: J06-H054-TA-1-3
CUSTOMER: Digicel
Customer : Digicel
NET SOIL BEARING CAPACITY =100 kPa reference Design
FPF/EMA
gs F b2
Soil Density = 16.00 kN/m3 x
e
B
Soil Condition Sc = DRY 0
F
Angle of Soil Friction q = 30.00 deg. y
Net Allowable Soil Bearing Pressure Qall = 100.00 kPa
Gross Bearing = Qall + Qoverburden Soil = Qgross = 143.20 kPa F
2. FOUNDATION DESIGN DIMENSIONS Fx z
2.a MAT/FOOTING y ho
Length of foundation (x-axis) L = 2.50 m ts
q q
Width of tower (z/y-direction) B = 2.50 m c
Thickness of mat / footing t = 0.20 m e t
Thickness of Soil Cover ( tsc )= tsc = 2.50 m
Tower Face Width W = 3.70 m
2.b PEDESTAL
Pedestal section (x-axis) b1 = 0.20 m
Pedestal section (z-axis) b2 = 0.20 m
Height above ground ho = 0.50 m
Top of pedestal to bottom of footing ( ho + tsc + t ) H = 3.20 m
qeff = q gross - tsc * ( d c- Sc * 9.806 ) - t * ( d s -Sc * 9.806 ) = 106.20 kPa for design bottom reinf, beam shear
Customer :
Digicel NET SOIL BEARING CAPACITY =100 kPa reference Design
FPF/EMA
Pedestal Capacities :
As fy on one face = 490873.85 N
a = As Fy / (.85 fc b ) = 115.50 mm
Ku= a / (g d ) = 1.35
Mou Capacity : Mou = Asfy{ d - a/2} = 20.98 kN-m
f= 7.12
ratio: Mux/Mnx +Muz/Mnz < 1.0= 1.25 unsafe
Uplift Capacity : Pu = .9 As total Fy= 1325.36 kN safe > 281kN-m
Ties Shear Capacity: notes concrete shear capacity neglected Vs=.95*Av*Fy*d/s = 53.99 kN unsafe
Punching Shear :
dSLAB= 119 mm
r govern= 0.0096 b 2 = 1.0
uC BEAM SHEAR = b 1 b 2 b 3 ( r fc ) 1/3 = 0.684 MPa b1 = 1.1
b2 = 1.0
uCo = .17 * ( 1+2/b h ) fc 1/2 = 1.70 MPa where b h= 1.0
<= 0.34 fc 1/2
Maximum Punching Shear Stress: Pudown / b o x dSLAB = 1.525 MPa safe < 1.7 MPa
Beam Shear Stress - vu = f x qeff ( B/2 - b1/2 - d SLAB ) /d = 1.380 MPa unsafe
Maximum Moment = w l2 / 8
= 4.1 kN-m
npc= 14 pc
length/pc= 2.50 meter
Total Weight= 521.50 kg
L= 2.50 meter
w= L/4 * qmax = 66.4 kN/m
= 12.96 kN-m
npc= 2
l/pc= 2.50
L= 2.50 meter
w= 1.15* L/2 * qmax = 152.7 kN/m
= 29.82 kN-m
npc= 1
l/pc= 2.50
Strut Design
tsc= 2.50
t= 0.20
L=sqrt((L/2)2 +(t+ tsc)2) 2.98 meter
TA=(L/2)*(L/4) 0.781 m2
Vertical= 83.0 kN
npc= 8
l/pc= 2.98
Post
L= 3.00 meter
P= 318.0 kN
npc= 1
l/pc= 56.00
n setup= 4 6993.2 kg
35-Triangular Normal Duty J06-H054-TA-1-3
Rebar Estimates
Pedestal
Mark Bar dia wt/LM npc L/pc wt/pc weight nlegs Total
Vertical 25 3.85 12 3.45 13.29 159.53
ties main 12 0.89 17 0.40 0.36 6.04
secondary 12 0.89 34 0.36 0.32 10.87
sub total per pedestal 176.43 4.00 705.73
Footing
Top Bars 12 0.89 22 2.45 2.18 47.85
Bot Bars 20 2.47 20 2.45 6.04 120.84
sub total per pedestal 168.69 4.00 674.78
Concrete Volume
B B2 H Vol/pc npc total /item
Pedestal 0.20 0.20 3.00 0.12 4 0.48
Footing 2.50 2.50 0.20 1.25 4 5.00
column no= #REF! H&L exh diff= #REF! diff exb= #REF!
10 0.616
12 0.888
16 1.579
20 2.466
25 3.854
28 4.833
32 6.313
36 7.991
Strain