Sie sind auf Seite 1von 1

HEALTH AND SAFETY MANAGEMENT SYSTEMS

RISK ASSESSMENT – GROUNDWORK: PLACING BACKFILL

TASK: GROUNDWORK – PLACING BACKFILL / HARDCORE

1. ANTICIPATED SITE HAZARDS

EXISTING ENVIRONMENT

Access / Egress Adjacent Areas Adjacent to Water Asbestos Biological Hazards


Confined Spaces Contaminated Ground Laser / RF Fields Means of Escape Needles / Sharps
Occupied Premises Overhead Services Stability of Structure Underground Services
Others (Please State)

CONSTRUCTION PHASE

Access / Egress Adjacent to Water Asbestos Collapse of Excavation Collapse of Structure

Confined Spaces Contact with Services COSHH Dust Extreme Temperature


(Electricity, Gas, Water)

Falling Objects Fire Fragile Materials Manual Handling Noise / Vibration

Site Security Struck by Traffic / Plant Tools and Equipment Trip on Level Vehicles Overturning

Working at Height Others (Please State) General Construction Activities

2. WHO MAY BE HARMED?


Employees (E) Sub-contractors (S) General Public (GP) Official Visitors Others (O)

3. RISK EVALUATION AND CONTROL MEASURES


Significant Health and Safety
Risk Control Measures
Risks
 Keeping traffic routes clear
 Operatives adequately trained
 Site speed limit in place
1 Vehicles overturning High
 Dumpers to be evenly loaded
 Seat belts to be worn at all times by operator
 Roll-over protective structure to be in place
 Manual handling assessment carried out
2 Manual handling Medium  Operatives trained in manual handling
 Use of mechanical aids wherever possible
 Segregation of traffic routes
3 Collision with vehicles Low  No reversing on site
 Amber flashing beacons to be fitted and working
 Machinery kept in good condition by adequate maintenance
 Defects reporting procedure
4 Use of machinery Low  Vehicles fitted with warning lamps and all round visibility
 Operators to be trained, competent and authorised
 Use of adequate PPE when operating machinery
5 Noise Low  Use of ear defenders

4. PERSONAL PROTECTIVE EQUIPMENT


Safety Helmet Safety Boots Goggle / Visor Overalls Gloves
Hearing Protection Respiratory Protective Equipment

5. ADDITIONAL REQUIREMENTS / INFORMATION

RISK ASSESSMENT KEY S = Hazard Severity HS6-25 Page 1 of 1


Risk Assessment = S x L 1 = Slight 2 = Serious 3 = Major Risk Assessment Date: January 2012
3 = Likely Medium (3) High (6) High (9) Groundwork: Placing Backfill / Hardcore
L = likelihood 2 = Possible Low (2) Medium (4) High (6)
1 = Rare Low (1) Low (2) Medium (3)

Das könnte Ihnen auch gefallen