Beruflich Dokumente
Kultur Dokumente
ELECTROSTATIC PRECIPITATOR
Units of
Sl. Description Data
Measurement
A Input Data
1 Type of Boiler
3 Fuel Fired
Gas/Air volume (app)
0
5 Gas Temperature (Design) C
6 Gas Moisture (app) % by volume
Inlet Dust Concentration per kg of flue gas
gm/kg
7 100% Indonesian coal gm/kg
70% Indonesian coal + 30% Indian coal gm/kg
Emission Required
8 a) All fields working (Guarantee/Design) mg/Nm3
b) With one field out of service (Guarantee/Design) mg/Nm3
9 Suction Pressure mm WG
10 No.of fields Nos.
B Technical Data
1 Manufacturer
2 Type
3 Design
4 Manufacturer's model no.
Dimensions
a) Width (across gas flow) m
b) Flange to flange length (in direction of gas flow) m
c) Height between support level to top of monorail
m
beam
5 d) Height between top insulator compartment to top of
m
monorail beam
e). Field width m
f). Field Height m
g). Field Length m
h). No. of gas passages
i). Spacing of gas passages mm
1 of 11
TECHNICAL SPECIFICATION FOR
ELECTROSTATIC PRECIPITATOR
18 Specific collection area and the corresponding gas flow m2/m3/s & m3/s
20 Treatment time and the corresponding gas flow, sec & m3/s
21 Treatment length m
22 Gas velocity through ESP m/s
Length of total
Elec. Fields
23 Aspect Ratio
/Height of Elec.
field
24 Effective migration velocity cm/s
25 Outlet dust concentration with one field out of service mg/Nm3
4 Configuration
5 Diameter/ Thickness mm
6 Height in contact with gas m
7 Total effective electrode length m
8 No. of electrodes per ESP
9 Method of suspension
10 Spacing of electrodes in the direction of gas flow mm
5 of 11
TECHNICAL SPECIFICATION FOR
ELECTROSTATIC PRECIPITATOR
1 Make
2 Type
3 Material
4 Insulator rating %
5 Minimum flashover voltage KV
6 Leakage distance m
7 Dust protection of insulator
8 No. of support insulators/ESP
9 Heating arrangement of support insulators
10 No. of heaters / support insulator
11 Rating of heater for support insulator
0
12 Temperature control of support insulator C
13 No. of rapper shaft insulators / ESP
14 Heating arrangement of rapper shaft insulators
15 No. of heaters / rapper shaft insulator
16 Rating of heater for rapper shaft insulator
17 Temperature control of support insulator
18 Wall through bushings
19 No.of insulator chamber per T/R set
K Ventilation system
1 Total pressurizing air requirement m3/hr
2 Pressuring air per compartment m3/hr
3 Number of fans normally operating
4 Number of spare fans
5 Fan capacity m3/hr
6 Fan speed rpm
7 Fan motor rating KW
8 manufacturer and type of fan
9 Duct heater capacity at normal operation KW
10 Spare duct heater capacity KW
11 Total number of duct heaters No.s
12 Manufacturer and type of duct heaters
0
13 Temperature of air to insulator compartments C
14 Number of insulator heater No.s
15 Capacity of each heater KW
16 Total insulator heater capacity KW
L Transformer Rectifier Sets
1 Type
2 Manufacturer
3 Rating and other data
7 of 11
TECHNICAL SPECIFICATION FOR
ELECTROSTATIC PRECIPITATOR
4 Class of insulation
5 Class of bushings
6 Half wave/full eave rectification
7 Rated current output of each rectifier set mA
8 Rated voltage output of each rectifier set KV
9 Expected operating current each mA
0
10 Temperature rise over ambient C
9 of 11
TECHNICAL SPECIFICATION FOR
ELECTROSTATIC PRECIPITATOR
10 of 11
TECHNICAL SPECIFICATION FOR
ELECTROSTATIC PRECIPITATOR
(k.cal/m/hr/deg.
a) 50deg.C
C)
(k.cal/m/hr/deg.
b) 100deg.C
C)
(k.cal/m/hr/deg.
c) 150deg.C
C)
(k.cal/m/hr/deg.
d) 200deg.C
C)
7 Resistive to micro-organism (yes/no)
8 Incombustibility (yes/no)
9 Material of skin casing
10 Thickness of skin casing mm
11 Cladding
a). Material
b). Thickness
S Auxiliary control Panel
1 Class of Protection
2 Feeders list details
3 Module type (drawout/Non-drawout)
4 Make (Vendors list)
5 Dimensions mm
T Earthing
1 Equipment Earthing details
2 Structure Earthing
U Others
1 Field Junction boxes for Heaters & Instruments
2 Hopper Fluidizing arrangement
3 Power & Control cables with cable trays etc
Interconnecting duct work with supports and Non-
4
metallic inlet & outlet expansion joints
5 Application of Insulation and Cladding
6 Surface preparation & Painting
11 of 11