FIRED HEATERS
PAGE 1 of 3
PROCESS MANUAL TABLE OF CONTENTS
DATE 03-96
1.0
1.0 INTRODUCTION
1.1 GENERAL
1.2 CHARACTERISTICS AND USE OF FIRED HEATERS
1.3 SPECIFICATION SHEETS
1.4 DATA SOURCES
1.5 TERMS AND DEFINITIONS
K:\WRK090\037\345\MANUALS\FIRHEAT\007-TOC.SAM-02/06/1997
` FLUOR DANIEL
SECTION TOC
FIRED HEATERS
PAGE 2
PROCESS MANUAL TABLE OF CONTENTS
DATE 03-96
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-TOC.SAM-02/06/1997
` FLUOR DANIEL
SECTION TOC
FIRED HEATERS
PAGE 3
PROCESS MANUAL TABLE OF CONTENTS
DATE 03-96
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-TOC.SAM-02/06/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 1 of 9
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
1.0 INTRODUCTION
1.1 GENERAL
Fired heaters or furnaces are used extensively in the process industry. Some familiar
examples are open hearth blast furnaces, cement kilns, refinery crude oil heaters and
glass furnaces. We will limit our discussion here, however, to fired heaters commonly
used in the chemical process industry, i.e., direct fired tubular heaters. We will use the
words "fired heater" and "furnace" in this context even though they do not fully define the
normal process-type heater.
You, as a Process Engineer, are responsible for specifying required process parameters
such as heat duty, flow, and fuel composition as well as basic furnace configuration. The
task force Mechanical Engineer assigned to fired heaters can assist in formulating a
basic configuration for the furnace. Using all this information the vendor does the
mechanical design, specifying the number of tubes, tube length, and other detailed
information. In short, FDI specifies the performance requirements for a fired heater while
the vendor actual designs it.
This section provides some examples of calculations and specification data sheets for
several types of fired heaters. All are widely used throughout the refining and
petrochemical industries. You should note that the examples presented here are taken
from actual FDI projects.
All furnaces have a fire-box or combustion space where a fuel is burned, and a stack
through which flue gases are discharged to the atmosphere. Fuel is usually natural gas,
refinery gas or fuel oil, but it may be coal or coke. The heat released in the fire-box is
used directly or indirectly to produce a physical or chemical change on a process
material.
Fired heaters or "process furnaces" common to the refining and petrochemical industries
are direct fired tubular heaters. These are generally of two types, cabin or box
(Figure 1-1) and cylindrical or vertical (Figure 1-2). The fluid to be heated is contained in
tube coil rows disposed along the walls and ceiling of the combustion chamber. The
principal mode of heat transfer is radiation. A "convection" section is generally added to
increase the efficiency of the furnace by extraction of additional h eat from the
combustion flue gas enroute to the stack. For more details on fired heater geometry see
reference article entitled Fired Heaters I. In a direct fired tubular heater, radiant heat
from the open-burner flames in the fire-box heats the process material flowing through
the heater tubes. In an indirect heater, the burner flames are enclosed on the sides by
walls, and thus the flames heat these walls. The walls in turn radiate heat to the process
material in the heater tubes (or other enclosure).
There are two general categories of direct fired tubular heaters. We will refer to these as
simple heaters and reactor heaters. A simple heater, such as a crude oil heater, does
just what its name implies; it raises the temperature of a process material. In doing so, it
may vaporize some or all of that material. A familiar type of simple heater is an
incinerator.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 2
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Figure 1-1
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 3
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Figure 1-2
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 4
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Incinerators are used to burn waste gases. These gases usually have low heating values
and are often toxic. Incinerators ensure essentially complete combustion of such
material. Usually as much heat of combustion as possible is recovered and, hence, the
incinerator is used to heat some process material. A reactor heater also transfers heat to
the process material, but in addition to producing a physical change, the heat initiates
and drives a chemical reaction. A catalyst may be present in the heater tubes to
promote the reaction. Such is the case for a reformer and a fired catalytic cracker.
Other types of reactor heaters such as thermal crackers or fired hydrodealkylation
reactors require no catalyst. Examples of calculations and equipment specification
sheets for both simple and reactor heaters are presented in this section.
At this point you might ask why there is a need for simple or reactor-type fired heaters.
Why not just use conventional shell and tube heat exchangers or reactors with heating
jackets? Generally, a fired heater is used when the required heat duty is unusually large
or when the process temperature is too high for steam or a heat transfer medium such as
Dow-therm or hot oil. Very large heat duties require very large shell and tube heat
exchangers. The practical size of such exchangers is limited by required fluid velocities,
fouling tendencies, etc. Such considerations may warrant the use of a fired heater.
Steam pressures required to give a saturation temperature above 400 oF (204 oC) are not
always available in a process plant. And, above the critical temperature of 703 oF
(373 oC), the latent heat of steam ceases to exist. Dowtherm A generally cannot be used
at temperatures above 750 oF (399 oC). The upper limit for hot oil is around 600 oF
(316 oC). Molten salts can be used at temperatures up to 1,100 oF (529 oC), but these
have very limited application. Invariably, there may be circumstances where either a
fired heater or a shell and tube exchanger will work. In that case, economics and space
requirements may dictate the choice. Note that a fired heater cannot be used if the
process fluid is heat sensitive or if plant or area safety requirements prohibit the use of
an open flame. We have now highlighted some of the major considerations in the
application of fired heaters. You, the Process Engineer, should recognize that client
preferences, site-specific concerns and other matters pertaining to a given project also
influence the selection of process equipment. These will vary in nature and importance
depending upon the project, but still must be considered.
Before concluding our discussion, we want to give you some idea of the variety of
applications of fired heaters in the process industry along with typical operating
temperatures. These are presented in Table 1-1.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 5
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Table 1-1
The Process Engineer is responsible for completing all necessary process calculations
prior to initiating the fired heater specification sheets. The Process Engineer and
Mechanical Engineer are jointly responsible for completing the fired heater specification
sheets, such as forms E-0522A-I, the Steam-HC Reformer Specification Sheets, and
forms E-553A-H, the Fired Heater Specification Sheets. This section contains completed
examples of these specification sheets and the calculations pertaining to each.
The following FDI specification forms for fired heaters are routinely used:
Description Form
Incinerator E-460A-F
Steam-HC Reformer E-522A-I
Fired Heater E-553A-H
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 6
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
The Process Engineer should complete the following items before starting fired heater
calculations:
General specifications for fired heaters are written by the Mechanical Engineers. A copy
should be obtained as soon as it is available. In some cases the client's specifications
are used. These should be read prior to starting calculations, otherwise you may have to
start over. Process guidelines may be issued in the form of job bulletins or they may
have been developed in book form. Other books such as Process Design Guidelines for
Gas Plants, Design Manuals, etc. should be read when applicable.
A preliminary plot plan is usually available in the early stages of a job. If one is not
available, you can make your own sketches and refer to previous similar jobs. In any
case, you must update your pressure and temperature survey and revise your
calculations as information is developed or received throughout the job. It may become
necessary to revise the fired heater specification.
Physical properties may be obtained from computer runs, Vol. II General Data, or other
sources. Your lead engineer should give you some guidelines in order to maintain
uniformity on the job. In addition, refer to Section III, References for Physical Properties.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 7
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 8
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Flux The maximum local heat transfer rate in the coil section.
Density
(Maximum)
Forced A heater in which the combustion air is supplied by a fan.
Draft
Heater
Fouling Resistance to heat transfer caused by a build-up of residue
Resistance on the inner surface of the coil.
Header Sometimes called return bend, common reference for a 180
degree cast or wrought fitting, which connects two or more
tubes.
Header Box Internally insulated structural compartment, separated from
the flue gas stream, which is used to enclose a multiplicity of
headers.
Heat The total heat absorbed by the coil(s) excluding any
Absorption combustion air preheat.
Heat Release The total heat liberated from the specified fuel, using the
lower heating value of the fuel.
Heating Value, The total heat obtained from the combustion of a specified
Higher (HHV) fuel at 15 oC (59 oF).
Heating Value, The higher heating value minus the latent heat of
Lower (LHV) vaporization of the water formed by combustion of hydrogen
in the fuel; also called the net heating value.
Induced Draft A heater in which a fan is used to remove flue gases.
Heater
Natural Draft A heater in which a stack effect induces the combustion air
Heater and removes the flue gases.
Pilot A small burner which provides ignition energy to light the
main burner.
Plenum Sometimes called "windbox" is a chamber surrounding the
burners which is used to distribute air to the burners or to
reduce combustion noise.
Plug Type Header A return bend, normally cast, which is provided with one or
more openings to enable inspection, mechanical tube
cleaning or draining.
Primary Air The portion of the total combustion air which first mixes with
the fuel.
Radiant Section The portion of the heater in which the heat is transferred to
the tubes primarily by radiation.
Secondary Air Air supplied to the fuel to supplement primary air.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 1.0
FIRED HEATERS
PAGE 9
PROCESS MANUAL INTRODUCTION
DATE 10-94
1.0
Shield Section Section containing those tubes which shield the convection
section tubes from direct radiation.
Sootblower A mechanical device for discharging steam or air to clean
heat absorbing surfaces.
Stack A vertical conduit, to discharge flue gas to the atmosphere.
Strakes Sometimes called spoilers, they are metal attachments to the
outside of the stack that reduce wind-induced vibration.
Tube Guide A device used with floor supported vertical tubes to prevent
tubes from buckling, and with top supported vertical tubes to
restrict movement.
Tube Pass As material enters the heater, its total flow is divided among
several groups of tubes. Each of these groups is called a
tube pass.
Volumetric Heat The heat released divided by the net volume of the radiant
Release section which excludes the volume of the coils and refractory
dividing walls.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-01.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 1 of 41
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
1.0
2.1 GENERAL
Before discussing the examples presented in this section, we want to give you some
process design guidelines for fired heaters. Unless otherwise noted, what we present
here will apply to process heaters in general. Details that are specific to a particular type
of fired heaters are discussed either in the corresponding example (presented later in this
section) or in the appropriate FDI design manual or other reference. You should refer to
these as needed.
Our discussion here will provide you with some of the fundamental means needed for
calculating and specifying process heaters. You should note that the numerical values of
certain parameters given in our discussion, e.g., furnace efficiencies and radiant heat
fluxes, are based on experience and "generally accepted practice" in the process
industry. As such, they should not be construed as "hard and fast" rules but rather as
guidelines. With this in mind, let's now proceed with our discussion.
You, the Process Engineer, or the Mechanical Engineer, must specify the allowable
radiant heat flux for a process heater. Note that as heat flux increases, the tube life
decreases but so does the initial cost of the heater. You must, therefore, choose a value
that strikes a compromise between these factors. Sometimes, the client prefers to
specify the radiant heat flux. If, however, the decision is left to you, refer to Table 2-1 for
some typical average radiant flux for various types of heaters. You should also consult
with a heater specialist in the Mechanical Engineering Department. (Values of tubeside
pressure drop and mass velocity are also given in Table 2-1).
You must also specify the absorbed duty for a fired heater. This is the duty required to
carry out the desired physical or chemical change in the process fluid. The furnace
vendor, in turn, calculates the fired duty of the heater, i.e. the heat that must be supplied
by the burners in order to transfer the absorbed duty. In most cases, the heat absorbed
in the radiant section ranges from about 45 % to 55 % of the net heat input when
operating with 20 to 30 percent excess air. High flux heaters and "all radiant' types
(without a convection section) tend toward the low end of the efficiency range. Heaters
for services with low process temperatures and low heat fluxes have radiant efficiencies
in the upper end of the range.
For a reasonable estimate of heater performance, you can assume that 50 % of the net
heat release is absorbed in the radiant section. How much of the remaining heat can be
absorbed from the flue gas is discussed in Section 2.4 of these design criteria.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 2
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 09-97
Table 2-1
Notes:
(2) The maximum average heat flux to any tube in the convection section, based on bare outside
diameter surface, shall not exceed the maximum average flux allowable in the radiant section.
Steam generation coils may have up to 40,000 Btu/hr ft2 (126.2 kW/m2) maximum average flux.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 3
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Table 2-2
Notes:
(1) If required to meet low pressure drop requirements, heaters handling 100 % vapor at inlet and
outlet conditions may be designed with arbor type coils.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 4
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
The principle heat loss from a fired heater is the heat carried off by the flue gas leaving
the stack. The principle methods for improving heater efficiency, therefore, are reduction
of the flue gas volume and reduction of stack temperature. For a given fired duty, the
amount of fuel and the amount of air theoretically required for complete combustion are
fixed. The only way we can reduce flue gas volume, then, is through reduction in the
amount of excess air supplied to the burners. But, excess air is required for complete
combustion of the fuel and stable burner operation. Furthermore, on a weight basis, flue
gas must escape from the furnace stack at the same rate that air and fuel are supplied to
the burners. In the case of a natural draft heater, the flue gas must be hot enough, i.e.,
have sufficient buoyancy, to do this. So, to lower both the amount of excess air and the
flue gas temperature, furnace designers have turned to mechanical draft fired heaters.
Mechanical draft typically enables heaters to operate in the upper end of the radiant
efficiency range given in Section 2.2 of this discussion. Such heaters employ an induced
draft fan to pull flue gas out of the stack. Since much of the energy required for escape
is supplied by the fan, the flue gas can leave the radiant section at a lower temperature
than in a natural draft furnace. A forced draft fan is used on the inlet side to push
ambient air into the furnace combustion chambers. Modern mechanical draft furnaces
can operate at 10 % excess air when fired with natural gas and 10-20 % excess air when
fired with clean liquid fuels. Despite the benefits of mechanical draft operation,
considerable heat can still be lost from the stack. To further improve furnace efficiency,
stack gas heat recovery is necessary. We discuss this in Section 2.4, the next part of
these design criteria.
Before we move on, however, let's look at two more sources of heat loss from process
furnaces. First, heat is transmitted from heater surfaces to the outside air by radiation
and convection. Losses of 1 to 1 1/2 percent of the fired duty for natural draft furnaces
are normal. For mechanical draft furnaces having an air preheater, losses of 2 to 2 1/2
percent of the fired duty can be expected. Air preheaters require extensive runs of hot
air (Air preheat is discussed further in Section 2.4.) In general, heat losses should not
exceed 3 % of the fired duty and the maximum metal casing temperature should not
exceed 180 oF (82 oC) at ambient temperature of 80 oF (27 oC) in still air. Second, the
furnace combustion chamber and convection section operate under slightly negative
pressure. If leaks are allowed to develop, quantities of excess air greater than what is
required for complete fuel combustion will be pulled into the furnace. This results in
additional heat loss from the flue stack. Losses due to leaks, however, generally result
from poor plant maintenance rather than design. In order to competently specify a
process heater, you must be aware of all of the heat losses discussed here. The furnace
vendor must take these into account in the mechanical design of a heater.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 5
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
By using stack gas heat recovery you can, in general, design fired heaters for overall
thermal efficiencies of from 83-91 %. This is considerable since the highest radiant
efficiency for a process heater is about 55 %. It should come as no surprise then, that
convection section heat recovery is an integral part of specifying and designing fired
heaters.
In specifying a flue gas hat recovery system, you must first calculate the amount of heat
available for recovery. This can be related to the furnace radiant duty as follows:
You can obtain the radiant duty from the process heat and material balance if the
process fluid only goes through the radiant section. Otherwise you will have to split the
process duty between the radiant and convection sections.
In the early stages of a job, vendor data for your particular heater will not be available, so
you will have to estimate the radiant and overall efficiencies. And, as we mentioned
above, you may also have to estimate the split in process duty between the radiant and
convection sections. For guidance, you should refer to the design data for similar
heaters on past jobs and to the appropriate FDI design manual. Also, you should consult
with a heater specialist to the Mechanical Engineering Department.
Instead of using the above equation, you can calculate the amount of flue gas heat
available for recovery using a computer program (consult with a computer specialist).
The output for this program should include temperature-enthalpy data for the stack gas.
Using this data, you can plot a cooling curve and find the amount of available heat. Use
of this method is discussed in detail in Section 5.2 of this manual, Reformer Calculations.
Even though the example presented there is a steam-hydrocarbon reformer, the
discussion of the Furnace Calculation Program applies to fired heaters in general. You
should refer to that part of our discussion for further information.
The second major step in specifying convection section heat recovery is to decide what
to do with the available heat. There are three options generally available. First, you can
heat the process fluid before it goes to the radiant section. This reduces the furnace
radiant duty and size and thus can significantly reduce the initial cost of the heater.
Second, you can use the stack gases to generate steam in either a waste heat boiler or
in steam coils fitted into the flue stack. This is often the preferred choice if the steam can
be used in the plant. Third, you can preheat the incoming combustion air. This is often
done as it does the most to improve furnace efficiency. We should point out that the use
of air preheat requires mechanical draft operation. The relatively high friction losses in
the air preheater and associated duct work make natural draft operation infeasible.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 6
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
The expected overall thermal efficiencies for mechanical draft fired heaters range up to
91 % with air preheat and up to 89 % using only a waste heat boiler. For natural draft
heaters, the maximum expected efficiencies range from 84 to 88 %. Most convection
heat recovery schemes usually employ air preheat and one of the other two types of
recovery we have discussed. We will now present a few examples of such schemes
along with some further discussion.
Figure 2-1 shows a typical fired reboiler flow scheme. Material from the column sump is
first heated in the convection section and then in the radiant section. Heating the
process fluid in the convection section reduces the radiant duty and overall size of the
furnace. An induced draft fan pulls flue gas out of the stack and through the air
preheater, while the combustion air is pressured through the air preheater by a forced
draft fan. Here the flue gas heats the incoming combustion air on its way to the
burners.With air preheat included, overall thermal efficiencies as high as 91 % can be
achieved. See the article entitled Fired Heaters - IV ... located at the end of this manual
for a discussion on the types of air preheaters available.
Figure 2-2 shows another typical convection heat recovery scheme for a fired heater.
For heaters with fired duties on the order of one to several hundred million Btu per hour,
and with radiant efficiencies of around 50 %, there is considerable heat that can be
recovered from the flue gas. Generally, the convection heat recovery schemes for such
heaters are an integral part of the plant steam balance. For the case shown in Figure
2-2, we are preheating the feed and generating steam in the convection section. The
steam drum operates at saturated conditions. It is really a surge drum for both water and
heat. Use of it allows better control of steam generation and superheating in the
convection coils. Without the upper three "economizer" coils, this type of heater would
have an overall thermal efficiency of about 58 %. With them, its overall efficiency is
around 85 %.
Before concluding our remarks here, we should tell you about the limitations in flue gas
heat recovery. First, the maximum average heat flux rate to any tube in the convection
section, based on bare outside diameter surface, shall not exceed the maximum average
flux rate allowable in the radiant section. Steam generation coils, however, may have up
to a 40,000 Btu/hr ft2 (126.2 kW/m2) maximum average flux rate. Second, for steam
generation coils, the limiting approach temperature is 50 oF (28 oC). The controlling
resistance to heat transfer is obviously on the flue gas side of the coil. The film
coefficients on this side are on the order of 0.2-20 Btu/hr ft2 oF (1.14-114 W/m2 oC) versus
1,000 - 3,000 Btu/hr ft2 oF (5,680-17,030 W/m2 oC) on the vaporizing side. Extended heat
transfer surface, e.g., fin tubes, and relatively high approach temperatures are used to
compensate for this. Experience has shown that for stable operation, 50 oF (28 oC)
should be the lowest approach temperature for this service. Third, the amount of heat
that you can ultimately extract from the flue gas is often limited by the SO3 content of the
gas. Sulfur in furnace fuels partially ends up as SO3 in the stack gas. If the stack
temperature gets low enough, this will combine with condensing moisture to produce
sulfuric acid. The obvious result is severe corrosion problems in the convection section.
The acid dew point in flue gases is normally in the range of 300-350 oF (149 -177 oC).
We will say more about this in Section 2.6 of this section dealing with combustion.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 7
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-1
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 8
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-2
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 9
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
The type, composition and heating value of the fuel used obviously determines both the
design and operation of the furnace burners. At the same time, some of these fuel
properties determine the type and amount of pollutants emitted from the stack as well as
the corrosion and fouling tendencies in the convection section. The important fuel
properties that you need to be aware of are listed and discussed below.
a. Gaseous Fuels
Often, the principle furnace fuel is a refinery or plant fuel gas. Such fuel
gas is usually a mixture of by-product and waste gases from various
units at the site. Its composition can change considerably as the various
contributing units are taken on or off line or operated at varying rates.
For such fuels, you should determine the range of compositions the gas
could logically have and calculate the LHV and HHV (higher heating
value) for each of these compositions. Alternately, you could estimate
the heating values according to the following equations:
where:
You should note that the LHV equation also correlates saturated
hydrocarbons with hydrogen to within ±35 Btu/SCF (1,380 kJ/Nm3) up to
44 molecular weight. Based on the results of these calculations, you
need to report the range of heating values, compositions and molecular
weights for the fuel gas.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 10
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
b. Liquid Fuels
A chart for determining the net and gross heats of combustion of fuel oils
and petroleum fractions is given in Figure 2-3. Alternately, you can
estimate the heating values of liquid fuels using the following equations:
c. Solid Fuels
During combustion, the vanadium in fuel oil forms oxides. The resulting
vanadium slag is extremely corrosive to metal if allowed to deposit. Above
1,250 oF (677 oC), the slag will erode metal surfaces.
During combustion, these elements form oxides and complex salts. Like
vanadium compounds, these are extremely corrosive toward metal if allowed to
deposit. Also, they will erode metal surfaces at temperatures above 1,250 oF
(677 oC). In addition, sodium compounds often attack refractory materials.
As mentioned earlier, the sulfur in fuel burns to SO2 and SO3. The SO2, of
course, is an air pollutant regulated by the Federal EPA. The SO3 combines with
any condensing moisture in the stack gas to make highly corrosive H2SO4. We
will say more about this in the next part of our discussion, Section 2.6 dealing
with combustion.
a. Heat Release
Heat release for process heaters shall be based on the LHV (lower
heating value) of the fuel. Fuel oil and/or gas composition analysis shall
be supplied with the heater specification. Vanadium, sodium and sulfur
should be included in the fuel analysis.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 11
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-3
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 12
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
b. Fuel Gas
Fuel gas should normally be supplied upstream of the fuel control valve
at 35 psig (0.241 MPag), and at 20 psig (0.138 MPag) to the burner.
Provisions must be made to ensure that no condensation occurs in the
fuel lines. Together, these measures will allow adequate flow control of
the furnace fuel gas. Consult with the heater representative of
Mechanical Engineering regarding burning of low pressure or low heating
valve gases.
c. Fuel Oil
Note that heavy fuel oil systems should be recirculating loop type. One
barrel of oil should be circulated through the system for each barrel
consumed at the design heat release of the burners. Light fuel oil
systems, on the other hand, may be dead end types. Regardless of
configuration, the system should deliver fuel oil to the burners at a
viscosity of 30 centistokes.
d. Pilot Burners
Pilot burners are supplied as an integral part of the main burner. They
are most often installed where it is desired to simplify burner ignition
procedures (particularly with oil firing), where an extreme turndown to a
fixed, minimum load is required, where intermittent on-off operation is
required or where extreme modulation of firing rate is needed.
Pilot burners are almost always gas-fired and are usually fueled from an
independent source such as a propane or LPG drum or a natural gas
leader which is not part of the regular refinery fuel gas system. If the
pilots are fueled from the main burner supply line, the gas offtake to the
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 13
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
piles must be upstream of the control and block valves for the main
burner supply.
e. Soot Blowers
Soot removal is often required on heaters fired with fuel oil. It is not
needed if the heater is only fired with fuel gas. The main cause of
outside tube deposits is high vanadium, sulfur, sodium and ash content
in the fuel oil. They must be provided on heaters with convection tubes
and primary fuel oil firing if fuel contains:
If extended surface tubes are used in the convection section with oil
firing, the extended surface should consist of studs or thick fins rather
than conventional fins.
Soot blowers clean the outside of tubes by blasting them with high
velocity steam or air. Steam is usually used in process heaters. Soot
blowing equipment is available in two basic designs: (1) rotating-element
type and (2) retractable-lance type.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 14
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
cool. The rate of travel is about 6 ft/min (1.83 m/min) and rotation about
once per inch of travel length. This type may also be used in a vertical
position if clearance is a problem. Maximum travel length is about
40 feet (12.2 m).
Steam is usually 150 to 200 psig (1.034 to 1.379 MPag) but 400 to 600
psig (2.758 to 4.137 MPag) is more effective and should be considered if
it is available. Steam consumption of the lance type is about 8,000 to
12,000 lbs/hr (3,630 to 5,440 kg/hr) per blower. The blower operates
about 2.5 minutes once each eight hours. The nonretractable type uses
about 10,000 to 14,000 lbs/hr (4,540-6,350 kg/hr) for about 40 seconds.
Total steam consumption is about the same for the two types.
Drive motors for soot blowers can be either electric or air, although
electric drive is most common.
Based on your specifications, the furnace vendor will decide how much excess air the
heater needs, do a combustion heat and material balance and calculate the flue gas
composition. You may have to perform these calculations yourself early in the job to
determine the amount of recoverable heat in the stack gas. As we mentioned earlier,
you can do this by hand or by computer. Whichever way you go about this, you need to
have an understanding of the principles of combustion stoichiometry. To illustrate these
principles, we have included an example calculation in Section 2.12.1. The textbook
entitled, Steam, Its Generation and Use, by Babcock & Wilcox is also useful reference.
Another consideration is the generation of SO2, SO3 and NOx in the combustion process.
Sulfur in fuel burns to SO2 and traces of SO3 during theoretical combustion. The
presence of excess air greatly enhances the production of SO3. At present, there is a
federal regulation on the sulfur contents of fuel for new or modified refinery heaters. This
regulation does not apply to process heaters in other types of industrial plants. There are
no other federal regulations governing emissions from process heaters, but many states
have set regulations. Texas, for instance, limits sulfur dioxide emissions from process
heaters to 440 ppm in the stack gas. Sulfur trioxide, on the other hand, poses more of a
corrosion problem than an environmental one. SO3 combines with water vapor in the
stack gas to form H2SO4. If the stack gas cools below its acid dew point - as it could in
the convection heat recovery section - then aqueous H2SO4 condenses on the stack
internals. You should always determine the lower temperature limit for heat recovery in
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 15
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
the convection section. Figure 2-4 will enable you to do this once you know the SO3
content of the flue gas.
How does one determine the SO3 content of the furnace stack gas? To answer this, let's
look at an example calculation. Consider a furnace fuel oil of the composition given in
the example calculations in Section 2.12.2. First, we must calculate the number of moles
of each fuel component in some given amount of fuel. here we chose 100 lb of fuel as
our basis. Now, most of the sulfur in the fuel will form SO2 in the flue gas and some will
form SO3. In practice, the maximum SO3 level in furnace flue gases is found to be 5 % of
the SO2 concentration. This is higher than that predicted by equilibrium considerations,
but closely agrees with actual measurements. Using this along with the total moles of
sulfur in our 100 lb (basis) sample, we can calculate the relative number of moles of SO2
and SO3 in the flue gas. From here the stoichiometry calculations required to find the
complete stack gas composition and the subsequent use of Figure 2-4 are rather
straightforward. Therefore, we leave it to you to follow our example calculations at the
end of this subsection on your own. Before we move on, however, we should mention
one more thing. Once you have found the acid gas dew point for a particular heater, you
should add a safety factor to that temperature. In the absence of client specifications or
other guidelines, the lower flue gas temperature limit should 50 oF (28 oC) above the acid
dew point. This will cover operating conditions different from design. Watch out for
turndown operations. You may have to provide bypasses for the process fluid controlled
according to the stack temperature. We will say more about turndown in Section 2.8.
Nitrogen oxides are a by-product from most combustion operations. They form by
thermal fixation of molecular nitrogen in the combustion air. NOx also forms from
nitrogen compounds in the fuel. The Federal EPA regulations, made effective in
December 1971, impose a national limit on NOx emissions from new boilers of over
250 MM Btu/hr (73.3 MW) heat release. Various states and municipalities have also
passed laws limiting the emission of NOx from combustion units. Reference tot he legal
restrictions of various locations is required to determine limits imposed on process fired
heaters. Consult with an environmental engineer.
Tests show that certain restrictions can be met on fired heaters without modification or
special designs because of their smaller size and design characteristics. Relatively low
flame burst temperature due to low heat flux and distributed of burner arrangement is
credited. However, problems may arise with large forced draft burners and from fuel
nitrogen content greater than 0.3 % wt. Your responsibility is to inform the vendor of NOx
regulation requirements so he can design for them.
In specifying a process heater, you should have a basic understanding of how to safely
control it. Our purpose here is to familiarize you with the fundamental control variables,
instruments, and safety devices common to almost all fired heaters. You should
recognize that for any specific heater the control scheme will probably be considerably
more complicated than we show here.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 16
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-4
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 17
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Low process flow causes overheating and coking in the tubes. Coking in
turn causes higher pressure drop and more overheating. The end result
is lower tube and refractory life. Most heaters shut down automatically
for low process flow in any one tube pass. (As material enters the
heaters, its total flow is divided among several groups of tubes. Each of
these groups is called a tube pass.)
b. Firing Rate
The firing rate is usually controlled by adjusting the fuel flow according to
the heater process outlet temperature. This is depicted in Figure 2-5.
Note, however, that vaporizing streams may have little outlet
temperature variation with heat input. In that case, another control
variable must be chosen. Most heaters shut down automatically for low
fuel pressure or flow.
c. Air Supply
If forced or induced draft fans are used, the air flow can be controlled
either by fan plenum dampers or fan (driver) speed control. (The plenum
is a chamber surrounding the burners. It is used to distribute air to the
burners and reduce combustion noise.) The air flow control is usually
set automatically according to the fuel flow rate as shown in Figure 2-6.
In this way a constant air to fuel ratio can be maintained.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 18
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-5
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 19
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-6
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 20
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
The furnace operators use these as guides to adjust the flows through
the tube passes. They should be located very close to where the passes
leave the firebox (combustion chamber).
These allow the operators to balance the firing between the various
burners in the firebox and to monitor the refractory temperature levels.
Under normal conditions, the readings from the various indicators should
not differ by more than 100 oF (55 oC).
d. Tubeskin Thermocouples
e. Draft Gauges
These are usually inclined manometers. They provide air and flue gas
pressure drop and flow data. They are used when adjusting burners and
to indicate limiting operating conditions.
f. Individual Control
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 21
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Each installation must be studied to determine which failure can lead to trouble.
The protective control system should be designed so that it cannot in itself lead
to an unsafe condition and that it will not make start-up difficult or lead to
unnecessary shutdowns. The greatest danger is from a fuel system that may fail
long enough for the flame to extinguish and then reintroduce fuel while the
refractory is hot enough to ignite the fuel.
Upon shutdown of a heater for any reason, steam should be directed into
the firebox and header box (an internally insulated compartment,
separated from the flue gas stream, which is used to enclose a
multiplicity of headers or manifolds). The steam serves two purposes.
First, it snuffs out the burner flames and second, it inerts the atmosphere
in the firebox and in the header box. This prevents ignition of residual
fuel or process material that may leak from damaged tubes. Automatic
systems are sometimes provided; however, most systems are manual.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 22
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
b. Peep Doors
These allow operators to see the internals of the radiant section. They
can thus visually check for tube or burner damage or monitor the tubes
during decoking.
Often, plant personnel will operate a fired heater at lower than design throughput.
This is called turndown operation. If you are aware of special turndown
conditions at which the client wishes to be able to operate, you should indicate
this under "Remarks" on the specification data sheets. The vendor will take this
into account in the mechanical design of the heater. Generally, the minimum
operating range of the burners is 25-35 % of the normal design duty.
Satisfactory turndown operation may require special instrumentation or one or
more auxiliary burners. To illustrate why, let's look at an example.
Consider the fired heater shown in Figure 2-2. Assume that we are operating the
heater at 75 % throughput. Now consider the convection section where we
generate and export steam to the other parts of the plant. Let's say that the
plant does not have enough boiler capacity to make up for any cutback in steam
production here. At 75 % of design throughput, fired duty is about 75 % of its
design value. And, it follows that there is about three-fourths as much flue gas
going up the stack relative to the design case. Now, if we keep the water flow
through the convection coils at design rates, we might still be able to extract
enough heat to maintain design steam production. But, in the process, we will
most likely cool the flue gas below its acid dew point. From our earlier
discussion, this is clearly an untenable situation. In this case, one or more
auxiliary burners are needed in the stack. During turndown operation, the
operators can fire these burners to put sufficient heat into the flue gas to
maintain the desired level of steam production and keep the flue gas above its
acid dew point. Alternately, stainless steel tubes may be used in the uppermost
convection coil along with a stainless steel liner in the stack itself. Stainless steel
will not corrode in an acid environment; however, this material is very expensive
relative to carbon steel.
Now, if it is not critical to maintain design steam production at all times, then we
might choose to limit steam production at reduced furnace firing rates. To do
this, we could provide a bypass for the boiler feedwater around the preheat coil.
Flow through the bypass could be controlled to maintain stack exit temperature
safely above the acid dewpoint. During turndown operation, the bypass will open
allowing colder boiler feedwater to enter the steam drum. This changes the
system heat balance, lowering the overall steam production. As you can see,
client preferences and site specific considerations can dictate what
accommodations are needed for turndown operation.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 23
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Before leaving this subject, let's look at one more example. Consider the fired
reboiler shown in Figure 2-1. In this case, the convection section is used to heat
the process fluid and the incoming combustion air. For a reduced process
throughput, the fired duty and air flow are proportionally lower. Since no
significant imbalance in the various heat duties should result, special burners or
instruments are probably not needed. Note that in this case, turndown operation
of the system as a whole is likely to be limited by the design of the associated
distillation column.
2.8.2 Overdesign
Fired heaters are often capable of satisfactory operation at nominally higher than
design duties and process throughputs. Such "overdesign" is inherent in most
process equipment. As you are probably aware, the heat transfer and pressure
drop correlations used in the design of fired heaters all have varying degrees of
uncertainty. To compensate for this, the vendor allows for more heat transfer
surface, a greater number of tubes, extra firing, etc. The vendor can then
confidently guarantee the required performance of the heater. Sometimes the
client specifies the amount of overdesign for various parts of the furnace. If,
however, this is left up to you (and the vendor), the following two general
guidelines may be used. First, burners and flues should be specified to permit
operation at 125 % of design heat release and 30 % excess air for fuel gas or
40 % excess for fuel oil. Second, fired heater duty should generally be designed
for continuous service at 10 % above the normally expected process operating
duty. This should be defined as normal flow at a lower inlet temperature. These
guidelines also compensate for variations in operations elsewhere in the unit,
e.g., fouling in an exchanger that preheats the furnace feed.
Heater type selection is the joint responsibility of the Process and mechanical
Engineers. You can refer to Table 2-2 for general guidance. You should first
review the article entitled "Fired Heaters -1" taken from the July 19, 1978 issue of
Chemical Engineering. A copy of this article, included at the end of this article,
discusses the various types of fired heaters listed in Table 2-2.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 24
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Each of these heater types may be shop fabricated if size permits. Shop
fabrication reduces costs. However, shop fabrication should not be forced to the
extent of getting an improperly proportioned heater.
a. Design Temperature
Outlet Temperature
Design Fluid Temperature
For vacuum or coking services, maximum oil film temperature should not
be more than 50 oF (28 oC) above the maximum bulk oil temperature.
b. Design Pressure
Full vacuum (15 psi (0.103 MPa) external pressure) and 150
psig (1.034 MPag) minimum internal pressure for vacuum
service.
Where corrosion rates are available, heater tubes shall have sufficient corrosion
allowance for 100,000 hours operation. Where corrosive rates are not available,
the corrosion allowance guidelines from the Process Design Criteria Manual
given below may be used.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 25
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
The process engineer must specify allowable pressure drop. Pressure drop is
the main factor in determining tube size and number of parallel passes.
Heater designers like to see high allowable pressure drop because this reduces
the number of parallel passes and tube size, hence, cost. It also reduces the
process piping, valving and controls required. If a maximum skin temperature or
film temperature is specified, higher pressure drop permits these criteria to be
met with less heater surface. These savings, however, are balanced by the
higher pumping cost.
Large heaters justify more pressure drop than small heaters because the larger
flow rates require more parallel passes at the usual diameters and lengths of
heater tubes.
When the process fluid is heated in both the radiant and convection sections of
the heater, consider providing a combined allowable pressure drop. This lets the
heater designer utilize the available pressure drop in an optimum design.
Manifolds are the piping outside the heater box which connect the passes to
process piping. Sometimes they are furnished by the heater manufacturer when
the thermal expansion of the manifold and the heater tubes can be handled best
by one designer, or whenever it is economical to use extruded header openings.
Sometimes they are furnished by Fluor Daniel as part of the process piping.
Unless it is certain that the heater vendor will furnish the manifolds and include
the manifold pressure drop in the allowed pressure droop for the heater, then the
process engineer should allow for it in the process piping pressure drop.
See Table 2-1 for a listing of typical pressure drops for various types of heater
services.
a. Multipass Heaters
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 26
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
individually controlled passes and which have low pressure drops, i.e.,
catalytic reformer heaters. Also, keep in mind that similar equivalent
lengths and head are required and not absolute symmetry.
b. Two-Phase Flow
Slugging and vibration has been encountered in heater outlet lines with
two-phase flow when the velocity is too low. The following
recommendations should help prevent these problems from occurring in
these situations.
1. Calculate the velocity and mix density at the highest and lowest
pressure of the line. A large pressure drop in the line may
require intermediate velocity and density calculations and line
size changes. Pressure drop is to be calculated in the usual way
for two-phase flow.
If the velocity is too low, either the line size must be decreased and
higher pressure drop allowed, or the mixture density must be varied by
changing the vapor/liquid ratio; or a piping design must be used as
described in the following paragraph.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 27
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
due to pressure drop limitations, then the larger line may be used
provided the horizontal portions are sloped downward and a P-trap is
added to the vertical portion. Two methods of sloping the line are shown
in Figure 2-8.
In all cases, even if slugging is not indicated on the limiting velocity chart,
all upward changes in direction should be vertical and not sloped. This
will prevent a liquid pocket from forming at the bend which would
ultimately lead to slugging as shown in Figure 2-8.
c. Burner Piping
Burner valves are usually special globe or needle valves with position
indicators. Gas burner valves are located close to the burners, but far
enough away to protect the operator from flashback. Oil burner valves
are located close to the peepholes. When atomizing steam is required, a
check valve is provided in the steam line to prevent oil from backing into
the steam system.
You should prepare a heater grid as part of the specification for any heater in
vaporizing service where the pressure drop through the tubes is 50 psi
(0.345 MPa) or greater and where the process material is a mixture of
components, e.g., crude oil or naphtha. Typically, crude and vacuum heaters
and fired reboilers fall into this category. A heater grid graphically shows the
equilibrium relationships between temperature, pressure, enthalpy and
vapor-liquid distribution for the process material. Figure 2-9 shows an example
heater grid. The exact temperature-pressure equilibrium path through the heater
cannot normally be predicted in advance and varies with vendor design. The
heater grid enables the vendor to extrapolate the equilibrium data as needed in
the design.
To prepare a heater grid, you must first estimate the pressure profile for the
process flowpath. You can refer to Table 2-1 for guidelines for minimum
pressure drop through the heater. From the column or crude tower computer
simulation, you know the pressure and temperature of the process material at
the tower inlet and the required duty of heater. You must decide on the percent
vaporization in the heater. This is usually on the order of 40-50 % for reboilers
and 50-75 % for crude and vacuum heaters. When dealing with a crude or
vacuum heater, you know the pseudo-composition of the process material, i.e.,
ASTM distillation data, characterization factors, etc., and its flowrate from the
process heat and material balance. In the case of a reboiler, however, you must
estimate the process stream composition based on the composition and
flowrates of both the bottoms liquid and the liquid leaving the bottom tray. Once
you determine the process material composition for the reboiler loop, and set the
percent vaporization, then the process flowrate is fixed. you can then run
computer flash calculations on the material for various temperatures, over the
range of system pressures. Using the results, you can construct a heater grid as
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 28
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
shown in Figure 2-9. For vacuum column heaters, the procedure we have
outlined here is further complicated by
Figure 2-7
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 29
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-8
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 30
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Figure 2-9
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 31
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
the need for a trial and error calculation to optimize the size of the line between
the heater and the column. Refer to the Fluor Daniel Crude and Vacuum Unit
Design Manual for more details.
2.10 DECOKING
Coke is a residue of heavy aromatic compounds often formed on heat transfer surfaces
from which hydrocarbons are evaporated. In general, coke deposits can be expected on
the insides of fired heater tubes in hydrocarbon service above 600 oF (316 oC). The
heavier the hydrocarbons, the greater their coking tendency is. The presence of
hydrogen and/or steam tends to retard coke formation. Some coking and noncoking
furnace applications are listed below.
Coking Services
Noncoking Services
For a process heater in coking service, you must specify tube temperature and pressure
during decoking. Usually, pressures are in the range of 10-50 psig (0.069-0.345 MPag).
Tube temperatures must be kept below 1300 oF (704 oC). You must also specify the
necessary auxiliary equipment such as the decoking quench drum, steam and air flow
meters, etc.
Decoking of furnace tubes is, in general, carried out as follows. The operators first shut
the heater down and remove any process material remaining in the tubes. next, they put
steam through the tubes at rates of 15-20 lb/sec ft2 (73.2-97.6 kg/m2 sec) and fire the
heater to yield a flue gas temperature of 1,350 oF (732 oC). This cracks about 90 % of
the coke off the tubes. next, the operators reduce the steam rates to around 5-7 lb/sec
ft2 (24.4-34.2 kg/m2 sec) and cut back on firing to lower the flue gas temperature to
1,200 oF (649 oC). Next, they gradually admit air in with the steam to burn off the
remaining coke. The burning process is monitored by watching tube temperature and
CO2 levels in the furnace effluent. Tubes must be kept below 1,300 oF (704 oC) and CO2
should stay below 19 % in the effluent gas. Visual monitoring of the tubes to watch for
hot spots is a must. Sometimes the operators choose to decoke at night when hot spots
are easier to see.
For a heater in coking service, you should specify a permanent steam-air decoking
system. One such system having two-directional manifolds appears in Figure
2-10.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 32
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
These are called "two directional" since steam and air can flow in either direction through
the furnace tubes. Using this type of system, only one tube pass can be decoked at a
time. Water is injected into the decoke effluent from each pass to stop the cracking and
combustion processes and to cool the material off. A knockout drum is needed to catch
the quench effluent. The drum should drain or be pumped out to an API separator where
oil, water and coke solids can be separated.
Figure 2-11 shows an alternate decoking system. In this system, all furnace tubes are
decoked at the same time. This saves considerable time and, hence, results in greater
on-stream time for both the heater and the unit in general. Steam and air injection is in
one direction only and this simplifies the manifolding at the heater. Here the decoking
effluent is quenched to 1,000 oF (538 oC) upstream of the knockout drum. Water is then
injected into the drum to further cool the effluent. There are, however, several
disadvantages to this type of system compared to the two-directional type. Since the
decoking steam is not condensed by the initial water injection, the knockout drum must
be bigger and must operate at a higher temperature. The venting rate from the drum is
higher since the incoming steam is not condensed. In practice, the cracking step in the
decoking process is not as effective as for a two-directional system.
As with most process equipment, at least one revision of equipment specification data
sheets will be required. The process information provided on the "Revision A" data
sheets usually doesn't change in subsequent issues. It can and does change if someone
finds an error in it or if the vendor recommends a change that is acceptable to Fluor
Daniel and the client. Remember, furnace designers have developed numerous
proprietary designs for tubular heaters to make efficient use of fuel and provide
satisfactory and economic mechanical design. You should always take advantage of the
vendor's greater knowledge of heater design. The case of the steam-hydrocarbon
reformer presented in Section 5.0 provides an example. In a note on page 2 of the
original data sheets, we specifically gave the vendor permission to alter the convection
heat recovery scheme to improve reformer efficiency. As it turns out, the vendor didn't
change the heat duties or steam flows, bit did change the water circulation rate through
the steam generation coil. The Process Engineer originally specified a ratio of four
pounds of water circulated for every one pound of steam generated. The vendor
changed this ratio to 9/1 due to undesirable two-phase flow/boiling heat transfer
characteristics at the lower circulation rate. For the most part though, the furnace
designer provides information that must be added to the specification sheets. This is
usually transmitted to Fluor Daniel in letters and on drawings. The task force mechanical
Engineer assigned to fired heaters adds this information to the specification sheets. The
vendor provides mechanical design details for the radiant and convection sections, the
tubes, the burners, the air preheater, etc. The designer also provides heater
performance data based on burner tests made with the same type of fuels to be used in
the plant. You should review the "Approved for Construction" specification sheets for
each of the examples presented in this section. This will give you an overview of the
amount and type of vendor data that is needed to fully specify a fired heater.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 33
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
1.0
Figure 2-10
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 34
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
1.0
Figure 2-11
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 35
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
1.0
a. Basic Data
2. Diesel one barrel = 5.4 x 106 Btu LHV or 5.8 x 106 Btu HHV
FX-B, 2/12/79.
1 BBL = 292.1 lb
C/H wt Ratio = 6
wt wt % lbs/BBL MOL/BBL
C: 6 86 251 20.92 C
H: 1 14 41 20.50 H2
7 100 292
MW = 205
1BBL = 1.43 MOLES
b. Heat Balance
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 36
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 37
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 38
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
BOILER FREQUENCY
STACK LOSSES
MOLS F.G. from 100 MOL/hr Gas 34.77 0.002 22.53 2.91 120.96
MOLS F.G. from 0.057 BBL/hr 1.19 N/L 1.38 0.36 8.02
Diesel
TOTAL MOLS/hr F.G. 35.96 23.91 3.27 128.98
Heat Cont. (Mcp) (F.G.) (∆T) Btu/hr 152,542 - 82,346 9,957 381,910 626,755
Heat Cont. (Mcp) (F.G.) (∆T) Btu/hr 133,052 75,543 8,772 336,444 553,811
Note:
Air @ 80 oF 0 - -
o
Fuel Gas @ 95 F 10,500 - -
Fuel Oil @ ? oF Neglect - -
Atomizing Steam Neglect - -
Total Fuel LHV Btu/hr 3,070,000 -
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 39
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
Wt % Lb MW MOLES
Carbon 87.26 87.26 12 7.27
Hydrogen 10.49 10.49 1 10.49
Oxygen 0.64 0.64 16 0.04
Nitrogen 0.28 0.28 14 0.02
Sulfur 0.84 0.84 32.06 0.26
Ash 0.04 0.04
≈100 ≈100 18.08
χ = MOLES SO3
0.26 − χ
χ = 20
0.26 = 21 χ
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 40
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
MOLES O2
7.27 C + (1/1) 7.27 O2 → 7.27 CO2 7.27
10.49 H + (1/4) 10.49 O2 → 5.245 H2O 2.62
0.04 O + (1/2) 0.04 O2 → 0.04 O2 0.02
0.02 N + (1/1) 0.02 O2 → 0.02 NO2 0.02
0.2476 S + (1/1) 0.02476 O2 → 0.2476 SO2 0.25
0.0124 S + (3/2) 0.0124 O2 → 0.0124 SO3 0.0186
10.1992
Note that we have implicitly assumed that none of the N2 from the air
reacts to form NOx. Strictly speaking, this is not true, but is a good
approximation.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 2.0
FIRED HEATERS
PAGE 41
PROCESS MANUAL PROCESS DESIGN CRITERIA
DATE 10-94
MOLE
MOLES MW FRACTION LB
CO2 7.27 44 0.1194 319.88
H2O 5.250 19 0.0862 94.41
O2 2.040 32 0.0335 65.28
N2 46.04 28 0.7563 1,289.12
NO2 0.02 46 0.0003 0.92
SO2 0.2476 64 0.0041 15.81
SO3 0.0124 80 0.0002 1.04
60.875 1.0000 1,786.46
e. Calculate PPM SO3 (Dry Basis) and partial pressure of H2O vapor, then
find SO3 dew point from Figure 2-4.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-02.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 1 of 25
PROCESS MANUAL FIRED HEATER REBOILER
DATE 03-96
1.0
1.0
2.0
3.1 GENERAL
We now discuss heater process calculations and how to specify a fired heater reboiler.
This is one of the most common kinds of fired heaters used in the oil and petrochemical
industries. The principle uses for fired heater reboilers are large duty, high temperature
services such as crude towers, large debutanizers, and large desulfurizer fractionators
(the case for out example reboiler). At appropriate points in our presentation, we refer to
the Fired Heater Specification Sheets at the end of this subsection to point out where the
results of our calculations should be filled in. Before beginning, however, we want to give
you some background information about our example heater.
3.2 CALCULATIONS
The first step in the calculations is to establish the heat and material balance for the unit
in which the reboiler functions. This is usually done on the computer. Figures 3-1A and
3-1B show an example of what the output looks like. (Computer output is from a different
example.) At this point we know only the reboiler duty and some of the properties of the
liquid to the reboiler. For our example heater, the required duty is 55.56 MM Btu/hr
(16.3 MW). The fluid conditions at the column inlet are 498 oF (259 oC) and 140 psig
(0.965 MPag). The computer calculations are based on a once-through thermosyphon
reboiler with liquid from the last tray as feed. For a fired reboiler, the Process Engineer
sets the percent vaporization and performs additional calculations, either by hand or
computer, to characterize the process conditions for the fired heater. The calculations
should proceed as follows:
You must choose the type of heater to be used, locate it on the available plot
space, and then lay out the circulation loop in as much detail as possible. You
should consult your lead engineer and a heater specialist in the Mechanical
Department for help in selecting the type of fired heater appropriate for your
particular application. Figure 3-2 at the end of this section shows the layout for
our example reboiler.
Unlike shell and tube type exchangers, fire heaters are often located a minimum
of 25 ft (7.62 m) from other fired heaters, 50 ft (15.24 m) from other process
equipment and 100 ft (30.48 m) from buildings. On top of these requirements,
heaters must be located so as to allow sufficient access for maintenance.
Together, all of these considerations ensure that a fire reboiler will be located
some finite distance (on the order of 50 ft) (15.24 m) away from the distillation
tower it serves.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 2
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
Figure 3-1A
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 3
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
Figure 3-1B
STRIPPER
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 4
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
Figure 3-2
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 5
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
You must estimate the pressure profile for the reboiler circulation loop. We have
done this in Figure 3-2 for our example reboiler. From the computer stripper
calculation we know that the fluid conditions at the column inlet are 140 psig
(0.965 MPag) and 498 oF (259 oC). Based on experience with similar heaters,
we assumed a total pressure drop through the radiant and convection sections of
45 psi (0.31 MPa). We have allowed 20 psi (0.138 MPa) drop across the heater
inlet control valve. The static head loss between the pump centerline and the
heater inlet is approximately 7 psi (0.048 MPa) (20' (6.1 m) of liquid with 0.7531
specific gravity). And, we have assumed the following line friction losses:
10 psi (0.069 MPa) from the pump to the heater inlet control valve.
3 psi (0.021 MPa) from the control valve to the heater inlet.
15 psi (0.103 MPa) from the heater outlet to the tower inlet.
This usually ranges from 40-50 % for fixed reboilers. In this case we have
chosen 42 %. Vaporization of more than 50 % of the heater throughput often
leads to increased coking, poor fluid hydraulics, reduced internal heat transfer,
and tube overheating. Now, we know the reboiler duty and we have set the
composition of the reboiler feed and the percent vaporization. This fixes the
circulation rate through the reboiler. To calculate this number, we must now run
flash calculations on the system.
You should do the flash calculations for various temperatures at the system
pressures you assigned earlier. This is most often done on the computer. The
preferred models are a heat exchanger or a series of flashes. The results of
these calculations give the vapor-liquid distribution, compositions, physical
properties and enthalpies over the range of temperatures and pressures under
consideration.
For our example, we ran computer flash calculations for pressures of 140, 150,
160, 180, 190 and 200 psig (0.965, 1.034, 1.103, 1.241, 1.310 and 1.379 MPag)
at temperatures ranging from 484 oF (251 oC) to 532 oF (278 oC). We found the
circulation rate to be 1,051,186 lb/hr (476,810 kg/hr). With 42 % vaporization in
the reboiler, there are 441,498 lb/hr (200,260 kg/hr) of vapor with a molecular
weight of 120 and 609,688 lb/hr (276,550 kg/hr) of liquid with an API Gravity of
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 6
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
54.5o at the heater outlet. The heater outlet temperature is 507 oF (264 oC) at a
pressure of 155 psig (1.069 MPag).
We plotted the results of the flash calculations on a heater grid as shown with the
heater specification sheets at the end of this subsection. Note that we split the
data between two separate graphs instead of putting it all on one chart as shown
in the design criteria part of this section.
After completing the above calculations you can fill in the following general information
and material balance data on "Revision A" of the Fired Heater Specification Sheets
(Form E-533A):
1 Client Name
2 Heater Service
3 Unit
4 Heater Type
5 Heater Section
6 Service
7 Heat Absorption
8 Fluid Type
9 Process Fluid Flowrate
10 Allowable Pressure Drop Through Heater Tubes
15-24 Fluid Conditions at Heater Inlet
25-35 Fluid Conditions at Heater Outlet
Note that we have left the vendor to decide the split of heat absorption between the
radiant and convection sections. Furnace designers have developed many proprietary
designs for tubular heaters to make efficient use of fuel and provide satisfactory and
economic mechanical design. Unless you encounter a special situation, you should give
the vendor a free hand in this phase of the design.
As a continuation of our discussion we will complete filling out "Revision A" of the Fired
Heater Specification Sheets and we will present these along with the final "Approved for
Construction" version of these data sheets for our example in Section 3.5. You should
note that other than specifying materials of construction and corrosion allowance, the
Mechanical Engineer assigned to fired heaters made no changes to the "Revision A"
data sheets. There are probably two reasons for this. First, as mentioned in the
introduction to this section, Fluor Daniel specifies the performance of a fired heater while
the furnace vendor actually does the mechanical design. The Mechanical Engineer
monitors and checks the vendor's work throughout the design on behalf of both Fluor
Daniel and the client. He or she will keep the Process Engineer abreast of any changes
recommended by the vendor and will assist in revising the specification sheets as
needed. Second, the Process Engineer consulted with his counterpart in the Mechanical
Engineering Department during the initial specifications of the heater. Such matters as
basic furnace configuration, convection heat recovery, equipment items included in the
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 7
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
scope, etc., were discussed. This should be a standard practice in all such cases. In
this way, much unnecessary recycle of information can be avoided.
The following items must also be filled in by the Process Engineer for the initial issue of
the specification sheets. These are listed below and discussed according to subject and
location on the data sheets.
As the radiant heat flux increases; the tube life decreases, but so does the initial
cost of the heater. The designer must optimize these quantities. Heat flux is
normally based on client specifications or FD standard practices. Table 2-1
gives some typical radiant fluxes for fired heaters. You should also consult with
the Mechanical Engineering Department's heater group. For our example, we
have chosen a maximum average radiant heat flux of 12,500 Btu/hr ft2
(39.44 W/m2).
Design pressure is normally the higher of the reboiler pump shut-off pressure or
the tower design pressure. Tube design temperature is normally 25 - 100 oF
(14 - 55 oC) (typically 50 oF) (28 oC) above the design outlet temperature. Often,
the design temperature is taken to be the highest temperature corresponding to
the tower design pressure, i.e., the highest relief temperature for the system.
Refer to the FD Houston Utilities and Offsites Training Manual, Section 6, for a
discussion of upset or relief conditions. For our example, the design conditions
are 260 psig (1,793 MPag), the tower design pressure and 650 oF (343 oC), the
temperature in the reboiler for an overhead product cooler failure.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 8
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
This section defines what fired heater items (including auxiliaries such as
combustion air and flue gas fans and soot blowers) must be supplied by the
vendor and which items will be supplied by FD. Usually, FD and the client will
jointly decide on such details in the early stages of the project.
At the beginning of a job the client usually provides this information to FD. It is
then transmitted to the Process Engineer in the form of job bulletins or in a book
along with other design data.
The client may supply information on fuel types, composition and available
temperature and pressure. Otherwise, the Utilities Engineers develop this
information. For our example, we have specified three fuels, two for the furnace
burners and one for the pilots. Refinery fuel gas is the normal heater fuel. The
composition of this gas varies and the supply of it is subject to interruption.
Pipeline natural gas, on the other hand, is the fuel for the pilots. This is not
unusual since for stable operation the pilots require a reliable supply of gaseous
fuel having constant composition. For future operation, we have specified No. 6
Fuel Oil.
The heating value of the fuel gas ranges from 600 - 1,034 Btu/SCF
(23,620 - 41,010 kJ/Nm3) and its specific gravity ranges from 0.567 to 0.704.
These numbers reflect wide variations in composition. We have provided the
composition of the fuel gas corresponding to its lowest heating value. Under
these conditions, the gas contains 40.8 % H2 and 8.0 % N2, both on a molar
basis. The gas also contains 0.2 grains of sulfur per standard cubic foot (SCF)
(0.48 g/Nm3). Paraffin hydrocarbons ranging from methane through butane
comprise the balance of the fuel gas.
Our client wants the capability to fire the heater with No. 6 Fuel Oil. This oil has
a LHV of 18,000 Btu/lb (41,870 kJ/kg) and a HHV of 19,000 Btu/lb
(44,200 kJ/kg). Its carbon to hydrogen ratio is 8.7/1 on a weight bases and it has
a flash point of 150 oF (66 oC). The oil contains 0.30 % bound nitrogen, 0.74 %
sulfur, and 0.05 % ash, all on a weight basis. The levels of sodium and
vanadium are 40 ppm and 20 ppm, respectively.
The pilot gas is pipeline natural gas containing 97 % methane, 1.6 % CO2, and
1.4 % N2, all on a molar basis. Its molecular weight is 16.6 and its specific
gravity is 0.575. The gas has a LHV of 882 Btu/SCF (34,720 kJ/Nm3) and a
HHV of 975 Btu/SCF (38,380 kJ/Nm3), and we will deliver it to the pilots at
150 psig.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 9
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
Materials were not specified in this case since the desulfurized naphtha is not
corrosive. The Mechanical Engineer will select the materials based on physical
properties and will then assign a corrosive allowance for the heater tubes and
fittings. You should review these specifications made by the Mechanical
Engineer.
This completes our work on "Revision A" of the specifications sheets located at
the end of this narrative. The Mechanical Engineer reviews these data sheets
and adds information on metallurgy and tube corrosion allowance. Directly
behind these initial specifications are copies of the "Approved for Construction"
issue. These contain all of the pertinent detailed information issued by the
vendor.
A fired reboiler is a simple-type direct fired tubular heater as defined in the introduction to
this section. From our discussion so far, you probably realize that a fired reboiler
basically consists of a radiant and a convection section, a flue stack, burners, internal
piping and ducts, and numerous related controllers and indicators. Other related
equipment items, e.g., combustion air fans, are not part of the heater itself even though
they may be supplied by the vendor and their functions may be directly linked to that of
the heater. The auxiliary equipment is basically descried in the first section on Page 2 of
the specification. In addition, the following items may also be considered auxiliaries.
Receives solid coke and combustion products from the decoking process. The
solid coke is still burning when it reaches this vessel and must be quenched with
water. FD usually furnishes this system.
FD usually designs the emergency shutdown system for fired heaters. Some
elements such as the flame detector (not used in our example) may be supplied
by the vendor.
You must fill out specification sheets for the major equipment items. The
emergency shutdown system will be shown on the Mechanical Flow Diagram as
a joint effort with Control Systems.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 10
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 11
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 12
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
Pages 3-8 of the Revision A specification sheets (Forms E533C-H) are not shown since
the Process Engineer did not add any information to them in this example. In practice,
however, you should include these blank data sheets with your original specification.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 13
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 14
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 15
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 16
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 17
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 18
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 19
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 20
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 21
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 22
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 23
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 24
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 3.0
FIRED HEATERS
PAGE 25
PROCESS MANUAL FIRED HEATER REBOILER
DATE 10-94
1.0
(Compared with Shell and Tube Exchanger choices as described in Process Manual
225.003-Heat Exchangers).
These considerable disadvantages have limited the application of fired heater reboilers in
recent years. Principal uses are now large duty, high temperature services such as
crude towers, large debutanizers/naphtha stabilizers, large desulfurizer
stabilizers/fractionators.
An early decision on fired heater usage is required to improve plot plan layout, to ensure
proper cost estimation, sufficient allocation of plot space, and design/construction
manpower.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-03.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 1 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
1.0
2.0
3.0
4.1 GENERAL
We now discuss heater process calculations and how to specify a crude oil heater. This
type of heater is found exclusively in oil refineries. It is used to partially vaporize the oil
feed to an atmospheric crude tower in a crude unit. At appropriate points in our
presentation, we refer to the Fired Heater Specification Sheets at the end of this
subsection to point out where the results of our calculations should be filled in. Before
beginning, however, we want to give you some background information about our
example heater.
Our example is a crude heater on an atmospheric crude column in an oil refinery. The
atmospheric column is part of a crude unit. Such a unit separates virgin crude oil into
several fractions which have characteristic boiling ranges. The refiner can either market
these directly or process the further into saleable products. In a typical crude unit, the
virgin oil is first treated to remove chlorides and other ionic species. This is called
desalting. The oil is then heated and partially vaporized in a fired heater, the crude
heater. From here, the crude goes to the atmospheric tower where the vapor is
fractionated into an overhead product and several sidedraw products. These are sent to
other units for further separation and processing. Refer to the flowsketch shown in
Figure 4-1. The higher boiling crude fractions, taken out the bottom of the column,
undergo further separation in a vacuum stripping tower.
4.2 CALCULATIONS
Establishing the heat and material balance is the first step in calculating a crude unit.
This is usually done on the computer. Figure 4-2 shows the computer printout for the
crude oil feed to the heater. At the heater inlet the oil conditions are 148.7 psia
(1,025 MPaa) and 517 oF (269 oC). The total flow is 765,600 lb/hr (347,270 kg/hr).
Figure 4-3A and 4-3B shows the feed compositions and conditions at inlet to the crude
column. At a pressure of 44.7 psia (0.308 MPaa) and a temperature of 710 oF, (377 oC)
there are 609,631 lb/hr (276,530 kg/hr) of liquid and 155,963 lb/hr (70,744 kg/hr) of
vapor.
The heat required to vaporize slightly over 20 % of the crude oil feed and deliver it to the
tower at these conditions equals 113.69 MM Btu/hr (33.31 MW). This is the duty of the
crude heater. At this point you do not know the process conditions at the heater outlet.
You must calculate these as follows:
You must choose the type of heater to be used, locate it on the available plot
space, and then lay out the flowpath in as much as detail as possible. You
should consult your lead engineer and a heater specialist in the Mechanical
Department for help in selecting the type of fired heater appropriate for your
particular application. Figure 4-1 shows the process flow for our example heater.
Unlike shell and tube type exchangers, fired heaters are often located a minimum
of 25 ft (7.62 m) from other fired heaters, 50 ft (15.24 m) away from other
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 2 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Figure 4-1
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 3 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Figure 4-2
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 4 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Figure 4-3A
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 5 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Figure 4-3B
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 6 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
process equipment and 100 ft (30.48 m) away from building, boilers, motor
control centers, etc. These minimum distances are favored by the Oil Insurance
Association (O.I.A.) and Factory Mutual Insurance and should be followed if
client standards are not given. Remember, that in addition to the safety
problems posed by an open flame, you must consider accessibility for
maintenance in locating a heater. Taken together, these considerations ensure
that a crude heater will be located some finite distance (on the order of 50 ft)
(15.24 m) away from the column it serves.
You must estimate the pressure drop through the heater and from the heater to
the column. The heater pressure drop is usually in the range of 70-100 psi
(0.482-0.689 MPa); however, the drop can be as high as 150-200 psi
(1.034-1.379 MPa). For our example, we chose 100 psi (0.689 MPa) pressure
loss through the crude heater. For the line running from the heater to the column
there is no static head loss. We have allowed 4 psi (0.028 MPa) friction loss in
this line.
You should now do flash calculations on the crude oil for ranges of temperature
and pressure that overlap those you expect the system to operate at. Base
these conditions on your heat and material balance and pressure profile. The
flash calculations are most often done on the computer. The preferred models
are a heat exchanger or a series of flashes.
For our example, we ran computer flash calculations for pressures of 1.0, 34, 60,
100 and 140 psig (0.007,0.234, 0.414, 0.689 and 0.965 MPag) at temperatures
ranging from 500 oF (260 oC) to 750 oF (399 oC). At the heater outlet we found
that out of a total flowrate of 765,600 lb/hr (347,270 kg/hr), we have 601,425
lb/hr (272,800 kg/hr of liquid having an API gravity of 11 o at 60 oF (16 oC) and
164,175 lb/hr (74,470 kg/hr) of vapor having a molecular weight of 159.8. This
represents 21.4 % vaporization by weight in the heater. The outlet temperature
is 718 oF (381 oC) at a pressure of 34 psig (0.234 MPag).
We plotted the results of the flash calculations as shown on pages 9-12 of the
"Revision A" heater specification sheets (see Section 4.5). Note that we present
the data on four separate plots instead of putting it all on one chart as shown in
the design criteria part of this section. Note also that we have not included
enthalpy data in our plots. This is acceptable since the vendor uses our flash
data to calculate the two phase pressure drop throughout the heater. The
necessary parameters include temperature, pressure, vapor-liquid distribution,
liquid gravity, and vapor molecular weight. The vendor designs the burners and
other pieces of the furnace based on the duty we calculate.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 7 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
We must first estimate the amount of heat in the flue gas available for recovery.
The absorbed (or process) duty of the heater is 113.69 MM Btu/hr (33.31 MW).
The crude oil feed is heated first in the convection section and then routed to the
radiant section. It is reasonable to assume that 30 % of the process duty will be
absorbed in the convection section and 70 % in the radiant section. The radiant
duty, therefore, is 79.58 MM Btu/hr (23.34 MW). We have specified a vertical
cylindrical type crude heater with mechanical draft. A reasonable radiant
efficiency is 53 % and, if we don't use an air preheater, a reasonable overall
thermal efficiency is 86 %. Now, we can estimate the available heat in the flue
gas using the following equation we introduced in part 2 of this section:
And we find that the available convection heat is 49.55 MM Btu/hr (14.53 MW).
The process fluid absorbs 34.10 MM Btu/hr (10.0 MW) of this heat (30 % of the
absorbed duty), and, hence there are 15.44 MM Btu/hr (4.53 MW) left over.
How should we recover the remaining stack gas heat? We could only generate
approximately 15,000 lb/hr (6,804 kg/hr) of steam with it. This is insignificantly in
terms of the overall needs of the refinery and probably wouldn't yield a sufficient
return on the investment in the necessary equipment such as a stream drum and
boiler feed pumps. And, besides, there isn't room for such auxiliary equipment in
our example since plot space is limited. We could use the flue gas heat to
preheat the incoming combustion air. This would raise the overall thermal
efficiency of the heater to around 90 % but would require a capital investment in
the preheater, air ducts, etc. This is often what is done but in our case there is
still a better alternative. Upon examining the heat and material balance for the
crude unit we notice that the required reboiler duty for a column called the
prefractionator is 12.8 MM Btu/hr (3.75 MW). This column separates the crude
column overhead product into an overhead off gas stream and a light naphtha
bottoms product. To reboil this column using heat from crude heater flue gas
eliminates the need for a separate reboiler. Also, the capital investment in the
required flue stack coils for the crude heater is minimal. Hence, this is our
choice.
Note that according to our estimates we still have 2.64 MM Btu/hr (0.77 MW) of
recoverable flue gas heat. Remember, though, we made a number of
assumptions in our calculations and used a "rule of thumb" correlation. Based
on the results we are confident that there is sufficient heat in the flue gas to heat
the incoming crude oil and to reboil the prefractionator. To go beyond this
requires an accurate determination of the split in absorbed duty between the
radiant and convection sections and a more rigorous calculation of the
recoverable heat. We did this is the case of the steam-hydrocarbon reformer
example presented in Section 5.0. We refer you there for details. In the case of
our crude heater example, however, the project schedule didn't allow sufficient
time for an in-depth look at convection heat recovery. The vendor will ultimately
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 8 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
decide on the split of absorbed duty between the radiant and convection sections
and will rigorously calculate the convection heat recovery. The vendor will inform
FDI of any necessary changes and will recommend if any additional heat
recovery is feasible.
To adequately specify the convection reboiler section, you must calculate the
process conditions for the reboiler circulation loop. This is discussed in detail in
Section 3.2 entitled Fired Heater Reboiler. For our example here, we present the
final results of the required calculations and leave it to you to research the
details. The results appear on the specification sheets in Section 4.5.
After completing the above calculations you can fill in the following general information
and material balance data on "Revision A" of the Fired Heater Specification Sheets
(Form E-533A):
As a continuation of our discussion we will complete filling out "Revision A" of the Fired
Heater Specification Sheets and we will present these along with the final "Approved for
Construction" version of these data sheets for our example in Section 4.5. You should
note that other than specifying materials of construction and corrosion allowance, the
Mechanical Engineer assigned to fired heaters made no changes to the "Revision A"
data sheets. There are probably two reasons for this. First, as mentioned in the
introduction to this section, Fluor Daniel specifies the performance of a fired heater while
the furnace vendor actually does the mechanical design. The Mechanical Engineer
monitors and
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 9 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
checks the vendor's work throughout the design on behalf of both Fluor Daniel and the
client. He or she will keep the Process Engineer abreast of any changes recommended
by the vendor and will assist in revising the specification sheets as needed. Second, the
Process Engineer consulted with his counterpart in the Mechanical Engineering
Department during the initial specifications of the heater. Such matters as basic furnace
configuration, convection heat recovery, equipment items included in the scope, etc.,
were discussed. This should be a standard practice in all such cases. In this way, much
unnecessary recycle of information can be avoided.
The following items must also be filled in by the Process Engineer for the initial issue of
the specification sheets. These are listed below and discussed according to subject and
location on the data sheets.
As the radiant heat flux increases; the tube life decreases, but so does the initial
cost of the heater. The designer must optimize these quantities. Heat flux is
normally based on client specifications or FDI standard practices. Table 2-1
gives some typical radiant fluxes for fired heaters. You should also consult with
the Mechanical Engineering Department's heater group. For our example, we
have chosen a maximum average radiant heat flux of 11,500 Btu/hr ft2
(36.24 kW/m2. This is slightly above the recommended maximum for crude
heaters of 11,000 Btu/hr ft2 (34.66 kW/m2); however, based on experience with
similar crudes, the client preferred such a relatively high flux.
For crude heaters, the design pressure is usually the maximum sustained heater
inlet pressure encountered during normal operations. The design temperature is
normally 50 oF (28 oC) above the maximum tubeskin temperature calculated by
the vendor. For our example, the client agreed to our criteria for design
temperature but stipulated that design pressure must be 50 psi (0.345 MPa)
above normal operating pressure. For our example heater then, the design
pressure is 184 psig (1.269 MPag).
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 10 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
This section defines what fired heater items (including auxiliaries such as
combustion air and flue gas fans and soot blowers) must be supplied by the
vendor and which items will be supplied by FDI. Usually, FDI and the client will
jointly decide on such details in the early stages of the project.
At the beginning of a job, the client usually provides this information to FDI. It is
then transmitted to the Process Engineer in the form of job bulletins or in a book
along with other design data.
The client may supply information on fuel types, composition and available
temperature and pressure. Otherwise, the Utilities Engineers develop this
information. For our example, the client specified three fuels, two for the furnace
burners and one for the pilots. No. 2 Fuel Oil is the normal heater fuel. No. 6
Fuel Oil is an alternate fuel. Pipeline natural gas, on the other hand, is the fuel
for the pilots. This is not unusual since for stable operation, the pilots require a
reliable supply of gaseous fuel having constant composition. Table 4-1 gives the
composition and properties of each of these fuels.
In this case, we specified 9 % Cr steel for both the radiant and convection
process tubes. The crude contains 1.8 % by weight sulfur and is thus highly
corrosive. Based on corrosion rates provided by the client, we assigned a
corrosion allowance of 0.2 inches to allow for 100,000 hours of operation. The
Mechanical Engineer will designate the ASTM specification and grade of the
steel for the process tubes and will select the materials of construction for other
parts of the furnace such as the supports, header boxes, etc. You should review
these specifications made by the Mechanical Engineer.
This completes our work on "Revision A" of the specification sheets located in
Section 4.5. The Mechanical Engineer reviews these data sheets and adds
information on metallurgy as we discussed above. Directly behind these initial
specifications are copies of the "Approved for Construction" issue. These
contain all the pertinent detailed information issued by the vendor.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 11 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
A crude heater is a simple-type direct fired tubular heater as defined in the introduction to
this section. From our discussion so far, you probably realize that a crude heater
basically consists of a radiant and a convection section, a flue stack, burners, internal
piping ducts, and numerous related controllers and indicators. Other related equipment
items, e.g., combustion air fans, are not part of the heater itself even though they may be
supplied by the vendor and their functions may be directly linked to that of the heater.
The auxiliary equipment is basically described in the first section of page 2 of the
specification. In addition, the following items may also be considered auxiliaries.
Receives solid coke and combustion products from the decoking process. The
solid coke is still burning when it reaches this vessel and must be quenched with
water. FDI usually furnishes this system.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 12 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Table 4-1
TYPE
OIL GAS
DESCRIPTION
FUEL OIL FUEL OIL NATURAL GAS
No. 2 No. 6 (PILOTS ONLY)
o
API 37 14
o o
Viscosity, SSU @ 100 F (38 C) 35
Viscosity, SSU @ 122 oF (50 oC) 325
o
Temperature at burner, C AMB 150 (66) 75 (24)
Net heating value, Btu/lb (kJ/kg) 18,400 (42,790) 17,500 (40,700)
Hydrogen, Wt. %
Sulfur, Wt. % 0.65 0.7
Vanadium, Wt. ppm 50
Ash. Wt. % 0.15
Vapor pressure, @ 100 oF NIL
Header pressure, Normal psig (MPag) 100 (0.689) 100 (0.689) 55 (0.379)
Burner pressure, Normal psig (MPag) 60 (0.414) 60 (0.414)
Composition - mole %
CH4 97
C2H6 -
C3H8+ -
N2 1.4
CO2 1.6
3
H2S, Grains/100 SCF (g/Nm ) 15 (36)
MW 16.6
LHV Btu/SCF (kJ/Nm3) 882 (34,720)
3
HHV, Btu/SCF (kJ/Nm ) 995 (39,170)
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 13 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Fluor usually designs the emergency shutdown system for fired heaters. Some
elements such as the flame detector (not used in our example) may be supplied
by the vendor.
You must fill out specification sheets for the major equipment items. The
emergency shutdown system will be shown on the Mechanical Flow Diagram as
a joint effort with Control Systems.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 14 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 15 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 16 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
Pages 3 - 8 of the Revision A Specification Sheets are not shown since the only
information the Process Engineer added to them for this example was process
tube metallurgy. In practice, however, you should include these blank data
sheets with your original specification.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 17 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 18 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 19 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 20 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 21 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 22 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 23 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 24 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 25 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 26 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 27 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 28 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 29 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 30 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 31 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 4.0
FIRED HEATERS
PAGE 32 of 32
PROCESS MANUAL CRUDE OIL HEATER
DATE 10-94
1.0
K:\WRK090\037\345\MANUALS\FIRHEAT\007-04.SAM-04/15/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 1 of 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
2.0
3.0
4.0
5.1 GENERAL
Within practical limits, waste heat recovery from the reactor flue gases and effluent
should be maximized. Therefore, the reformer heat balance usually becomes an integral
part of plant heat and steam balances. Any change then, in the reformer performance
specifications could require revision of the plant heat and steam balances. You must
keep this in mind throughout the project.
5.2.1 Background
The naphtha feed in our example has an API gravity of 68 o and a molecular
weight of 73.67. ASTM (D-86) distillation data for the material is given on page 4
of the "Revision A" Specification sheets.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 2 of 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Figure 5-1
HYDROGEN PLANT
SIMPLIFIED PROCESS FLOW DIAGRAM
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 3 of 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
5.2.2 Calculations
a. General
We will present and discuss calculations for the example reformer in the
order in which you should perform them. At appropriate points we will
refer to the reformer specification to show where the results of the
calculations should be filled in. The example calculations and
appropriate tables and graphs follow this narrative in Section 5.5. You
should refer to these throughout this discussion.
Variable Value
The output for our reformer calculation from the computer material
balance is shown in Figure 5-2. The composition, flow, and some
physical characteristics for the reformer effluent are given as well as the
radiant duty. On a molar basis, the reformer outlet stream contains
37.97 % H2, 7.51 % CO, 7.69 % CO2, 45.04 % H2O, and 1.78 %
unreacted CH. The stream has an average molecular weight of 14.66.
Its pressure is 364 psia (2.510 MPaa).
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 4 of 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Figure 5-2
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 5 of 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Since the process temperature exiting the reformer is so high (1,570 oF (854 oC)
in our case), the heat content of the flue gas going to the convection section is
much larger than for most fired heaters. The manner in which this heat is
recovered is one of the main differences in various plant designs. You, as a
Process Engineer, are responsible for specifying the heat recovery scheme for
the reformer and for the unit in general. You must look at heat recovery from the
process streams as well as from the furnace flue gases.
The amount of heat available for recovery from the process streams can be
readily found. One needs only to examine the duties of the various process heat
exchangers as given in the computer heat and material balance calculation. The
radiant duty of the reformer is also found here and with it the heat recovery in the
convection section of the furnace can be estimated. A key factor in making
these estimates is the radiant efficiency of the furnace, defined as: Radiant
duty/total Btu fired x 100. This ratio is very close to 47-48 % in most reformer
furnace designs. Thus, the fired duty can be readily estimated. It is practical,
and advisable, to design for overall thermal efficiencies of 83-88 %. The heat
available for recovery in the convection section is given by the following equation
that we introduced in Section 2.0:
Alternately, you could use a computer program. The program should calculate
the fired duty, combustion air flow, fuel usage, and radiant efficiency for given
conditions of radiant duty, and preheat air temperature. It is especially useful if
the reformer convection heat balance requires a trial and error solution as is the
case in our example.
Before we discuss this calculation any further, let's look at the heat recovery
scheme we devised for our example. This is shown in Figure 5-3.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 6
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Figure 5-3
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 7
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
Reformer effluent gas is used to make steam in the waste heat boiler and is then
sent on to the High Temperature Shift Reactor (HTS). From here the process
gas goes to the Low Temperature Shift Reactor (LTS) where it is cooled against
boiler feed water both as it enters and leaves this reactor. This heated boiler
feed water goes to a vessel called a steam drum. The steam drum operates at
650 psig (4.482 MPag) and 498 oF (259 oC) (saturation conditions). There are
two water circulation loops in operation here. Saturated water from the steam
drum passes through the waste heat boiler and a steam/water mixture returns to
the drum via natural circulation. Circulation pumps send another stream of
saturated water through furnace convection coil No. 3 and a saturated mixture is
then returned to the drum. Steam from the drum is superheated in convection
coils Number 1 and 2. From coil No. 2, steam at 750 oF (399 oC) is sent to the
plant 600 psig (4.137 MPag) steam system. From coil No. 1 superheated steam
at 817 oF (436 oC) is mixed with naphtha vapor in the feed to the reformer. The
molar steam to carbon ratio of the mixture is 4/1 as discussed in Section 5.2.2b,
Process Heat and Material Balance. The heat from the steam raises the
temperature of the combined feed to 800 oF (427 oC). Now that we understand
the flow paths of the Hydrogen Plant steam balance, let's proceed with the
calculations.
In our example, the client placed the following two stipulations on the reformer
convection heat recovery:
The furnace flue gas must not be cooled below 325 oF (163 oC). One of
the fuels for this furnace contains 0.3 % sulfur by weight. As we
discussed in Section 2.6, some of this sulfur ends up as SO3 in the flue
gas. If sufficiently cooled, the SO3 combines with condensing moisture
in the stack to form aqueous H2SO4. The acid dew point for our example
reformer lies in the range 275 oF to 300 oF (135 oC to 149 oC). The
required flue gas outlet temperature of 325 oF (163 oC) will thus ensure
that no acid condenses in the stack.
The minimum approach temperature for the steam generation coil (coil
No. 3) will be 50 oF (28 oC). We generate saturated steam at
approximately 500 oF (260 oC) in this coil and in the process must not
cool the stack gas below 550 oF (288 oC) at this point.
Now, how do these considerations affect our calculations? First, the heat
available for air preheat is that available from the flue gas as it cools from 550 oF
(288 oC) to 325 oF (163 oC). The heat available from the flue gas then depends
strictly on its flowrate up the stack. The flue gas flowrate depends on the fired
duty depends on the radiant duty, the radiant efficiency and the combustion air
preheat temperature. And, the air preheat temperature depends on how much
heat is available from the flue gas and on the combustion air flow itself. And
there you have it, a trial and error calculation is required.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 8
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
Let's go through the calculation scheme and look at the results for the 400 oF
(204 oC) air preheat case:
Using the computer output (Figure 5-4 A&B), plot the flue gas cooling
curve for each case, as shown in Figure 5-5.
Calculate the Hydrogen Plant steam balance for each case as shown in
the example hand calculations at the end of this subsection. The results
for our example are summarized below.
Plot the duties of each reformer convection coil on the same plot as the
corresponding flue gas cooling curve. See Figure 5-5.
From the plot determine the amount of heat available in the flue gas for
air preheat. For our example, 34 MM Btu/hr (9.97 MW) are available.
Determine an average heat capacity for air and over the temperature
range from 40 oF (4.4 oC) (our designated air intake temperature) up to
the air preheat temperature. Data is available in such references as the
Handbook of Tables for Applied Engineering Science. For our example,
the average heat capacity for air over the range of 40 oF (4.4 oC) to
400 oF (204 oC) is 0.2293 Btu/lb oF (0.94 kJ/kg oC). (Alternately, you
could plot an enthalpy versus temperature heating curve for air over the
appropriate temperature range.)
Now, using the combustion air flow the computer printout, calculate the
heat required to raise the temperature of the intake air to the
corresponding air preheat temperature. If this duty matches that
determined from flue gas cooling curve, then you have arrived at the
solution. As you can see from the calculations, this is the case we have
shown here.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 9
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
Using the information from the foregoing calculations, we can fill in the following
items on page 2 of "Revision A" of the Steam-HC Reformer Specification Sheets
(Form E-522-B):
4 Coil Duties
Note that we are instructing the vendor to specify various parameters for the air
preheat coil even though we have calculated some of these already. Thermal
and Mechanical design of this part of the reformer (or any furnace for that
matter) is the responsibility of the vendor. Although we are reasonably confident
of our results, we can, in this way, use the vendor's numbers as a check. Note
also that we specifically gave the vendor permission to vary our steam flows and
duties if greater furnace efficiency will result. Furnace designers have developed
numerous proprietary designs for tubular heaters to make efficient use of fuel
and provide satisfactory and economic mechanical design. In short, we wish to
take advantage of the vendor's greater knowledge of heater design.
There are still some items on the reformer specification sheets that we have not
yet filled in. These are covered in the next part of this section entitled
Specification Sheets.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 10
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
Figure 5-4A
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 11
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
1.0
Figure 5-4B
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 12
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Figure 5-5
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 13
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Using the information from the computer calculations, we can fill in the following items on
the first page of "Revision A" the Steam-HC Reformer Specification Sheets (Form
E-522-A): Note that specification sheets must be filled out for each of the six cases of
the material balance (refer to the "background" part of this subsection).
In this part of our discussion, we will complete filling out "Revision A" of the reformer
specification sheets and will present these along with the final "Approved for
Construction" version of these data sheets for our example in Section 5.5. You should
note that in this case the Mechanical Engineer assigned to fired heaters made no
changes to the "Revision A" data sheets. There are probably two reasons for this. First,
as mentioned in the introduction to this section, Fluor Daniel specifies the performance of
a fired heater while the furnace vendor actually does the mechanical design. Further, a
steam-hydrocarbon reformer is a highly specialized piece of equipment. Even such
details as tube and fitting metallurgy, normally specified by the Mechanical Engineer, are
usually left up to the vendor. The Mechanical Engineer monitors and checks the
vendor's work throughout the design on behalf of both Fluor Daniel and the client. He or
she will keep the Process engineer abreast of any changes recommended by the vendor
and will assist in revising the specification sheets as needed. Second, the Process
Engineer consulted with his counterpart in the Mechanical Department during the initial
specifications of the heater. Such matters as basic furnace configuration, convection
heat recovery, equipment items included in the scope, etc., were discussed. This should
be a standard practice in all such cases. In this way much unnecessary recycle of
information can be avoided.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 14
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
The following items must also be filled in by the Process Engineer for the initial issue of
the specification sheets. These are listed below and discussed according to subject and
location on the data sheets.
Most large reforming furnaces are designed on the assumption that heat transfer
is the rate limiting mechanism of the process, rather than catalytic activity.
Table 2-1 gives some typical radiant fluxes for steam-hydrocarbon reformers.
For our example, we have chosen an average radiant heat flux of 20,000 Btu/hr
ft2 (63.0 kW/m2). You should note that adequate catalytic rate data over the full
range of conditions encountered in reforming is not available. You should,
therefore, choose a conservative heat transfer rate in specifying a reformer.
Here we have indicated that the furnace vendor will specify this information.
Actually, the furnace vendor will in turn consult a catalyst vendor for this
information.
In this case, we set the process tube design pressure at 430 psig (2.965 MPag),
25 psig (0.172 MPag) above the highest normal operating pressure. For the
design temperature, we chose 1,620 oF (882 oC), 50 oF (28 oC) above the highest
normal operating temperature. For the steam-feed preheat coil, the design
conditions of 500 psig (3.447 MPag) and 1,210 oF (654 oC) are 10 % greater than
the highest respective operating values. The design conditions for the steam
superheat coil (725 psig (4.998 MPag) and 920 oF (493 oC)) and the design
temperature for the steam generation coil (650 oF) (343 oC) are the same as for
the respective plant systems they tie into. Notice that we instructed the vendor
to specify the design pressure for the steam generation coil. In this case, we
control the outlet pressure. The back pressure at the inlet will depend on the two
phase hydraulics in the coil.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 15
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
At the beginning of the job, the client usually provides this information to FDI. It
is then transmitted to the Process Engineer in the form of job bulletins or in a
book along with other design data.
The client may supply information on fuel types, composition, and available
temperature and pressure. Otherwise, the Utilities Engineer will have to develop
this information. For our example, we have specified three fuels: purge gas
natural gas, fuel oil. Each of these is discussed below.
a. Purge Gas
Purge gas is a waste gas stream from the H2 product purification step.
As per client preference, we indicated to the vendor that all available
purge gas will always be fired. Natural gas or fuel oil will supplement the
purge gas.
On a molar basis, purge gas contains 63.55 % CO2, 26.89 % H2, 7.58 %
CH4, 1.2 % CO, 0.78 % H2O. It has a molecular weight of 30.20, an
HHV of 168 Btu/SCF (6,610 kJ/Nm3), and an LHV of 146 Btu/SCF
(5,750 kJ/Nm3). We will deliver the purge gas to the burners at 2 psig
(0.014 MPag) and 100 oF (38 oC). Its design flowrate is 30.84 MMSCFD
(826 x 103 Nm3/d).
b. Natural Gas
c. Fuel Oil
The fuel oil for our example has an API gravity of 27 o and lower and
higher heating values of 18,100 Btu/lb (42,100 kJ/kg) and 19,240 Btu/lb,
(44,750 kJ/kg) respectively. It contains 0.3 % sulfur by weight, but has
negligible amounts of vanadium, sodium and ash. We will deliver it to
the burners at 60 oF (16 oC) and provide atomizing steam at 250 psig
(1.724 MPag) and 450 oF (232 oC). ASTM (D-86) distillation data for the
oil is given on page 4 of the specification sheets.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 16
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
Steam to Coil #1
Inlet
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 17
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
P _ 407 psia
T = 817 oF
Heat In
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 18
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
5. Coil #3
∴ Duty Coil #3
Heat Out
1. Steam to Coil #1
176,500 lb/hr
H = 1,202.5 Btu/hr
2. Blowdown
O.01 χ lb/hr
H = 485.6 Btu/lb
Heat In
2. Coil #3 Steam
χ lb/hr
H = 1,202.5 Btu/lb
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 19
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
H = 1,202.5 Btu/lb
Heat Out
1. Blowdown
3,490 lb/hr
H = 485.6 Btu/lb
2. H2OL to WHB
155,935 lb/hr
H = 485.6 Btu/lb
3. H2OL to Coil #3
χ lb/hr
Coil #3 Duty
Coil #2 Flow/Duty
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 20
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
∆H = 34 MM Btu/hr
MW = 28.9
From data for air in handbook of tables for applied Engineering Science,
(Total 38 pages)
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 21
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 22
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 23
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 24
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 25
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 26
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 27
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 28
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 29
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 30
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 31
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 32
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 33
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 34
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 35
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 36
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 37
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 38
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 39
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 40
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 41
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 42
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 43
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 44
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 45
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 46
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 47
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 48
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 49
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 50
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 51
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 52
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 53
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 54
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 55
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 56
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 57
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 5.0
FIRED HEATERS
PAGE 58
PROCESS MANUAL STEAM - HYDROCARBON REFORMER
DATE 10-94
K:\WRK090\037\345\MANUALS\FIRHEAT\007-05.SAM-04/16/1997
` FLUOR DANIEL
SECTION 6.0
FIRED HEATERS
PAGE 1 of 2
PROCESS MANUAL MATERIALS OF CONSTRUCTION
DATE 10-94
1.0
2.0
3.0
4.0
5.0
The Mechanical Engineer generally chooses the heater tube material. You should review
his or her choice to be sure you agree with it. The Mechanical Engineer selects a given
material based on its ability to withstand the temperature and pressure of the particular
service. Temperature, however, is of primary consideration in choosing the right tube
material. Some typical applications are summarized below:
Choosing a material for furnace tube application must balance tube cost against tube life.
Often, shorter tube life may be more economical than expensive alloy tubes. Sometimes
it is economical to use different tube materials in the radiant and convection sections;
however, welding problems may occur with dissimilar alloys. The desired tube life is
generally 100,000 hours. This equals 11.4 years at 8,760 hours per year. Figure 6-1
gives data for furnace tube design stress for different steels over some commonly
encountered operating temperature ranges. Information on the relative cost of these
steels is included.
Sometimes process considerations require special tube metallurgy. In that case, the
Process Engineer should select the tube material. The following important items related
to corrosion or service problems come up frequently in process furnaces. They influence
material selection and the Process Engineer should always consider them.
Hydrogen service
Sulfur/H2S service
Vanadium and sodium
Carbon deposits
Carbide precipitation
Graphitization
Carburization
Oxidation
Stress corrosion cracking
K:\WRK090\037\345\MANUALS\FIRHEAT\007-06.SAM-02/25/1997
` FLUOR DANIEL
SECTION 6.0
FIRED HEATERS
PAGE 2
PROCESS MANUAL MATERIALS OF CONSTRUCTION
DATE 10-94
1.0
Figure 6-1
K:\WRK090\037\345\MANUALS\FIRHEAT\007-06.SAM-02/25/1997
` FLUOR DANIEL
SECTION 7.0
FIRED HEATERS
PAGE 1 of 1
PROCESS MANUAL UTILITY REQUIREMENTS
DATE 10-94
1.0
1.0
2.0
3.0
4.0
5.0
6.0
In the early stages of a project you must estimate the utilities required for the fired heater you are
specifying. The estimates are a necessary part of both the furnace calculations and the plant
utility balance. The utilities you must consider include fuel, steam or electricity and boiler feed
water. Fuel consumption is estimated through stoichiometry calculations. These can be done by
hand or by using the Furnace Calculation Program on the computer. Refer to Section 2.6 and
Section 5.2 for further discussion of this program. For mechanical draft furnaces, you must
estimate the steam or electric consumption of the drivers for the forced and induced draft fans.
Hydraulic horsepower and efficiencies for the drivers are needed. Refer to the section in this
manual on motors and drivers for guidance. For those heaters where steam is generated in the
convection section, you must estimate the boiler feedwater requirements and the power or steam
consumption of the accompanying pumps. Note that the amount of boiler feed water required is
influenced by both the amount of recoverable heat in the flue gas and by the demand for the
steam to be produced.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-07.SAM-02/25/1997
` FLUOR DANIEL
SECTION 8.0
FIRED HEATERS
PAGE 1 of 2
PROCESS MANUAL REFERENCES, CODES AND STANDARDS
DATE 10-94
1.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.1 REFERENCES
1. *Berman, Herbert L., Fired Heaters-I, Finding the basic design for your
application; Chemical Engineering, June 19, 1978.
4. *Berman, Herbert L., Fired Heaters-IV, How to Reduced your Fuel Bill, Chemical
Engineering, September 11, 1978.
6. * Neal, James E. and Clark, Roger S., Saving Heat Energy in Refractory-Lined
Equipment; Chemical Engineering, May 4, 1981.
7. * Frankel, Irwin, Shortcut Calculation for Flue Gas Volume, Chemical Engineering,
June 1, 1981.
9. Krebs; T.M.' Hydrocarbon Processing and Petroleum Refiner, Volume 41; page
135, 1962.
10. Kern, D.Q., Process Heat Transfer, Chapter 19, Furnace Calculations.
11. Nelson, W.L., Petroleum Refinery Engineering, Chapter 18, Tubestill Heaters.
12. Rickerman, J. H., Heater Designs for the Petroleum Industry, Transactions of the
A.S.M.E., October, 1945.
13. Maker, F.L., Flashflow Pressure Drop in Heaters; Petroleum Refiner, Volume 34,
No. 11; November, 1955, p.140.
14. Gallagher, J.T., Cost of Direct Fired Heaters, Chemical Engineering, July 17,
1967, p.232
K:\WRK090\037\345\MANUALS\FIRHEAT\007-08.SAM-02/25/1997
` FLUOR DANIEL
SECTION 8.0
FIRED HEATERS
PAGE 2
PROCESS MANUAL REFERENCES, CODES AND STANDARDS
DATE 10-94
1.0
The following list of codes and standards provides basic information about fired heaters
for Process Engineers.
API Standard 560, Fired Heaters for General Refinery Service, 1986 API RP533 Air
Preheat Systems for Fired Process Heaters, 1986.
API RP 531M, Measurement of Noise from Fired Process Heaters, (Metric Only), First
Edition, 1980.
FDI Specification SP-00000-45-1, "Fired Heaters." (Review this specification before final
issue of your first specification.)
Customer Standards. (These are incorporated into FDI's Narrative Specification and the
overall specification is normally approved by the customer.)
K:\WRK090\037\345\MANUALS\FIRHEAT\007-08.SAM-02/25/1997
` FLUOR DANIEL
SECTION 9.0
FIRED HEATERS
PAGE 1 of 1
PROCESS MANUAL REFERENCE ARTICLES
DATE 10-94
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Included in this section are copies of articles identified in Section 8.1 from 1. through 7.
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997
K:\WRK090\037\345\MANUALS\FIRHEAT\007-09.SAM-02/25/1997