Beruflich Dokumente
Kultur Dokumente
www.samjungtech.co.kr / www.samjungtech.com
In these days of increasingly more congested city life, the parking system must not
only just park vehicles but also be capable of providing comfort to users and of
considering value of the building and of meeting the demands of new era.
Complete with high standards of safety, durability, quickness, people-friendly design,
various models, and thorough After-sale Service,
Samjung Tech solves the problems of parking in big cities by providing the most convenient
and highly functional parking systems with the world's best technology and most experiences.
Based on the long history of experiences and know-how, Samjung Tech creates comfortable
and pleasant parking environment by providing various parking systems complete with high
standards of safety, durability, and quickness.
Flexible arrangement of entrance and exit is Translo simultaneously operates vertically and This elevator for a vehicle is operated by a driver
possible due to combining a vertical lift and horizontally to move vehicles in and out on all who drives in a vehicle into the elevator.
horizontal trolley. This type can efficiently cope levels. Time required to move a vehicle in and out
with plans of utilizing underground space as well is less than a minute in average. By arranging the
as moving lines of vehicles. This no-pallet type number of entrance and exit as well as their
holds the record of minimum time required for a locations flexibly, increasing the number of
vehicle in and out in Korea. vehicles to be parked and making moving lines of
vehicles flow are easily managed.
An elevator located in the center of the tower for a ELE PARKING (Independent Steel Type)
vehicle moves vehicles vertically as well as horizontally.
Applying the latest elevator system, this can reach the
express running speed, while providing low-noise, low-
vibration operating mechanism. You can experience
Samjung's advanced technology with the highest
standards of safety.
Special Features
■ Low-noise, low-vibration operating mechanism is attained by
adopting wire rope elevator system.
■ Vehicle in and out time is reduced greatly with elevation speed of
120m/min.
■ Including turntable in standard installation of a lift enables easy
operation of a vehicle in and out even for inexperienced drivers.
Location of entrance can be selected according to site needs.
Special Features
■ This system is ideal where site shape is narrow in width and long
in length, and offers highest rate of efficiency in using space.
Standard Specifications
Motor Max. 15kW
Standard Measurements
Elevation
Speed Max. 20m/min capacity(vehicles) W(mm) H(mm)
L(mm)
Motor Max. 3.7kW level 2 level 3 level 4 2100 Pitch 2250 Pitch level 2 level 3 level 4
Horizontal
Speed Max. 20m/min 6 8 10 9,900 10,350 H1 H1 H1
8 11 14 12,000 12,600 5,670 7,510 9,340
Power Supply Max. 65KVA
10 14 18 14,100 14,850 6,590 8,420 10,250
12 17 22 16,200 17,100 7,510 9,340 11,170
14 20 26 18,300 19,350
16 23 30 20,400 21,600
18 26 34 22,500 23,850 6500
20 29 38 24,600 26,100
22 32 42 26,700 28,350 H2 H2 H2
24 35 46 28,800 30,600 4,220 6,050 7,880
26 38 30,900 32,850
28 41 33,000 35,100
30 35,100 37,350
Special Features
■ This system is ideal where site shape is almost square looking.
Standard Specifications
Motor Max. 15kW
Elevation
Speed Max. 20m/min
Motor Max. 3.7kW
Horizontal
Speed Max. 20m/min
Motor Max. 2.2kW
Turn table
Speed Max. 27m/min Standard Measurements
Power Supply Max. 75KVA
capacity(vehicles) H(mm)
W(mm) L(mm)
level 2 level 3 level 4 level 2 level 3 level 4
8 12 16 10,350 H1 H1 H1
C800 : 12,800
12 18 24 12,600 H2+ H of a beam H2+ H of a beam H2+ H of a beam
C900 : 13,100
16 24 32 14,850 over over over
C1,000 : 13,200
20 30 40 17,100
C1,100 : 13,300
24 36 19,350 H2 H2 H2
C1,200 : 13,400
28 21,600 4,800 6,900 9,000
>>>
This pallet type shortens time of taking vehicles in and CART PARKING
out due to simultaneous operation of elevation and
sliding. It also offers easy installation of entrance and
exit by adding a lift.
Special Features
■ Vehicle in and out time has been reduced sharply by simultaneous
operation of vertical and horizontal movements.
■ It also offers easy installation of entrance and exit by adding a lift.
Standard Specifications
Motor Max. 30kW Standard Measurements
Elevation
Speed Max. 60m/min WO over 300
Direction driving horizontal W1 2,600
W2 5,000
Driving Power friction friction
Trolley W(mm) W3 7,400
Speed Max. 150m/min Max. 46m/min W4 9,800
Motor Max. 2.2kW Max. 2.2kW W5 3,500
Power 1 LIFT Max. 65KVA W6 3,700
Supply 2 LIFT Max. 110KVA L1 5,450
L2 5,450
L(mm)
L3 L2+200
L4 5,700
H1 2,000
H2 4,350
H(mm) H3 6,500
H4 VAR
H5 3,200
PIT(mm) 1,000
>>>
Special Features
■ Making entrance in through and adding a lift will increase the
capacity and improve the flow of vehicle moving lines.
■ Use of underground space can be maximized when planning a
new building. It's semi-permanent and offers easy maintenance
as parking lots are built with concrete.
■ Parking lots can be built with steel frame structure. (possible to
reduce construction time)
Standard Specifications
Driving Power rope or chain Standard Measurements
Elevation Motor Max. 22kW
W1 2,300
Speed Max. 90m/min W2 4,600
Horizontal Max. 3.7kW, Max. 150m/min W3 6,900
Trolley W(mm)
Vertical Max. 5.5kW, 16sec/cycle W4 300
W5 800
Power Supply Max. 70KVA
WL 3,800
L1 5,500
L(mm) L2 5,500
LL 6,000
H1 1,650
H2 650
H(mm)
H3 2,300
H4 3,200
PIT(mm) 1,600
>>>
Special Features
■ Simultaneously operating vertically and horizontally enables to
reduce vehicle in and out time (average time is one min).
■ Installation of entrance is made easy when a lift is combined.
■ It is semi-permanent and offers easy maintenance as parking lots
are built with concrete and there is no pallet.
■ Use of underground space can be maximized when planning a
new building with low parking lot height (1,900mm).
Standard Measurements
W0 700
W1 2,300
Standard Specifications W2 4,600
W3 6,900
Driving Power rope or chain W(mm)
W4 9,200
Elevation Motor Max. 22kW
W5 1,400
Speed Max. 60m/min WL 3,400
Elevation Max. 18kW, Max. 50m/min L1 5,500
Translator Horizontal Max. 5.5kW, Max. 50m/min L(mm) L2 5,500
LL 5,800
Vertical Max. 5.5kW, 16sec/cycle
H1 1,650
Power Supply Max. 70KVA H2 300
H(mm) H3 1,950
H4 2,400
H5 3,200
PIT(mm) 1,600
Upper and lower pallets repeatedly move vertically and This type is a new concept in parking systems. It
horizontally to move vehicles in and out. Depending on connects cages for vehicles to vertically rotating chain.
site condition, continuous installation of units are Compared to the existing Tower Parking, this type is
possible with simple installation and maintenance. small in size with the capacity of maximum 12 vehicles.
This is an elevator for a vehicle. There is an operation This economical parking garage is built by using
panel inside it so that a driver can easily run the system. assembling type of light-weighted steel frames, and the
parking space can be multiplied easily.
Parking Garages
Standard Specifications
※ Requirements for Building Construction Single Type Double Type
1. A ventilation fan (over W300 x H300) and Loading Weight 2,500kg
gallery must be installed in the mechanical
Motor Max. 24kW
room.
2. Entrance door (over W900 x H1800) must be Speed Max. 20m/min
equipped with a lock, and be made of fire-proof
material, and be installed over a fire-proof door
Standard Measurements
sill. Chunan Branch office of Samsung SDI(2 floors, 3 levels) Geoje Shipyard of Samsung Heavy Industries(3 floors, 4 levels)
Single Type Double Type
3. Electric wirings are for watertank, elevator,
and related devices only and cannot be used for W1 2,500
any other purpose. If styrofoam is used as a W2 2,600
ceiling material, it must be finished with a fire- W(mm)
W3 3,400 7,350
proof coverings.
4. Switches for electric lights and ventilation fan W4 2,500
must be located near the entrance and must L1 6,000
have separate power source. L(mm) L2 6,500
5. Electric wirings must be done for intercom
L3 3,000 4,500
device in control room.
6. Mechanical room's ceiling height must H1 Min. 3,600
maintain minimum 2100mm and must be H(mm) H2 Max. 20,000
equipped with a fire extinguisher.
H3 1,200
R1 10,500
* Please enquire separately to our company for
freight elevator. (Kg) R2 9,900
Kangbuk Samsung Hospital in Seoul(3 floors, 4 levels) Masan Samsung Medical Center(3 floors, 4 levels)
R3 6,600
Consultation
You may visit us or call us from anywhere to talk to
our experts. We will visit the site and offer detailed
Unmanned Parking Fee Collector information on size of building, condition of location,
Parking Ticket Issuer surrounding environment, use and configuration of
Exit Reader the ground, size of budget, planning, construction,
Gate and after-sale service.
Licence Plate Reader
Parking Fee Indicator Planning and Construction
Country's top experts will draw a blue print based on
meticulous on-site research and consultation
results.
During the process of planning, correcting, and
deciding the final design, our experts will keep close
contact with you for finding the best way of carrying
out the job. Especially, construction stage is the
most important part of the process. We will do our
best to minimize disruption of existing building as
well as to shorten the construction time without any
compromising.
A/S
Samjung Tech's After-sale Service is available
nation-wide. Our principle is accident-free, trouble-
free construction. However, just in case of any
problem, we are ready to offer our on-site after-sale
service anywhere in the country.
ADBANCED PARKING CONTROL SYSTEM
Aug. 1974 Established Samsung Heavy Industries Co., Ltd. Apr. 2001 Established a subsidiary company, Samjung
machines and electrics
Samjung
Jun. 1979 Launched parking system business
May. 2001 Established a subsidiary company, Samjung
Oct. 1979 Delivered tower parking #1 system
(Daegu, Mido Department Store)
Sep. 2001 Established a factory in Gimpo
Jan. 1992 Launched refrigeration & air conditioning
business Feb. 2002 Registered specialized fire-fighting facility
construction business
Jun. 1992 Delivered absorption chiller and heater #1
We fully commit to be a leading company (Cheonan, Fahil Building) Jun. 2002 Passed in KOSDAQ preliminary examination
providing the best service for customers Dec. 1999 Established Samjung tech Co., Ltd. Oct. 2002 ISO 9001 : 2000 Version Up
Tech
and making a contribution to the society.
Mar. 2000
May. 2000
Jul. 2000
Acquired a license for elevator and parking
system construction business
Selected as a venture capital investment
business from SMBA
Jan. 2005
Dec. 2005
Acquired a license for electric facility construction
business
Acquired a license for steel structure construction Jan. 2006 Received the first order of PSD project
business, mechanical equipment construction
business Nov. 2006 Awarded a ‘Korea’s best brand certification’ for
the Parking System, by Journalist Federation of
Aug. 2000 Established a subsidiary company, Samjung Korea
parking system
Nov. 2006 Moved headquaters office(9th fl. Dongyoung
Feb. 2001 Established a subsidiary company, Samjung Munhwa Center B/D 772, Yeoksam-dong,
HVAC ENG Gangnam-gu, Seoul, Korea