Sie sind auf Seite 1von 2

DESAIN BALOK LENTUR

SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK)

1. GENERAL INFORMATION
02 March 2019
Project : GD. ARSIP Engineer : T.A
Tipe Balok : B1 250x400 mm Check by : T.A
Code : SNI 2847-2013 / ACI 318-14 Units : Metric

MATERIAL PROPERTIES
Concrete
Mutu beton pelat lantai, K- 250 f c' = 21.2 MPa
Modulus elastisitas beton, Ec. = 21615.9 MPa
Faktor bentuk distribusi tegangan beton, b1 = 0.85
Modulus keruntuhan lentur beton, fr = 0,62 * l * sqrt ( fc' ) = 2.85 MPa
Nilai perbandingan modulus elastis, n= 9.25
Regangan maksimum, ecmax = 0.003
Steel
Mutu baja tulangan pokok, U- 40 fy = 400 MPa
Mutu baja tulangan sengkang, U- 40 fys = 400 MPa
Modulus elastisitas tulangan, Es = 200000 MPa
Regangan minimum, esmin = 0.005
Regangan maksimum, esmax = 0.002

SECTION PROPERTIES B1
Panjang bentang balok, L= 4.8 m
Tinggi, h= 400 mm
Lebar, b= 250 mm
Tebal bersih selimut beton, sb = 40 mm
Berat sendiri pelat, fFlx = 0.9

2. PENULANGAN

Jarak tulangan terhadap sisi luar beton, ds = sb + Ds + D/2 = 56.50 mm


Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 4.15
Digunakan jumlah tulangan dalam satu baris, ns = 4 bh

@Ksc.2018 Page 1 of 2
Notasi Tumpuan Lapangan
Atas Bawah Atas Bawah
Momen (kNm) -73.7 24.55 -14.4 55.8
Jarak antar tulangan baris 1 dan 2, 0 0 0 0
d' = 57 57 57 57
Tebal efektif balok (mm) d= 344 344 344 344
Tinggi balok tekan ekivalen, a= 58 18 11 43
Tinggi blok tekan maksimum, Cmax = 129 129 129 129
Tinggi balok tekan ekivalen maksimum, amax = 109 109 109 109
Single reinforcement or double reinforcement.? Single Single
Compressive force developed in concrete, C= - -
Moment resisted by concrete compression, Muc = - -
Moment resisted by compression steel, Mus = - -
fs' = - -
Required compression steel, As ' = - - - -
Required tensile steel, As.1 = - -
Tensile steel for balancing, As.2 = - -
Total tensile reinforcement, 0 0
As Perlu (mm2) 650 204 118 481
2
As Min (mm ) 301 301 301 301
As Pakai (mm2) 650 301 301 481
Dia. Tulangan (mm) 13 13 13 13
As.1 (mm2) 133 133 133 133
Jumlah perlu (buah) 5.0 3.0 3.0 4.0
Jumlah terpasang (buah) 6.0 3.0 3.0 4.0
As Terpasang (mm2) 796 398 398 531
Mnc (kNm) - - - -
Mns (kNm) - - - -
Mn (kNm) 90 48 48 62
Check OK.! OK.! OK.! OK.!
Tulangan Terpasang 6 D 13 3 D 13 3 D 13 4 D 13
Luas sengkang Perlu (mm2/m) Av / Sperlu = 712 126
Dia. Tulangan (mm) Ds = 10 10
Luas 1 buah tulangan, Av1 = p / 4 * Ds2 = 79 79
Jumlah kaki sengkang awal, n= 2 2
Spasi perlu, sperlu = 221 1250
Jarak Minimum, 6 * D (mm) smin = 78 -
de / 4 (mm) smin = 86 -
Jarak Maksimum, de / 2 (mm) smax = 172 172
smax = 150 150
Spasi minimum (mm) 75 150
Tulangan Terpasang 2D10-75 2D10-150

@Ksc.2018 Page 2 of 2