EQUIPMENT CODE HRMT-IC-001 LOCATION Bar Laboratory Schedule for the Month of March MANPO Daily/e Ever Weekly Every Monthly Remarks ACTIVITIES WER very y 15th usage Othe Day r Day
1. Check power cable Trainees The activity
is done Clean and kept dry Trainer before and Properly attached after using Inspect for damages, the cuts and splices and equipment replace if necessary
2. Check the blade Trainees Activity is
done before Free from rust and chip Trainer using the equipment
3. Check the nuts and bolts Trainees Activity is
done before Trainer using the equipment
4. Check the ice pan Trainees Activity is
done before Free from rust and dirt Trainer using the equipment
5. Check the lever/handle Trainees Activity is
done before Trainer using the equipment
6. Check the main motor Trainees Activity is
done during Trainer using the equipment
7. Check the quality of the Trainees Activity is
finish crushed ice done after Trainer using the equipment
Prepared by: Reviewed by: Approved by:
LORENZO G. ROJO JESSICA B. ESQUILLO MARIA ANNA LISSA A. RUBA