Sie sind auf Seite 1von 6

Abdul Rahim

A-10, Block “T”, North Nazimabad, Karachi – 74700,


Phone: 6670019
Cell: 0300 – 2240196

CAREER OBJECTIVE:

To obtain a position in an Organization offering opportunities for experience and


advancement, utilizing my professional qualifications and enthusiasm.

PERSONAL PROFILE:
Father’s Name : ABDUL RASHID
Date of Birth : 12-05-1974.
Marital Status : Married.
Nationality : Pakistani.
Religion : Islam.
Place of Birth : Karachi (Sindh).
Domicile : Karachi (Sindh).
N.I.C. #. : 42101 – 1572796 – 1

ACADEMIC QUALIFICATION:

• H.S.C. (Pre-Engineering) from Board of Intermediate Education Karachi in


the year 1993.

PROFESSIONAL QUALIFICATION:

• B. Tech. Electronics from Preston University, Karachi in the year 2002


with G.P.A. 2.4

• D.A.E. Electrical from Jinnah Polytechnic Institute in July 1995 with 1st
Division.

• Two years Vocational course in Electrical from T.T.C. Hyderi, Karachi in the
year 1994 with 1st Division.
Cont’d ….. P/2
(2)
• One year Diploma in Industrial Electronics from S.B.T.E. in the year
1996 with 1st Division.
• 45 days certificate course in Pneumatic Systems & PLC Programming
from Creative Institute of Technology in the year 2002.

• 45 Credit hours course of Programmable Logic Controller from ACT in the


year 2002, which includes:

i) Introduction to automation systems.


ii) PLC hardware & software.
iii) PLC programming.
iv) Troubleshooting.
v) PLC selection criteria.

• Worked on Siemens Samatic S-7 PLC in Applied Computer Technology.

PROFESSIONAL EXPERIENCE:
From 13 Sept.
G.S. Industries (Pvt.) Electrical 1993
Ltd. Technician to 14-01-1996

From 18-02-
Assistant
Lotus Industries (Pvt.) 1996
Electrical
Ltd. to 29-11-1997
Supervisor
From 05-12-
Electrical 1997
Moon Light Industries
Supervisor to 26-01-1999

From 10-02-
Assistant
Gul Ahmed Textile Mills 1999
Electrical
Ltd. to 02-05-2004
Engineer
Manager
From 05-05-
Electrical/Elect
2004
Artistic Milliners Unit-4 ronics
to till date
&Power
Generation

JOB DESCRIPTION IN VARIOUS ORGANIZATIONS:

G .S. INDUSTRIES
• Worked in various Textile Dyeing & Finishing Machines for their Electrical
maintenance.
• Basically my main job responsibilities were to take care of maintenance
including modification of Textile, Dyeing, and Finishing & Printing
Machines.

Cont’d ….. P/3

(3)
LOTUS TEXTILE

• During job in M/s. Lotus Textile, I was independently involved in some


other erections and modifications. My assignments were as follows:

1. Erection & Commissioning of Manfort Thermex (Continuous Dyeing).

2. Modification work of Mercerizing Machine, Changing from Ring


Transformer to individual DC Drive System.

MOON LIGHT INDUSTRIES

• I was involved in some erection & modification jobs Descriptions are as


follows:

1. Modification of Continuous Bleaching Machine, change from old drive to


Semiconductor DC drives system. This system designing is based on
close loop system.

2. Modification of Famatex Stenter Burner System, Changing the Control


System & Installing the New Temperature Controller & Flame
programmers.

3. Designing of Washing Range Pane. Erection & Commissioning of Zimmer


RSDM 565 Rotary Printing, fully Automated & Computerized.

4. DC motor Control in Synchronization Mode with close loop control system,


each DC motor control was individual semiconductor drives with Tacho
Feed Back.

GULL AHMED TEXTILE MILL


• I was involved in erection & modification in Gul Ahmed Textile Mills Ltd.,
Unit #. 8. My main responsibilities are as follows:
1. Erection & Commissioning of Babcock Stenter. This is a DCS system.
I worked in a Stenter PLC Program.

2. Erection / commissioning of integrated paste system. Brandmake is Strock


Barbanenet (Holland).

3. Designed Thermo-oil heater Control Panel. Mechanical system designed


by Sitara Engineering.
Cont’d…….P/4
(4)
4. Designed a curing Machine Electrical control system. This system is AC
Invertors Drive System with close loop designing.

5. Involved in erection / commissioning of flock coating unit in GTM 8. There


were 2 stenter with flock & coating line.

6. I completed erection & commissioning of Eglie flock & coating line.


This system is PLC based Simatic S-7 300 base systems.

7. My working responsibility is to look after the electrical and electronics


maintenance of a finishing and dyeing plant. The machine description is
following:

o Stenter Finishing Machines.


o Shrinking Range Machines.
o Calendar Machines.
o Nipco-L Calendar.
o Stork Age Machines.
o Goller bleaching and Mercerizing range.

8. I was responsible for the implementation of Computerized Maintenance


Management Systems (MP2 by Data Stream, USA).

ARTISTIC MILLINERS ( UNIT-4 )

• Presently, I am working in Artistic Milliners Unit No. 4 as a Manager


Electrical, Electronics and Power House. My responsibilities are to look
after all plant, electrical and electronics maintenance and troubleshooting.

• I completed erection and commissioning of denim weaving, dyeing &


finishing machinery. The machine description are as follows:

1. Ball warping. (West point).


2. Rebeamers (West point).
3. Morrison indigo dyeing. (MorrisonTextileMachinery USA).
4. Sizing 12 Creel (Beninger Zell).
5. Flat finishing and over dyeing range. (MorrisonTextileMachinery USA).
6. LUWA A/C plant. (Luwa, Switzerland).

I am also running 2.2 MW Power Plant including 2 Nos. CAT Gensets


Model G-3516B with Terberg Control Automation System.

Cont’d ……P/5
(5)
My job responsibilities are as follows:

• Operational control of power house, distribution equipment & utilities.

• Load center management & Supervision of Routine/Casual changes.

• Liaison with Electrical Inspectorate, S.S.G.C, and other agencies.

• Maintenance management of entire generation, transmission, distribution


network, weaving looms, process machines and accessories.

• Spares/Consumables inventory management for all equipment and


machines.

• Planning and implementation of routine/periodic maintenance.

• Organization and administrative control over Power House, Electrical,


Electronics, Air conditioning department staff.

• Liaison with vendors of all equipment for technical back-up and seeking
assistance, trouble shooting and arrangement of spares for timely
rectification of faults.

• Supervision of works and activities in progress, entrusted to other parties


( Vendors and Contractors ).

• Establishment of Management Information Systems (MIS).

• Operation of communication control module, events logging and


maintenance of CCM and Allied System.

• Assisting purchase department in procurement of consumables and


spares by providing technical specification and sources.

• Updating all maintenance management instructions through on-line data


support provided by Caterpillar.
• Efficiency monitoring of the system and preparation of Gas versus
Electrical unit analysis.

• Planning, designing and suggesting about new projects associated with


power.

• Implementation of company’s policies and directives.

• To suggest management about cost reduction and production efficiency of


self generated power plant.