POP WORKS

1M+1H M-MASON H-HELPER

time interval STEP-1 STEP-2 STEP-3 STEP-4 STEP-5 STEP-6 STEP-7

Apply
Make Check
plaster on
level dots level by
walls and
First apply on walls using plum
Surface Apply level
P.O.P on and mark & right
Preparation Bond IT Mix P.O.P surface
ceiling offset with angle
in raio using
bottom check at
1:1.5 bottom
patti corners
(Water patti
:Gypsum

2
4

8 H M

10 M

12 M

14 M

16 M
18 H M
20 M
22 M
24
26 M
28 H M
30 M
32 M
34
36 M
38 M
40 H M
42
44 M
46 M
48
50 M
52 M
54 M
56 H M
58
60
10 30 12
STEP-8

Cleaning the
Idle
surroundings

P.O.P Activity (In min) Time (in min)

Surface Preparation
0
Apply Bond IT 0

Mix P.O.P in raio 1:1.5


(Water :Gypsum 10

First apply P.O.P on ceiling


30

Make level dots on walls and


mark offset with bottom patti
H 0

Apply plaster on walls and level


surface using bottom patti
H 12

Check level by using plum &


right angle check at corners
H 0

Cleaning the surroundings


H 10
Idle 24
H
H
M H
H

H
H
M H
H
H

M H
H
H
M H
H
H
H

M&H
M H
10 24
P.O.P WORK
Surface Preparation

10 Apply Bond IT

Mix P.O.P in raio 1:1.5 (Water


24 :Gypsum

First apply P.O.P on ceiling

Make level dots on walls and mark


offset with bottom pat

Apply plaster on walls and level


surface using bottom pat
30
Check level by using plum & right
10 angle check at corners

Cleaning the surroundings

Idle
Time (in min) 12
5 (Water

eiling

alls and mark


at

s and level
m pat

plum & right


rs

ndings