1. Data Perencanaan
1) Berat sendiri beton = 2400 kg/m3
2) Berat sendiri floor deck tebal 0,9 mm = 12,48 kg/m2
3) Berat spesi tebal per 1 cm = 21 kg/m2
4) Berat keramik = 24 kg/m2
5) Berat ducting + mekanikal = 19 kg/m2
6) Berat plafond + penggantung = 18 kg/m2
7) F’c = 30 Mpa (N/mm2)
8) Fy = 400 Mpa (N/mm2)
2. Analisis Pembebanan
A. Beban Mati (DL)
1) Berat sendiri beton tebal = 2400 x 0,12 = 288 kg/m2
2) Berat sendiri floor deck (tebal 0,9 mm) = 12,48 kg/m2
3) Berat spesi per cm tebal = 21 x 2 = 42 kg/m2
4) Berat keramik = 24 kg/m2
5) Berat ducting + mekanikal = 19 kg/m2
6) Berat plafond + penggantung = 18 kg/m2
+
2
DL = 403,48 kg/m
b. Data beton
9) F’c = 25 MPa (N/mm2)
10) Ec = 4.700 x √fc′
= 4.700 x √25 MPa
= 23.500 N/mm2
c. Kekuatan shear connector stud (1 buah stud)
Qn = 0,5 x Asc x (fc’ x Ec)0,5
= 0,5 x 314,16 mm2 x (25 N/mm2 𝑥 23.500 N/mm2)0,5
= 120.399,26 N
Asc x Fu = 314,16 mm2 x 410 N/mm2 = 128.805,3 N
Maka, Qn Asc x Fu
120.399,26 N < 163.362,8 N (OK)
d. Kontrol Koefisien Reduksi
wr hs
rs = 0,6 x (
hr
) x (hr − 1) 1
32 mm 93 mm
= 0,6 x (
53 mm
) x (53 mm − 1) 1
= 0,6 x 0,6 x (1,75 − 1) 1
rs = 0,27 < 1
Maka,
Qn = Qn x rs
= 120.399,26 N x 0,27 = 32.917,99 N
e. Gaya Geser Horizontal (Vn = c)
As (connector) =
C1 = As x fy
= 314,16 mm2 x 250 N/mm2
= 78.539,816 N
C2 = 0.85 x fc’ x Ac
= 0.85 x 25 N/mm2 x (beff x tb)
𝐿 6.000 𝑚𝑚
Dimana, beff = = = 1.500 mm
4 4
beff = 1.500 mm S = 3.000 mm (OK)
Maka, C2 = 0,85 x fc’x (beff x tb)
= 0,85 x 25 N/mm2 x (1.500 mm x 67 mm)
= 2.135.62 5 N
C2 C1
Sehingga, Vn = C2 (gaya geser 1 conector)
= 2.135.625 N
Balok WF 500.200.9.14
6.000 mm
Gambar 4.4 Perletakan Stud Connector
mutu E70xx
18 cm
g. Control las
11) Baja BJ 37 Fy = 240 MPa (N/mm2) = 2.400 kg/cm2
Fu = 370 MPa (N/mm2) = 3.700 kg/cm2
12) Fu las E70xx = 70 Ksi = 70 x 70,3 kg/cm3
13) Akibat Pu, maka
𝑄𝑛 32.917,99 𝑘𝑔
Pu = = = 3.358,98 kg
𝑔 9,8
Pu
fvp =
x d2 x 0,25
3.358,98 kg
=
3,14 x (2𝑐𝑚)2 x 0,25
3.358,98 kg
=
3,14 cm2
= 1.069,20 kg/cm2
Fu = x 0,6 x F70xx
= 0,75 x 0,6 x 70 x 70,3 kg/cm3
= 2.214,45 kg/cm3
fvp
Te =
fu
1.069,20 𝑘𝑔/𝑐𝑚2
=
2.214,45 𝑘𝑔/𝑐𝑚3
= 0,48 cm
te
a =
0,707
0,48 𝑐𝑚
=
0,707
= 0,68 cm