DBS Hardware Installation Quality

Report

Project Name:

SITE ID,
NAME

SUPERVISOR
NAME

SUBCONTRAC
TOR

INSTALLATION TARGET ACTUAL


START COMPLETION COMPLETION

DATE_____ DATE_____ DATE____

1 Installation of the Main Equipment

Check item Result Remarks

1. All boards are securely and firmly  Passed Failed


installed in the cabinets and/or walls and
stand horizontal.
2. All MRRUs are securely mounted in the  Passed Failed
vertical position on the proper mounting
poles and are properly grounded.
3. The connectors of each trunk cable are  Passed Failed
connected securely and firmly.
4. The connectors are properly crimped and  Passed Failed
the heat shrink sleeve has been used to
insulate the connectors’ metal parts.
5. Grounding cables and power cables are  Passed Failed
terminated using properly crimped lags and
sleeves.

Page 1 of 8
DBS Hardware Installation Quality

Report

Check item Result Remarks

6. The power cables, grounding cables,  Passed Failed


trunk cables, Ethernet cables, fibers and RF
cables are kept from any external damage.
7. The RF cables in the horizontal direction  Passed Failed
are fixed to the cable trays and ladders
8. The unused ports are properly covered  Passed Failed
using protective caps.
9. RF cables are not too tight but firmly held  Passed Failed
with reserve a certain margin at the bends
10. The fiber, power and grounding cables  Passed Failed
are bound tidily and neatly and the cable
ties are evenly arranged with proper
tightness and are directed in the same way.
All the excessive ties should be totally cut
off without leaving any residue behind.
11. The cables are laid in a way that  Passed Failed
facilitates future expansion and
maintenance.
12. Rack mounted equipments are installed  Passed Failed
with enough spacing in between to facilitate
access to all equipments in the rack during
maintenance
13. Labeling tags are attached at both ends  Passed Failed
of the fiber and power cables. The labels
also correspond to the sectors
14. DC boxes, DDF and BBU’s are properly  Passed Failed
labeled using the labeling printer
15. Cables running across sharp metallic  Passed Failed
surfaces are protected by padding the sharp
metal edge
16. Installation and termination of 4E1s from  Passed Failed
BBU to DDF according the required quality
standard.

Page 2 of 8
DBS Hardware Installation Quality

Report
2 Antenna Installation

Check item Result Remarks

1. Antenna are well Installed and installed at  Passed Failed


the tower for each sector in the required
height
2 waterproofing for antenna is well done  Passed Failed

3. Antenna azimuth for each sector


Sector 1:

Sector 2:

Sector 3:
4Mechanical Tilt for each antenna
Sector 1:

Sector 2:

Sector 3:
5.Electriccal Tilt for each antenna
Sector 1:

Sector 2:

Sector 3:

Page 3 of 8
DBS Hardware Installation Quality

Report

3. Installation of Power and Grounding Cables

Check item Result Remarks

1. The cable in yellow-green or yellow are  Passed Failed


used for the PGND cable, the cable in black
for the GND cable, and the cable in blue for
the –48V power cable.
2. All the power cables and grounding cables  Passed Failed
are made from an intact section of copper
core materials without any cut.
3. The power cables and the grounding  Passed Failed
cables are bundled separately from other
cables outside the cabinet at a spacing not
less than 5 cm.
4. When copper lugs are made for both ends  Passed Failed
of the power cables and the grounding
cables, the welding or crimping of the
connection are reliable. The bare cable cores
or the levers of the lugs should not be
exposed.
5. For the power supply and grounding  Passed Failed
cables, their grounding terminals are
mounted firmly and have good contact.
6. Labels are attached to both sides of the  Passed Failed
power and grounding cables.
7. The antistatic specifications are followed  Passed Failed
in the procedures of board unpacking and
plugging/unplugging.
8. The installation tools should meet the  Passed Failed
antistatic requirements.

Page 4 of 8
DBS Hardware Installation Quality

Report

4 Installation of RF Jumpers

Check Item Result Remarks

1. All RF jumpers and connectors are  Passed Failed


neatly installed and arranged.
2. All RF jumpers are neatly routed and do  Passed Failed
not make any sharp bends ≤20 times
feeder diameter
3. RF jumpers are not cris-crossing with  Passed Failed
each other or with other cables.
4. All RF connector termination on MRRU  Passed Failed
ports and combiner/surge arrestor ports
are sufficiently tight
5. The RF jumpers are properly labeled,  Passed Failed
there’s no mismatch of color codes
6. All outdoor RF joints are waterproofed.  Passed Failed

5 Sanitation of the Shelter and Site


Environment

Check item Result Remarks

1. The packing cartons/cases and boards of  Passed Failed


BTS equipment have been cleared in the
equipment room and site compound.
2. There are no cut cable ties or other  Passed Failed
sundries on/under the floor and inside each
cabinet and the compound.
3. The equipment room meets the dustproof  Passed Failed
requirements.
4. Floor of the equipment room has been  Passed Failed
cleaned up and there are no litters in the
room or compound.

Page 5 of 8
DBS Hardware Installation Quality

Report
5. Excess materials have been dully filled in  Passed Failed
the MR and returned to the warehouse.
6. You have confirmed by calling NMC that  Passed Failed
the sites has no alarms caused by your
presence in the site: before leaving the site.
7. There are no damages to the landlord’s,  Passed Failed
Customer’s property and sites as you leave
the sites

6. Cabinet Installation Checklist

Check item Result Remarks

1. The installation position of the cabinet  Passed Failed


strictly complies with the engineering design.
2. In the wall-mounted scenario, the holes of  Passed Failed
the mounting ears are well aligned with the
holes of the expansion bolt assemblies. In
addition, the mounting ears are secured on
the wall evenly and steadily.
3. In the metal-pole-mounted scenario, the  Passed Failed
supports for the metal pole are secure on the
floor.
4. If the cabinet is installed on the floor, the  Passed Failed
base is securely installed.
5. Either the horizontal error or vertical error  Passed Failed
of the cabinet is less than 3 mm.
6. All the bolts, especially those for electrical  Passed Failed
connections, are tight. Both the spring washer
and the flat washer are installed in the correct
sequence.
7. The cabinet is neat and clean.  Passed Failed

Page 6 of 8
DBS Hardware Installation Quality

Report
8. The paint on the surface is intact. If any  Passed Failed
paint is damaged, you must apply touch-up
paint to avoid erosion.
9. Filler panels are installed in the space  Passed Failed
reserved for customer equipment
10. The cabinet door can be easily opened or  Passed Failed
closed, the lock works properly, and the gag
lever post is secure.
11. All labels, tags, and nameplates are  Passed Failed
correct, legible, and complete.

I.

Final Sign-off
Conclusion:
I declare that all the above report for each item has been confirmed by
physical inspection on site and that I will assume full responsibility for any
impact caused by misreporting of actual site status.
The site is complete and ready for cutover.
By Subcontractor: By Airtel:

Name:______________________________ Name:_____________________________
______ _______

Signature:__________________________ Signature:__________________________
_______ _______

Date:_______________________________ Date:______________________________
______ _______

Page 7 of 8
DBS Hardware Installation Quality

Report

Page 8 of 8