Sie sind auf Seite 1von 15

SweOffshore combines ser- SweOffshore provides off-

vices and assets to provide shore accommodation ser-


efficient vices with the highest
solutions based on a full ser- safety and quality
vice concept standards

Spirit and drive of a


young company com-
bined with 100 years of
experiences and

SweOffshore holds ISO 9001


Safety and quality are our
and 14001 accreditations to
fundamentals – based on
ensure
that we provide further
consistent high quality in our
services for your benefits.
services

SweOffshore provides
you with the services
needed to secure effi-
ciency as well as safety
and comfort for your

Accommodation concept: We make sure our custom-


“Supporting our customers in ers
achieving the most efficient Secure as high operational
performance possible” uptime as possible

We provide full service


solutions with high fo-
cus on food, comfort
and safety

SweOffshore +46(0)31 788 78 00


Fabriksgatan 10 commercial@sweoffshore.com
SE-412 50 Gothenburg, Sweden www.sweoffshore.com
Introduction

SweOffshore Accommodation concept, “Supporting our Customers in achieving the most efficient performance
possible” means that we secure higher operational uptime by:

 Ability to operate in higher waves


 Efficient processes at crew transfers
 Minimizing time at Port Calls
 Securing the well being on board
 Large storage space for tools and equipment

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

SweOffshore provides full-service delivery of personnel, equipment and vessels within our business areas of off-
shore accommodation. Our services are based on plug-and-play architecture, ensuring scalability while providing
unique product customization options.

SweOffshore upholds a lean and efficient organization, balancing speed of delivery with safety and quality of ser-
vice. Our management team has many years of combined experience within offshore, shipping in general, subsea,
marine logistics, IT & communication and finance.

SweOffshore has build extensive relationships with carefully selected partners who are ready to commit resources
as needed within specialized fields such as naval architects, IT and communication and logistics. These partners are
also supporting us in the further development of our services and vessels.

Our aim is that our clients will see us as a partner rather than as a supplier. By listening to our customers’ needs we
find the most optimal solution in terms of economy, time and reliability – all based on our fundamental focus on
safety and quality. We are on a continuous basis experiencing that our new and innovative services are highly val-
ued by our costumers.

We add value to our customers’ business.

The information in this document is believed to be correct, but not guaranteed.


1
Health, Safety, environment and quali-

SweOffshore strives to always provide safe and high quality services. This includes using new technology and inno-
vative solutions to meet and exceed the expectations of our clients.

SweOffshore's integrated management system for safety, quality, environment and work environment ensures that
we can meet clients’ requirements and follow applicable legislation and have a “green focus” towards the environ-
ment.

We are constantly working towards continuous improvement. Our management system is certified in accordance
with ISO 9001:2008 and ISO 14001:2009 and we have begun the process of certifying in accordance with OHSAS
18001 as well. Following that we will start the ISO 22000:2005 for Catering Services.

We are committed to creating a safe and healthy working environment, for our employees, our clients and for all
other parties involved in our activities. This includes complying with applicable legislation, ensuring that the neces-
sary personal protective equipment is available and in use, and a safe way of thinking is promoted through a con-
stantly safety awareness.

Safety briefing during loading of containers Safety briefing

2
Quality operation

SweOffshore provides offshore accommodation services with the highest safety and quality standards.

The SweOffshore Accommodation concept is much more than “just” providing vessel and hotel services. Our ser-
vices are developed to: “Supporting our customers in achieving the most efficient performance possible” meaning
that we secure as many operational days as possible. We secure this by only operating vessels with less weather
impact, by limiting the time at port and by having extended communication facilities limiting the waiting time for
crew boats etc. We operate this vessel above 2,5 meter Hs.

Our accommodation offering is based on:

 Providing a full service concept


 Being the best in class on safety and quality
 Combining assets and services to optimize operational time
 Providing additional services to increase comfort on-board
 Proprietary Information System for monitoring and control of operations
 Providing the basis for your people to work as efficient as possible

1 Safety 2 Comfort 3 Optimization

Safety and quality are our funda- We provide full service solutions We understand the importance of
mentals – our base to which we with high focus on food and com- efficiency and flexibility for the
add services for your benefit. fortable stay on-board. offshore wind industry.

3
Helideck
Built: 2002
Size: 19,5m octagonal
Design helicopter: Super Puma AS332L2 and smaller
(9,3t , 19,5m D-value)
Class: Lloyds Register
Other rules: UK CAA CAP 437
Fire-fighting: Integrated DIFFS pop-spray system +
3 foam monitors (dual independent systems)
Substructure: Steel substructure
Lighting: Complete light arrangement for night
operations fitted.
Piping: Complete drain and fire-fighting piping fitted,
painted stainless steel on firewater, painted
carbon steel on drains.
Access ways: 3 access ways, access platforms, walkways
and stairs fitted.
Material: Helideck, stairs and access ways: aluminium
Substructure: steel
Piping: stainless steel

Lloyds approved, CAP437 compliant

Offshore bunkering station


Emergency Offshore Bunkering System
Built: 2013
Capacity: 8 m3/hour capacity.
Bunkers from vessels fuel tanks (MGO/MDO)
Lloyds approved

Boat landing & crane


Built: 2012, upgraded 2013 and 2015
Location: Stern
Direct impact: 60 m.t.
Crane: 5 m outreach, 1,5 t SWL
Crago: Separate cargo door
Approval: Lloyds and Rina approved
Conditions: Push area approx from 890 to 4350 mm above
water line.

4
IT & Communication

SweOffshore is on the very forefront in terms of utilizing IT and communication for the benefit of our customers.

The on board offices network is Ethernet with fibre optic cables and can be split into several VLANS able to config-
ured as per our customers’ needs.

The network is accessible across the entire vessel, including all cabins and all public areas, via WiFi and further via
cables in office areas. If a user doesn’t have a personal PC the internet can be accessed from any other type of de-
vice such as tablets and smartphones.

On board we have an IP based radio communication system. This allows communication via an application, from
and to iPhone, Android and PC´s to most of the modern radio systems over 3G or our WiFi network.

The IP communication supports most radio systems such as Motorola Trbo, Tetra, Analogue UHF and VHF etc. It
also enables ship to shore communication via satellite.

5
Regina Baltica General arrangement
Built 1980, upgraded to accommodation vessel 2012. Refurbished
2013-2014
Flag Latvian

Class Lloyd’s Register

Length 145 meter

Breadth 25 meter

Draft 5 meter

Client capacity 300 people in single cabins

Office areas About 200 m² office areas and meeting rooms

Operational days 30-40 days without port call

Fuel consumption per 24 hour, MDO At anchor about 8 tonnes, sailing 13 knots about 40 tonnes

Warehouse capacity 2 decks with full container height and Ro/Ro access

Boat landing SweO type 1 at stern, upgraded 2013

Communication Marine IT system with Vsat antenna, standard speed of 4/2


Mbit. With IP communication system
Helicopter landing platform Yes, Super Puma, Sikorsky S-72 and equal.

Offshore bunker station Yes

Fresh water maker Yes, about 20 tonnes/day

At sea, size matters...

6
Deck 8

 On deck 8 you will find the helicopter lounge with plenty of seating and a big screen TV —perfect for
pre flight briefings.
 You also have the entrance and exit to the helicopter landing platform with direct access to the heli-
copter lounge.

Helicopter landing platform

Helicopter lounge Helicopter Landing platform

7
Deck 7

 Deck 7 is all about socialization and relaxation, here you find large seating arrangements, the TV-lounge, arcade
rooms, a cinema and the restaurant.
 If you prefer having a work out instead, just visit our fitness centre. It is equipped with cardio machines, a multigym
and free weights.

Restaurant Fitness centre open 24/7

TV-lounge Healthy meals

8
Deck 6

 On the 6th deck you have plenty of office space. Offices and meeting rooms all with WiFi and Ethernet network.
There is also a briefing lounge in direct access to the offices
 Here you will also find the reception which is manned 24/7, a small candy shop and the SweOffshore representative
in the liaison office.

One of the client offices One of the conference rooms

Reception open 24/7 Starboard office

9
Deck 5

 Deck 5 is all about accommodation. At this moment we can accommodate up to 300 people, all in single cabins.
Every cabin has an ensuite bathroom, minimum 90 cm bed, a desk and chair, a wardrobe and, off course, WiFi ac-
cess.

Cabin 1 Cabin 2

Corridor port side Cabin TV

10
Deck 4

 On deck 4 there are plenty of space that can be used for additional storage of containers or perhaps for storing of
cloths and personal belongings.
 Other possibilities are to use this deck for a workshop or for sports activities.

Crew change Reception on deck 4 Lockers

Outer clothing storage and drying Ramp to deck 4 and entrance to deck 2

11
Deck 3

 All cabins and passenger corridors on deck 3 have been refurbished in 2013 with a custom fitted bed, desk and
wardrobe.

Cabin 1 Cabin 2

Corridor and stair to deck 4 Cabin TV

12
Deck 2

 On deck 2 you have all the storage space you’ll ever need, easily accessed from the boat landing and conveniently
loaded through the bow ramp. Fits about 25 TEU’s.
 At the aft, by the boat landing, there is also a custom built bunker station ensuring that the ctv’s will never run out of
fuel.

Container storage on cargo deck 2 Loading containers with mafi truck

Boat landing Boat landing

13

Das könnte Ihnen auch gefallen