Head Dean HRMT