Sie sind auf Seite 1von 3

Project: USJ17_CELLAR - (*1YR-8AUF-H56D-Z7G9)

PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1

PAD/PILE FOOTING RESULTS

F1
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C4 1 -11.8 0.0 0.2 G+Q *F
2 -8.5 0.0 0.1 G+Q
3 -10.6 0.0 0.2 (G+Q)P11 *F
4 -10.4 -0.1 0.2 (G+Q)P12 *F
5 -11.6 -0.1 0.2 (G+Q)P21 *F
6 -8.3 0.0 0.1 (G+Q)P22 *F
7 -10.0 0.1 0.2 G+Q+Nx
8 -10.0 -0.1 0.2 G+Q-Nx
9 -10.0 0.0 0.3 G+Q+Ny
10 -10.0 0.0 0.0 G+Q-Ny
1C5 1 -22.5 0.0 0.2 G+Q *F
2 -16.3 0.0 0.1 G+Q
3 -21.3 0.0 0.2 (G+Q)P11 *F
4 -17.6 -0.1 0.2 (G+Q)P12 *F
5 -18.8 -0.1 0.2 (G+Q)P21 *F
6 -14.4 0.0 0.1 (G+Q)P22 *F
7 -18.9 0.1 0.2 G+Q+Nx
8 -18.9 -0.1 0.2 G+Q-Nx
9 -18.9 0.0 0.3 G+Q+Ny
10 -18.9 0.0 0.0 G+Q-Ny
1C6 1 -35.0 0.0 0.2 G+Q *F
2 -25.4 0.0 0.1 G+Q
3 -35.0 0.0 0.2 (G+Q)P11 *F
4 -31.3 -0.1 0.2 (G+Q)P12 *F
5 -31.3 -0.1 0.2 (G+Q)P21 *F
6 -21.5 0.0 0.1 (G+Q)P22 *F
7 -29.3 0.1 0.2 G+Q+Nx
8 -29.3 -0.1 0.2 G+Q-Nx
9 -29.3 0.0 0.3 G+Q+Ny
10 -29.3 0.0 0.0 G+Q-Ny
1C3 1 -35.0 0.0 0.2 G+Q *F
2 -25.4 0.0 0.1 G+Q
3 -35.0 0.0 0.2 (G+Q)P11 *F
4 -31.3 -0.1 0.2 (G+Q)P12 *F
5 -31.3 -0.1 0.2 (G+Q)P21 *F
6 -21.5 0.0 0.1 (G+Q)P22 *F
7 -29.3 0.1 0.2 G+Q+Nx
8 -29.3 -0.1 0.2 G+Q-Nx
9 -29.3 0.0 0.3 G+Q+Ny
10 -29.3 0.0 0.0 G+Q-Ny
1C2 1 -24.4 0.0 0.2 G+Q *F
2 -17.7 0.0 0.1 G+Q
3 -23.2 0.0 0.2 (G+Q)P11 *F
4 -19.5 -0.1 0.2 (G+Q)P12 *F
5 -20.7 -0.1 0.2 (G+Q)P21 *F
6 -15.5 0.0 0.1 (G+Q)P22 *F
7 -20.5 0.1 0.2 G+Q+Nx
8 -20.5 -0.1 0.2 G+Q-Nx
9 -20.5 0.0 0.3 G+Q+Ny
10 -20.5 0.0 0.0 G+Q-Ny
1C1 1 -12.8 0.0 0.2 G+Q *F
2 -9.3 0.0 0.1 G+Q
3 -11.6 0.0 0.2 (G+Q)P11 *F
4 -11.5 -0.1 0.2 (G+Q)P12 *F
5 -12.7 -0.1 0.2 (G+Q)P21 *F
6 -8.9 0.0 0.1 (G+Q)P22 *F
7 -10.8 0.1 0.2 G+Q+Nx
8 -10.8 -0.1 0.2 G+Q-Nx
9 -10.8 0.0 0.3 G+Q+Ny
10 -10.8 0.0 0.0 G+Q-Ny
1W1 1 -599.6 -339.4 0.1 G+Q *F
2 -440.3 -225.4 0.0 G+Q
3 -516.1 -238.9 -0.1 (G+Q)P11 *F
4 -426.3 -250.6 0.1 (G+Q)P12 *F
5 -373.2 -111.2 0.0 (G+Q)P21 *F
6 -427.0 -253.2 0.0 (G+Q)P22 *F
7 -495.5 -252.1 0.0 G+Q+Nx
8 -493.8 -289.0 0.0 G+Q-Nx
9 -497.2 -269.8 0.3 G+Q+Ny
10 -492.1 -271.2 -0.2 G+Q-Ny
1W2 1 -816.8 -631.6 0.0 G+Q *F
2 -600.7 -417.9 0.0 G+Q

Project: USJ17_CELLAR
Project: USJ17_CELLAR - (*1YR-8AUF-H56D-Z7G9)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-2

3 -714.5 -423.0 -0.1 (G+Q)P11 *F


4 -526.9 -198.5 0.1 (G+Q)P12 *F
5 -513.8 -179.3 0.0 (G+Q)P21 *F
6 -760.9 -644.9 0.0 (G+Q)P22 *F
7 -672.3 -480.6 0.0 G+Q+Nx
8 -673.0 -522.3 0.0 G+Q-Nx
9 -673.6 -495.6 0.2 G+Q+Ny
10 -671.7 -507.2 -0.2 G+Q-Ny
1W3 1 -553.2 -407.6 -0.2 G+Q *F
2 -405.5 -269.8 -0.1 G+Q
3 -420.1 -179.7 -0.2 (G+Q)P11 *F
4 -438.9 -221.1 -0.1 (G+Q)P12 *F
5 -381.6 -132.7 -0.1 (G+Q)P21 *F
6 -455.1 -316.2 -0.2 (G+Q)P22 *F
7 -457.2 -308.9 -0.1 G+Q+Nx
8 -458.0 -338.7 -0.2 G+Q-Nx
9 -456.8 -327.2 0.0 G+Q+Ny
10 -458.4 -320.4 -0.3 G+Q-Ny
1W4 1 -788.4 -424.5 -0.1 G+Q *F
2 -580.0 -281.7 -0.1 G+Q
3 -716.9 -191.6 -0.2 (G+Q)P11 *F
4 -554.3 -311.5 0.0 (G+Q)P12 *F
5 -472.7 -138.4 0.0 (G+Q)P21 *F
6 -496.8 -354.7 -0.2 (G+Q)P22 *F
7 -649.8 -314.0 -0.1 G+Q+Nx
8 -648.0 -362.2 -0.1 G+Q-Nx
9 -646.4 -338.9 0.1 G+Q+Ny
10 -651.4 -337.3 -0.3 G+Q-Ny
1W5 1 -1513.4 -35.6 -1.9 G+Q *F
2 -1116.7 -23.0 -1.3 G+Q
3 -1224.6 21.5 -1.1 (G+Q)P11 *F
4 -1133.4 -24.9 -1.0 (G+Q)P12 *F
5 -842.6 -2.1 -0.6 (G+Q)P21 *F
6 -1107.0 68.7 -1.6 (G+Q)P22 *F
7 -1237.2 -28.0 -1.2 G+Q+Nx
8 -1243.2 -27.2 -1.8 G+Q-Nx
9 -1240.2 14.8 -1.5 G+Q+Ny
10 -1240.2 -69.9 -1.5 G+Q-Ny
1W6 1 -650.6 -306.2 -0.8 G+Q *F
2 -479.6 -203.9 -0.5 G+Q
3 -534.6 -240.0 -0.4 (G+Q)P11 *F
4 -367.1 -127.4 -0.4 (G+Q)P12 *F
5 -376.3 -111.7 -0.3 (G+Q)P21 *F
6 -595.5 -340.5 -0.7 (G+Q)P22 *F
7 -533.5 -241.6 -0.5 G+Q+Nx
8 -534.1 -247.8 -0.8 G+Q-Nx
9 -533.5 -229.6 -0.6 G+Q+Ny
10 -534.1 -259.7 -0.6 G+Q-Ny
1W7 1 -431.7 62.7 -0.4 G+Q *F
2 -318.3 41.8 -0.3 G+Q
3 -324.8 12.1 -0.3 (G+Q)P11 *F
4 -300.8 46.3 -0.2 (G+Q)P12 *F
5 -254.4 27.7 -0.1 (G+Q)P21 *F
6 -314.8 60.2 -0.4 (G+Q)P22 *F
7 -353.6 49.3 -0.2 G+Q+Nx
8 -354.4 51.0 -0.5 G+Q-Nx
9 -354.3 57.8 -0.4 G+Q+Ny
10 -353.7 42.5 -0.4 G+Q-Ny
1W8 1 -182.7 24.2 -0.5 G+Q *F
2 -130.0 16.1 -0.3 G+Q
3 -214.0 7.5 -0.3 (G+Q)P11 *F
4 -199.0 18.7 -0.3 (G+Q)P12 *F
5 -200.8 10.1 -0.1 (G+Q)P21 *F
6 -155.7 13.1 -0.4 (G+Q)P22 *F
7 -160.1 19.3 -0.3 G+Q+Nx
8 -154.6 19.3 -0.5 G+Q-Nx
9 -157.3 29.5 -0.4 G+Q+Ny
10 -157.4 9.2 -0.4 G+Q-Ny
Columns: 1C4, 1C5, 1C6, 1C3, 1C2, 1C1, 1W1, 1W2, 1W3, 1W4, 1W5, 1W6, 1W7, 1W8
bx = 15662.5 mm by = 14600.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -5678.0 kN Mx = 9959.6 kN.m
My = 2564.5 kN.m
Footing Dimensions:
Lx = 15762.5 mm Ly = 14700.0 mm
h = 300.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 62.058 kN/m2 S-min = 20.300 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2

Project: USJ17_CELLAR
Project: USJ17_CELLAR - (*1YR-8AUF-H56D-Z7G9)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-3

As-min (Both Dir's) = 496.00 mm2/m


Punching Check (At Column Face):
Vt = 9540.9 kN V-eff = 11628.9 kN
v = 93.78 N/mm2 > v-Rdmax = 4.05 N/mm2 Fail !!!
Punching Check (At 'd'):
Vt = 9531.0 kN V-eff = 11618.9 kN
v = 25.79 N/mm2 > v-Rdc = 0.46 N/mm2 Fail !!!
X Dir: Footing Design: M = 0.1 kN.m/m
K/K' = 0.00 < 1.0
As = 496.00 mm2/m T12-225
Shear Check (At Column Face):
v = 0.01 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.00 N/mm2 < v-Rdc = 0.46 N/mm2
Y Dir: Footing Design: M = 0.1 kN.m/m
K/K' = 0.00 < 1.0
As = 496.00 mm2/m T12-225
Shear Check (At Column Face):
v = 0.01 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.00 N/mm2 < v-Rdc = 0.46 N/mm2

Project: USJ17_CELLAR

Das könnte Ihnen auch gefallen