Professional Advisor – An Architect nominated by the Owner and

approved by IAPoA to organize the ADC on behalf of the Owner.


PP3 Midterm Exam Reviewer
Technical Advisors – Specialist personnel who may be consulted by
the Jurors during the conduct of the ADC to permit them to obtain
all necessary relevant information.
SPP Document 206
Competition Secretariat – The body formed by the Owner and
COMPREHENSIVE ARCHITECTURAL SERVICES approved by the Professional Advisor, to assist the Professional
Advisor and the Jury in the administrative conduct of the ADC
 Pre-Design Services (SPP 201)

 Regular Design Services (SPP 202)


SPP Document 209
 Specialized Architectural Services (SPP 203)
PROFESSIONAL ARCHITECTURAL CONSULTING SERVICES (PACS)
Construction Services SPP 204

 Fulltime Supervision Services (SPP 204-A)


On March 20, 1980, then President Ferdinand E. Marcos,
 Construction Management Services (SPP 204-B) recognizing the role of the members of accredited professional
organizations (APOs) in nation building and in the pursuit of national
 Post-Construction Services (SPP 205) goals, issued Letter of Instruction (LoI) No. 1000 which directs all
government agencies and any of its instrumentalities to give priority
to members of the APOs in the hiring of its employees and in the
PROJECT MANAGEMENT (PM) involves management activities over engagement of professional services. This amply demonstrated the
and above the normal architectural and engineering (A&E) services President’s confidence in the capabilities of Filipino professionals i.e.
carried out during the pre-design, design and construction phase. registered and licensed professionals (RLPs)
The over-all objective is to have control over time, cost and quality
relative to the construction of a project

SPP Document 207


DESIGN-BUILD SERVICES

simplifies and expedites the process of project delivery while


providing creative cost effective solutions.

 Scope of Design-Build Service


Comprehensive Development refers to the holistic and progressive
 Schematic Design Phase
growth and advancement of a community, province, region and
 Design Development Phase nation inclusive of their respective economic, social, physical,
environmental and institutional sectors.
 Contract Document Phase

 Construction Phase
Consortium or Association refers to a coalition of purely Filipino
professional consultants

SPP Document 208


Consulting Agreement means a binding covenant or understanding
ARCHITECTURAL DESIGN COMPETITION (ADC)
entered into by a professional consulting architect (PCA) and/or
- is to state the principles upon which competitions are based and consulting firm (i.e. RAF only) with an Owner/ Client, whether in
by which Promoters/ Owners should be guided in organizing ADCs. Government, private sector or CSO or the international community
It has been drawn up in the interest of Project Proponents/ Owners (with projects on Philippine soil), that provides such terms and
and Competitors. conditions mutually agreed upon by the parties, under which
specific work, study or joint venture requiring special or technical
Owner -person or organization that undertakes or promotes an ADC skills and expertise, shall be undertaken

-issues the invitation to Architects to submit plans/designs

Jury - appointed by the Owner to assess the entries to the Consulting Architectural Firm (CAF) refers to an architectural
competition. Jurors-members of the Jury-consists of a majority of corporation, association, group or partnership duly registered with
RLAs, assisted by a lay Juror to represent the intention of the the Securities and Exchange Commission
Owner.
Direct Costs or Reimbursable Expenses-living and travelling
expenses of employees, partners, and principals when away from
the home office on business Office Management Basics

1. Employment and human resources. It's critical to have an


employment policy in place. A policy manual gives you a blueprint
Foreign Consultant (FC) or Foreign Architect (FA) refers to an for the way the company approaches employment.
individual, not a citizen of the Philippines
2. Project management. Keeping track of projects is critical to the
successful completion of important tasks and represents an
essential piece of documentation.
Multiplier refers to a factor which compensates the Professional
Consulting Architect overhead costs of the office 3. Equipment and furniture requirements. You don't need every
piece of office equipment out there to run a smooth operation. But
you do need certain products that are going to optimize people's
Overhead-provisions for office, light, air-conditioning, and similar performance.
items for working space 4. Inter- and intra-office communications. For many small
businesses, the responsibility for communication falls upon the
office manager.
Project Cost means the total cost of the project which includes but
is not limited to construction cost, fees for professional services, the 5. Conflict resolution. Conflicts are inevitable. Knowing how to
cost of land, right-of-way (ROW), legal, administrative and other handle them properly, however, will make life easier.
related expenses of the client 6. The company and its people. Knowing how to run an office must
include understanding the company and its people. Knowing the
product line and how it fulfills a need is just as important as
Salary Cost means the cost of salaries (including sick leave, vacation, ordering more toner for the printer.
holiday and incentive pay applicable thereto

Project management is the discipline of planning, organizing,


COMPENSATION OF PACS securing, and managing resources to achieve specific goals

Per Diem or Hourly Basis is compensated for all the time he Two forefathers of project management
devotes to the work, including travel time
Henry Gant- the father of planning and control techniques, who is
- based on the complexity of the work involved and the extent of his famous for his use of the Gantt chart as a project management tool;
experience/specialization Henri Fayol for his creation of the 5 management

Retainer is used when the services of a Professional Consulting Manager as executive is the most difficult and has the highest
Architect (PCA) is expected to be required at intervals over a period degree of responsibility. Bridge between top management and staff
of time
Control is defined by Webster as “to check or regulate to keep
within limits

Salary cost times a multiplier, plus direct cost or reimbursable Risk management is the identification, assessment, and
expenses- multiplied by a factor from 3.0 as a multiplier plus cost of prioritization of risks followed by coordinated and economical
certain items that are reimbursable to the PCA classified under application of resources to minimize, monitor, and control the
“Direct Cost” or “Reimbursable Expenses” probability and/or impact of unfortunate event

Fee = Salary Cost x Multiplier + Reimbursable Expenses


Planning. It is an intellectual process, the conscious
determination and direction of action.
Fixed/ Lump Sum payment-computation of a lump-sum as an
appropriate percentage of the estimated total cost of the project
Plans may be classified as: a. Objectives of the enterprise d. Budget
b. Policies e. Programs c. Procedures
Percentage of total project cost is calculated as an agreed
percentage of the ultimate cost of the project/service.

ORGANIZATIONAL STRUCTURE
• Sole Proprietorship • Partnership

• Consultant • Corporate Setting

general forms of collaboration

• sub-contractual relationships with one or more consultants

• association of two or more architectural firms, with one entering


into the prime contracts with the owner

• joint venture between or among firms

• multiple agreements

INTER-PROFESSIONAL COLLABORATION
World Trade Organization (WTO) is the only international
organization dealing with the global rules of trade between nations.
Its main function is to ensure that trade flows as smoothly,
predictably and freely as possible

GATT- General Agreement on Tariff and Trade

GATS- General Agreement on Trade in Services

-is to liberalize services trade, not to deregulate services, many of


which are closely regulated for very good reasons.

Basic principles

• Most-favored-nation treatment • Market Access

• National treatment • Transparency

• Objective and Reasonable Regulations

• Unrestricted International payments

CONCILIATION/ MEDIATION: An attempt to achieve an amicable


settlement

Conciliation is a way of settling disputes between parties arising


from, or connected with construction contracts in the Philippines
(except labor disputes). The dispute is referred to a panel of
conciliators tasked to bring the parties to an agreement.

Mediation is a way of settling disputes between parties arising from,


or connected with construction contracts in the Philippines (except
labor disputes). A single neutral third party, called mediator, brings
the disputing parties to a negotiation.

Arbitration is defined as the investigation and determination of


matters of differences between contending parties by one or more
unofficial persons, called arbitrators or referees, chosen by the
parties [Bouvier’s Law Dictionary 225]. It is in tended to avoid the
formalities, the delay, the expense and vexation of ordinary
litigation [Curtis-Castle Arbitration, 42 Am.St., Rep 200].