ARCHITECT
PRE DESIGN MDPE (Multiple of Direct Personnel Expense), Professional Fee plus Ex
(Honorarium), Lump Sum, PCC (Project Construction Cost), Mixed Metho
Group 2 (Moderate)
PCC (Percentage of Construction Cost)
Group 3 (Exceptional)
PCC (Percentage of Construction Cost)
First Building
Second Building
Third Building
Fourth and Succeding Structure
Group 7 (Housing Projects)
No. of Units
First Unit
Two to Ten Units
Eleven Units and Above
PAYMENT SCHEDULE
Work Phase
Signing of Agreement
Completion of Schematic Design Phase*
Architectural Interior
Physical Planning
Type I - Any complex consisting of several sturctures
Project Size
50 hectares or less
51 to 100 hectares
101 to 200 hectares
More than 200 heactares
Type II - Subdivision Planning for Housing Properties within Metro Manila
provincial capital
Project Size
100 hectares or less
101 to 200 hectares
More than 200 heactares
METHODS OF COMPENSATION
Based on 1979 UAP Doc
ARCHITECT
el Expense), Professional Fee plus Expense, Per Diem plus Reimbursible
roject Construction Cost), Mixed Method of compensation.
PHP 200/hr
PAYMENT SCHEDULE
Breakdown of Professional
Cumulative Payments
Fee
5% of (SPPCC**)
15% of Basic Fee 20% of Basic Fee
35% of Basic Fee
15% of Basic Fee
50% of Basic Fee 85% of Professional Fee
85% of Professional Fee
15% of Professional Fee 100% of Professional Fee
10% of Professional Fee - Architect's Liability
5% of Professional Fee - Periodic Construction Supervision
(PCS) Fee - Progress Billing
Remaining 10% of Professional
12%15%
several sturctures
Minimum Basic Fee
PHP 5,000 per hectare
PHP 250,000 plus PHP 4,500/ha. in excess of 50 ha.
PHP 475,000 plus PHP 4,000/ha. in excess of 100 ha.
PHP 875,000 plus PHP3,000/ha. in excess of 200 ha.
Housing Properties within Metro Manila, cities, regional center and
Group 1 (Simple)
PCC (Percentage of Construction Cost) DAEDS (Detailed Architectural and Engineering Design
Services)
PHP 50 million and less 5%
Over PHP 50 million to 100 million PHP 2,500,000 plus 4% of excess of PHP 50 million
Over PHP 100 million to 200 million PHP 4,500,000 plus 3% of excess of PHP 100 million
Over PHP 200 million to 500 million PHP 7,500,000 plus 2% of excess of PHP 200 million
Over PHP 500 million to 1 billion
Over PHP 1 Billion PHP 18,500,000 plus .5% of excess of PHP 1 billion
PCC (Percentage of Construction Cost) DADS (Detailed Architectural Design Services)
Over PHP 500 million to 1 billion PHP 13,500,000 plus 0.6% of excess of PHP 500 million
Over PHP 1 Billion PHP 18,500,000 plus 0.6% of excess of PHP 1 billion
Group 2 (Moderate)
PCC (Percentage of Construction Cost) DAEDS (Detailed Architectural and Engineering Design
Services)
PHP 50 million and less 6%
Over PHP 50 million to 100 million PHP 3,000,000 plus 5% of excess of PHP 50 million
Over PHP 100 million to 200 million PHP 5,500,000 plus 4% of excess of PHP 100 million
Over PHP 200 million to 500 million PHP 9,500,000 plus 3% of excess of PHP 200 million
Over PHP 500 million to 1 billion PHP 18,500,000 plus 2% of excess of PHP 500 million
Over PHP 1 Billion PHP 28,500,000 plus 1% of excess of PHP 1 billion
PCC (Percentage of Construction Cost) DADS (Detailed Architectural Design Services)
Breakdown of Professional
Work Phase
Fee
ofessional Fee(RPF)
ype of building
pe of building
pe of building
pe of building
ance
ULE
*Upon 15 days
Cumulative Payments after submission
to the owner.
**Statement of
20% of Basic Fee Probable Project
40% of Basic Fee Construction
Cost
90% of Professional Fee
***Within 15
days after the
awards of bid
**Statement of
Probable Project
Construction
Cost