Beruflich Dokumente
Kultur Dokumente
T code: COOIS
STEP-2
(VA03) WE FIND THE DETAILS OF SHADE NAME AND COUNT FOR
PRODUCTION ORDER CREATION. PO IS CRATED BY MAKETING TEAM
PRESS ENTER
FILL THE BATCH NUMBER WHICH IS CONFIRMED FROM PAIKIG TEAM AND
PRESS ENTER AND SELECT DOMESTIC /OR JOB WORK (AS REQUIRED)
STEP-5
2ND ACTIVITY
2 SET ACTIVITY