HAZARD IDENTIFICATION, RISK

ASSESSMENT AND RISK CONTROL FORM

DHAFER M. AL ZLAIQ & PARTNERS GEN. CONT.


CO.

Activity/Job/Task: Install New Waterproofing Materials On The Roof.


Location: Berry Gas Plant Substation# 30.

Consequences Existing Controls Level of Additional


Hazard
(Who and How) (Physical & Procedural) Risk Controls

On Skin: Irritation.
See "chronic" Monitor and supervise
Repairing cracks / effects - continuously.
damaged roof slabs. Dermatitis. Eyes: Irrigate
(Use of Fosroc Chemicals). Prolonged skin immediately with
contact can result
copious quantities
in chemical burns.
of water for
Irritating to eyes, several minutes.
respiratory system and On Eyes: Irritating 1. Follow the MSDS.
Obtain medical
skin and may injure eye
2. Use proper PPE’s like attention
Irritant tissue if not
Gloves, Goggles, Cover- urgently.
removed
a) Inhalation of harmful promptly. all etc. Skin: Wash
dust from the cement. 3. Clean your hands with immediately with
b) Skin and eye contact By Inhalation: water. copious quantities
with cement / concrete Irritating to 4. Provide adequate of water. Remove
particles. respiratory ventilation. contaminated
system. 5. Use proper mask. clothing
Inflammation of 6. Wear rubber boots in immediately.
the nasal mucous addition to the Obtain medical
membrane by recommended Acceptable advice if skin
exposure to protective clothing. disorders develop.
cement dust. Handling:
Inhalation:
By Ingestion: May Avoid creating dust. In case Remove from
cause irritation of of insufficient ventilation, exposure. If feeling
mouth, throat and wear suitable respiratory unwell obtain
digestive tract. equipment. Avoid skin and medical attention.
eye contact.
Chronic: Cement, Ingestion:
cementations Wash out mouth
grouts and with water. Do
mortars are
NOT induce
known to cause
both irritant and vomiting. Obtain
allergic contact. medical attention.

Page 1 of 4
HAZARD IDENTIFICATION, RISK
ASSESSMENT AND RISK CONTROL FORM

DHAFER M. AL ZLAIQ & PARTNERS GEN. CONT.


CO.

Fixing of thermal Monitor and


insulation & EPDM supervise
water proofing by glue continuously.
(Solvent borne adhesive)
In case of contact
a. Inhalation of harmful with eyes, rinse
dust. immediately with
b. Inhalation of harmful plenty of water and
chemical vapors. seek medical
c. Skin and eye contact
with harmful chemical / advice.
1. Irritating to
vapors.
eyes due to After skin contacts
chemical wash away with
vapors / dust. soap and water and
2. Vapors may 1. Follow the MSDS.
cause rinse. If skin
2. Provide adequate irritation persists
drowsiness and
dizziness. ventilation.
see a physician.
3. Repeated 3. Use proper mask. Acceptable
exposure may 4. Use proper PPE’s like In case of ingestion
cause skin Gloves, Goggles, Cover- consult a physician
dryness or
cracking. all etc. immediately. Show
4. Breathing 5. Clean your hands with the Material Date
difficulties / water. Safety Sheet.
irritation.
5. Skin irritation / Do not empty into
burns / allergy. drains; dispose of
this material and its
container in a safe
way.

Page 2 of 4
HAZARD IDENTIFICATION, RISK
ASSESSMENT AND RISK CONTROL FORM

DHAFER M. AL ZLAIQ & PARTNERS GEN. CONT.


CO.

1. Comply with Saudi


Work at Height (Scaffold) Aramco GI 8.001 for
Safety Requirements
Fall, slip, crash, stampede. For Scaffolds. Monitor and
2. Make sure the PTWC is supervise
1. Working on scaffolding ready from the Acceptable continuously.
concerned authority. It
a. Mishandling of materials. Ensure the first aide
should be available at
b. Falling of tools, the worksite. help is nearby.
materials / workers. 3. Check the tag is
c. Slip, crash, stampede. provided with the
scaffolding with valid
1. Physical injury. inspection date.
2. Paralysis due to 4. Provide barricade/
backbone injury warning tape around
as a result of fall the work area and
caution sign boards.
from height.
5. Use Fall Protection
3. Back strain. Full-body Harness with
4. Damage to the lanyard. Full body
harness must be tied to
property/
rigid structure (Life
equipment. line) all the time while
5. Affect to work working on the
scaffolding.
progress.
6. Safety officer should
conduct the work site
safety meeting with co-
worker.
7. Take special attention
while working near
cable trays and electric
panels. Do not contact
the scaffold component
with them.
8. Maintain good
housekeeping
throughout the work.

Page 3 of 4
HAZARD IDENTIFICATION, RISK
ASSESSMENT AND RISK CONTROL FORM

DHAFER M. AL ZLAIQ & PARTNERS GEN. CONT.


CO.

1. Make sure the PTWC is


Hot work ready from the
concerned authority. It
Ignition source can make Monitor and
should be available at
fire/ Electrical shock supervise
the worksite.
while working. 1. Physical injury 2. Wear the appropriate continuously.
/ burn. PPEs like rubber Ensure the first
1. Drilling work: gloves, safety glasses, aide help is
2. Material / ear plug etc. Acceptable.
a) Electrical shock, fire. nearby.
property 3. Make sure the
b) Too much of noise can
cause hearing ability. damage. equipment is in good
c) Sharp edge of the drill condition and properly
3. Too much of guarded.
bit and drill chips/
noise may cause 4. Check wires, to make
waste may cause
accident/ incident. temporary sure the wires are not
change in damaged, frayed/
2. Grinding /cutting work hearing. worn. Use only
correctly grounded
with machines: 4. Affect to work equipment.
a) Electrical shock, fire. progress. 5. Take care of extension
cords, they don’t twist
b) Too much of noise. or break.
c) Sharp edge of the 6. Keep them away from
traffic area/ don’t block
cutting disc and the aisle.
cutting chips. 7. Keep electrical tools
properly maintained/
insulated. Use GFCI
extension codes only.
8. Provide adequate fire
extinguishers as
required.
9. Provide barricade/
warning tape around
the work area and
caution sign boards.

Page 4 of 4