Sie sind auf Seite 1von 4

Galfar Engineering & Contracting SAOG. GEN-QA-000-012-F/02; Rev.

Contract No.: C311520


Construction Services for Yibal Khuff Project On
Plot

REQUEST FOR INSPECTION & APPROVAL

To: PDO RFI No.: YKP - RFI - 068.

Project Title: YIBAL KHUFF PROJECT Planned Date of Tests: 15/02/19.

JobNo.: 132/1012/00 Time of Test Initiation: 0830 Hrs. to 1000 Hrs.

Contract No. 311520 Meeting point: In front of the tank, T - 4001.

FPD Q - round, involving Piping, static, rotating, civil & structural.


1. Static, rotating, piping, civil surveillance (as usual).
Description:
2. Manual valves.
3. HFE, operability & maintainability with emphasis to pre - commissioning/ commissioning.

Area - 01. Area - 02. ✘


Area - 03. Area - 04. Area - 05.
Mian piperack. Unit 30. Unit 33. Unit 24. Unit 38.
Sub - station bldgs. Unit 31. Unit 36. Unit 44. Unit 39.
KMCR & admin bldg. Unit 32. Unit 40. Unit 45. Unit 82.
Road/ fence/ U/ G. Unit 34. Unit 41. Unit 46. Unit 83.
F & detectors. Unit 35. Unit 42. Unit 47. Unit 84/ 85.
Unit 43. Unit 48. Unit 87.
Unit 49. Unit 88.
Unit 89.

Basis for Inspection (Specification / QA/QC Documents): Applicable documents.

Location: Refer to the selected area above.

Drawing Ref.: Applicable documents/ drawings as reqd.

STAGE OF INSPECTION INSPECTION ON

1 Receiving: 4 Activity: Others (specify):


2 In-Process: 5 Product:

3 Final: 6 Material:

We confirm that our Engineer / Supervisor has checked the above activity in detail as per drawing and specificati
submission to Customer / Consultant for Inspection.
Galfar Engineering & Contracting SAOG. GEN-QA-000-012-F/02; Rev. 0

Verification Personnel Contractor Representative Submission Date

FOR CUSTOMER / CONSULTANT USE ONLY

(Resident Engineer's / Project Engineer's comments after Inspection)

Accepted
Accepted with comments
Not accepted (to re-submit with commented one)

Name: Signature:

Designation: Date:

Note: All Quality records identified in the respective QA/QC Procedures and QC Plans shall also be maintained
in addition to the above approval.
Galfar Engineering & Contracting SAOG. GEN-QA-000-012-F/02; Rev. 0

PROVAL

YKP - RFI - 068.

15/02/19.

0830 Hrs. to 1000 Hrs.

nt of the tank, T - 4001.

ng/ commissioning.

Area - 05. Area - 06.


Unit 38. Pipeyard.
Unit 39. Workshop.
Unit 82. Warehouse.
Unit 83.
Unit 84/ 85.
Unit 87.
Unit 88.
Unit 89.

Others (specify):

per drawing and specification before


Galfar Engineering & Contracting SAOG. GEN-QA-000-012-F/02; Rev. 0

Time

Inspection)

s shall also be maintained

Das könnte Ihnen auch gefallen