AM 4:00
 Departure for Pagbilao Power Staion
 Breakfast: Caluag, Quezon
PM 12:30
 Lunch: Take out Chowking
 Visit:: Pagbilao Power Staion @Pagbilao, Quezon
 Dinner: La Vista Pansol Resort @ Calamba, Laguna
 Rest: La Vista Pansol Resort

DAY 2 05, February 2019


AM 8:00
 Breakfast: La Vista Pansol Resort
 Visit:: Aboitiz Power @ Calauan, Laguna
 Lunch: Jollibee Gumaca
PM 3:00
 Visit:: Venna Energy (Wind Farm) @ Pililla, Rizal
 Dinner: La Vista Pansol Resort
 Rest: La Vista Pansol Resort

DAY 3 06, February 2019


AM 9:00
 Breakfast: La Vista Pansol Resort
 Visit:: Fuji Haya Electric @
 Lunch: Mang Inasal
PM 1:00
 Visit:: Saden Philippines @ Calamba, Laguna
 Dinner: NEAP @ Marikina, Metro Manila
 Rest: NEAP

DAY 4 07, February 2019


AM 9:00
 Breakfast: NEAP @ Marikina, Metro Manila
 Visit:: WESCOR Transformer Corporation @ Novaliches, Quezon City
 Lunch: TABRIEZA Grill and Restaurant @ Valenzuela, Metro Manila
PM 1:00
 Visit:: Valenzuela Solar Farm @ Valenzuela, Metro Manila
 Dinner: Pipanganan Capampangan @ San Fernando, Pampanga
 Rest: Anne Raqeul’s Resort @ Olongapo, Zambales

DAY 5 08, February 2019


AM 9:00
 Breakfast: Jollibee @ Subic Bay, Zambales
 Visit:: Bataan Nuclear Power Plant @ Morong, Bataan
 Lunch: Hale Spot
PM 1:00
 Visit:: One Subic Power @ Subic Bay, Zambales
Subic Bay Rolling Tour
 Dinner: Hale Spot
 Departure for Naga City
DAY 1

DATE and TIME VISITED: Feb 4, 2019 3pm

COMPANY NAME: TEAM ENERGY / PAGBILAO POWER STATION

LOCATION: Ibabang Polo, Pagbilao, Quezon Province

COMPANY INFORMATION: TeaM Energy, a partnership between noted Japanese firms Tokyo Electric Power
Company and Marubeni Corporation is one of the largest independent power producers in the country with more
than 2,000 MW of installed generating capacity nationwide. It operates two coal-fired facilities: the 1,200-MW
Sual Power Station in Pangasinan, and the 735-MW Pagbilao Power Station in Quezon.

WHAT DID I LEARN?

Pagbilao Power Station generates electricity from steam. Its entire process can be simplified into four main
steps:COMBUSTION (From Potential Energy to Heat Energy), BOILING (Heat Energy), TURBINE ROTATION
(From Heat Energy to Mechanical Energy), GENERATION (From Mechanical Energy to Electrical Energy). In
Combustion, Fuel is burned to create heat. By using finely pulverized coal, efficient combustion is assured and
high temperatures are achieved. Boiling, The heat is applied to demineralized water inside the boiler, turning it
into steam. This high-pressure, superheated steam is then sent to the turbine. Turbine Rotation, where a series
of turbine blades are mounted on a shaft. When steam passes through them, the turbines turn like fans and
cause the shaft to rotate. And last is the Generation, where a series of turbine blades are mounted on a shaft.
When steam passes through them, the turbines turn like fans and cause the shaft to rotate.

Documentation:
DAY 2

DATE and TIME VISITED: Feb 5, 2019 9am

COMPANY NAME: ABOITIZ POWER MAKBAN GEOTHERMAL POWERPLANT

LOCATION: BRGY. BITIN, LAGUNA

COMPANY INFORMATION: A 480mw Geothermal Plant Owned By Aboitiz And Its Steam Came From Mount
Makiling And Mount Banahaw Hence The Name Of The Powerplant. It Was Commisioned In 1979.

WHAT DID I LEARN?


I Learned That Geothermal Plants Are One Of The Most Contributors Of Power In The Philippines. Its Capacity
Is 480 Mw But The Steam Used For The Generators Were Bought From The Philippine Geothermal Production
Company. The Pgpc Handles The Drilling Exploration And The Purification Of Steam And Also The Delivery Of
The Steam To Aboitiz. I Also Learned That The Aboitiz Handle Almost All Of The Power Plant In The Philippines
And The Aboitiz Owns The Visayan Electric Company,The Second Largest Distributing Company In The
Philippines. This Plant Operates To 400 Mw But It Only Harvest 200mw Because Of The Factor Of Steam
Decline Or The Steam Wont Produce Much Pressure To The Turbine To Generate Power. It Was Said To Occur
3 To 6 Percent Per Annum. And I Learn That This Site Covers Up To 162000 Hectares Of Land From Laguna
Batangas And Quezon Province And It Was Protected By Our Presidential Decree 1111 Or The Geothermal
Reservoir Which Is Said That The Government Can Explore The Geothermal Site For Some Development
Purposes.

DOCUMENTATION:
DATE and TIME VISITED: Feb 5, 2019 3:35 Pm

COMPANY NAME: VENA ENERGY (WIND FARM)

LOCATION:PILILLA, RIZAL

COMPANY INFORMATION: 54 Mw Wind Farm, 27 Wind Turbines With 2 Mw Of Power Each.

WHAT DID I LEARN?


I Learned That Before Making This Or Having This Wind Farm, It Was Surveyed And Cleared By The Company
Making It Ensuring The Physibility Of This Project. It Consulted Many Engineers And Sociologist For This
Project.It Has A 125 Meters Risk Free Height For Flying Birds Not To Be Hit.This Hub Has A 80 Meter Height
And Iit Has Three Rotor Blades With 45 Meters Connected To A Gearbox Which Is Also Connected To A 2mw
Alternator Connected Straight To The Grid Going To Meralco. The Wind Must Have A Speed 4 To 5 Meters Per
Second Up To 25 M/S Speed To Rotate And Generate. Exceeding This Will Automatically Lock The Rotor To
Ensure The Safety Of The Equipment And Also The Safety Outside The Hub. The Land Covering The Place Is
70 Hectares And It Has 27 Active 2mw Turbines Having A Total Of 54 Megawatts.
Each Turbine Has A Share Of 1 Hectare For Its Safety Clearance And Security.

DOCUMENTATION:
DAY 3
DATE and TIME VISITED: Feb 6, 2019 10pm

COMPANY NAME: FUJI-HAYA ELECTRIC CORP

LOCATION: CARMEL RAY INDUSTRIAL PARK, BRGY CANLUBANG CALAMBA LAGUNA

COMPANY INFORMATION: A Japanese Electrical Manufacturing Company That Utilizes And Makes Electric
Components And Equipment Such A Circuit Breakers, Panel Boards And Switch Gears.

WHAT DID I LEARN?


I Learned That FUJI HAYA ELECTRIC CORP Manufactures And Distributes Many Electrical Components But Its
Raw Materials Came From Korea Which Made Its Product More Reliable And Has Greater In Quality. They Make
Low To Medium Voltage Switch Gears That Rates From 400 Volts For Low Voltages Switch Gears And 35
Kilovolts For Medium Voltage Switch Gears. They Also Show Us The Mechanisms Of Their Low Voltage Circuit
Breaker Which Is Cranked 7 Time When The Voltage Is Off To Operate The Component. Aside From Breakers
And Switchgears We Also Saw The Assembly Of It And The Measuring Of Bus Bars From Aluminium To Copper
Bus. The Tour Guide Also Made Present Their Capacitor Bank Which Has Its Limit Switch For Changing Its
Capacitance For Greater Adjustment For The Power Factor You Need To Use In Your System.

DOCUMENTATION: N/A
DATE and TIME VISITED: Feb 6, 2019 3pm

COMPANY NAME: SANDEN INTERNATIONAL PHILIPPINES INC.

LOCATION: YULO AVENUE, CALAMBA LAGUNA

COMPANY INFORMATION: A Japanese Air Conditioning Company That Is Based On Tokyo And Is The Best In
The Market As An Automotive Aircondition Unit Maker.

WHAT DID I LEARN?


I Learned That Sanden International Philippines Inc. One Of These Is Air Conditioning Systems For Car
Manufacturers All Over The World Like Suzuki, Isuzu, Kia, Hino, Honda, Toyota And Even The American And
European Brands Like Ford, Mclaren, Aston Martin, Tesla Motors And A Lot More. This Company Also Offers
Other Products Like Heating, Ventilation And Air Conditioning System Units, Compressors, Vending Machines,
Refrigerators, Freezers, Condensers, Evaporators And Heat Pumps. Sanden International Uses Alot Of Copper
Tube For Their Equipments Because Its Cheaper And Easy To Bend. Its Equipment Such As Benders And
Tester For Leaks Are Automatic Or Computerized So That Testing Would Be Easy And More Efficient Rather
Than More Man Power.

DOCUMENTATION:
DAY 4

DATE and TIME VISITED: Feb 7, 2019 10am

COMPANY NAME: WESCOR TRANSFORMER CORPORATION

LOCATION: VILLILA VILLAGE, NOVALICHES QUEZON CITY

COMPANY INFORMATION: A Family Corporation Was First Built From A Repair Shop To The One Of The
Leading Transformer Manufacturing Corporation In The Philippines.

WHAT DID I LEARN?


WESCOR TRANSFORMER CORP Has Two Transformer To Offer, The Dry Type Which Ranges From 1
Kilovolt-Ampere To 3000 Kilovolt-Ampere And Oil Immersed Transformers Which Is From 37.5 To 167 Kilovolt
Ampere But It Depends On The Order Of The Customer. The Small Dry Type Ranging In 200 Kilovolt Ampere
Below Can Be Finished And Ready To Deliver For Up To 3 Days While The 200 Kilovolt Ampere And Above
Ranges Can Be Ready For 5 To 7 Days. The Oil Type Or The Oil Immersed Type Is Different Because It Was
Custom Or Pre-Order Transformer Which Is Only Be Made If Someone Is Ordering It. It Can Be Made For
Almost 15 Days And A Month For A Transformer Used In Substation. Some Of The Materials Used In The
Transformer Were Bought From South Korea Which Is The Small Magnetic Wires And The Dog Bones. Dog
Bones Were Used For Making A Gap For The Iron Core Which Is Made Of Fiberclass. Before Delivery, It Was
Tested By Using A Megohm Meter For Open And Short Circuit Testing Of The Transformers. These Products
Were Based On The Specifications And Design In Compliance Of The Standards Of The Following Associations
And Bodies In Terms Of Electrification And Electrical Component/Equipment Licensing Such As The NATIONAL
POWER CORPORATION(NAPOCOR), National Electrical Manufacturers Association - American National
Standard Institute (NEMA-ANSI) And The Philippine Electric CODE (PEC).

DOCUMENTATION:
DATE and TIME VISITED: Feb 7, 2019 3pm

COMPANY NAME: VALENZUELA SOLAR POWER FARM

LOCATION: BRGY. ISLA, VALENZUELA CITY

COMPANY INFORMATION: This Is A Former Fish Pond With A 12 Hectare Of Land. It’s A 8.5 Mega Watt Solar
Farm.

WHAT DID I LEARN?


SOLAR ENERGY Is One Of The Solutions Nowadays For Resolving The Problem Of Global Warming. Its A
Renewable Energy Source And This Farm Uses Poly Crystalline Photovoltaic Module Which Has A 16-24
Percent Efficiency. But In Some Cases Efficiency Differs On Many Cases Like Some Of The Modules’ Part Were
Broken And Some Were Not Cleaned Because Dust And Water Can Affect The Production Of Energy Due To
The Blockage Of The Sunlight. The Production Of Energy On Solar Power Plants Were Not Constant Because
As They Shown Us From Their SCADA, The Production Of Energy Is Very Dependent On Weather Because
Clouds Can Block The Sunlight. This Photovoltaic Panels Were Connected Series To Add Their Output Voltages
Which Is 30 Volts Each And Being Connected Into Parallel To Be Add Up Again For Current Ranging On 0.30
Amperes Minimum To 2 Amperes Maximum. And The Connection Were On The Control Box With Some Fuses
And Other Protective Equipment And Directly Wired To The SCADA For Monitoring. After The Production It Was
Converted To AC Via INVERTER Because As You Know Solar Panels Produce DC Power, Only Generators
Produce AC.

DOCUMENTATION:
DAY 5
DATE and TIME VISITED: Feb 8, 2019 10pm

COMPANY NAME: BATAAN NUCLEAR POWER PLANT

LOCATION: MORONG, BATAAN

COMPANY INFORMATION: A 621 Megawatt Nuclear Powered Plant Which Uses Uranium 235 for Fuel. It Is
Ran by NAPOCOR Since It Was Constructed

WHAT DID I LEARN?


This Power Plant Was Fueled With Uranium 235 Which Is Very Abundant In Our World And It Only Cost
$25/Pound. Cheap But Later On The Time It Was Constructed And Already Tested It Was Ready To Be Used,
The Fuel Is On Its Way But The Chernobyl Incident Happened And As Usual Misconception The Things
Happened Way Back And The Situation Pushed This Project To Be Abolished. The Fuel Were Sold Back And
The Philippines Owed Millions Of Dollars From The Investors And Other Company. But First Lets Talk About The
Brightside Of This Project. This Nuclear Power Plant Has The Capacity Of 621 Megawatts And It Was Located
On Napot Point, Morong Bataan Covering Upto 389 Hectares Of Land 18 Meters Above The Sea Level. This
Uses A Pressurize Water Reactor To Produce Torque On The Shaft To Generator To Produce Energy. This Can
Supply 6 To 7 Percent Of Luzons Entire Consumption. Now On The Other Hand We Go The Maintenance Which
Other People Already Know That This Is A Threat For Out Safety But If We Can Handle It Right We Can Have A
Safe Environment. This Plant Also Has Its Protocol On Treating The Waste Like For Low Level Waste Which Is
The Clothes They Used They Can Seal And Wait For A Week To Be Decontaminate. For The Intermediate Level
And High Level Waste It Can Be Treated Or Seal For Decontamination For 10-20 Years.

DOCUMENTATION:
DATE and TIME VISITED: Feb 8, 2019 3pm

COMPANY NAME: ONE SUBIC POWER GENERATION CORP

LOCATION: SUBIC FREEBAY ZONE, OLONGAPO CITY

COMPANY INFORMATION: A Diesel Powered Plant Owned By Phinma And Has A Capacity Of 116 Megawatt
But The 6 Megawatt Is Used By The System So It Was Only 110 Mega Watts They Deliver To The Grid.

WHAT DID I LEARN?


This Site Uses 8 Units Of Diesel Generator To Produce Power. Each Unit Has 18 Cylinders Of Piston Used To
Drive The Shaft And Thus Producing Power. This Diesel Generators Operate Synchronously And They Have To
Meet The 116 Mega Watt Requirement But Since They Have A Low Efficiency They Only Achieve 60-65
Megawatts But It Depends Many Factors Like The Demand. They Consume Upto 0.24 Liter Or 240 Ml Of Diesel
To Have A 1 Kilowatthour Of Power.

DOCUMENTATION:
Republic of the Philippines
BICOL STATE COLLEGE OF APPLIED SCIENCES AND TECHNOLOGY
City of Naga

Field trip Documentation


(Laguna, Marikina, Valenzuela, Bataan, Subic)

a partial fulfillment to the subject


Seminars and Field Trip

Sergio A. Verdadero Jr. BSEE5B


Student

Engr. Jairus Jori John Luna REE


Instructor

February 18, 2019


S/Y 2018-2019

Das könnte Ihnen auch gefallen