Sie sind auf Seite 1von 1

60.

0
LEGEND

BACKSTAGE
MALE
5.0 TOILET
5.0 DRAINAGE/MANHOLE
FACULTY
STAGE TOILET
WATER SUPPLY
STORAGE CEAFA FACULTY
4.0 ROOM 4.0

SEWER PIPE/ WASTE


EE LAB PIPE
7.0 6

OPEN TO OPEN TO
2ND FLOOR 2ND FLOOR
SOIL/VENT/WASTE
BLEACHERS 14.0 STACK

EE LAB
7.0 5 FLOOR/GROUND
CLEAN OUT
LABORATORY 1

AMPHITHEATER
CONTROL VALVE
ROOM

LABORATORY 2
54.0 6.0 ARCHITECTURE AND FINE ARTS DEPARTMENT 6.5
EE LAB
4

CLASS ROOM 413 CLASS ROOM 414 CLASS ROOM 415 CLASS ROOM 403
LOBBY
LABORATORY 3
EE LAB
6.5
7.0 3

FACULTY
ROOM 4.0

4.0

ELECTRICAL
ENGINEERING ELEVATOR CLASS ROOM 402
5.0
ELEVATOR
LAB
6.5

EE LAB 8.0
6.5 1 CLASS ROOM 401

SHE

7.0 4.0 4.0 7.0

A FOURTH FLOOR LEVEL PLUMBING LAYOUT


P-02 SCALE: 1:100MTS

PROJECT LEADER INSTRUCTOR PROJECT / LOCATION: OWNER PREPARED BY: No. REVISIONS DATE
STATE U

BatStateU
SHEET CONTENT SHEET NO.
S

NI
TANGA

VE

ENGR. JUAN DELA CRUZ ENGR. ALLAN B. DE VILLA FLOOR PLANS


RSITY

MECHANICAL ENGINEER PROFESSIONAL MECHANICAL ENGINEER ETC


BATANGAS STATE UNIVERSITY A
BA

Gov. Pablo Borbon Main Campus II 3


PRC Reg No.: SECTION: ME - 1111 PRC Reg No. PTR No.
190 3 Alangilan, Batangas City
PH TIN: GROUP NO: 01 TIN: Issued on: BatStateU Main Campus 2
I L IPPI NES
MECHANICAL ENGINEERING DATE SUB: Issued at: Alangilan Batangas City PRESIDENT
DEPARTMENT

Das könnte Ihnen auch gefallen