Sie sind auf Seite 1von 5

EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITED

PROJECT - Strengthening & Construction of Residential Tower at Goregaon (West) Mumbai

  TENDER FOR STRENGTHENING, RCC, STRUCTURAL, MEP AND FINISHES WORKS OF


RESIDENTIAL TOWER AT GOREGAON (WEST) MUMBAI FOR ASHVI DEVELOPERS
PRIVATE LIMITED

ADDENDUM 1 (Date 16 November 2013)

Sl. No Tender Reference Clause Revision

Name of Employee shall be


M/s Ashvi Developers Private Limited,
Vol I / Section 4 / Contract
1. “Ariisto House”, N. S. Phadake Road,
Data Sheet
Near East – West Flyover, Andheri (East),
Mumbai 400 069.

Contractor shall use DG as available at site at no cost to be paid to


Vol I / Section 4 / Contract Employer. Contractor to bear all operation and maintenance cost to
2.
Data Sheet maintain the DG in good working condition and hand over to
Employer in good working condition after completion of work.

3. Vol I / Section 5 / Appendix F Revised Basic Rate Annexure

4. Vol III / Section 8 / BOQ Revised BOQ for Strengthening Work

5. Pre-bid Meeting Queries Clarification to pre-bid meeting queries.

Signed and stamped hard copy of Tender Document in sealed


6. Submission Date envelope to be submitted in Employer Office by 17:00 Hrs on
Tuesday, 26 November 2013.

Addendum 1 1 of 1                                          Seal & Sign of Bidder


EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITED
PROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

BASIC RATE OF MATERIAL


Allowable
Sr.No. Description Unit Basic Rate Wastage in
%

1 CEMENT-OPC BAG 300.00 2%

2 REINFORCEMENT STEEL - TMT Fe 500 MT 47,000.00 3%

3 REINFORCEMENT STEEL - TMT Fe 500 MT 50,000.00 5%

4 RUBBLE Cum 800.00 5%

5 Concrete M60 (Including Pumping) Cum 7,200.00 5%

6 Concrete M50 (Including Pumping) Cum 6,607.00 5%

7 Concrete M40 (Including Pumping) Cum 5,161.00 5%

8 Concrete M30 (Including Pumping) Cum 5,039.00 5%

9 Concrete M25 (Including Pumping) Cum 4,839.00 5%

10 Concrete M20 (Including Pumping) Cum 4,550.00 5%

11 Concrete M15 (Including Pumping) Cum 4,250.00 5%

12 Concrete M10 (Including Pumping) Cum 3,800.00 5%

13 BRICKS (230x115x75) no 5.25 5%

14 BRICKS (230x150x75) no 10.50 5%

15 Solid blocks- 390x190x190mm NOS 55.00 3%

16 Solid blocks- 390x190x150mm NOS 36.00 3%

17 Solid blocks- 390x190x90mm NOS 26.00 3%

18 Siporex blocks - 100x240x650mm NOS 59.00 3%

19 Vitrified Tiles (600X600) Sqm 538.00 5%

20 Vitrified Tiles (300 x 300) Sqm 323.00 5%

21 Vitrified Tikes (800 x 800 ) Sqm 974.00 5%

22 Anti skid Ceramic Tiles (600x150) Sqm 753.00 5%

23 Black Granite 20mm thick Sqm 1,400.00 5%

24 Indian Marble18mm thick Sqm 484.00 5%

25 Baroda green marble Sqm 630.00 5%

26 Kota Stone Sqm 410.00 5%

27 Composite Arificial Marble 18mmthick sqm 2,400.00 5%

28 Glaas Mosaic Tiles Sqm 8,614.00 5%

29 Vitrified Tiles (1000X1000) Sqm 970.00 5%

30 Ceramic Tiles (300X300) Sqm 323.00 5%

31 Ceramic Tiles (300X600) Sqm 484.00 5%

Addendum 1 ‐ Basic Rate Annexure Page 1 of 3 Seal Sign of Bidder


EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITED
PROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

BASIC RATE OF MATERIAL

Wastage in
Sr.No. Description Unit Basic Rate
%

32 Glazed Tiles (200x300) Sqm 284 5%

33 Texture Paint Sqm 645 3%


Not
34 Teak wood frame size 6"x21/2" Cum 80,463
Applicable
Not
35 Teak wood frame size4""x21/2" Cum 80,463
Applicable
Not
36 Red meranti wood size 4"x21/2" Cum 35,761
Applicable
Not
37 Flush shutter 35mmthickwith commerical Veener finish with (ISI) sqm 2,906
Applicable
Not
38 Flush shutter 45mmthick withcommerical Veener finish (2HR FIRE RATING) sqm 4,540
Applicable
Not
39 Flush shutter 45mmthick with (1HR FIRE RATING) sqm 3,850
Applicable
Not
40 Alumininum sliding window including fixing sqm 3,770
Applicable
Not
41 Aluminium Window Toilet including fixing sqm 2,690
Applicable
Not
42 S.S railing with glass including fixing Rft 1,200
Applicable
43 Gypsum ceiling board 12mmthick SFT 17 2%
Not
44 Mortise handle with button dead lock No 1,200
Applicable
Not
45 Mortise lock No 1,300
Applicable
Not
46 Night Latch No 968
Applicable
Not
47 Open Door closer No 940
Applicable
Not
48 BRASS Butt Hinges 4"x1 1/2" Heavy Duty No 296
Applicable
Not
49 Handle S.S 12"LONG pair 750
Applicable
Not
50 S.S Railway type Hinge SIZE 125MM No 125
Applicable
Not
51 S.S Railway type Hinge SIZE 100MM No 88
Applicable
Not
52 HT Strands KG 60
Applicable
Not
53 35mm thick Flush shutter with laminate finish Sqm 2,906
Applicable
Flush shutter 35mmthick with commerical Veener finish (2HR FIRE Not
54 sqm 3,500
RATING) Applicable
Not
55 Aldrop Lock No 300
Applicable

Employer will supply RMC, Steel and major finishing items along with MEP materials on a star rate basis as mentioned
above. Employer shall give all VAT bill to Contractor and it shall be consignee name in form of bid. Any increase or
decrease on the star rate will be in Employer’s account adjusted from RA Bill. Variation in the wastage is agreed by
Ariisto and bider. Employer will be liable to supply the fixed quantity according to the project and if any additional
1 quantity will be required to be procured by bidder for any reasons attributable to bidder and or on account of additional
wastage or for any other reasons it will be at the sole cost of bidder.

Above mentioned basic price of materials are the landed cost of materials at Project site including all taxes, duties,
cesses including VAT, Central & Local taxes, Loading, Transportation etc. complete. The unloading shall be factored in
the overall item rate.

Contractor should submit the Reconcilation Statement along with Running Account Bill (RA Bill). Contractor should take
2 all necessary care to see that wastage should not be exceeded % mentioned . If wastage exceeds by below mentioned
wastage %, cost of the extra wastage shall be recovered at 10% higher than supply rate and shall be deducted from
Running Bill. For Rolling Margin, Testing shall be done from every lot of steel of all diameter received at site and
wastage shall be calculated based on rolling margin

Bidder will submit list of materials with specifications as to quality and quantity as required on site at least one month in
3 advance to Employer. Such specifications shall be submitted along with the Price list and the vendor list. Employer
shall at its sole discretion either supply below or at par with the purchase rate or give consent to bidder for the

Addendum 1 ‐ Basic Rate Annexure Page 2 of 3 Seal Sign of Bidder


EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITED
PROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

Formula for Basic price variation reimbursement is,


4
= [(Actual procurement price - Basic Price)] + Appropriate Tax, if applicable.

The Contractor, before procuring any item with base rate shall provide all documentary justification (three quotes) for
5
the base rate of materials. Final decision on supplier will be by Employer.

Addendum 1 ‐ Basic Rate Annexure Page 3 of 3 Seal Sign of Bidder


Project: Ariisto Residential Tower
Loction: Goregaon, Mumbai
Client: Ashvi Developers Private Limited
TECHNICAL CLARIFICATION- CIVIL + FINISHES PACKAGE
Sr
Description Reference Queries Clarification
No
Request you to provide the horizontal connection details
1 Raft Scanned copy of ref drgs are attached Not Required
between existing & new raft.
For introduction of additional columns as
2
per the drawings provided
We understand from drawings that existing slab & beams are As per information PT bonding system is used and also we
PT Slab Scanned copy of ref drgs are attached are breaking only concrete not any reinforcement and tendon
PT. Kindly confirm the scope of destressing.
so no need of destressing.
After introducing additional columns, whether the punchered These additional columns are not crossing any tendon and
Punchured Slab slab will be PT or not. Kindly confirm. If PT then kindly confirm also we are breaking only concrete not any reinforcement and
the scope of Re-stressing. tendon so Re-stressing is not required
As per drawings, the beams are PT beams, so kindly provide New slab beams are coming at the back side of lift only so
New Slab & PT Beam Connection
the details of connection of new slab with existing PT beams. whereas old and new slab and beam connection is required
we will do epoxy grouting or equivalent.
From drawings we understand that the existing slab grade is M60 grade is used for column, for additional column we are
Grade of Concrete M40, whereas the grade of new concrete works is mentioned breaking concrete at junction. For new column and slab/beam
as M60 as per BOQ. Kindly provide the details of bonding in and raft provide Nitobond or equivalent for old and new
between concrete bonding

Addendum 1 - Pre-bid Queries Clarification Seal Sign of Bidder