Sie sind auf Seite 1von 273

ENA PROPERTIES LIMITED

ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205


Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
1 Engineer’s site office of minimum 15 sqm plinth area L.S. 1.00 250,000.00
2 Providing and maintenance one project profile signboards sqm. 60.00 600.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 1
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
Earth work in excavation in all kinds of soil for foundation trenches including. layout, providing center lines,
local bench-mark pillars, leveling, ramming and preparing the base, fixing bamboo spikes and marking layout
3 with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc.

Layout and marking for earthwork in excavation in foundation accepted by the Engineer. [Plinth area of the sqm. 4,089.22 50.00
4 structure shall be considered for measurement]

Earthwork in excavation in foundation trenches cum 4,693.04 250.00


5

6 Sand filling in foundation trenches cum 1,173.26 780.00


7 Earth filling in foundation trenches and plinth cum 703.96 210.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 2
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
8 Site Development/Improvement by carted/dredged earth or sand cum 1,082.08 260.00
9 One layer of brick flat soling in foundation or in floor with first class or picked jhama bricks sqm. 1,420.54 850.00
10 Mass concrete (1:3:6) in foundation or floor cum 108.24 7,800.00
11 Damp proof course (DPC) (1:1.5:3) sqm. 60.00 2,500.00
12 Supplying and laying of single layer polythene sheet sqm. 462.82 80.00
Brick works 250mm and above with first class machine made bricks cum 100.00 8,920.00
13 (Cement: CEM-II/A-M)

125 mm brick works with first class machine made bricks sqm. 46,997.21 1,060.00
14

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 3
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
Supplying, fitting and fixing glazed wall tiles (Italian) sqm. 1,110.00 2,265.00
15

Supplying, fitting and fixing mirror polished homogeneous floor tiles (Italian) sqm. 17,193.22 2,841.00
16

Supplying, fitting and fixing GP homogeneous stair tiles (Italian) sqm. 859.66 2,866.00
17

Reinforced cement concrete works using steel shutter with minimum cement content relates to mix ratio 1:1.5:3 cum 7,504.01 16,500.00
18 having minimum f'cr = 30 Mpa,
(Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing)

19 Formwork/shuttering, prop and necessary supports etc. (steel) sqm. 19,710.00 950.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 4
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
Supplying, fabrication and fixing to details as per design deformed bar reinforcement in concrete in accordance M 1,295.94 75,000.00
20 with BDS 1313, fy = 415 Mpa
21 Supplying, fitting and fixing 0.45 mm thick corrugated galvanized iron sheet sqm 610.84 950.00
22 Supplying and making door and window frames (Chowkat) cum 12.00 250,000.00
23 Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size Each 1,200.00 150.00
Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide plank) solid wood single leaf sqm 455.39 16,000.00
24 door shutter (Teak Chambal Wood)
Supplying, fitting and fixing of 'King Brand' (made in Korea/equivalent) hydraulic door closer (big size) including each 200.00 4,500.00
all necessary tools and accessories etc. all complete approved and accepted by the Engineer.
25

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 5
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
26 Supplying, fitting and fixing MORTICE door lock approved and accepted by the Engineer. each 200.00 5,000.00
Supplying, fitting and fixing of best quality magnetic door shock absorber including all necessary tools and each 200.00 650.00
27 accessories etc.

Supplying, fitting and fixing best quality heavy type 19 mm dia and to 300 mm long brass hasp bolt including each 200.00 1,500.00
28 cutting grooves in door shutter and frames, screws etc.
Supplying, fitting and fixing window grill made of 12mm x 12mm M.S. solid bar 100mm c/c with outer frame of sqm 1,500.00 3,500.00
29 approx. 38x6 mm F.I. bar
30 Supplying, fitting and fixing of Aluminium sliding doors sqm 350.00 4,500.00
31 Supplying, fitting and fixing of Aluminium sliding window sqm 1,500.00 7,500.00
32 Supplying, fitting and fixing of Aluminium fixed composite window sqm 250.00 5,800.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 6
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
33 Supplying fitting and fixing of Aluminium corrugated curtain wall sqm 3,252.79 8,500.00
34 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) sqm 93,068.77 345.00
Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado (1:4) with cement sqm 120.00 950.00
35

36 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) sqm 23,234.20 340.00
37 On exterior surface applying as per manufacturer instructions 3 coat of weather coat of approved quality sqm. 58,151.49 280.00

38 Painting to door and window frames and shutters in two coats with approved best quality sqm. 500.00 350.00
Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local agent of the sqm. 23,234.20 320.00
39 manufacturer in a sealed container, applying to wall and ceiling in 2 coats over a coat of brand specified primer

40 Constructing surface drain of 300 mm clear width and depth up to 300 mm rm. 100.00 3,500.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 7
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: City Center
Rajshahi, Bangladesh
Detail Estimate and Bill of Quantities

MAIN BUILDING CONSTRUCTION


BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE
TAKA
sqm 505.00 12,500.00
41 Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick 2.5” dia pipe for
hand-rail as per drawing and accepted by the Engineer.
42 Roofing works sqm 930.00 4,500.00
43 Septic tank No 1.00 1,500,000.00
Total Tk.

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 8
AMOUNT
TAKA
250,000.00
36,000.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 9
AMOUNT
TAKA

204,460.97

1,173,259.90

915,142.72
147,830.75

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 10
AMOUNT
TAKA
281,340.26
1,207,458.18
844,270.38
150,000.00
37,025.72
892,000.00

49,817,040.65

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 11
AMOUNT
TAKA
2,514,150.00

48,845,925.56

2,463,787.80

###

18,724,500.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 12
AMOUNT
TAKA
97,195,702.68

580,300.85
3,000,000.00
180,000.00
7,286,245.35

900,000.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 13
AMOUNT
TAKA
1,000,000.00
130,000.00

300,000.00

5,250,000.00

1,575,000.00
11,250,000.00
1,450,000.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 14
AMOUNT
TAKA
27,648,698.88
32,108,726.77
114,000.00

7,899,628.25
16,282,416.36
175,000.00
7,434,944.24

350,000.00

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 15
AMOUNT
TAKA
6,312,500.00

4,185,000.00
1,500,000.00
###

Sultan Mahmud S.Samial Alam Structural Engr. Director (Cons. and Dev.) 16
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

1 BUILDING & OTHER CONSTRUCTION WORKS

1.1 MAIN BUILDING 564,261,019

1.2 GROUND AND LANDSCAPE 45,477,930


1.3 ROAD, DRAINAGE, FENCE & SERVICE GATE 15,968,558
SUB - TOTAL ( 1 ) 625,707,506

2 HOTEL & ADMINITATIVE FURNITURE

1 RESTAURANTS

1.1 COFFEE SHOP RESTAURANT 9,857,819.95

1.2 GENERAL RESTAURANT 6,131,775.51

1.3 NEW CIAO RESTAURANT 4,877,342.41

1.4 SPORTS BAR 12,338,304.61

1.5 SPORTS BAR TOILET 1,956,540.23

SUB - TOTAL ( 2.1 ) 35,161,783

2 . KITCHEN

Page 17 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

2.1 MAIN KITCHEN 10,759,945.62

2.2 CIAO KITCHEN 1,829,797.32

2.3 KITCHEN EQUIPMENT 103,383,446.00

SUB - TOTAL ( 2.2 ) 115,973,189

3 . SIGNAGE 93,000.00

3.1 INTERIOR SIGNAGE 4,161,519.36

3.2 EXTERIOR SIGNAGE 4,627,560.96

SUB - TOTAL ( 2.3 ) 8,882,080

4 MISCELLANEOUS

4.1 HEALTH CLUB 36,601,485.95

4.2 POOL DECK 5,370,744.42

SUB - TOTAL ( 2.4 ) 41,972,230

3 INTERIOR DESIGN

Page 18 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

1 GUEST ROOMS & RELATED FACILITIES

1.1 GUEST ROOMS 125,908,677.75

1.2 GUEST ROOM CORRIDORS 16,389,349.00

SUB - TOTAL ( 3.1 ) 142,298,027

2 LOUNGES

2.1 LOBBY & LOUNGE 54,791,713.72

2.2 PACIFIC LOUNGE - CLUB FLOOR LOUNGE 14,973,436.14

AIR LINE CREW LOUNGE, BALL ROOM LOUNGE & PRAYER


2.3 12,881,268.42
ROOMS

SUB - TOTAL ( 3.2 ) 82,646,418

3 BALL ROOM & PREFUNCTION

Page 19 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

3.1 BALL ROOM 62,200,482.40

3.2 PREFUNCTION AREA ( FOR BALL ROOM ) 7,753,258.18

3.3 SERVICE PANTRY (FOR BALL ROOM) 216,114.08

SUB - TOTAL ( 3.3 ) 70,169,855

4 FUNCTION ROOM

4.1 MEETING ROOMS 25,573,796.89

4.2 PREFUNCTION AREA ( FOR MEETING ROOM ) 5,680,475.81

SUB - TOTAL ( 3.4 ) 31,254,273

5 OTHERS

5.1 FRONT DESK 1,248,436.65

5.2 BUSINESS CENTER 2,947,824.53

Page 20 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

5.3 RETAIL SPACES 439,614.72

SUB - TOTAL ( 3.5 ) 4,635,876

6 PUBLIC CIRCULATION SPACES

6.1 CORRIDORS 14,858,602.49

6.2 ELEVATOR LOBBIES 7,031,537.30

SUB - TOTAL ( 3.6 ) 21,890,140

4 OVERALL MECHANICAL,ELECTRICAL & PLUMBING COST

1 MECHANICAL SYSTEM WORKS

1.2 AIR CONDITIONING AND VENTILATION SYSTEM 72,055,358.40

1.2 ELEVATORS 165,175,340.00

1.3 FIRE PROTECTION , SPRINKLER SYSTEM 26,630,382.60

Page 21 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

1.4 STEAM & CONDENSATE PIPING SYSTEM 3,100,806.00

1.5 GAS PIPING 2,036,700.00

SUB - TOTAL ( 4.1 ) 268,998,587

2 ELECTRICAL SYSTEM WORKS 116,379,271.86

SUB - TOTAL ( 4.2 ) 116,379,272

3 TELECOMMUNICATION AND SOUND SYSTEM WORKS

3.1 FIRE ALARM AND DETECTION SYSTEM 16,140,244.86

3.2 TELEPHONE SYSTEM 21,381,983.40

3.3 PA SYSTEM 2,412,888.72

3.4 SOUND SYSTEM FOR BALL ROOM 650,442.00

SUB - TOTAL ( 4.3 ) 40,585,559

Page 22 of 273
ENA PROPERTIES LIMITED
ENA Tower,57/3,57/4, Panthapath,Kalabagan,Dhaka-1205
Project Name: Best Western Plus (Hotel Project)
Project Location: Shaheb Bazar,Rajshahi, Bangladesh
BILL OF QUANTITIES

GRAND SUMMARY

BILL DESCRIPTION AMOUNT

NO. TAKA TOTAL AMOUNT

4 PLUMBING, SANITARY AND SEWAGE SYSTEM WORKS

4.1 PLUMBING SYSTEM FOR HIGH RISE BUILDING 14,266,553.40


4.2 PLUMBING SYSTEM FOR LOW RISE BUILDING 1,123,231.68
4.3 NEW CIAO BUILDING 244,724.85

4.4 SEWERAGE SYSTEM 4,144,824.00

4.5 HEAT EXCHANGER FOR SWIMMING POOL SYSTEM 5,038,740.00

SUB - TOTAL ( 4.4) 24,818,074

TOTAL AMOUNT (TAKA) 1,631,372,869

In Word: Taka One Hundred Sixty Three Crore Thirteen Lac Seventy Two Thousand Eight Hundred Sixty Nine Only.

Page 23 of 273
MAIN BUILDING CONSTRUCTION
BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


BoQ ITEM DESCRIPTION UNIT QTY RATE AMOUNT
TAKA TAKA
1 Engineer’s site office of minimum 15 sqm plinth area L.S. 1.00 250,000.00 250,000.00

2 Providing and maintenance one project profile signboards sqm. 60.00 600.00 36,000.00
Earth work in excavation in all kinds of soil for foundation trenches including. layout, providing - -
center lines, local bench-mark pillars, leveling, ramming and preparing the base, fixing
3 bamboo spikes and marking layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc.

Layout and marking for earthwork in excavation in foundation accepted by the Engineer. sqm. ### 50.00 204,461.00
4 [Plinth area of the structure shall be considered for measurement]

5 Earthwork in excavation in foundation trenches cum ### 250.00 1,173,260.00

6 Sand filling in foundation trenches cum ### 780.00 915,142.80


7 Earth filling in foundation trenches and plinth cum 703.96 210.00 147,831.60
8 Site Development/Improvement by carted/dredged earth or sand cum ### 260.00 281,340.80
One layer of brick flat soling in foundation or in floor with first class or picked jhama bricks sqm. ### 850.00 1,207,459.00
9

10 Mass concrete (1:3:6) in foundation or floor cum 324.72 7,800.00 2,532,816.00

11 Damp proof course (DPC) (1:1.5:3) sqm. 60.00 2,500.00 150,000.00

12 Supplying and laying of single layer polythene sheet sqm. 462.82 80.00 37,025.60
Brick works 250mm and above with first class machine made bricks cum 100.00 8,920.00 892,000.00
13 (Cement: CEM-II/A-M)
125 mm brick works with first class machine made bricks sqm. ### 1,060.00 ###
14

Supplying, fitting and fixing glazed wall tiles (Italian) sqm. ### 2,265.00 2,514,150.00
15

Page 24 of 273
MAIN BUILDING CONSTRUCTION
BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


Supplying, fitting and fixing mirror polished homogeneous floor tiles (Italian) sqm. ### 2,841.00 ###
16

Supplying, fitting and fixing GP homogeneous stair tiles (Italian) sqm. 859.66 2,866.00 2,463,785.56
17

Reinforced cement concrete works using steel shutter with minimum cement content relates to cum ### 16,500.00 ###
mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa,
18 (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing)

19 Formwork/shuttering, prop and necessary supports etc. (steel) sqm. ### 950.00 ###
Supplying, fabrication and fixing to details as per design deformed bar reinforcement in M ### 75,000.00 ###
20 concrete in accordance with BDS 1313, fy = 415 Mpa

21 Supplying, fitting and fixing 0.45 mm thick corrugated galvanized iron sheet sqm 610.84 950.00 580,298.00

22 Supplying and making door and window frames (Chowkat) cum 12.00 250,000.00 3,000,000.00

23 Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size Each ### 150.00 180,000.00
Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide plank) solid sqm 455.39 16,000.00 7,286,240.00
24 wood single leaf door shutter (Teak Chambal Wood)
Supplying, fitting and fixing of 'King Brand' (made in Korea/equivalent) hydraulic door closer each 200.00 4,500.00 900,000.00
25 (big size) including all necessary tools and accessories etc. all complete approved and
accepted by the Engineer.

Supplying, fitting and fixing MORTICE door lock approved and accepted by the Engineer. each 200.00 5,000.00 1,000,000.00
26

Supplying, fitting and fixing of best quality magnetic door shock absorber including all each 200.00 650.00 130,000.00
27 necessary tools and accessories etc.
Supplying, fitting and fixing best quality heavy type 19 mm dia and to 300 mm long brass hasp each 200.00 1,500.00 300,000.00
28 bolt including cutting grooves in door shutter and frames, screws etc.
Supplying, fitting and fixing window grill made of 12mm x 12mm M.S. solid bar 100mm c/c sqm ### 3,500.00 5,250,000.00
29 with outer frame of approx. 38x6 mm F.I. bar

Page 25 of 273
MAIN BUILDING CONSTRUCTION
BILL OF QUANTITIES

BILL NO.1.1 - MAIN BUILDING CONSTRUCTION


30 Supplying, fitting and fixing of Aluminium sliding doors sqm 350.00 4,500.00 1,575,000.00

31 Supplying, fitting and fixing of Aluminium sliding window sqm ### 7,500.00 ###

32 Supplying, fitting and fixing of Aluminium fixed composite window sqm 250.00 5,800.00 1,450,000.00

33 Supplying fitting and fixing of Aluminium corrugated curtain wall sqm ### 8,500.00 ###
34 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) sqm ### 345.00 ###
Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado (1:4) sqm 120.00 950.00 114,000.00
35 with cement

36 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) sqm ### 340.00 7,899,628.00
On exterior surface applying as per manufacturer instructions 3 coat of weather coat of sqm. ### 280.00 ###
37 approved quality
Painting to door and window frames and shutters in two coats with approved best quality sqm. 500.00 350.00 175,000.00
38

Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local sqm. ### 320.00 7,434,944.00
39 agent of the manufacturer in a sealed container, applying to wall and ceiling in 2 coats over a
coat of brand specified primer

sqm 505.00 12,500.00 6,312,500.00


41 Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick
2.5” dia pipe for hand-rail as per drawing and accepted by the Engineer.
42 Roofing works sqm 930.00 4,500.00 4,185,000.00

43 Septic tank No 1.00 ### 1,500,000.00


Total Tk. ###

Page 26 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

1 GENERAL
1.1 Demolising existing plantings/structures where if necessary including breaking, cutting, ls 1 70,680.00 70,680
detaching, removing, cleaning, patching, keeping provision for following construction/finishing
processes, etcs all complete and instruction of the Engineer-in-charge.

2 PLAN AREA 1
2.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 5,696,250.00 5,696,250
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction,water spouts, decoration walls, sculptures, lighting works and
others as per design, specification and instruction of the Engineer incharge and supplying, fitting
and fixing floor tiles finish including ramming and leveling etc. as per design and drawings
complete in all respect with all features. This will include among others, the following plant
species with numbers as may be required. The contractor shall submit the details for
construction in the shop drawings for approval.

1) Wahsingtonia filifera
2) Mac Arthur Palm
3) Ceiling Wax Palm
4) Breadtruit Tree
5) Plumeria ruba

Page 27 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
6) Tiger Claw
7) Dwraf pandanus
8) Montain Flax
9) Calibea cream
10) Sexy pink
11) Fan iris
12) Brazilian snapdragon
13) Boston fern
14) Heliconia
15) Dwarf jamacian
16) Chinese Rose
17) Creeping daisy
18) Spider lily
19) Calibea rad
20) Sanadu
21) Malysia grass

3 PLAN AREA 2
3.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 12,369,000.00 12,369,000
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge and supplying, fitting and fixing Black Granite tiles finish
including ramming and leveling etc. as per design and drawings complete in all respect with all
features. This will include among others, the following plant species with numbers as may be
required. The contractor shall submit the details for construction in the shop drawings for
approval.

Page 28 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
1) Washingtonia fillfera
2) Mac Arthur Palm
3) Ceiling Wax Palm
4) Breadtruit Tree
5) Plumeria ruba
6) Tiger Claw
7) Calabash Tree
8) Dracaena
9) Indian cork Tree
10) Sago Palm
11) Homolamena
12) Red ginger
13) Jungle queen ginger
14) Milacle plant
15) Fountain plant
16) Colgtheo
17) Evergreen plant
18) Giant olocsia
19) Colibea cream
20) Heliconia
21) Sossy
22) Carpet plant
23) Spider plant
24) Asytasia concetia
25) Bostom fem
26) Scheffiear bagnalenais
27) Tool flower
28) Rod ivy

Page 29 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
29) Fan iris

4 PLAN AREA 3
4.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 4,068,750.00 4,068,750
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge and supplying, fitting and fixing Black Granite tiles finish
including ramming and leveling etc. as per design and drawings complete in all respect with all
features. This will include among others, the following plant species with numbers as may be
required. The contractor shall submit the details for construction in the shop drawings for
approval.

1) Ptychosperma macarthurii
2) Ravenala madagascariensis
3) Teysmannia altifrons
4) Plumeria ruba
5) Crescentia cujete
6) Teysmannia altifrons
7) Dracaena spp.

Page 30 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

5 PLAN AREA 4
5.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 4,394,250.00 4,394,250
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge and supplying, fitting and fixing gravel render, yellow
sand stone,brown sand stone,aterite render and brick work render finish including ramming and
leveling etc. as per design and drawings complete in all respect with all features. This will
include among others, the following plant species with numbers as may be required. The
contractor shall submit the details for construction in the shop drawings for approval.

1) Mac Arthur Palm


2) Heliconia Calibea crem & red (mix)
3) Plumeria ruba

Page 31 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
6 PLAN AREA 5
6.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 2,278,500.00 2,278,500
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge and supplying, fitting and fixing Black brown sand stone
and mohm brick, nut grass cover finish including ramming and leveling etc. as per design and
drawings complete in all respect with all features. This will include among others, the following
plant species with numbers as may be required. The contractor shall submit the details for
construction in the shop drawings for approval.

1) Couroupita guianensis Aubl


2) Ptychosperma macarthurii
3) Teysmannia altifrons
4) Ravenala madagascariensis
5) Syperus papyrus
6) Nympahea spp.
7) Dracaena spp.

7 PLAN AREA 6

Page 32 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
7.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 2,115,750.00 2,115,750
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge complete in all respect with all features. This will
include among others, the following plant species with numbers as may be required. The
contractor shall submit the details for construction in the shop drawings for approval.

1) Syperus alternitolius
2) Nympahea spp.
3) Crescentia cujete
4) Indian cork tree

8 PLAN AREA 7

Page 33 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
8.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 7,323,750.00 7,323,750
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge complete in all respect with all features. This will include
among others, the following plant species with numbers as may be required. The contractor shall
submit the details for construction in the shop drawings for approval.

1) Couroupita guianensis Aubl


2) Ptychosperma macarthurii
3) Crescentia cujete
4) Ravenala madagascariensis
5) Cyrtostachys lakka Becc.
6) Plumeria ruba
7) Dracaena spp.
8) Nympahea spp.
9) Asplenium nidus
9) Tiger Claw
10) Syperus papyrus

9 PLAN AREA 8

Page 34 of 273
GROUND AND LANDSCAPING
BILL OF QUANTITIES
BILL NO.16 GROUND AND LANDSCAPING
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA
9.1 Landscaping Works consisting of supplying and planting plants including excavation, prepairing ls 1 7,161,000.00 7,161,000
top soil, fertilizing , watering and replacing dead plants until end of maintenance period etc.
including physical construction, decoration, lighting works and others as per design, specification
and instruction of the Engineer incharge complete in all respect with all features. This will include
among others, the following plant species with numbers as may be required. The contractor shall
submit the details for construction in the shop drawings for approval.

1) Couroupita guianensis Aubl


2) Guaiacum ofticinale
3) Brassaia actinophylla
4) Crescentia cujete
5) Ficus benjamina
6) Ptychosperma macarthurii
7) Cyrtostachys lakka Becc.
8) Terminalia Ivoriensis A.chev
9) Maniltoa gemmipara
10) Livistona rotundifolia
11) Mdlingtonia hortensis
12) Plumeria ruba
13) Philippin tree fern

Sub total for Bill No.16 Carried forward to Summary 45,477,930

Page 35 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA

1 ROAD
1.1 GENERAL
1.1.1 Demolising existing pavements/structures where if necessary including breaking, cutting, detaching, ls 1 604,500 604,500
removing, cleaning, patching, keeping provision for following construction processes, etcs all complete
and instruction of the Engineer-in-charge.

1.2 Earth Work 0


1.2.1 Levelling and compacting existing ground including cutting and filling true to level as per profile and sqm 4,900 270 1,323,353
as per direction of the Engineer in charge.
0
1.2.2 Earth work in box cutting in all types of soils,removing soils to a safe distance, maintaining proper cum 1,700 37 62,608
camber and grade as per drawing and as per direction of the Engineer in-charge.
0
1.2.3 Earth work in road embankment upto a lift of 1.5 m in selected material including cutting and throwing cum 660 36 23,631
earth in layers not exceeding 150 mm in thickness, breaking clods upto 40 mm size in each layer,
ramming, leveling and dressing as per required side slope with earth borrowed from the road side Govt.
acquired land for all leads and maintaining the embankment true to level and side slopes as per profile
for one year form the date of completion as per direction of the Engineer in charge including making
dug. bailing profiling etc.complete.

Page 37 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
1.2.4 Supply and compacting soil aggregate base course including ramming, leveling and dressing as per cum 1,400 565 790,314
required side slope with soil aggregate CBR >30 % borrowed from specified area and maintaining the
base course true to level and side slopes as per direction of the Engineer in charge.

0
1.2.5 Supply and compacting course sand cushion (F.M 1.20) including ramming, leveling with sand material cum 230 565 129,837
borrowed from specified area and maintaining the sand cushion true to level as per direction of the
Engineer in charge.

- 0
1.3 Pavement 0
1.3.1 Supply and pouring 250 mm thick reinforced cement concrete (minimum cylinder strength of 21 Mpa) sqm 4,500 1,325 5,963,625
pavement including supplying and laying 0.07mm thick plastic sheet above sand layer, supplying,
fabricating and placing of reinforcement 9 mm dia. 170mm x 300 mm wire mesh, casting in steel forms,
compacting by Mechanical vibrators and tapered rods, levelling , broom surface finishing and curing for
28 days etc all complete as per direction of the Engineer in charge.

- 0
1.3.2 Supply and laying of Concrete paving block 60mm thick of approved size, shape and colour for side sqm 100 823 82,305
walk having minimum compressive strength of 35 Mpa over 50mm sand cushioning etc all complete as
per direction of Engineer in Charge.

- 0
1.4 Pavement Joints 0

Page 38 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
1.4.1 Providing expansion joints across the RCC road pavement with 25 mm gap between the adjacent 0
panels, supplying dowel bars of size 25mm dia. 500mm long MS. rod placed at 300 mm c/c, half
length of the bar fixed within one slab keeping remaining portion of the bar free within adjacent slab
being inserted in metal cap embedded in the slab, inside of pipe fully painted and greased, filling the
gap between the slabs with flexible joint filler, finishing the top with mastic joint sealer etc all complete
as per direction of the Engineer in-charge.

1) Joints for 250 mm thick RC pavement rm 80 109 8,705


1.4.2 Providing contraction joints across the RCC road pavement with supplying dowel bars of size 25mm - 00
dia. 500mm long MS. rod placed at 300 mm c/c, half length of the bar fixed within one side of joints
keeping remaining portion of the bar painted and greased, cutting the top surface 50 mm depth by slot
cutting machine and finishing with mastic joint sealer etc all complete as per direction of the Engineer
in-charge.

1) Joints for 250 mm thick RC pavement rm 420 432 181,629


- 0
1.4.3 Providing longitudinal joints across the RCC road pavement , supplying deformed tie bars of size 0
16mm dia. 750mm long MS. rod placed at 600 mm c/c, half length of the bar fixed within each side of
slab, cutting the top surface 50 mm depth by slot cutting machine and finishing with mastic joint sealer
etc all complete as per direction of the Engineer in-charge.

1) Joints for 250 mm thick RC pavement rm 920 363 333,684


- 0

Page 39 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
1.4.4 Providing dummy joints across the RCC road pavement , supplying deformed tie bars of size 12mm 0
dia. 600mm long MS. rod placed at 600 mm c/c, half length of the bar fixed within each side of slab,
cutting the top surface 50 mm depth by slot cutting machine and finishing with mastic joint sealer etc
all complete as per direction of the Engineer in-charge.

1) Joints for 250 mm thick RC pavement rm 1,300 237 308,295


0
1.4.5 Providing butt joints between existing structures and the RCC road pavement , filling the gap between 0
the slabs and structures with flexible joint filler, finishing the top with mastic joint sealer etc all complete
as per direction of the Engineer in-charge.

1) Joints for 250 mm thick RC pavement rm 50 109 5,441


- 0
1.5 Curbs 0
1.5.1 Constructing reinforced cement insitu concrete curb (minimum cylinder strength of 28 Mpa) including 0
supplying, fabricating and placing of reinforcement in position, casting in steel forms, compacting by
Mechanical vibrators and tapered rods, levelling and curing for 28 days etc all complete as per direction
of the Engineer in charge.

1) 200 x400mm + 300x250 mm height curb and gutter m 920 949 872,712
2) 150x300 mm height curb m 80 572 45,756
3) 150x150 mm height RC stop log m 190 572 108,671
- 0
2 Miscellaneous 0
Supplying and installing reflectorized paint marking on road and car parking pavement all complete as 0
per direction of the Engineer in charge.

Page 40 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
1) Directional arrows sqm 40 698 27,900
2) Center line stripe sqm 150 698 104,625
3) Solid line 45 in white sqm 50 698 34,875
4) White marking in parking area sqm 120 698 83,700
- 0
2 DRAINAGE 0
2.1 Supplying, fitting and fixing of Drainage system works as per Design, Technical Specification and 0
instruction of the Engineer, complete in all respect.
2.1.1 Manhole for drainage set 30 13,950 418,500
2.1.2 Drainage pipes dia. 600 mm. (RCP) m 800 2,065 1,651,680
2.1.3 Drainage pipes dia. 800 mm. (RCP) m 300 3,529 1,058,805
0
3 FENCE 0
3.1 Earth Work 0
3.1.1 Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and 0
preparing the base, bailing out water and shoring if necessary, providing center line and bench mark
pillars, removing the spoils etc. to a lead not exceeding 60 m.

1) Upto 1.50 m depth and lead beyond 60 m cum 180 35 6,261


3.1.2 Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the cum 90 -
38 3,4070
building site, watering, leveling and consolidating each layer upto finished level.
- 0

Page 41 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
3.1.3 Sand filling in foundation trenches and plinth with coarse sand having minimum F.M.-1.20 layers cum 8 379 3,028
including leveling watering and consolidating each layer upto finished level.
- 0
3.2 Concrete Work 0
3.2.1 50 mm thick lean concrete course to give a minimum Cylinder strength of 13.5 Mpa concrete with sqm 150 3,915 587,295
cement, sand (F.M. 1.2), picked jhama chips, in/c breaking chips, screening, centering, shuttering,
casting and curing.

0
3.2.2 Reinforced cement concrete works to give a minimum Cylinder strength of 28 Mpa concrete from a 0
machine mixed typical batch with fresh Portland cement type 1 (conforming to ASTM C150 latest
edition), best quality coarse Sylhet sand (minimum F.M. 2.5 and 20 mm down) graded crushed stone
chips including cost of breaking chips, screening through proper sievers, cleaning and washing
thoroughly, centering, shuttering with M.S. sheet and steel form, placing of reinforcement cage in
position, mixing the aggregates with mixer machine, casting in steel forms, compacting by Mechanical
vibrators and tapered rods and curing for 28 days etc all complete as per direction of the Engineer in
charge (Excluding the cost of reinforcements and its fabrication)

- 0
3.2.2.1 In Individual and continuous footing of column, raft and floor slab at plinth level. cum 60 5,104 306,230
0
3.2.2.2 In Foundation beam cum 9 5,450 49,048
0
3.2.2.3 In pedestal, column, capital lift wall and wall: 0

Page 42 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
1) Below Plinth level and in Ground Floor cum 8 7,256 58,047
0
3.3 Reinforcing Steel 0
3.3.1 Supplying, fabrication and fixing to details as per design deformed/round bar reinforcement in concrete 0
in accordance with ASTM A615 or equal in/c. straightening and cleaning rust, if any, bending & binding
in position in/c. supply of G.I. wires etc. complete in all respects in all floors.

0
(1) SR 24 round bar with minimum fy = 235 Mpa quintal 5 4,213 21,065
(2) SD 40 deformed bar with minimum fy = 390 Mpa/276 Mpa quintal 110 4,365 480,196
0
3.4 Wall & Wall Finishing 0
3.4.1 Brick wall of width one brick with 1st class bricks in cement mortar ( 1: 4 ) and making bond with 0
connected walls in/c necessary scaffolding, raking out joints, cleaning and soaking the bricks for at
least 24 hours before use and washing out sand curing at least for 7 days in all floors ( F.M. of sand =
1.2)

1) Ground Floor sqm 210 292 61,227


3.4.2 Minimum 12mm thick cement plaster (1:6) to wall inner/outer surface, finishing the corner and edges 0
in/c washing of sand cleaning the surface, scaffolding and curing at least for 7 days etc. all complete as
per direction of the Engineer in charge.

1) Ground Floor sqm 420 91 38,279


0

Page 43 of 273
ROAD, DRAINAGE, FENCE & SERVICE GATE
BILL OF QUANTITIES
BILL NO.18 - ROAD, DRAINAGE, FENCE & SERVICE GATE
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY TAKA
3.4.3 Painting to walls and columns two coats with Acrylic paint of best quality and approved colour over a sqm 420 86 36,326
coat of priming including cleaning finishing and polishing with sand paper and necessary scaffolding
etc. all complete in all floors.

0
4 SERVICE GATE 0
3.5.1 Supplying fitting and fixing of service gate in/c cost of all materials accessories, labour for installation, set 1 93,000 93,000
mending good the damages etc all complete as per design drawing and direction ot the Engineer in-
charge.

0
Sub total for Bill No.18 Carried forward to Summary 15,968,558

Page 44 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner

1 COFFEE SHOP RESTAURANT


1.1 GENERAL
Demolising existing structure/finishings where if necessary including breaking, ls 1 26,970.00 26,970
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.

1.2 INTERIOR AND FF&E WORKS


1.2.1 Ceiling
1.2.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical sqm 424 1,478.70 626,969
hot press with cement plaster paste and fixed to wood frame suspended from ceiling
maintaining straight lines and desired finished level at bottom face with vertical
wooden strut as required in/c making holes in slabs, or beams by electric drill
machine and mending good the damages, if any, during execution of the work in/c
cost of all materials accessories scaffoldings, labour for installation, screws, nails,
etc all complete as per drawing design and direction ot the Engineer in-charge.

Page 45 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
1.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 424 86.49 36,672
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

1.2.2 Wall & Wall Finishing


1.2.2.1 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 340 86.49 29,407
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

1.2.2.2 Skirting & Nosing


Supplying, fitting and fixing Granite stone base of approved quality, texture & size rm 110 6,586.26 724,489
over cement mortar including cutting and grinding the stones setting in position
keeping horizontal and vertical alignment correct, filling the joints with white
cements, cutting and grinding the top surface and finishing etc. complete in all
respect.

1.2.3 Floor & Floor Finishing


1.2.3.1 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 230 6,584.40 1,514,412
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

Page 46 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
1.2.3.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 104 6,584.40 684,778
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

1.2.3.3 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 20 6,584.40 131,688
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

1.2.3.4 Supplying, fitting and fixing Ceramic tile 200mmx200mm on 20 mm thick cement sqm 51 948.60 48,379
mortar (1:3) base and raking out the joints with white cement including cutting and
laying tiles in proper way and finishing with care etc. all complete as per direction of
the Engineer in-charge.

1.2.4 Counter & shelf


1.2.4.1 Supplying, fitting and fixing Granite stone top of approved quality, texture & size sqm 16 5,375.40 86,006
over 20 mm thick cement mortar (1:2) including cutting and grinding the Granite tiles
setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

Page 47 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
1.2.4.2 Supplying, fitting and fixing Ceramic tile 200mmx200mm on 20 mm thick cement sqm 26 896.52 23,310
mortar (1:3) base and raking out the joints with white cement including cutting and
laying tiles in proper way and finishing with care etc. all complete as per direction of
the Engineer in-charge.

1.2.5 Built-in Furniture


1.2.5.1 Supplying, fitting and fixing natural Burma Teak wood antique cabinet waiter station set 1 91,791.00 91,791
of approved quality and shape including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the
Engineer in-charge.

1.2.5.2 Supplying, fitting and fixing natural Burma Teak wood bench of approved quality and rm 14 -
13,485.00 -
188,790
shape composed of wood framing and face, wood scereen on top, stone top and
edge, seat fabric with plywood backing, stone base, etc. including costing of fitting,
fixing all necessary accessiories complete in all respect as per drawing and direction
of the Engineer in-charge.

1.2.6 Movable Furniture


1.2.6.1 Supplying and placing custom banquette table 1450x1875 mm and mending good set 2 36,716.40 73,433
the damages etc. all complete as per direction of the Engineer in-charge.

Page 48 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
1.2.6.2 Supplying and placing custom square table 900 mm square and mending good the set 11 23,253.72 255,791
damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.3 Supplying and placing antique cabinet waiter station 900x600mm and mending good set 4 48,955.20 195,821
the damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.4 Supplying and placing custom rectangular table 1200x750mm and mending good set 11 25,701.48 282,716
the damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.5 Supplying and placing dining chair and mending good the damages etc. all complete set 99 23,253.72 2,302,118
as per direction of the Engineer in-charge.
Built-in sofa seat set 4 128,507.40 514,030
1.2.6.6 Supplying and placing custom banquette table 1200x975 mm and mending good the set 4 29,490.30 117,961
damages etc. all complete as per direction of the Engineer in-charge.

Built-in sofa seat set 2 163,884.60 327,769


1.2.6.7 Supplying and placing custom table 600x750 mm and mending good the damages set 11 18,358.20 201,940
etc. all complete as per direction of the Engineer in-charge.

1.2.6.8 Supplying and placing antique host stand 1800x900 mm and mending good the set 1 91,791.00 91,791
damages etc. all complete as per direction of the Engineer in-charge.

Page 49 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

1.2.7 Lighting fixtures & Electrical Accessories


1.2.7.1 Supplying, fitting and fixing of single recepticle as per Design, Technical each 8 852.62 6,821
Specification and instruction of the Engineer, complete in all respect.

1.2.7.2 Supplying, fitting and fixing of telephone outlet as per Design, Technical each
Specification and instruction of the Engineer, complete in all respect.

1.2.7.3 Supplying, fitting and fixing recess down light and mending good the damages each 74 2,762.10 204,395
etc. all complete as per drawing and direction of the Engineer in-charge.

1.2.7.4 Supplying, fitting and fixing 1.2 m cold cathode tube lighting and mending good each 9 103,118.40 928,066
the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

1.2.7.5 Supplying, fitting and fixing wall washer and mending good the damages etc. all each 4 2,734.20 10,937
complete as per drawing and direction of the Engineer in-charge.

1.2.7.6 Supplying, fitting and fixing sigle switch and mending good the damages etc. all each 6 1,129.95 6,780
complete as per drawing and direction of the Engineer in-charge.

1.2.7.7 Supplying, fitting and fixing wall scone and mending good the damages etc. all each 21 2,762.10 58,004
complete as per drawing and direction of the Engineer in-charge.

Page 50 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

1.2.7.8 Supplying, fitting and fixing track light and mending good the damages etc. all each 2 32,894.10 65,788
complete as per drawing and direction of the Engineer in-charge.
Sub total 9,857,820
2 GENERAL RESTAURANT
2.1 INTERIOR AND FF&E WORKS - -
2.1.1 Ceiling
2.1.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical sqm 95 1,481.49 140,742
hot press with cement plaster paste and fixed to wood frame suspended from ceiling
maintaining straight lines and desired finished level at bottom face as required in/c
making holes in slabs, or beams and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per drawing design and direction ot
the Engineer in-charge.

2.1.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 210 86.49 18,163
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

2.1.1.3 Supplying, fitting and fixing Mosaic tile 20mmx20mm on 20 mm thick cement mortar sqm 44 767.25 33,759
(1:3) base and raking out the joints with white cement including cutting and laying
tiles in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.

Page 51 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

2.2.1 Wall & Wall Finishing


2.2.1.1 Supplying, fitting and fixing Burma Teak wood panel of approved quality and shape sqm 14 5,998.50 83,979
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

2.2.1.2 Supplying, fitting and fixing Burma Teak wood screen of approved quality and shape sqm 6 16,391.25 98,348
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

2.2.1.3 Emulsion painting of approved quality and color to walls and columns two coats over sqm 74 86.49 6,400
a coat of primer or sealer including cleaning, sand papering the surface and
necessary scaffolding etc. all completerin all floors.

2.2.2 Skirting & Nosing


2.2.2.1 Supplying, fitting and fixing Burma Teak wood base of approved quality and shape rm 30 1,464.75 43,943
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

2.2.4 Floor & Floor Finishing

Page 52 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
2.2.4.1 Supplying and laying Fire proof Axminister carpet Islamic wave carpeting including sqm 146 4,756.95 694,515
underlayments in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

2.2.4.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 31 6,584.40 204,116
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

2.2.4.3 Supplying, fitting and fixing Granite stone border of approved quality, texture & size sqm 37 6,584.40 243,623
over 20 mm thick cement mortar (1:2) including cutting and grinding the Granite tiles
setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

2.2.5 Built-in Furniture


2.2.5.1 Supplying, fitting and fixing banquette composed of seats, water vessel at top, ls 1 93,000.00 93,000
Granite top and sides, ceramic tiles finishings, flush recessed uplights and mending
good the damages etc. all complete as per design, drawings and direction of the
Engineer in-charge.

2.2.6 Movable Furniture

Page 53 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
2.2.6.1 Supplying and placing custom booth 1100diameterx1450mm and mending good the each 2 73,432.80 146,866
damages etc. all complete as per direction of the Engineer in-charge.

2.2.6.2 Supplying and placing round dining table 36"diameterx30"and mending good the each 2 25,701.48 51,403
damages etc. all complete as per direction of the Engineer in-charge.

2.2.6.3 Supplying and placing lounge chair 21"x31"x24" and mending good the damages each 8 45,895.50 367,164
etc. all complete as per direction of the Engineer in-charge.

2.2.6.4 Supplying and placing dinning table 32"x24" and mending good the damages etc. all each 4 18,358.20 73,433
complete as per direction of the Engineer in-charge.

2.2.6.5 Supplying and placing dining chair and mending good the damages etc. all complete each 48 15,298.50 734,328
as per direction of the Engineer in-charge.

2.2.6.6 Supplying and placing dinning table 48"x30"x30" and mending good the damages each 12 36,716.40 440,597
etc. all complete as per direction of the Engineer in-charge.

2.2.6.7 Supplying and placing sheer drapery and mending good the damages etc. all each 12 45,895.50 550,746
complete as per direction of the Engineer in-charge.

Page 54 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
2.2.6.8 Supplying and placing antique host stand 1200x450x860 mm and mending good the each 1 55,074.60 55,075
damages etc. all complete as per direction of the Engineer in-charge.

2.2.6.9 Supplying and placing antique cabinet 1200x675x1200 mm and mending good the each 1 122,388.00 122,388
damages etc. all complete as per direction of the Engineer in-charge.

2.2.6.10 Supplying and placing coffee table and mending good the damages etc. all complete each 4 226,417.80 905,671
as per direction of the Engineer in-charge.

2.2.7 Lighting fixtures & Electrical Accessories


2.2.7.1 Supplying, fitting and fixing of Pendant light fixture suspended from multiple 1 607,569.00 607,569
wires as per Design, Technical Specification and instruction of the Engineer, set
complete in all respect.

2.2.7.2 Cancelled

2.2.7.3 Supplying, fitting and fixing cold cathode tube lighting (22 m length) and mending set 1 196,137.00 196,137
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

Page 55 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
2.2.7.4 Supplying, fitting and fixing of recessed downlights including all accessroies, set 41 2,762.10 113,246
supports, fittings as per Design, Technical Specification and instruction of the
Engineer, complete in all respect.

2.2.7.5 Supplying, fitting and fixing aircon grill and mending good the damages etc. all each
complete as per drawing and direction of the Engineer in-charge.

2.2.7.6 Supplying, fitting and fixing of single recepticle as per Design, Technical set 10 852.62 8,526
Specification and instruction of the Engineer, complete in all respect.

2.2.7.7 Supplying, fitting and fixing of telephone outlet as per Design, Technical set
Specification and instruction of the Engineer, complete in all respect.

2.4.2.4 Doors & Windows


Aluminium Windows

Page 56 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
(a) Supplying, fitting and fixing of Aluminium composite fixed windows as per the
U.S. Architectural Aluminium Manufacturere's Association (AAMA) standard
specification having wall frame, section of all Aluminium members will be anodized
to Aluminium Bronze/Silver colour with a coat not less than 15 micrones in thickness
and density of 4mg per square cm etc. keeping provision for fitting 6 mm thick clear
float glass panel including neoprene, sealant etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

1) size : 1,000 mm x 2,600mm sqm 21 2,827.20 59,371

(b) Supplying, fitting and fixing in Aluminium window frame with distortion free 6 mm sqm 21 1,841.40 38,669
thick clear float glass foreign made and of approved quality and shade including
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

Sub total 6,131,776

3 NEW CIAO RESTAURANT


3.1 GENERAL
3.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 186,000.00 186,000
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.

3.2 INTERIOR AND FF&E WORKS


Page 57 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
3.2.1 Movable Furniture
3.2.1.1 Supplying and placing Table and mending good the damages etc. all complete as set
per direction of the Engineer in-charge.

3.2.1.2 Supplying and placing Table and mending good the damages etc. all complete as set 20 11,718.00 234,360
per direction of the Engineer in-charge.

3.2.1.3 Supplying and placing Table and mending good the damages etc. all complete as set 1 11,718.00 11,718
per direction of the Engineer in-charge.

3.2.1.4 Supplying and placing Sunlonger and mending good the damages etc. all complete set
as per direction of the Engineer in-charge.

3.2.1.5 Supplying and placing Side table and mending good the damages etc. all complete set 8 5,580.00 44,640
as per direction of the Engineer in-charge.

3.2.1.6 Supplying and placing Sunshade umbrella and mending good the damages etc. all set 8 5,580.00 44,640
complete as per direction of the Engineer in-charge.

3.2.1.7 Supplying and placing Chair and mending good the damages etc. all complete as set
per direction of the Engineer in-charge.

Page 58 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
3.2.1.8 Supplying and placing Chair and mending good the damages etc. all complete as set 62 9,439.50 585,249
per direction of the Engineer in-charge.

3.3.5 Structural Wood Work


3.3.5.1 Supplying and making seasoned wood works in frames of roof truss of required size cum 2 5,510.25 11,021
with wall plates as per design in/c supplying, fabricating and hoisting , scaffolding,
fitting and fixing in position with bolts and nuts etc, all complete. (All sizes of wood
are finished)

3.3.5.2 Painting to timber structure two coats with Acrylic paint of best quality and sqm 170 86.49 14,703
approved colour over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

3.3.6 Miscellaneous - -
3.3.6.1 Supplying and fixing P.V.C. Water stop 6" in concrete wall at the level of 150 mm rm 15 627.75 9,416
above all basement floors under ground level complete in all respects .

3.3.6.2 Supplying and applying water proofing system on roof slab complete in all respects . sqm 37 1,325.25 49,034

3.4 ARCHITECTURAL WORKS


3.4.1 Roofing

Page 59 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
3.4.1.1 Supplying, fitting and fixing timber roof tiles on wooden purlins all complete as per sqm 124 2,743.50 340,194
direction of the Engineer in-charge.

3.4.1.2 Supplying, fitting and fixing RC flashing w/Acrylic paint on timber roof tiles all rm 43 571.95 24,594
complete as per direction of the Engineer in-charge.

3.4.1.3 Supplying, fitting and fixing RC sculpture w/Acrylic paint on roof all complete as per set 2 13,950.00 27,900
direction of the Engineer in-charge.

3.4.1.4 Supplying and constructing steel trowel floor finishing on RC roof deck in proper way sqm 40 83.70 3,348
and finishing with care etc. all complete as per direction of the Engineer in-charge.

3.4.1.5 Painting to parapet walls two coats with Acrylic paint of best quality and approved sqm 14 84.91 1,189
colour over a coat of priming including cleaning finishing and polishing with sand
paper and necessary scaffolding etc. all complete in all floors.

3.4.2 Wall & Wall Finishing


3.4.2.1 90 mm thick Concrete block wall in cement mortar ( 1: 4 ) and making bond with
connected walls in/c necessary scaffolding, raking out joints, cleaning and curing at
least for 7 days in all floors.( F.M. of sand = 1.2)

1) Ground Floor sqm 13 291.56 3,790

Page 60 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
3.4.2.2 Minimum 12mm thick cement plaster (1:6) to wall surface, finishing the corner and
edges in/c washing of sand cleaning the surface, scaffolding and curing at least for
7 days etc. all complete as per direction of the Engineer in charge.

1) Ground Floor sqm 68 91.14 6,198

3.4.2.3 Painting to walls two coats with Acrylic paint of best quality and approved colour sqm 68 85.56 5,818
over a coat of priming including cleaning finishing and polishing with sand paper and
necessary scaffolding etc. all complete in all floors.

3.4.2.4 Supplying, fitting and fixing 25mm thick timber louver all complete as per direction of sqm 9 5,744.15 51,697
the Engineer in-charge.

3.4.2.5 Supplying, fitting and fixing 25mm thick timber frame panel all complete as per sqm 70 13,671.00 956,970
direction of the Engineer in-charge.

3.4.3 Miscellaneous - -
3.4.3.1 Providing handrailing with 4"x4" timber column, 2"x4" rails with paints, etc, all rm 39 6,510.00 253,890
complete including making necessary grooves in floor, manding good all damages,
finishing etc. as per design, drawings and direction of Engineer in-Charge.

3.4.4 Floor & Floor Finishing - -


3.4.4.1 Supplying and laying Burma Teak wood deck in proper way and finishing with care sqm 202 5,054.55 1,021,019
etc. all complete as per direction of the Engineer in-charge.
- -

Page 61 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
3.4.4.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 92 6,584.40 605,765
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

3.4.5 Accordion Doors - -


3.4.5.1 Supplying, making and fixing of accordion door composed of 25mm thick timber
panel, 35 mm thick timber moulding frame and 6mm thick clear glass panels
including all accessories finished with sand papering, etc. all complete as per
design and drawing and direction of the Engineer -in-charge and standard practice.

1) size : 3,000 mm x 2,500mm sqm 42 4,673.25 196,277


2) size : 3,000 mm x 2,950mm sqm 39 4,673.25 182,257
3.4.6 Windows - -
3.4.6.1 Supplying, fitting and fixing of Aluminium composite fixed windows with fixed
partition as per the U.S. Architectural Aluminium Manufacturere's Association
(AAMA) standard specification having wall frame, section of all Aluminium members
will be anodized to Aluminium Bronze/Silver colour etc. including all accessories
handel, locks,bolts etc. keeping provision for fitting 6 mm thick clear glass panel
including neoprene, sealant etc. complete in all respect as per drawing and direction
of the Engineer in-charge.

2) size : 1,550 mm x 400mm sqm 2 2,828.13 5,656


Sub total 4,877,342

Page 62 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4 SPORTS BAR
4.1 GENERAL
Demolising existing structure/finishings where if necessary including breaking, ls 1 15,810.00 15,810
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.

4.2 INTERIOR AND FF&E WORKS


4.2.1 Ceiling
4.2.1.1 Supplying fitting and fixing of Aluminium Grid ceiling in/c making holes in slabs, or sqm 162 2,999.25 485,879
beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per design drawing and direction ot
the Engineer in-charge.

4.2.1.2 Supplying fitting and fixing of Space frame for hanging stage light in/c making holes set 1 97,650.00 97,650
in slabs, or beams by electric drill machine and mending good the damages, if any,
during execution of the work in/c cost of all materials accessories scaffoldings,
labour for installation, screws, nails, etc all complete as per design drawing and
direction ot the Engineer in-charge.

Page 63 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.1.3 Supplying fitting and fixing of Cracking Glass ceiling in/c making holes in slabs, or sqm 8 19,530.00 156,240
beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per design drawing and direction ot
the Engineer in-charge.

4.2.1.4 Supplying fitting and fixing of 9 mm thick Gypsum board laminated by mechanical sqm 168 1,543.80 259,358
hot press with metal LG stud frame in natural anodized finish at 600 mm x 600 mm
in grid, suspended from ceiling by 12 SWG double ply wire fixed to the ceiling by
rowel plug, screws, hooks, nails etc. maintaining straight lines and desired finished
level at bottom face with vertical wooden strut as required in/c making holes in
slabs, or beams by electric drill machine and mending good the damages, if any,
during execution of the work in/c cost of all materials accessories scaffoldings,
labour for installation, screws, nails, etc all complete as per drawing design and
direction ot the Engineer in-charge.

4.2.1.5 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 168 86.49 14,530
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

4.2.2 Wall & Wall Finishing

Page 64 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.2.1 Supplying fitting and fixing of Aluminium Cladding with hard wood blocking in/c sqm 38 7,207.50 273,885
making holes on columns by electric drill machine and mending good the damages,
if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per design
drawing and direction ot the Engineer in-charge.

4.2.2.2 Supplying fitting and fixing of Mirror finish stainless steel post diameter 150 mm in/c rm 12 8,370.00 100,440
making holes on columns by electric drill machine and mending good the damages,
if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per design
drawing and direction ot the Engineer in-charge.

4.2.2.3 Supplying fitting and fixing of Mirror finish stainless steel post diameter 100 mm in/c rm 17 4,650.00 79,050
making holes on columns by electric drill machine and mending good the damages,
if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per design
drawing and direction ot the Engineer in-charge.

4.2.2.4 Supplying fitting and fixing of 6 mm thk 100 mm width adjustable clear glass shelves rm 8 585.90 4,687
with support and mending good the damages, etc all complete as per design
drawing and direction ot the Engineer in-charge.

Page 65 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.2.5 Supplying fitting and fixing of 12 mm thk. Frosted Laminate Glass including SS sqm 27 9,323.25 251,728
frame w/ silicorn etc. and mending good the damages, etc all complete as per
design drawing and direction ot the Engineer in-charge.

4.2.2.6 Supplying fitting and fixing of 6 mm thk. Clear glass tinted mirror (Copper) and sqm 6 -
5,696.25 -
34,178
mending good the damages, etc all complete as per design drawing and direction ot
the Engineer in-charge.

4.2.2.7 Supplying fitting and fixing of Glass box panel and mending good the damages, etc sqm 32 4,296.60 137,491
all complete as per design drawing and direction ot the Engineer in-charge.

4.2.2.8 Supplying, fitting and fixing Acoustic Textile wall covering finishing of approved sqm 185 2,465.43 456,105
quality and pattern complete in all respect as per drawing and direction of the
Engineer in-charge.

4.2.2.9 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 75 86.49 6,487
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

4.2.3 Wooden Works


4.2.3.1 Supplying, fitting and fixing Burma Teak wood frame of approved quality and pattern cum 3 45,529.08 136,587
as per drawing and direction of the Engineer in-charge.

Page 66 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.3.2 Supplying, fitting and fixing 4 mm thick Plywood finishing of approved quality and sqm 48 1,046.25 50,220
pattern as per drawing and direction of the Engineer in-charge.

4.2.3.3 Supplying, fitting and fixing 6 mm thick Plywood finishing of approved quality and sqm 103 1,250.85 128,838
pattern as per drawing and direction of the Engineer in-charge.

4.2.3.4 Supplying, fitting and fixing 6mm thick plywood on 4mm thick Plywood backing of sqm 5 2,162.25 10,811
approved quality and pattern complete in all respect as per drawing and direction of
the Engineer in-charge.

4.2.3.5 Supplying, fitting and fixing 10mm thick plywood wall covering of approved quality sqm 18 1,520.55 27,370
and pattern as per drawing and direction of the Engineer in-charge.

4.2.3.6 Supplying, fitting and fixing 12mm thick plywood wall covering of approved quality sqm 9 1,701.90 15,317
and pattern as per drawing and direction of the Engineer in-charge.

4.2.3.7 Supplying, fitting and fixing 15 mm thick Plywood backing for counter of approved sqm 31 1,883.25 58,381
quality and pattern as per drawing and direction of the Engineer in-charge.

4.2.3.8 Supplying, fitting and fixing shelf edging solid wood of approved quality and pattern rm 21 1,395.00 29,295
complete in all respect as per drawing and direction of the Engineer in-charge.

Page 67 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.3.9 Supplying, fitting and fixing 15 mm thick solid wood baseboard of approved quality rm 152 902.10 137,119
and pattern as per drawing and direction of the Engineer in-charge.

4.2.3.10 Supplying, fitting and fixing Timber moulding (around Laminate Glass) of approved rm 31 697.50 21,623
quality and pattern as per drawing and direction of the Engineer in-charge.

4.2.3.11 Supplying, fitting and fixing band stand floor and DJ floor finish 25mm thk. Solid sqm 28 12,694.50 355,446
wood strip size 100mmx600mm tounge joint w/ coated Polyurthane finish of
approved quality and pattern complete in all respect as per drawing and direction of
the Engineer in-charge.

4.2.4 Counter & shelf


4.2.4.1 Supplying, fitting and fixing Marble solid surfacing top and back splash as per sqm 35 5,728.80 200,508
design, drawing and direction of the Engineer in-charge.

4.2.4.2 Supplying, fitting and fixing Granite top as per design, drawing and direction of the sqm 9 6,975.00 62,775
Engineer in-charge.

4.2.5 Skirting, Nosing & Moulding


4.2.5.1 Supplying, fitting and fixing High Gloss Polyurethane topguard copper trim of rm 154 265.05 40,818
approved quality and pattern complete in all respect as per drawing and direction of
the Engineer in-charge.

Page 68 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

4.2.5.2 Supplying, fitting and fixing 10mm thick Plywood U groover of approved quality and rm 26 1,520.55 39,534
pattern as per drawing and direction of the Engineer in-charge.

4.2.5.3 Supplying, fitting and fixing 6mm thick Plywood U groover of approved quality and rm 21 1,325.25 27,830
pattern as per drawing and direction of the Engineer in-charge.

4.2.6 Floor & Floor Finishing


4.2.6.1 Supplying, fitting and fixing 20 mm thick Marble stone flooring of approved quality, sqm 24 5,384.05 129,217
texture & size over 20 mm thick cement mortar (1:2) including cutting and grinding
the Marble stone setting in position keeping horizontal and vertical alignment correct,
filling the joints with white cement, cutting and grinding the top surface and finishing
etc. complete in all respect.

4.2.6.2 Supplying, fitting and fixing Carpet tiles flooring with all complete as per direction of sqm 280 4,756.95 1,331,946
the Engineer in-charge.

4.2.6.3 Supplying, fitting and fixing glazed ceramic floor tiles on 20 mm thick cement mortar sqm 5 1,292.70 6,464
(1:3) base and raking out the joints with white cement including cutting and laying
tiles in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.

4.2.7 Tempered Glass Doors 12 mm thick

Page 69 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.7.1 Supplying. Fitting and fixing of 12 mm thick frameless Tempered glass
w/transparency sticker miages door with fixed partition including all accesories like
hinge,jamp,handel, locks, floor spring, door closer, rib glass, glass fitting etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,650 mm x 1,700mm sqm 5 23,250.00 116,250

4.2.8 Wood Doors


(a) Supplying and making door frames with seasoned wood of required size
including painting fitted and fixed in position finished with sand papering mending
good the damages if any. (All sizes of wood are finished)

1) Burma Teak wood cum 1 50,127.00 50,127

(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) rm 15 182.09 2,731
with the vertical members of the frame, fixing the frame in wall mending good
damages, fixing Stainless steel hinges w/ball bearing with the vertical members of
the frame for leaf shutter, all complete as per plan and direction of the Engineer in-
Charge.

(Running metre of the door frame will be considered towards measurement)

Page 70 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
(c) Supplying, making and fixing 40 mm thick solid Burma Teak wood door panel sqm 5 11,160.00 55,800
plywood finish with wood trim to hardwood frames including all accessories knob,
pivot, handel, floor spring, door closer etc. finished with sand papering complete as
per direction of the Engineer -in-charge and standard practice.

(d) Painting to door and window frames and shutters paint/ of best quality and
approved colour. Over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

1)Hard wood sqm 10 83.70 837

4.2.9 Lighting fixtures & Electrical Accessories


4.2.9.1 Supplying, fitting and fixing wall bracket including making holes in walls and set 18 3,069.00 55,242
mending good the damages etc. all complete as per direction of the Engineer-in
-charge.

4.2.9.2 Supplying, fitting and fixing of Speaker as per Design, Technical Specification and set 9 5,301.00 47,709
instruction of the Engineer, complete in all respect.

4.2.9.3 Supplying, fitting and fixing of cold cathode tube Indirect Light as per Design, set 99 8,879.64 879,084
Technical Specification and instruction of the Engineer, complete in all respect.

Page 71 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.9.4 Supplying, fitting and fixing of Lucifer Strip Light as per Design, Technical set 278 3,836.25 1,066,478
Specification and instruction of the Engineer, complete in all respect.

4.2.9.5 Supplying, fitting and fixing of Stage Lighting as per Design, Technical Specification set
and instruction of the Engineer, complete in all respect.

4.2.9.6 Supplying, fitting and fixing of Fluorescent Tube with light box as per Design, set 1 1,255.50 1,256
Technical Specification and instruction of the Engineer, complete in all respect.

4.2.9.7 Supplying, fitting and fixing of Picture Lamp as per Design, Technical Specification set 3 6,138.00 18,414
and instruction of the Engineer, complete in all respect.

4.2.9.8 Supplying, fitting and fixing of Single power point as per Design, Technical set 7 1,129.95 7,910
Specification and instruction of the Engineer, complete in all respect.

4.2.9.9 Supplying, fitting and fixing of telephone point as per Design, Technical Specification set 1 148.80 149
and instruction of the Engineer, complete in all respect.

4.2.9.10 Supplying, fitting and fixing of Junction Box as per Design, Technical Specification set 5 148.80 744
and instruction of the Engineer, complete in all respect.

Page 72 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.9.11 Supplying, fitting and fixing of Floor mounted Junction Box as per Design, Technical set 1 148.80 149
Specification and instruction of the Engineer, complete in all respect.

4.2.9.12 Supplying, fitting and fixing of Halogen Recessed Uplight as per Design, Technical set 2 2,232.00 4,464
Specification and instruction of the Engineer, complete in all respect.

4.2.10 Movable Furniture


4.2.10.1 Supplying and placing Round Table Bonet 1500Dx100H, Glass and mending good set 8 97,650.00 781,200
the damages etc. all complete as per direction of the Engineer in-charge.

4.2.10.2 Supplying and placing Stool 350Dx700H ,Uppholstery Vinyl and mending good the set 155 20,181.00 3,128,055
damages etc. all complete as per direction of the Engineer in-charge.

4.2.10.3 Supplying and placing Pool Table and mending good the damages etc. all complete set 1 139,500.00 139,500
as per direction of the Engineer in-charge.

4.2.10.4 Supplying and placing Air Hockey Table and mending good the damages etc. all set 1 139,500.00 139,500
complete as per direction of the Engineer in-charge.

Page 73 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
4.2.10.5 Supplying and placing Table Socker and mending good the damages etc. all set 2 69,750.00 139,500
complete as per direction of the Engineer in-charge.

4.2.10.6 Supplying,fitting and fixing Score Board and mending good the damages etc. all set 1 8,370.00 8,370
complete as per direction of the Engineer in-charge.

4.2.10.7 Supplying,fitting and fixing Cue Stick Rack and mending good the damages etc. all set 1 8,370.00 8,370
complete as per direction of the Engineer in-charge.

4.2.10.8 Supplying,fitting and fixing Art Work and mending good the damages etc. all set 8 13,950.00 111,600
complete as per direction of the Engineer in-charge.

4.2.11 Built-in Furniture - -


4.2.11.1 Supplying,fitting and fixing 5 layers of 12mm thick floating glass w/bevelled edge on set 2 10,741.50 21,483
Decorative Pedestal Sculpture Stand , and mending good the damages etc. all
complete as per design, drawing and direction of the Engineer in-charge.

4.2.12 Miscellaneous - -
4.2.12.1 Supplying, fitting and fixing prefabricated raised platform under Band stand and DJ ls 1 156,240.00 156,240
stand complete in all respect as per drawing and direction of the Engineer in-charge.

4.2.12.2 Supplying, fitting and fixing pull down projector screen complete in all respect as per ls 1 -
213,528.00 -
213,528
drawing and direction of the Engineer in-charge.
- -
Sub total 12,338,305
Page 74 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

5 SPORTS BAR TOILET


5.1 INTERIOR AND FF&E WORKS
5.1.1 Ceiling
5.1.1.1 Supplying fitting and fixing of 9 mm thick moisture resistant gypsum board laminated sqm 50 1,544.73 77,237
by mechanical hot press with aluminium T-bar frame in natural anodized finish at
600 mm x 600 mm in grid, suspended from ceiling by ply wire fixed to the ceiling by
rowel plug, screws, hooks, nails etc. maintaining straight lines and desired finished
level at bottom face with vertical wooden strut as required in/c making holes in
slabs, or beams and mending good the damages, if any, during execution of the
work in/c cost of all materials accessories scaffoldings, labour for installation,
screws, nails, etc all complete as per drawing design and direction ot the Engineer
in-charge.

5.1.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 50 86.49 4,325
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

5.1.2 Wall & Wall Finishing


5.1.2.1 Supplying, fitting and fixing glazed ceramic wall tiles on 20 mm thick cement mortar sqm 44 4,936.44 217,203
(1:3) base and raking out the joints with white cement including cutting and laying
tiles in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.

Page 75 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS

5.1.2.2 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 81 86.49 7,006
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

5.1.3 Wooden Works


5.1.3.1 Supplying, fitting and fixing wood frame of approved quality and pattern as per cum 1 50,127.00 50,127
drawing and direction of the Engineer in-charge.

5.1.3.2 Supplying, fitting and fixing Plywood finishing of approved quality and pattern as per sqm 21 2,371.50 49,802
drawing and direction of the Engineer in-charge.

5.1.4 Counter
5.1.4.1 Supplying, fitting and fixing Marble counter top and black splash on 20 mm thick sqm 3 5,384.70 16,154
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.4.2 Supplying, fitting and fixing Granite counter top and black splash on 20 mm thick sqm 2 5,384.70 10,769
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.5 Skirting, Nosing & Moulding


Page 76 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.5.1 Supplying, fitting and fixing 100 mm height Marble baseboard on 20 mm thick rm 23 992.31 22,823
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.5.2 Supplying, fitting and fixing 200 mm height Marble baseboard on 20 mm thick rm 3 1,984.62 5,954
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.5.3 Supplying, fitting and fixing 100mm height Granite baseboard on 20 mm thick rm 16 992.31 15,877
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.5.4 Supplying, fitting and fixing 200 mm height Granite baseboard on 20 mm thick rm 3 1,984.62 5,954
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

5.1.5.5 Supplying, fitting and fixing Carpet tiles Connice with all complete as per direction of rm 42 697.50 29,295
the Engineer in-charge.

Page 77 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.5.6 Supplying, fitting and fixing wood top cover on top of wall with all complete as per rm 6 1,255.50 7,533
direction of the Engineer in-charge.

5.1.5.7 Supplying, fitting and fixing moulding glazed clay tile white color on cement mortar rm 46 697.50 32,085
(1:3) base and raking out the joints with white cement including installing moulds in
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

5.1.5.8 Supplying, fitting and fixing 6mm grooved U shape strip line as per design, drawing rm 10 558.00 5,580
and direction of the Engineer in-charge.

5.1.6 Floor & Floor Finishing


5.1.6.1 Supplying, fitting and fixing 20 mm thick Marble stone on counter and flooring of sqm 19 5,384.05 102,297
approved quality, texture & size on wall over 20 mm thick cement mortar (1:2)
including cutting and grinding the Marble stone setting in position keeping horizontal
and vertical alignment correct, filling the joints with white cement, cutting and
grinding the top surface and finishing etc. complete in all respect.

Page 78 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.6.2 Supplying, fitting and fixing 20 mm thick Granite floor tiles on counter and flooring of sqm 12 6,586.26 79,035
approved quality, texture & size on wall over 20 mm thick cement mortar (1:2)
including cutting and grinding the Marble stone setting in position keeping horizontal
and vertical alignment correct, filling the joints with white cement, cutting and
grinding the top surface and finishing etc. complete in all respect.

5.1.6.3 Supplying, fitting and fixing Marble threshold on 20 mm thick cement mortar (1:3) rm 1 1,088.10 1,088
base and raking out the joints with white cement including cutting and laying tiles in
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

5.1.6.4 Supplying, fitting and fixing Granite threshold on 20 mm thick cement mortar (1:3) rm 1 1,088.10 1,088
base and raking out the joints with white cement including cutting and laying tiles in
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

5.1.7 Wood Doors


(a) Supplying and making door frames with seasoned wood of required size
including painting fitted and fixed in position finished with sand papering mending
good the damages if any. (All sizes of wood are finished)

1)Burma Teak wood cum 1 50,127.00 50,127

Page 79 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) rm 30 182.09 5,463
with the vertical members of the frame, fixing the frame in wall mending good
damages, fixing Stainless steel hinges w/ball bearing with the vertical members of
the frame for leaf shutter, all complete as per plan and direction of the Engineer in-
Charge.

(Running metre of the door frame will be considered towards measurement)

(c) Supplying, making and fixing 40 mm thick solid wood door panel plywood finish sqm 10 13,950.00 139,500
with wood trim to hardwood frames including all accessories knob, pivot, handel,
floor spring, door closer etc. finished with sand papering complete as per direction
of the Engineer -in-charge and standard practice.

(d) Painting to door and window frames and shutters paint/ of best quality and
approved colour. Over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

1)Burma Teak wood sqm 20 83.70 1,674


5.1.8 Plumbing Fixture & Bath Accessories

Page 80 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.8.1 Supplying fitting and fixing European type glazed porcelain auto flush toilet of best set 4 66,541.50 266,166
quality including all internal fittings and accessories as plastic seat cover, automatic
flush valve , spray hose , plastic connection pipe with brass coupling, etc. and
preparing the base with cement concrete and with wire net or rods, if necessary , in
all floors including making holes wherever required and mending good the damages
and fitting fixing complete with all necessay fittings and connection as per direction
of the Engineer in-charge.

5.1.8.2 Supplying, fitting and fixing paper holder including making holes in walls and set 4 3,557.25 14,229
mending good the damages etc. all complete as per direction of the Engineer-in
-charge.

5.1.8.3 Supplying, fitting and fixing Hook and mending good the damages etc. all complete set 4 3,557.25 14,229
as per direction of the Engineer-in -charge.

5.1.8.4 Supplying fitting and fixing European type glazed porcelain auto flush urinals of set 3 74,074.50 222,224
best quality including fitting, fixing the same in position after making holes in walls
and floor, providing plastic waste pipe with brass coupling upto grading below,
automatic flush valve and mending good the damages etc. all complete as per
direction of the Engineer in-charge.

Page 81 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.8.5 Supplying, fitting and fixing basin on the granite counter including making holes set 4 32,726.70 130,907
wherever required , fitting in position on the counter and mending good the
damages and supplying fitting fixing the same in position with C.I brackets,
including supplying faucet ,Waste , Bottle trap, stop valve etc. all complete as per
direction of the Engineer-in -charge.

5.1.8.6 Supplying, fitting and fixing hand dryer including making holes in walls and mending each 2 14,647.50 29,295
good the damages.

5.1.9 Furniture
5.1.9.1 Supplying, fitting and fixing Art work on wall including costing of fitting, fixing all set 4 8,370.00 33,480
necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

5.1.9.2 Supplying, fitting and fixing 6mm thick mirror on 6mm thick ply wood on hard wood sqm 5 16,740.00 83,700
backing and mending good the damages etc. complete in all respect as per desig n
and drawing

5.1.10 Lighting fixtures & Electrical Accessories


5.1.10.1 Supplying, fitting and fixing wall bracket including making holes in walls and set 4 3,069.00 12,276
mending good the damages etc. all complete as per direction of the Engineer-in
-charge.

Page 82 of 273
RESTAURANTS
BILL OF QUANTITIES
BILL NO.2.1 - RESTAURANTS
5.1.10.2 Supplying, fitting and fixing of Dawn Light as per Design, Technical Specification set 7 1,674.00 11,718
and instruction of the Engineer, complete in all respect.

5.1.10.3 Supplying, fitting and fixing of Speaker as per Design, Technical Specification and set 2 5,301.00 10,602
instruction of the Engineer, complete in all respect.

5.1.10.4 Supplying, fitting and fixing of cold cathode tube Indirect Light as per Design, set 20 9,486.00 189,720
Technical Specification and instruction of the Engineer, complete in all respect.

5.1.10.5 Supplying, fitting and fixing of Exhaust Grille as per Design, Technical Specification set
and instruction of the Engineer, complete in all respect.

5.1.10.6 Supplying, fitting and fixing of Supply Air Grille as per Design, Technical set
Specification and instruction of the Engineer, complete in all respect.

Sub total 1,956,540

Page 83 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner


1 GENERAL KITCHEN
1.1.2 Ceiling 0
1.1.2.1 Supplying fitting and fixing of 15 mm thick gypsum board laminated by mechanical hot press with sqm 20 1,481.49 29,630
cement plaster paste and fixed to wood frame suspended from ceiling maintaining straight lines and
desired finished level at bottom face with vertical wooden strut as required in/c making holes in
slabs, or beams by electric drill machine and mending good the damages, if any, during execution of
the work in/c cost of all materials accessories scaffoldings, labour for installation, screws, nails, etc
all complete as per drawing design and direction ot the Engineer in-charge.

0
1.1.2.2 Supplying fitting and fixing of 15 mm thick water proof gypsum board laminated by mechanical hot sqm 27 1,544.73 41,708
press with cement plaster paste and fixed to wood frame suspended from ceiling maintaining straight
lines and desired finished level at bottom face with vertical wooden strut as required in/c making
holes in slabs, or beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for installation,
screws, nails, etc all complete as per drawing design and direction ot the Engineer in-charge.

0
1.1.2.3 Emulsion painting of approved quality and color to exposed ceilings two coats over a coat of primer sqm 493 86.49 42,640
or sealer including cleaning, sand papering the surface and necessary scaffolding etc. all completerin
all floors.

Page84 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
0
1.1.2.4 Supplying fitting and fixing insulation layer and mending good the damages, if any, during execution sqm 98 0
of the work in/c cost of all materials accessories scaffoldings, labour for installation, screws, nails, etc
as per design drawing and direction ot the Engineer in-charge.

0
1.1.3 Wall & Wall Finishing 0
1.1.3.1 Light weight block wall with cement mortar ( 1: 4 ) and making bond with connected walls in/c 0
necessary scaffolding, raking out joints, cleaning and washing out sand curing at least for 7 days in
all floors.

1) Ground Floor sqm 803 1,129.95 907,350


0
1.1.3.2 Minimum 12mm thick cement plaster (1:6) to wall inner/outer surface, finishing the corner and 0
edges in/c washing of sand cleaning the surface, scaffolding and curing at least for 7 days etc. all
complete as per direction of the Engineer in charge.

1) Ground Floor sqm 1,110 91.14 101,165


0
1.1.3.3 Painting to walls and columns two coats with Acrylic paint of best quality and approved colour over sqm 1,110 86.49 96,004
a coat of priming including cleaning finishing and polishing with sand paper and necessary
scaffolding etc. all complete in all floors.

0
1.1.3.4 Supplying. Fitting and fixing of Laminated curtain glass wall with Aluminium mullion complete in all sqm 39 17,437.50 680,063
respect as per drawing and direction of the Engineer in-charge.
0
1.1.4 Skirting & Nosing 0

Page85 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
1.1.4.1 Supplying, fitting and fixing 300x100 mm RC curb nosing of approved quality and shape including rm 37 571.95 21,162
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per drawing and
direction of the Engineer in-charge.

0
1.1.5 Floor & Floor Finishing 0
1.1.5.1 Supplying and laying non slip epoxy finishing in proper way and finishing with care etc. all complete sqm 602 4,185.00 2,519,370
as per direction of the Engineer in-charge.
0
1.1.5.2 Supplying, fitting and fixing glazed ceramic floor tiles on 20 mm thick cement mortar (1:3) base and sqm 45 1,292.70 58,172
raking out the joints with white cement including cutting and laying tiles in proper way and finishing
with care etc. all complete as per direction of the Engineer in-charge.

0
1.1.5.3 Supplying and laying Polyurethane floor finishing in proper way and finishing with care etc. all sqm 98 4,743.00 464,814
complete as per direction of the Engineer in-charge.
0
1.1.6 Miscellaneous 0
1.1.6.1 Supplying and fabrication and intalling steel grating cover one gutter including painting as per rm 5 2,790.00 13,950
drawing and direction of the Engineer in-charge.
0
0
0
1.1.7 Steel Doors 0

Page86 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
1.1.7.1 Supplying, fitting and fixing of Stainless Steel doors with Stainless Steel frame, glass panel with 0
enamel painting including all accessories like steel bolts, stainless steel hinge, handle, door stoper
etc. complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 1900mm sqm 16 6,975.00 111,600


2) size : 2,050 mm x 1000mm sqm 2 6,975.00 13,950
3) size : 2,050 mm x 1000mm sqm 7 6,975.00 48,825
4) size : 2,050 mm x 1600mm sqm 4 6,975.00 27,900
0
1.1.7.2 Supplying, fitting and fixing of Stainless Steel doors with Stainless Steel frame, steel panel with 0
enamel painting including all accessories like steel bolts, stainless steel hinge, handle, door stoper
etc. complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 1000mm sqm 2 6,975.00 13,950


0
1.1.7.3 Supplying, fitting and fixing of Stainless Steel doors with Stainless Steel frame, steel panel insulation 0
inside and enamel painting including all accessories like steel bolts, stainless steel hinge, handle,
door stoper etc. complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 1000mm sqm 11 6,975.00 76,725


0

Page87 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
1.1.7.4 (c) Supplying, fitting and fixing in Stainless Steel door frame with distortion free 6 mm thick clear float sqm 20 6,975.00 139,500
glass foreign made and of approved quality and shade including costing of fitting, fixing all
necessary accessiories etc. complete in all respect as per drawing and direction of the Engineer in-
charge.

0
1.1.8 Aluminium Doors 0
1.1.8.1 (a) Supplying, fitting and fixing of Aluminium composite sliding doors with fixed partition as per the 0
U.S. Architectural Aluminium Manufacturere's Association (AAMA) standard specification having wall
frame ( size 2"x4"), section of all Aluminium members will be anodized to Aluminium Bronze/Silver
colour with a coat not less than 15 micrones in thickness and density of 4mg per square cm etc.
including all accessories hinge,handel, locks, floor spring, door closer, rib glass, glass fitting etc.
keeping provision for fitting 6 mm thick clear float glass panel including neoprene, sealant etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 1600mm sqm 4 3,744.18 14,977


0
(b) Supplying, fitting and fixing of Aluminium composite swing doors with fixed partition as per the 0
U.S. Architectural Aluminium Manufacturere's Association (AAMA) standard specification having wall
frame ( size 2"x4"), section of all Aluminium members will be anodized to Aluminium Bronze/Silver
colour with a coat not less than 15 micrones in thickness and density of 4mg per square cm etc.
including all accessories hinge,handel, locks, floor spring, door closer, rib glass, glass fitting etc.
keeping provision for fitting 6 mm thick clear float glass panel and 6mm reflective glass transom
including neoprene, sealant etc. complete in all respect as per drawing and direction of the Engineer
in-charge.

Page88 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
1) size : 2,050 mm x 1600mm sqm 3 3,744.18 11,233
0
(c) Supplying, fitting and fixing in Aluminium door frame with distortion free 6 mm thick clear float sqm 6 1,636.80 9,821
glass foreign made and of approved quality and shade including costing of fitting, fixing all
necessary accessiories etc. complete in all respect as per drawing and direction of the Engineer in-
charge.

0
0
0
0
0
0
0
0
1.1.9 Aluminium Windows 0
1.1.9.1 (a) Supplying, fitting and fixing of Aluminium composite opening windows D932 as per the U.S. 0
Architectural Aluminium Manufacturere's Association (AAMA) standard specification having wall
frame, section of all Aluminium members will be anodized to Aluminium Bronze/Silver colour with a
coat not less than 15 micrones in thickness and density of 4mg per square cm etc. including all
accessories adjustable hinge,handel, locks etc. keeping provision for fitting 12.38 mm thick tempered
glass panel including neoprene, sealant etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

1) size : 1,150 mm x 2,300mm sqm 3 3,744.18 11,233


2) size : 1,150 mm x 3,300mm sqm 4 3,744.18 14,977

Page89 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
3) size : 1,150 mm x 2,300mm sqm 3 3,744.18 11,233
4) size : 1,150 mm x 1,700mm sqm 2 3,744.18 7,488
5) size : 1,150 mm x 850mm sqm 2 3,744.18 7,488
6) size : 1,150 mm x 2,900mm sqm 7 3,744.18 26,209
7) size : 1,150 mm x 3,500mm sqm 8 3,744.18 29,953
- 0
1.1.9.2 (b) Supplying, fitting and fixing in Aluminium window frame with distortion free 6 mm thick clear float sqm 25 1,841.40 46,035
glass foreign made and of approved quality and shade including costing of fitting, fixing all
necessary accessiories etc. complete in all respect as per drawing and direction of the Engineer in-
charge.

Sub total 5,599,123


0
2 CIAO KITCHEN 0
2.1.2 Ceiling 0
2.1.2.1 Supplying fitting and fixing of 12 mm thick water proof gypsum board laminated by mechanical hot sqm 20 1,544.73 30,895
press with cement plaster paste and fixed to wood frame suspended from ceiling maintaining straight
lines and desired finished level at bottom face with vertical wooden strut as required in/c making
holes in slabs, or beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for installation,
screws, nails, etc all complete as per drawing design and direction ot the Engineer in-charge.

0
2.1.3 Wall & Wall Finishing 0

Page90 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
2.1.3.1 90 mm thick Concrete block wall in cement mortar ( 1: 4 ) and making bond with connected walls 0
in/c necessary scaffolding, raking out joints, cleaning and curing at least for 7 days in all floors.( F.M.
of sand = 1.2)

1) Ground Floor sqm 74 291.56 21,575


0
2.1.3.2 Minimum 12mm thick cement plaster (1:6) to wall inner surface, finishing the corner and edges in/c 0
washing of sand cleaning the surface, scaffolding and curing at least for 7 days etc. all complete as
per direction of the Engineer in charge.

1) Ground Floor sqm 150 91.14 13,671


0
2.1.3.3 Painting to walls and columns two coats with Acrylic paint of best quality and approved colour over sqm 150 86.49 12,974
a coat of priming including cleaning finishing and polishing with sand paper and necessary
scaffolding etc. all complete in all floors.

0
2.1.3.4 Supplying, fitting and fixing 25mm thick timber frame panel all complete as per direction of the sqm 46 13,671.00 628,866
Engineer in-charge.
0
2.1.4 Floor & Floor Finishing 0
2.1.4.1 Supplying, fitting and fixing ceramic floor tiles on 20 mm thick cement mortar (1:3) base and raking sqm 20 1,292.70 25,854
out the joints with white cement including cutting and laying tiles in proper way and finishing with
care etc. all complete as per direction of the Engineer in-charge.

0
2.1.5 Windows 0

Page91 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
2.1.5.1 Supplying, fitting and fixing of Aluminium composite fixed windows with fixed partition as per the U.S. 0
Architectural Aluminium Manufacturere's Association (AAMA) standard specification having wall
frame, section of all Aluminium members will be anodized to Aluminium Bronze/Silver colour with a
coat not less than 15 micrones in thickness and density of 4mg per square cm etc. including all
accessories handel, locks,bolts etc. keeping provision for fitting 6 mm thick clear glass panel
including neoprene, sealant etc. complete in all respect as per drawing and direction of the Engineer
in-charge.

1) size : 1,550 mm x 1,200mm sqm 3 2,828.13 8,484


2) size : 1,550 mm x 400mm sqm 2 2,828.13 5,656
Sub total 747,975
0
3 KITCHEN EQUIPMENT 0
3.1 GENERAL 0
3.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, detaching, ls 1 279,000.00 279,000
removing, cleaning, patching, keeping provision for following construction/finishing processes, etcs
all complete and instruction of the Engineer-in-charge.

0
3.2 MAIN PREPARATION 0
3.2.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the 0
damages etc. complete in all respect.
Cold storage 9,519,860
PR-01 4-tier slatted shelf lot 1
PR-02 Walk-in freezer w/system (meat) set 1
PR-03 Walk-in freezer w/system(seafood) set 1
Page92 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PR-04 4-Tier slatted shelf lot 1
PR-05 Walk-in chiller w/system set 1
PR-06 Walk-in chiller w/system (daily product) set 1
PR-07 4-Tier slatted shelf lot 1
PR-08 Walk-in chiller w/system (daily use) set 1
PR-09 4-Tier slatted shelf lot 1

Dry food storage 5,388,600


PR-10 Wooden platform each
PR-11 4-Tier plain shelf each
PR-12 4-Tier plain shelf each
PR-13 4-Tier plain shelf each

Butchery room
PR-14 Vacumm machine each 1
PR-15 Work top tabel w/under shelf each 1
PR-16 Smoke oven and mending each 1
PR-17 Equipment stand each 1
PR-18 Potato peeler each 1
PR-19 Mobile waste plastic bin each 1
PR-20 Fish sink each 1
PR-21 Work top table w/ under shelf each 1
PR-22 Mear chopper each 1
PR-23 Work top table w/ under shelf each 1

Page93 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PR-24 Meat slicer each 1
PR-25 Meat saw each 1
PR-26 Sink table each 1
PR-27 Food processor each 1
PR-28 Work top table w/ under shelf each 1
PR-29 Wall shelf each 1
PR-30 Double sink table each 1
PR-31 Work top table w/ under shelf each 1
PR-32 Work top table w/ under shelf each 1
PR-33 Spare item each 1
PR-34 Chopping block w/stand each 2

Vegetable & fruit preparation 1,026,400


PR-35 Double sink table each 1
PR-36 Work top table w/ under shelf each 1
PR-37 Work top table w/ under shelf each 1
PR-38 Wall shelf each 1
PR-39 Wink table each 1
PR-40 Work top table w/ under shelf each 1
PR-41 Food processor each 1
PR-42 Sink table each 1
PR-43 Wall shelf each 1
PR-44 Sink table each 1
PR-45 Spare item each

Page94 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PR-46 Spare item each

Production kitchen 22,131,750


Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
PK-01 Reel-kleen retractable hose reel and spray, T&S B-1403 each 1
PK-02 Double shell hood (duct and blower N.I.C) each 1
PK-03 Kachi biriani range each 5
PK-04 Spare item each
PK-05 high cabinet w/hinge door each 2
PK-06 high cabinet w/hinge door each 1
PK-07 2- HI. stock pot stove each 1
PK-08 Griddle each 1
PK-09 double shell hood (duct and blower N.I.C) each 1
PK-10 gas free standing fryer, Zanussi HFR/G 810 each 3
PK-11 table each 1
PK-12 Spare item each
PK-13 mobile work top table each 4
PK-14 Spare item each
PK-15 combi. oven (10x 1/1 GN.),Convotherm OCS 20.10 each 1
PK-16 tilting fry pan 40 gal. (gas) each 2
PK-17 tilting kettle40 gal.(gas) each 2
PK-18 Spare item each
PK-19 double shell hood (duct and blower N.I.C) each 1

Page95 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PK-20 Blast chiller each 2
PK-21 gas convection oven (double section) each 2
PK-22 double shell hood (duct & blower NIC) each 1
PK-23 mobil 4-tier plain shelf each 1
PK-24 grease trap each 1
PK-25 3-compartment sink table w/ port rail each 1
PK-26 4-tier slatted shelf each 1

Room service 1,693,560


Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
RS-01 sink unit each 1
RS-02 work top table w/ under shelf each 1
RS-03 wall shelf each 1
RS-04 room service cart each 4
RS-05 2-clear glass door upright refrigerator each 1
RS-06 ice cube machine w/bin (300 kg/ 24 hr.), Icematic N-300M each 1
RS-07 ice flake machine w/bin (300 kg/ 24 hr.), Icematic F-300M each 1
RS-08 water filter, Ametex PS-C1 each 2

Banquet Area 2,950,900


Supplying, fitting and fixing kitchen equipment and mending good the damages etc. all complete as
per direction of the Engineer in-charge.
BP-01 Warming banquet trolley (for 1/1GN) each 10

Page96 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
BP-02 Mobile work top table w/ under shelf each 12
BP-03 Mobile 4-tier plain shelf each 3
BP-04 Spare item each

3.3 MAIN KITCHEN / GROUND FLOOR


3.3.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
Cooking area 6,517,640
MK-01 4-Door upright refrigerator each 1
MK-02 Sink cabinet each 1
MK-03 Wall shelf each 1
MK-04 2-Door refrigerator base each 1
MK-05 Wall shelf each 1
MK-06 Nan-oven each 1
MK-07 Grease trap each 1
MK-08 Double sink table w/pot rail each 1
MK-09 4-tier slatted shelf each 1
MK-10 Work top table w/ under shelf each 2
MK-11 1-Kawali range w/ blower each 1
MK-12 2-Chinese range each
MK-13 1-HI. stock pot stove each
MK-14 3-Chinese range each 1
MK-15 2-HI. stock pot stove each 1

Page97 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
MK-16 3-Deck rice cooker (gas) each 1
MK-17 Griddle each 1
MK-18 Double shell hood ( duct and blower N.I.C ) each 1
MK-19 Gas convection oven (double full featured) each 1
MK-20 Spare item each
MK-21 HI. stock pot stove each 1
MK-22 Char-broiler, Zanussi HG/G 800 each 1
MK-23 Deep fat fryer each 1
MK-24 Work top table each 1
MK-25 Griddle (free standing) each 1
MK-26 The front-fried spectro-heat hot top each 1
MK-27 4-Open burner w/oven each 1
MK-28 Spare item each
MK-29 Gas ceramic broiler each 1
MK-30 Work top table each 1
MK-31 Hand sink w/soap dispenser each 3

Pick up counter 1,059,758


MK-32 Warming plate cabinet each 1
MK-33 Over height shelf each 1
MK-34 Banimarie cabinet each 1
MK-35 Infrared each 1
MK-36 Open cabinet each 3
MK-37 2-Door refrigerator base each 1

Page98 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
MK-38 Open cabinet each 1
MK-39 Over high shelf each 1
MK-40 Serving cabinet each 1
MK-41 Wall shelf each 1
MK-42 Sink cabinet each 1
MK-43 4-Door upright refrigerator each 1
MK-44 2-Door uprise freezer each 1
MK-45 Spare item each
MK-46 Spare item each

Order taker 102,640


MK-47 Wall shelf each 1
MK-48 Sink cabinet each 1
MK-49 Spare item each
MK-50 Spare item each

Cold kitchen 1,206,020


MK-51 Juice extractor each 1
MK-52 Sandwich unit each 1
MK-53 Converyer toaster (14 slices) each 1
MK-54 Open cabinet each 1
MK-55 Ice-cream cabinet, Songserm SGF-320 AY each 1
MK-56 Open cabinet each 1
MK-57 Open cabinet each 1

Page99 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
MK-58 Wall shelf each 1
MK-59 Sink cabinet each 1
MK-60 4-Door upright refrigerator each 1
MK-61 Contract grill each 1
MK-62 - each

Bar 667,160
MK-63 Pickup shelf each 2
MK-64 Spare item each
MK-65 Open cabinet each 1
MK-66 Bar blender, Hamilton beach # 908 each 1
MK-67 Cocktail unit each 1
MK-68 Coffee brewer, Cecil ware C-2002 each 1
MK-69 Spare item each
MK-70 Open cabinet each 1
MK-71 Beverage stand each 1
MK-72 Espresso machine w/grinder each 1
MK-73 Wall shelf each 1
MK-74 Sink cabinet each 1
MK-75 Wine refrigerator each 1
MK-76 4-Door upright refrigerator each 1
MK-77 Wine refrigerator (white) each 1
MK-78 Spare item each

Page100 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
Wash up area 3,618,060
MK-79 Mobile waste plastic bin each 1
MK-80 Grease trap each 1
MK-81 Soiled dish table w/pre-rinse faucet , T&S B-113 + B-109 each 1
MK-82 Vantilator ( duct & blower N.I.C ) each 1
MK-83 Conveyor dish washer ( 234 racks /hr ), Hobart C54 each 1
MK-84 Clean dish table w/rack shelf each 1
MK-85 4-Tier slatted shelf each 1
MK-86 4-Tier slatted shelf each 5
MK-87 4-Tier slatted shelf each 2
MK-88 4-Tier slatted shelf each 1
MK-89 Electric booster each 1

Service Station 744,140


MK-90 Beverage stand w/sink, ice bin each 1
MK-91 Water boiler 16.3 ltr. "Westbend" 100 cpus each 2
MK-92 Open wall cabinet each 1
MK-93 Open cabinet each 1
MK-94 Bun warmer ( 2 drawer ) each 1
MK-95 Spare item each
MK-96 Spare item each
MK-97 Spare item each

3.4 BANQUET PANTRY

Page101 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
3.4.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
Service station 1,708,956
BK-01 Sink cabinet w/ice bin each 1
BK-02 Open wall cabinet each 1
BK-03 Beverage station each 1
BK-04 Coffee urn Cecilware CL-100 each 1
BK-05 Mobile table with under shelf each 2
BK-06 Ice cube machine w/ice bin (300 kg/ 24 hr.), Icematic N-300M each 2
BK-07 Water filter, Ametex PS-C1 each 2
BK-08 Spare item each
BK-09 Spare item each

Wash up area 3,392,252


BK-10 4-Tier slatted shelf each 3
BK-11 Clean dish table w/ rack shelf each 1
BK-12 Conveyor dish washer (142racks/24hr.), Zanussi RT-142 EA each 1
BK-13 Ventilator (duct & blower N.I.C) each 1
BK-14 Soiled dish table w/pre-rinse faucet T&S B-113+B109 each 1
BK-15 -
BK-16 Mobile waste plastic bin each 1
BK-17 Electric booster each 1

3.5 NEW PASTRY

Page102 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
3.5.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
Confectionary Room 12,203,896
BA-01 Grease trap each 1
BA-02 Double sink table w/pot rail each 1
BA-03 4-Tired slated shelf each 1
BA-04 Spare item each
BA-05 Sough shelter(floor stand), "Rondo" Ecomat sso 615 each 1
BA-06 Dough khender "VMI" 1030 V each 1
BA-07 Mixer/blender with reduction; 40/20L "VMI" PH 401 each 1
BA-08 Scale 8kg."DIGI" DS-425 each 1
BA-09 Mobile flour bin each 3
BA-10 Wooden top table each 1
BA-11 Semi-automatic divider and rounder "DAUB" DR-63 each 1
BA-12 Mobile table each 1
BA-13 Mixer 5 qt. "Kitchen Aids" K5SS each 1
BA-14 2-Door refrigerator base (Granite top by ID) each 2
BA-15 Open cabinet (Granite top by ID) each 1
BA-16 Open cabinet (Granite top by ID) each 1
BA-17 Bakery trolley each 4
BA-18 Wall shelf each 1
BA-19 Sink cabinet each 1
BA-20 4-Door upright refrigerator each 1
BA-21 Icecream machine w/pasteurization "Tayler" 220 each 1

Page103 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
BA-22 Chocolated melter "Effector" F1 each 1
BA-23 Walk-in cold room w/system set 1
BA-24 4-Tired slated shelf lot 2
BA-25 Walkin freezer w/ system each 1
BA-26 4-Tired slated shelf lot 1

Bake Room 5,573,352


BA-27 Double shell hood (duct & boiler NIC) each 1
BA-28 Bake oven (3deck) "Salva" ED3118-2 each 1
BA-29 Retarder proover "Panem" AA 20V each 1
BA-30 1-HI pressure range each 1
BA-31 Double shell hood (duct & blower NIC) each 1
BA-32 Double shell hood (duct & blower NIC) each 1
BA-33 Spare item each
BA-34 Gas convection oven (double section) each 1

Deli Bakery 1,370,244


BA-35 2-Door refrigerator base each 2
BA-36 Espresso machine w/grider each 1
BA-37 Hand sink w/soap dispenser each 1
BA-38 Bakery showcase (ref.) each 3
BA-39 Sink cabinet each 1
BA-40 Open cabinet each 1
BA-41 Open cabinet each 1

Page104 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
Dispenser Bar

3.6 SHOW KITCHEN/GROUND FLOOR 200,148


3.6.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.

Salad/Cold cut 603,010


SK-01 Juice dispenser (3-bowl) "Corfrimell" Cof-360 each 1
SK-02 Conveyor toaster (14 slices) "Hatco" TQ-800 each 1
SK-03 Spare item each
SK-04 Spare item each
SK-05 Cold pan without system each 1
SK-06 Soap warmer w/2-container cap, 11ltr., "Vollarth" set 1
SK-07 Spare item each
SK-08 Spare item each
SK-09 Spare item each
SK-10 Spare item each
SK-11 Spare item each

Continental cousine 5,247,470


SK-12 Sink Cabinet each 1
SK-13 Spare item each
SK-14 Spare item each
Page105 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
SK-15 4-Drawer & 1-door refrigerator base each 3
SK-16 SS.supported each 1
SK-17 Salamander, "Garland" MSSR 16 each 1
SK-18 Spare item each
SK-19 Sink cabinet each 1
SK-20 Tandori oven each 1
SK-21 Char-boiler, "Garland" GD-30 RB each 1
SK-22 2-HI pressure range each 1
SK-23 Deep fat fryer, "Garland" GD-30 RB each 2
SK-24 Low table each 1
SK-25 Griddle , "Garland" GD-24 G each 1
SK-26 Table each 1
SK-27 4-Open burner w/oven, "Garland" S28 each 1
SK-28 Double shell hood (duct & blower N.I.C) each 1
SK-29 Pasta cooker,Zanussi PCPG 700 each 1
SK-30 Double shell hood (duct & blower N.I.C) each 1
SK-31 Work top table w/undershelf each 1
SK-32 Double shell hood (duct & blower N.I.C) each 1
SK-33 Chiefing dish w/heating element dia. 400 mm., "Seagul" each 10
SK-34 Warming plate dispenser (for plate dia.11") each 2
SK-35 Filter top each 1
SK-36 Spare item each

Japanese cousine 333,580

Page106 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
SK-37 2-Door refrigerator base each
SK-38 Sushi show case "Jinli" G150L each
SK-39 Spare item each
SK-40 Filter top each
SK-41 Sushi show case "Jinli" G150L each
SK-42 Fish sink w/chopping board each
SK-43 Filter top each
SK-44 Open cabinet each
SK-45 Open cabinet each
SK-46 Corner table each
SK-47 Filter top each
SK-48 2-Door refrigerator base (L=1.50m.) each
SK-49 Sink cabinet each
SK-50 Cold pan without system each 1
SK-51 Ice cream cabinet w/ dripper well faucet (FW-510) each 1
SK-52 Juice Dispenser each 1
SK-53 Spare item each

3.7 SPORTS BAR 1,213,718


3.7.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
SB-01 Bottle cooler each 1
SB-02 Coffee brewer, Cecil ware C-2002 each 1
SB-03 Cocktail unit each 1

Page107 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
SB-04 Bar blender "Hamilton beach" #908 each 2
SB-05 2-Door refrigerator base each 1
SB-06 Bottle cooler each 1
SB-07 Filler top each 1
SB-08 Cocktail unit each 1
SB-09 Filler top each 1
SB-10 Glass washer (under counter), Zanussi LS 6 EP each 1
SB-11 Double sink cabinet each 1
SB-12 Espresso machine w/grinder each 1
SB-13 Spare item each

3.8 PACIFIC LOUNGE


3.8.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
Bar 882,704
PB-01 2-Door refrigerator base each 1
PB-02 Espersso machine w/grinder each 1
PB-03 Bar blender each 1
PB-04 Filter top each 1
PB-05 Cocktail unit each 1
PB-06 Veberage stand each 1
PB-07 Filter top each 1
PB-08 Bottle cooler each 1
PB-09 Open cabinet each 1

Page108 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PB-10 Double sink cabinet each 1
PB-11 Spare item each
PB-12 Spare item each
PB-13 Spare item each

Pacific Pantry 1,603,750


Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
PP-01 Open cabinet each 1
PP-02 4-Gas top range w/elec.oven ,"Teka" E/60.24G A1,HI 735 each 1
PP-03 Frame cabinet for range each 1
PP-04 Double shell hood (duct & blower NIC) each 1
PP-05 Microwave oven 800 watts, "Teka" TMW20.1 BI S each 1
PP-06 Sink cabinet each 1
PP-07 Wall shelf each 1
PP-08 2-Door upright refrigerator each 1
PP-09 Spare item each
PP-10 Spare item each
PP-11 Wall shelf each 1
PP-12 Open cabinet each 1
PP-13 Spare item each
PP-14 Spare item each
PP-15 Mobile waste plastic bin each 1
PP-16 Sink table each 1

Page109 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
PP-17 Dish washer (600 plates/hr) each 1
PP-18 Spare item each
PP-19 Wall shelf each 1
PP-20 Ice cube machine w/bin (300kg/24 GH), "Icematic" N-300M each 1
PP-21 Water filter,"Ametex" PS-C1 each 1
PP-22 4-Tier slatted shelf ' each 1
PP-23 Spare item each
PP-24 Spare item each
PP-25 Spare item each

3.9 NEW CIAO 4,015,790


3.9.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
NC-01 Open cabinet ' each 1
NC-02 Spare item each
NC-03 Filler top ' each 1
NC-04 Sink cabinet ' each 1
NC-05 4-Door upright refrigerator each 1
NC-06 Wall shelf each 1
NC-07 Spare item each
NC-08 4-Tier slatted shelf each 2
NC-09 Clean dish table w/ rack shelf each 1
NC-10 Ventilator (duct & blower N.I.C) each 1
NC-11 Dish washer, "Hobart" AM-2 each 1

Page110 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
NC-12 Mobile waste plastic bin each 1
NC-13 Soiled dish table w/sink,pre-rinse T&S B-113+B-109 each 1
NC-14 Open cabinet each 1
NC-15 Salamander, "Garland" MSSR16 each 1
NC-16 SS. supported each 1
NC-17 Spare item each
NC-18 Spare item each
NC-19 Pizza oven each 1
NC-20 4-Drawer refrigerator base each 1
NC-21 Sink cabinet each 1
NC-22 Filler top each 1
NC-23 Exhaust hood (duct & blower N.I.C) each 1
NC-24 Deep fat fryer"Garland" GD-15F each 1
NC-25 Char boiler "Garland" GD-18 RB each 1
NC-26 Griddle "Garland" GD-15G each 1
NC-27 Shwo low table each 1
NC-28 Paster cooker "Zanussi" PCPG 700 each 1
NC-29 4-Open burner w/oven "Garland" GD-15G each 1
NC-30 Filler top each 1
NC-31 4-Drawer refrigerator base w/sink each 1
NC-32 Sandwich unit w/chopping block each 1
NC-33 2-Door refrigerator base w/granite top each 1
NC-34 Spare item each

Page111 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
3.10 JHARNA 2,822,600
3.10.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
J-01 Combi. Oven (6x1/1GN), "Convotherm" OSC 6.10 each 1
J-02 Double shell hood ( duct & blower N.I.C ) each 1
J-03 Front-fried spectro-heat hot top "Garland" M 45R each 1
J-04 Salamander, "Garland" MSSR 16 each 1
J-05 SS.supported each 1
J-06 Griddle, "Garland" GD-15G each 1
J-07 Char-boiler "Garland" GD-18RB each 1
J-08 Low table each 1
J-09 Spare item each
J-10 1- HI. pressure range each 1
J-11 Equipment stand each 1
J-12 1-Door refrigerator base each 1
J-13 Warming lamp each 3
J-14 1-Door refrigerator base each 1
J-15 Work top table w/under shelf each 1
J-16 4-Door upright refrigerator each 1

Salad 251,468
J-17 1-Door refrigerator base w/sink each 1
J-18 Salad unit w/ chopping each 1
J-19 Spare item each

Page112 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN

Bar 243,770
J-20 1-Door refrigerator base each 1
J-21 Espresso machine w/grinder (1-group) each 1
J-22 Sink unit each 1
J-23 Ice bind cabinet w/speed rail each 1
J-24 Bar blender "Hamilton beach" #908 each 1
J-25 Filter top each 1

Wash up area 564,520


J-26 Wall shelf each 1
J-27 Dish washer (under counter) "Hobart" HX-30 each 1
J-28 Wall shelf each 1
J-29 Sink table each 1
J-30 Work top table w/under shelf each 1
J-31 Work top table w/under shelf each 1
J-32 Double wall shelf each 1
J-33 Open cabinet each 1

3.11 STAFF CANTEEN 1,159,832


3.11.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
Cooking area
Page113 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
ST-01 Double shell hood (duct & blower N.I.C) each 1
ST-02 3-Deck rice cooker "Comet" CRA-150 each 1
ST-03 4-Open burner w/oven "Garland" N 44R each 1
ST-04 Double shell hood (duct & blower N.I.C) each 1
ST-05 Tilting frypan 40 gal. (gas), "Crown" GTS 40 each 1
ST-06 Tilting frypan 30 gal. (gas), "Crown" GLT 30 each 2
ST-07 Working top table w/under shelf each 3
ST-08 Spare item each

Preparation area 230,940


ST-09 Spare item each
ST-10 Sink table each 1
ST-11 Grease trap each 1
ST-12 Wall shelf each 1
ST-13 2-Door upright refrigerator each 1
ST-14 Spare item each
ST-15 Spare item each

Wash up area 898,100


ST-16 4-Tier slatted shelf each 1
ST-17 Clean dish table w/rack shelf each 1
ST-18 Ventilator ( duct & blower I.N.C ) each 1
ST-19 Dish washer,"Hobart" AM-2 each 1
ST-20 Soiled dish table w/sink, over rack shelf, pre-rinse "T&S" B-113 + B-109 each 1

Page114 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
ST-21 Mobile wash plastic bin each 1
ST-22 Spare item each
ST-23 Spare item each

Serving counter 718,480


ST-24 5-Food warmer w/ sneeze guard each 1
ST-25 Work top table/under shelf,sneeze guard each 1
ST-26 Ice bin cabinet each 1
ST-27 Ice well (without system) each 1
ST-28 Tray slide each 1
ST-29 Traffic rail each 1
ST-30 Cutlery stand each 1
ST-31 Water boiler 16.3 ltr. "Westbend" each 2
ST-32 Spare item each

3.12 NEW MEETING PANTRY/2ND FLOOR 461,880


3.12.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
MP-01 Work top table w/under shelf each 3
MP-02 Work top table w/under shelf each 1
MP-03 Spare item each
MP-04 Mobile work top table w/under shelf each 2
MP-05 Beverage stand w/ice bin each 1
MP-06 Wall shelf each 1

Page115 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
MP-07 Coffee brewer, "Cecilware" C-2002 each 1
MP-08 Spare item each
MP-09 Spare item each

3.13 POOL DECK-CIAO RESTAURANT 461,880


3.13.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
PB-01 Sink cabinet each 1
PB-02 Bar blender, "Hamilton Beach" #908 each 1
PB-03 Espresso machine each 1
PB-04 2-Door refrigerator base each 1
PB-05 Cocktail unit each 1
PB-06 Bootle cooler w/sink each 1
PB-07 Spare item each
PB-08 Spare item each

3.14 AIR LINE CREW LOUNGE 315,618


3.14.1 Supplying, fitting and fixing kitchen equipment as per design and drawings and mending good the
damages etc. complete in all respect.
AR-01 Open cabinet each 1
AR-02 Microwave oven each 1
AR-03 Wall cabinet w/hinge door each 1
AR-04 Wall cabinet w/hinge door each 1
AR-05 Sink cabinet each 1

Page116 of 273
KITCHEN
BILL OF QUANTITIES
BILL NO.2.2 - KITCHEN
AR-06 Upright refrigerator (residential type) , 10Q each 1
AR-07 Spare item each
AR-08 Espresso machine each 1

Sub total 103,383,446

Page117 of 273
SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
BoQ IT RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

1 GENERAL
Demolising existing signs where if necessary including breaking, cutting, detaching, 1 93,000.00 93,000.00
removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and as per instruction of the
Engineer-in-charge.
0.00
2 INTERIOR SIGNAGE 0.00
Supplying, fitting and fixing interior signage including all necessary supports, fixtures, 0.00
fittings and electrical connections wiring where necessary as per design drawings and
specifications and mending good the damages etc. all complete as per direction of the
Engineer in-charge.
2.1 Ground Floor 0.00
2.1.1 General Signs 0.00
2.1.1.1 No smoking each 19 3,928.32 74,638.08
2.1.1.2 Security each 1 3,571.20 3,571.20
2.1.1.3 Laundry plant each 1 3,571.20 3,571.20
2.1.1.4 Emergency exit each 1 3,571.20 3,571.20
2.1.1.5 11000 V danger each 1 3,571.20 3,571.20
2.1.1.6 High voltage each 2 3,571.20 7,142.40
2.1.1.7 No staff Allowed to use elevator empty handed each 2 3,571.20 7,142.40
2.1.1.8 Assistant chief engineer each 1 3,571.20 3,571.20
2.1.1.9 Director technical services each 1 3,571.20 3,571.20
2.1.1.10 Exit each 9 11,904.00 107,136.00
2.1.1.11 Control Room each 1 3,571.20 3,571.20
2.1.1.12 Associates only each 5 3,571.20 17,856.00
2.1.1.13 Room services only each 1 3,571.20 3,571.20
2.1.1.14 Please keep cooler clean & tidy at all time each 1 3,571.20 3,571.20
2.1.1.15 Pull each 8 1,904.64 15,237.12
2.1.1.16 Push each 9 1,904.64 17,141.76
2.1.1.17 Team members only each 1 3,571.20 3,571.20
2.1.1.18 Ball room - I each 1 29,760.00 29,760.00
2.1.1.19 Ball room - II each 1 29,760.00 29,760.00
2.1.1.20 Ball room - III each 1 29,760.00 29,760.00

Page 118 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.1.1.21 Employees only each 2 3,571.20 7,142.40
2.1.1.22 Pan Pacific Sonargaon Khaka each 1 59,520.00 59,520.00
2.1.1.23 Rest rooms each 1 6,666.24 6,666.24
2.1.1.24 Ladies each 1 6,666.24 6,666.24
2.1.1.25 Gentlemen each 1 6,666.24 6,666.24
2.1.1.26 Café bazar each 1 59,520.00 59,520.00
2.1.1.27 Jharna each 1 59,520.00 59,520.00
2.1.1.28 Café bazar time plate each 1 20,236.80 20,236.80
2.1.1.29 Health Club Manager associates only each 1 3,571.20 3,571.20
2.1.1.30 Health Club Manager each 1 3,571.20 3,571.20
2.1.1.31 Main building each 1 35,712.00 35,712.00
2.1.1.32 Kiosk ( Open - 9 A.M. to 9 P.M. ) each 1 4,761.60 4,761.60
2.1.1.33 Aromaz each 1 59,520.00 59,520.00
2.1.1.34 Shopping bazar each 1 59,520.00 59,520.00
2.1.1.35 Memory signage of takashi hayakawa each 1 3,571.20 3,571.20
2.1.1.36 Shopping archade atrium building aromaz each 1 35,712.00 35,712.00
2.1.1.37 Shoe shine service day time each 1 3,571.20 3,571.20
2.1.1.38 House phone each 1 7,618.56 7,618.56
2.1.1.39 House telephone each 3 7,618.56 22,855.68
2.1.1.40 Registration each 1 11,427.84 11,427.84
2.1.1.41 Business centre each 1 29,760.00 29,760.00
2.1.1.42 Brand ( Pan Pacific Logo ) each 1 35,712.00 35,712.00
2.1.1.43 Concierge Limousine service each 1 11,427.84 11,427.84
2.1.1.44 Bell desk each 1 11,427.84 11,427.84
2.1.1.45 Pan Pacific Sonargaon Khaka (with Logo) each 1 59,520.00 59,520.00
2.1.1.46 Entrance each 2 3,571.20 7,142.40
2.1.1.47 Door closed / Pleased used lobby entrance each 1 3,571.20 3,571.20
2.1.1.48 Business hours (10a.m. - 7 p.m.) each 1 4,761.60 4,761.60
2.1.1.49 Aromaz each 1 35,712.00 35,712.00
2.1.1.50 Closed each 1 1,904.64 1,904.64
2.1.1.51 Courtyard medical centre each 1 35,712.00 35,712.00
2.1.1.52 Savvy / Barber & beauty 3rd. FL. each 1 16,189.44 16,189.44
2.1.1.53 For emergency please dial - '0' each 1 1,904.64 1,904.64
2.1.1.54 Ladies locker room each 1 6,666.24 6,666.24
2.1.1.55 Ladies only each 2 6,666.24 13,332.48
2.1.1.56 Ladies hours / 10 a.m. to 12 noon (Except week-ends holidays) each 3 4,761.60 14,284.80

Page 119 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.1.1.57 Please use locker door for entrance each 1 3,571.20 3,571.20
2.1.1.58 Pan Pacific Sonargaon Hotel / Health club / Gymnasium each 1 16,189.44 16,189.44
2.1.1.59 Today temperatures / Day temperature / Water temperature each 1 16,189.44 16,189.44
2.1.1.60 Gents locker room each 1 6,666.24 6,666.24
2.1.1.61 Steam bath each 1 6,666.24 6,666.24
2.1.1.62 Toilet each 1 6,666.24 6,666.24
2.1.1.63 Sauna each 1 6,666.24 6,666.24
2.1.1.64 For mutual interest please do not use medicine / menthol in the sauna. The each 1 4,285.44 4,285.44
2.1.1.65 - management 3,571.20 0.00
2.1.1.66 Please do no walk on floor with wet body. Thanks. each 2 3,571.20 7,142.40
2.1.1.67 Health club general information each 3 35,712.00 107,136.00
2.1.1.68 Gents massage room - 1 each 1 7,618.56 7,618.56
2.1.1.69 No mobile use each 1 3,571.20 3,571.20
2.1.1.70 Warning board each 1 20,236.80 20,236.80
2.1.1.71 Photos features ?? each 7 3,571.20 24,998.40
2.1.1.72 Savvy each 1 3,571.20 3,571.20
2.1.1.73 Safety each 4 3,571.20 14,284.80
2.1.1.74 Receiving each 1 3,571.20 3,571.20
2.1.1.75 Authorised person only each 1 3,571.20 3,571.20
2.1.1.76 Purchasing department each 1 3,571.20 3,571.20
2.1.1.77 suppliers only each 1 3,571.20 3,571.20
2.1.2 Directional Signs - 0.00
2.1.2.1 To elevators each 1 16,189.44 16,189.44
2.1.2.2 Swimming pool each 1 16,189.44 16,189.44
2.1.2.3 Health club each 1 16,189.44 16,189.44
2.1.2.4 Pool café each 1 16,189.44 16,189.44
2.1.2.5 Aromaz each 2 16,189.44 32,378.88
2.1.2.6 Elevators each 1 16,189.44 16,189.44
2.1.2.7 Jharna each 1 16,189.44 16,189.44
2.1.2.8 Café bazar each 1 16,189.44 16,189.44
2.1.2.9 Ball room each 1 16,189.44 16,189.44
2.1.2.10 Hotel Intl Ltd. each 1 16,189.44 16,189.44
2.1.2.11 Travel agents each 1 16,189.44 16,189.44
2.1.2.12 Airlines each 1 16,189.44 16,189.44
2.1.2.13 Banks each 1 16,189.44 16,189.44
2.1.2.14 Medical Center each 2 16,189.44 32,378.88

Page 120 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.1.2.15 Savvy each 1 16,189.44 16,189.44
2.1.2.16 ATM each 2 16,189.44 32,378.88
- 0.00
2.2 Second Floor - 0.00
2.2.1 General Signs - 0.00
2.2.1.1 Exit each 6 11,904.00 71,424.00
2.2.1.2 Gents room each 1 7,618.56 7,618.56
2.2.1.3 Please keep the shower room clean each 1 3,571.20 3,571.20
2.2.1.4 Please keep the toilet clean each 3 3,571.20 10,713.60
2.2.1.5 No smoking each 4 3,928.32 15,713.28
2.2.1.6 Don't site on the air conditioner each 1 3,571.20 3,571.20
2.2.1.7 Use rubber mat for boot polishing each 1 3,571.20 3,571.20
2.2.1.8 Please keep locker room clean each 1 3,571.20 3,571.20
2.2.1.9 Key standard operating procedure each 1 3,571.20 3,571.20
2.2.1.10 Please switch off your pager, mobile phone during prayer time. each 2 3,571.20 7,142.40
2.2.1.11 Ladies room each 1 7,618.56 7,618.56
2.2.1.12 Safety each 2 3,571.20 7,142.40
2.2.1.13 I am Pan Pacific / Associate of the month / Associate of the year each 1 16,189.44 16,189.44
2.2.1.14 Pull each 7 1,904.64 13,332.48
2.2.1.15 Push each 7 1,904.64 13,332.48
2.2.1.16 No smoking please each 3 3,928.32 11,784.96
2.2.1.17 Finance each 1 3,571.20 3,571.20
2.2.1.18 People innovation each 1 3,571.20 3,571.20
2.2.1.19 Education each 1 3,571.20 3,571.20
2.2.1.20 Room services only each 2 3,571.20 7,142.40
2.2.1.21 Please keep cooler clean & tidy at all time each 1 3,571.20 3,571.20
2.2.1.22 Team members only please each 1 3,571.20 3,571.20
2.2.1.23 Ciao (Neon sign) each 2 59,520.00 119,040.00
2.2.1.24 Ciao Restaurant / Open from 6.p.m daily each 1 4,761.60 4,761.60
2.2.1.25 Associates only each 1 3,571.20 3,571.20
2.2.1.26 Rest rooms each 2 7,618.56 15,237.12
2.2.1.27 Ladies each 2 7,618.56 15,237.12
2.2.1.28 Gentlemen each 2 7,618.56 15,237.12
2.2.1.29 Donate each 1 3,571.20 3,571.20
2.2.1.30 The balcony each 1 35,712.00 35,712.00
2.2.1.31 Sonali bank each 1 35,712.00 35,712.00

Page 121 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.2.1.32 Office located notice board each 1 20,236.80 20,236.80
2.2.1.33 Besure door is locked after leaving each 1 3,571.20 3,571.20
2.2.1.34 Elevator each 1 3,571.20 3,571.20
- 0.00
2.2.2 Directional Signs - 0.00
2.2.2.1 House keeping each 1 16,189.44 16,189.44
2.2.2.2 People innovation & education each 1 16,189.44 16,189.44
2.2.2.3 Finance each 1 16,189.44 16,189.44
2.2.2.4 Shapla each 1 16,189.44 16,189.44
2.2.2.5 Prayer room each 1 16,189.44 16,189.44
2.2.2.6 Nirala each 2 16,189.44 32,378.88
0.00
2.3 Third Floor 0.00
2.3.1 General Signs 0.00
2.3.1.1 Room services only each 1 3,571.20 3,571.20
2.3.1.2 Elevator each 7 3,571.20 24,998.40
2.3.1.3 Exit each 2 13,094.40 26,188.80
2.3.1.4 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.3.1.5 as exits. 3,571.20 0.00
2.3.1.6 Lobby 1 13,094.40 13,094.40
2.3.1.7 Crew lounge / Open daily 6a.m. - midnight each 2 59,520.00 119,040.00
2.3.1.8 Room number each 47 2,142.72 100,707.84
2.3.1.9 Floor number (3rd) each 1 7,618.56 7,618.56
0.00
2.3.2 Directional Signs 0.00
2.3.2.1 Room directional signage each 8 17,856.00 142,848.00
0.00
0.00
2.4 Fourth floor 0.00
2.4.1 General Signs 0.00
2.4.1.1 Room services only each 1 3,571.20 3,571.20
2.4.1.2 Elevator each 3 3,571.20 10,713.60
2.4.1.3 Exit each 2 11,904.00 23,808.00
2.4.1.4 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.4.1.5 as exits. each 1 3,571.20 3,571.20
2.4.1.6 Non smoking room each 4 3,928.32 15,713.28

Page 122 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.4.1.7 Room number each 50 2,142.72 107,136.00
2.4.1.8 Floor number (4th) each 1 7,618.56 7,618.56
0.00
2.4.2 Directional Signs 0.00
2.4.2.1 Room directional signage each 2 17,856.00 35,712.00
0.00
2.5 Fifth floor 0.00
2.5.1 General Signs 0.00
2.5.1.1 Room services only each 1 3,571.20 3,571.20
2.5.1.2 Elevator each 4 3,571.20 14,284.80
2.5.1.3 Exit each 2 11,904.00 23,808.00
2.5.1.4 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.5.1.5 as exits. each 1 3,571.20 3,571.20
2.5.1.6 Associates only each 1 3,571.20 3,571.20
2.5.1.7 Room number each 50 2,142.72 107,136.00
2.5.1.8 Floor number (5th) each 1 7,618.56 7,618.56
0.00
2.5.2 Directional Signs 0.00
2.5.2.1 Room directional signage each 2 17,856.00 35,712.00
0.00
2.6 Sixth floor 0.00
2.6.1 General Signs 0.00
2.6.1.1 Room services only each 1 3,571.20 3,571.20
2.6.1.2 Elevator each 4 3,571.20 14,284.80
2.6.1.3 Associates only each 13 3,571.20 46,425.60
2.6.1.4 Exit each 2 13,094.40 26,188.80
2.6.1.5 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.6.1.6 as exits. each 1 3,571.20 3,571.20
2.6.1.7 Non smoking room each 31 3,571.20 110,707.20
2.6.1.8 Room number each 50 2,142.72 107,136.00
2.6.1.9 Floor number (6th) each 1 7,618.56 7,618.56
- 0.00
0.00
2.6.2 Directional Signs 0.00
2.6.2.1 Room directional signage each 2 17,856.00 35,712.00
0.00

Page 123 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
2.7 Seventh Floor 0.00
2.7.1 General Signs 0.00
2.7.1.1 Room services only each 1 3,571.20 3,571.20
2.7.1.2 Elevator each 3 3,571.20 10,713.60
2.7.1.3 Exit each 1 13,094.40 13,094.40
2.7.1.4 Non smoking room each 12 3,928.32 47,139.84
2.7.1.5 Associates only each 1 3,571.20 3,571.20
2.7.1.6 Pacific floor 7th each 2 7,618.56 15,237.12
2.7.1.7 Pull each 1 1,904.64 1,904.64
2.7.1.8 Push each 1 1,904.64 1,904.64
2.7.1.9 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.7.1.10 Room number each 50 2,142.72 107,136.00
2.7.1.11 Floor number (7th) each 1 7,618.56 7,618.56
- 0.00
2.7.2 Directional Signs - 0.00
2.7.2.1 Room directional signage each 2 17,856.00 35,712.00
2.7.2.2 Pacific Lounge / 8th floor each 1 17,856.00 17,856.00
2.7.2.3 Pacific floor 7th each 2 17,856.00 35,712.00
2.7.2.4 Pacific Lounge each 1 17,856.00 17,856.00
0.00
2.8 Eighth Floor 0.00
2.8.1 General Signs 0.00
2.8.1.1 Exit each 1 11,904.00 11,904.00
2.8.1.2 Room services only each 1 3,571.20 3,571.20
2.8.1.3 Elevator each 4 3,571.20 14,284.80
2.8.1.4 Non smoking room each 3 3,928.32 11,784.96
2.8.1.5 Associates only each 1 3,571.20 3,571.20
2.8.1.6 Pacific floor / 8th each 1 7,618.56 7,618.56
2.8.1.7 Pacific floor each 1 7,618.56 7,618.56
2.8.1.8 Pull each 1 1,904.64 1,904.64
2.8.1.9 Push each 1 1,904.64 1,904.64
2.8.1.10 Pacific Lounge each 1 59,520.00 59,520.00
2.8.1.11 Evening cocktails / from 06:00 pm to 8:00 pm each 1 3,571.20 3,571.20
2.8.1.12 Elevators may not be used in the event of fire use stairwells which are marked each 1 4,285.44 4,285.44
2.8.1.13 Room number each 38 2,142.72 81,423.36
2.8.1.14 Floor number (8th) each 1 7,618.56 7,618.56

Page 124 of 273


SIGNAGE
BILL OF QUANTITIES
BILL NO.2.3- SIGNAGE
0.00
2.8.2 Directional Signs 0.00
2.8.2.1 Pacific Lounge each 1 17,856.00 17,856.00
2.8.2.2 Pacific floor / 8th floor each 1 17,856.00 17,856.00
Room directional signage each 2 17,856.00 35,712.00
Sub total 4,161,519

3 EXTERIOR SIGNAGE
Supplying, fitting and fixing Exterior signage including all necessary supports, fixtures,
fittings and electical connections, wiring where necessary as per design drawings and
specifications including all necessary structure and mending good the damages etc. all
complete as per direction of the Engineer in-charge.
3.1 Indicator Signs each 1 3,571.20 3,571.20
3.1.1 Neon sign board at the top of the Hotel each 3 1,380,864.00 4,142,592.00
3.1.2 Hotel name signage each 1 345,216.00 345,216.00
3.1.3 Car park each 1 47,139.84 47,139.84
0.00
3.2 Directional Signs 0.00
3.2.1 Tennis court / Squash court each 4 22,260.48 89,041.92
0.00
0.00
0.00
0.00
0.00
0.00
Sub total 4,627,561

Page 125 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner

1 HEALTH CLUB
1.1 GENERAL
1.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 213,900 213,900
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-
in-charge.

1.2 INTERIOR AND FF&E WORKS


1.2.1 Ceiling
1.2.1.1 Supplying fitting and fixing of 9 mm thick Gypsum board laminated by mechanical sqm 470 1,545 726,023
hot press with metal LG stud frame in natural anodized finish at 600 mm x 600 mm
in grid, suspended from ceiling by 12 SWG double ply wire fixed to the ceiling by
rowel plug, screws, hooks, nails etc. maintaining straight lines and desired finished
level at bottom face with vertical wooden strut as required in/c making holes in
slabs, or beams by electric drill machine and mending good the damages, if any,
during execution of the work in/c cost of all materials accessories scaffoldings,
labour for installation, screws, nails, etc all complete as per drawing design and
direction ot the Engineer in-charge.

1.2.1.2 Supplying fitting and fixing of 9 mm thick Moisture resistance Gypsum board sqm 96 1,545 148,294
laminated by mechanical hot press with metal LG stud frame in natural anodized
finish at 600 mm x 600 mm in grid, suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc. maintaining straight
lines and desired finished level at bottom face with vertical wooden strut as required
in/c making holes in slabs, or beams by electric drill machine and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per drawing
design and direction ot the Engineer in-charge.

Page 126 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.1.3 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 566 86 48,953
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

1.2.2 Wall & Wall Finishing


1.2.2.1 Supplying, fitting and fixing glazed ceramic wall tiles on 20 mm thick cement mortar sqm 210 4,936 1,036,652
(1:3) base and raking out the joints with white cement including cutting and laying
tiles in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.

1.2.2.2 Supplying and setting 20 mm thick Marble stone of approved quality, texture & size sqm 50 5,384 269,202
on wall over 20 mm thick cement mortar (1:2) including cutting and grinding the
Granite stones setting in position keeping horizontal and vertical alignment correct,
filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

1.2.2.3 Supplying and setting 20 mm thick Granite wall tiles of approved quality, texture & sqm 31 4,936 153,030
size on wall over 20 mm thick cement mortar (1:2) including cutting and grinding the
Granite tiles setting in position keeping horizontal and vertical alignment correct,
filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

1.2.2.4 Supplying and setting 20 mm thick Marble stone of approved quality, texture & size sqm 47 5,384 253,050
on wall over 20 mm thick cement mortar (1:2) including cutting and grinding the
Granite stones setting in position keeping horizontal and vertical alignment correct,
filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

1.2.2.5 Supplying fitting and fixing of mirror including frame and mending good the sqm 80 13,950 1,116,000
damages, etc all complete as per design drawing and direction ot the Engineer in-
charge.

1.2.2.6 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 362 86 31,309
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

Page 127 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.3 Skirting, Nosing & Moulding
1.2.3.1 Supplying, fitting and fixing moulding glazed clay tile on cement mortar (1:3) base rm 175 237 41,501
and raking out the joints with white cement including installing moulds in proper
way and finishing with care etc. all complete as per direction of the Engineer in-
charge.

1.2.3.2 Supplying, fitting and fixing Marble baseboard on 20 mm thick cement mortar (1:3) rm 240 1,088 261,144
base and raking out the joints with white cement including cutting and laying tiles in
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

1.2.4 Floor & Floor Finishing


1.2.4.1 Supplying, fitting and fixing 20 mm thick Marble stone flooring of approved quality, sqm 254 5,384 1,367,548
texture & size on wall over 20 mm thick cement mortar (1:2) including cutting and
grinding the Marble stone setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

1.2.4.2 Supplying, fitting and fixing 20 mm thick Granite floor tiles of approved quality, sqm 34 6,586 223,933
texture & size on wall over 20 mm thick cement mortar (1:2) including cutting and
grinding the Marble stone setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

1.2.4.3 Supplying, fitting and fixing 20 mm thick Marble stone flooring of approved quality, sqm 34 5,384 183,058
texture & size on wall over 20 mm thick cement mortar (1:2) including cutting and
grinding the Marble stone setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

1.2.4.4 Supplying, fitting and fixing Carpet tiles flooring with all complete as per direction sqm 236 2,232 526,752
of the Engineer in-charge.

1.2.4.5 Supplying, fitting and fixing wood floor finish of approved quality and pattern sqm 43 5,371 230,942
complete in all respect as per drawing and direction of the Engineer in-charge.

Page 128 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.5 Frameless Glass Doors 12 mm thick
1.2.5.1 Supplying. Fitting and fixing of 12 mm thick frameless glass w/transparency sticker
miages door with fixed partition including all accesories like hinge,jamp,handel,
locks, floor spring, door closer, rib glass, glass fitting etc. complete in all respect as
per drawing and direction of the Engineer in-charge.
1) size : 2,700 mm x 900mm sqm 5 7,440 37,200
1) size : 2,400 mm x 1,800mm sqm 5 7,440 37,200
1) size : 2,800 mm x 900mm sqm 6 7,440 44,640
1) size : 2,090 mm x 840mm sqm 8 7,440 59,520

1.2.6 Wood Doors


(a) Supplying and making door frames with seasoned wood of required size
including painting fitted and fixed in position finished with sand papering mending
good the damages if any. (All sizes of wood are finished)
1) Burma Teak Wood cum 2 50,127 100,254

(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) rm 120 1,883 225,990
with the vertical members of the frame, fixing the frame in wall mending good
damages, fixing Stainless steel hinges w/ball bearing with the vertical members of
the frame for leaf shutter, all complete as per plan and direction of the Engineer in-
Charge.
(Running metre of the door frame will be considered towards measurement)

(c) Supplying, making and fixing solid Burma Teak wood door panel plywood finish sqm 22 4,673 102,812
with wood trim to hardwood frames including all accessories knob, pivot, handel,
floor spring, door closer etc. finished with sand papering complete as per direction
of the Engineer -in-charge and standard practice.

(d) Supplying, making and fixing solid wood door panel plywood finish with wood sqm 18 3,836 69,053
trim to hardwood frames including all accessories knob, pivot, handel, floor spring,
door closer etc. finished with sand papering complete as per direction of the
Engineer -in-charge and standard practice.

Page 129 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
(e) Painting to door and window frames and shutters paint/ of best quality and
approved colour. Over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

1)Hard wood sqm 86 84 7,198

1.2.7 Plumbing Fixture & Bath Accessories


1.2.7.1 Supplying, fitting and fixing Jacuzzi including all fittings (best Quality) and set 2 409,200 818,400
preparing the base with cement concrete and with wire net or rods, if necessary , in
all floors including making holes wherever required and mending good the damages
and fitting fixing complete with all necessay fittings and connection as per direction
of the Engineer in-charge.

1.2.7.2 Supplying, fitting and fixing Basin on the granite counter including making holes set 10 32,727 327,267
wherever required , fitting in position on the counter and mending good the
damages and supplying fitting fixing the same in position with C.I brackets,
including supplying faucet ,Waste , Bottle trap, stop valve etc. all complete as per
direction of the Engineer-in -charge.

1.2.7.3 Supplying fitting and fixing European type glazed porcelain auto flush toilet of best set 8 66,542 532,332
quality including all internal fittings and accessories as plastic seat cover, automatic
flush valve , spray hose , plastic connection pipe with brass coupling, etc. and
preparing the base with cement concrete and with wire net or rods, if necessary , in
all floors including making holes wherever required and mending good the damages
and fitting fixing complete with all necessay fittings and connection as per direction
of the Engineer in-charge.

1.2.7.4 Supplying fitting and fixing European type glazed porcelain auto flush urinals of set 6 74,075 444,447
best quality including fitting, fixing the same in position after making holes in walls
and floor, providing plastic waste pipe with brass coupling upto grading below,
automatic flush valve and mending good the damages etc. all complete as per
direction of the Engineer in-charge.

1.2.7.5 Supplying, fitting and fixing Hand dryer and mending good the damages etc. all set 2 13,950 27,900
complete as per direction of the Engineer-in -charge.

Page 130 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.7.6 Supplying, fitting and fixing Floor drain and mending good the damages etc. all set
complete as per direction of the Engineer-in -charge.

1.2.7.7 Supplying, fitting and fixing paper holder including making holes in walls and set 8 3,557 28,458
mending good the damages etc. all complete as per direction of the Engineer-in
-charge.

1.2.8 Movable Furniture


1.2.8.1 Supplying and placing Cabinet(HC-101) and mending good the damages etc. all set 1 64,170 64,170
complete as per direction of the Engineer in-charge.

1.2.8.2 Supplying and placing Table(HC-101) and mending good the damages etc. all set 2 12,555 25,110
complete as per direction of the Engineer in-charge.

1.2.8.3 Supplying, fitting and fixing Sauna including all fittings (best Quality) and set 2 232,500 465,000
preparing the base and sides with best quality wooden setting, including all fittings
& fixtures and accessories, heater, sauna kits consisting of prefabricated, thermally
insulated wall and roof sections panneleld with best quality wood, galvanized steel
floor frame, self-assembly wood wood sauna benches, edging strips for inside and
out, adjustable vent hatch, vent grille, conduits in wall sections for electrical
installation, screws, nails and detailed assembly instruction, all complete in all
respects as per manufacturer's instructions and direction of the Engineer-in-charge.

1.2.8.4 Supplying and placing Cabinet(HC-102) and mending good the damages etc. all set 1 50,220 50,220
complete as per direction of the Engineer in-charge.

1.2.8.5 Supplying and placing Cabinet(HC-103) and mending good the damages etc. all set 1 46,872 46,872
complete as per direction of the Engineer in-charge.

1.2.8.6 Supplying and placing Cabinet(HC-104) and mending good the damages etc. all set 1 41,850 41,850
complete as per direction of the Engineer in-charge.

1.2.8.7 Supplying and placing Table(HC-105) and mending good the damages etc. all set 2 8,370 16,740
complete as per direction of the Engineer in-charge.

Page 131 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.8.8 Supplying and placing Cabinet(HC-106) and mending good the damages etc. all set 2 27,900 55,800
complete as per direction of the Engineer in-charge.

1.2.8.9 Supplying and placing Cabinet(HC-107) and mending good the damages etc. all set 2 41,850 83,700
complete as per direction of the Engineer in-charge.

1.2.8.10 Supplying and placing Service Cabinet(HC-108) and mending good the damages etc. set 2 13,950 27,900
all complete as per direction of the Engineer in-charge.

1.2.8.11 Supplying and placing Bench and stool(HC-200) and mending good the damages etc. set 3 8,370 25,110
all complete as per direction of the Engineer in-charge.

1.2.8.12 Supplying and placing Stool(HC-201) and mending good the damages etc. all set 8 24,273 194,184
complete as per direction of the Engineer in-charge.

1.2.8.13 Supplying and placing Stool(HC-202) and mending good the damages etc. all set 3 11,160 33,480
complete as per direction of the Engineer in-charge.

1.2.8.14 Supplying and placing Stool(HC-203) and mending good the damages etc. all set 1 11,160 11,160
complete as per direction of the Engineer in-charge.

1.2.8.15 Supplying and placing Stool(HC-204) and mending good the damages etc. all set 3 8,370 25,110
complete as per direction of the Engineer in-charge.

1.2.8.16 Supplying and placing Massage Bed(HC-300) and mending good the damages etc. all set 2 22,320 44,640
complete as per direction of the Engineer in-charge.

1.2.8.17 Supplying and placing Equipment(Cardiovascular equipment) and mending good set
the damages etc. all complete as per direction of the Engineer in-charge consisting of
the following:
(a) Treadmill each 5 1,153,200 5,766,000
(b) Elliptical & Crosstrainer each 4 972,594 3,890,376
(c ) Cycle Upright each 2 466,767 933,534
(d) Cycle Recumbent each 3 486,297 1,458,891
(e) Cycle Trainer each 2 132,804 265,608

Page 132 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.8.18 Supplying and placing Equipment(Strength Equipment) and mending good the set 1 8,124,480 8,124,480
damages etc. all complete as per direction of the Engineer in-charge consisting of the
following
(a) Leg Extension each 1
(b) Seated Leg Curt each 1
(c ) Seated Leg Sled each 1
(d) Abductor each 1
(e) Abductor each 1
(f) Biceps Curt each 1
(g) Seated Triceps Flat each 1
(h) Vertical Press each 1
(I) Rear Delt/Pec Fly each 1
(j) Shoulder Press each 1
(k) Pulldown each 1
(l) Seated Row each 1
(m) Dip Chin Assist each 1
(n) Abbench Pro each 1
(o) Abbench Classic each 2

1.2.8.19 Supplying and placing Equipment (Free Weighjt)and mending good the damages set 1 1,881,520 1,881,520
etc. all complete as per direction of the Engineer in-charge consisting of the
following:
(a) Functional Trainer System each 1
(b) Smith Machine each 1
(c ) Flat Bench each 1
(d) Adjustable Seated Incline each 1
(e) Back Extension each 1
(f) Vertical Knee Up/Dip each 1
(g) Rubber Dumbell 5-50 lbs+ Rack each 1
(h) Beauty Bell 1-10 kg + Rack each 1
(I) Rubber Plate 150 kg each 1
(j) Weight Plate Tee each 1

1.2.8.20 Supplying and placing Equipment(HC-1103) and mending good the damages etc. all set 6
complete as per direction of the Engineer in-charge.

Page 133 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS

1.2.8.21 Supplying and placing Equipment(HC-1104) and mending good the damages etc. all set 17
complete as per direction of the Engineer in-charge.

1.2.8.22 Supplying and placing Water Cooler and mending good the damages etc. all set 3 11,160 33,480
complete as per direction of the Engineer in-charge.

1.2.9 Built-in Furniture


1.2.9.1 Supplying,fitting and fixing Art Work and mending good the damages etc. all set 2 8,719 17,438
complete as per direction of the Engineer in-charge.

1.2.9.2 Supplying,fitting and fixing Art Work and mending good the damages etc. all set 2 8,719 17,438
complete as per direction of the Engineer in-charge.

1.2.9.3 Supplying,fitting and fixing Art Work and mending good the damages etc. all set 2 8,719 17,438
complete as per direction of the Engineer in-charge.

1.2.9.4 Supplying, fitting and fixing reception counter composed of wood framing, plywood ls 1 58,590 58,590
sides and tops as per design, drawing and direction of the Engineer in-charge.

1.2.9.5 Providing wood handrailing all complete including making necessary grooves in ls 1 18,135 18,135
floor, manding good all damages, finishing etc. as per design, drawings and
direction of Engineer in-Charge.

1.2.9.6 Supplying, fitting and fixing refreshment counter composed of wood framing, ls 1 41,850 41,850
plywood sides and tops as per design, drawing and direction of the Engineer in-
charge.
- -
1.2.10 Light Fixture
1.2.10.1 Supplying, fitting and fixing of Dawn Light(HC-1000) as per Design, Technical set 9 1,674 15,066
Specification and instruction of the Engineer, complete in all respect.
- -
1.2.10.2 Supplying, fitting and fixing of Dawn Light (HC-1001)as per Design, Technical set 174 2,232 388,368
Specification and instruction of the Engineer, complete in all respect.

Page 134 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.2.10.3 Supplying, fitting and fixing of Dawn Light(HC-1002) as per Design, Technical set 16 2,232 35,712
Specification and instruction of the Engineer, complete in all respect.

1.2.10.4 Supplying, fitting and fixing of Exhaust as per Design, Technical Specification and set
instruction of the Engineer, complete in all respect.

1.2.10.5 Supplying, fitting and fixing of Single power point as per Design, Technical set 15 1,130 16,949
Specification and instruction of the Engineer, complete in all respect.

1.2.11 Miscellaneous
1.2.11.1 Supplying, fitting and fixing of Diameter 3" S/S handrail hang on the wall as per rm 4 3,139 12,555
Design, Technical Specification and instruction of the Engineer, complete in all
respect.
- -

1.3 ARCHITECTURAL WORKS


1.3.1 Wall & Wall Finishing
1.3.1.1 Brick wall of width one brick with 1st class bricks in cement mortar ( 1: 4 ) and
making bond with connected walls in/c necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use and washing out sand
curing at least for 7 days in all floors ( F.M. of sand = 1.2)
1) Ground Floor sqm 14 317 4,440

1.3.1.2 Minimum 12mm thick cement plaster (1:6) to wall inner/outer surface, finishing
the corner and edges in/c washing of sand cleaning the surface, scaffolding and
curing at least for 7 days etc. all complete as per direction of the Engineer in
charge.
1) Ground Floor sqm 31 91 2,825

1.3.1.3 Painting to walls and columns two coats with Acrylic paint of best quality and sqm 31 86 2,681
approved colour over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

- -

Page 135 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS
1.3.1.3 Supplying. Fitting and fixing of Laminated curtain glass wall with Aluminium sqm 153 17,438 2,667,938
mullion complete in all respect as per drawing and direction of the Engineer in-
charge.
- -
1.3.2 Skirting & Nosing
1.3.2.1 Supplying and casting 300x100 mm RC curb nosing of approved quality and shape rm 44 572 25,166
complete in all respect as per drawing and direction of the Engineer in-charge.

Sub total 36,601,486


2 POOL DECK
2.1 GENERAL
2.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 111,600 111,600
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.

2.2 INTERIOR AND FF&E WORKS


2.2.1 Movable Furniture
2.2.1.1 Supplying and placing Table(FD-100) and mending good the damages etc. all set 4 13,950 55,800
complete as per direction of the Engineer in-charge.

2.2.1.2 Supplying and placing Table and mending good the damages etc. all complete as per set
direction of the Engineer in-charge.

2.2.1.3 Supplying and placing Table and mending good the damages etc. all complete as per set
direction of the Engineer in-charge.

2.2.1.4 Supplying and placing Sunlonger(FD-200) and mending good the damages etc. all set 24 50,220 1,205,280
complete as per direction of the Engineer in-charge.

2.2.1.5 Supplying and placing Side table and mending good the damages etc. all complete as set 12 5,580 66,960
per direction of the Engineer in-charge.

2.2.1.6 Supplying and placing Sunshade umbrella and mending good the damages etc. all set 14 5,580 78,120
complete as per direction of the Engineer in-charge.

Page 136 of 273


MISCELLANEOUS
BILL OF QUANTITIES
BILL NO.2.4- MISCELLANEOUS

2.2.1.7 Supplying and placing Chair(PD-203) and mending good the damages etc. all set 12 9,765 117,180
complete as per direction of the Engineer in-charge.

2.2.1.8 Supplying and placing Chair(PD-204) and mending good the damages etc. all set
complete as per direction of the Engineer in-charge.

2.2.1.9 Supplying and placing Chair(PD-205) and mending good the damages etc. all set 1 9,765 9,765
complete as per direction of the Engineer in-charge.

2.2.2 Floor & Floor Finishing


2.2.2.1 Supplying, fitting and fixing 20 mm thick Granite floor tiles of approved quality, sqm 562 6,586 3,701,478
texture & size on wall over 20 mm thick cement mortar (1:2) including cutting and
grinding the Marble stone setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

2.2.2.1 Supplying, fitting and fixing ceramic floor tiles on 20 mm thick cement mortar (1:3) sqm 19 1,293 24,561
base and raking out the joints with white cement including cutting and laying tiles in
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.
Sub total 5,370,744

Page 137 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner


1 GUEST ROOMS
1.1 GENERAL
1.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 317,990.00 317,990
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.
- -
1.2 INTERIOR AND FF&E WORKS -
1.2.1 Ceiling -
1.2.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by sqm 1,250 924.00 1,155,000
mechanical hot press with cement plaster paste and fixed to wood frame
suspended from ceiling maintaining straight lines and desired finished level at
bottom face as required in/c making holes in slabs, or beams and mending good
the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as
per drawing design and direction ot the Engineer in-charge.

- -
1.2.1.2 Supplying fitting and fixing of 12 mm thick water proof gypsum board laminated sqm 555 965.00 535,575
by mechanical hot press with cement plaster paste and fixed to wood frame
suspended from ceiling maintaining straight lines and desired finished level at
bottom face as required in/c making holes in slabs, or beams and mending good
the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as
per drawing design and direction ot the Engineer in-charge.

- -
1.2.1.3 Emulsion painting of approved quality and color to exposed ceilings two coats sqm 2,120 54.00 114,480
over a coat of primer or sealer including cleaning, sand papering the surface and
necessary scaffolding etc. all completerin all floors.
- -

Page 138 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
1.2.1.4 Emulsion painting of approved quality and color to gypsum board ceilings two sqm 1,810 54.00 97,740
coats over a coat of primer or sealer including cleaning, sand papering the surface
and necessary scaffolding etc. all completerin all floors.

- -
1.2.1.5 Supplying fitting and fixing of Egg crate grille return air false ceiling in/c making sqm 95 1,358.00 129,010
holes in slabs, or beams by electric drill machine and mending good the damages,
if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per design
drawing and direction ot the Engineer in-charge.

- -
1.2.1.6 Supplying fitting and fixing of Burma Teak wood ceiling fixed to Garzan wood sqm 63 3,819.00 238,688
frame suspended from ceiling maintaining straight lines and desired finished level
at bottom face as required in/c making holes in slabs, or beams and mending
good the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as
per drawing design and direction ot the Engineer in-charge.

- -
1.2.2 Cornice , Skirting and iron mongery -
1.2.2.1 Supplying, fitting and fixing Burma Teak wood cornice with paint of approved m 2,415 285.00 688,275
quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

- -
1.2.2.2 Supplying, fitting and fixing 50 mm Burma Teak wood moulding channel with m 260 285.00 74,100
paint of approved quality and shape including costing of fitting, fixing all
necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.
- -
1.2.2.3 Supplying, fitting and fixing Burma Teak wood skirting with paint of approved m 2,085 285.00 594,225
quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

Page 139 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
-
1.2.2.4 Supplying, fitting and fixing 300 mm height Marble stone skirting on cement rm 990 575.00 569,250
mortar base and raking out the joints with white cement including cutting and
installing stones in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.
-
1.2.2.5 Supplying, fitting and fixing 100 mm height Marble stone skirting on cement rm 1,070 781.00 835,280
mortar base and raking out the joints with white cement including cutting and
installing stones in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.
-
-
1.2.3 Wall & Wall Finishing -
1.2.3.1 Supplying fitting and fixing of 10 mm thick gypsum board laminated by sqm 575 921.00 529,575
mechanical hot press with cement plaster paste and fixed to Garzan wood frame
maintaining straight lines as required in/c making holes on walls and beams by
electric drill machine and mending good the damages, if any, during execution of
the work in/c cost of all materials accessories scaffoldings, labour for installation,
screws, nails, etc all complete as per drawing design and direction ot the Engineer
in-charge.

- -
1.2.3.2 Supplying and installing Vinyl wall covering, siam silk, 54" wide including sqm 5,850 1,163.00 6,803,550
cleaning the surface and necessary scaffolding etc. all complete in all floors.

-
1.2.3.3 Supplying and installing Vinyl wall covering, allegory, 52/54" wide including sqm 1,365 1,628.00 2,222,220
cleaning the surface and necessary scaffolding etc. all complete in all floors.

-
1.2.3.4 Supplying. Fitting and fixing of good quality distortion-free mirror on water proof sqm 740 2,325.00 1,720,500
plywood backing on Garzan wood frame on wall including all necesary fittings,
sealants, etc. complete in all respect as per drawing and direction of the Engineer
in-charge.
-

Page 140 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
1.2.3.5 Supplying, fitting and fixing Mosaic tile, 20mmx20mm on 20 mm thick cement sqm -
mortar (1:3) base and raking out the joints with white cement including cutting
and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.
-
1.2.4 Floor & Floor Finishing -
1.2.4.1 Supplying, laying and fitting Fire proof Carpet flooring of approved pattern sqm 2,550 2,310.00 5,890,500
(#821) and color including underlayments in proper way and finishing with care
etc. all complete as per design and direction of the Engineer in-charge.

- -
1.2.4.2 Supplying, laying and fitting Fire proof Carpet flooring of approved pattern sqm 1,130 2,470.00 2,791,100
(#822) and color including underlayments in proper way and finishing with care
etc. all complete as per design and direction of the Engineer in-charge.

- -
1.2.4.3 Supplying, fitting and fixing Marble stone flooring of approved quality, texture & sqm 1,530 3,356.00 5,134,680
size over cement mortar (1:2) including cutting and grinding the stone setting in
position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.
-
1.2.4.4 Supplying, laying water proofing barrier as per drawing and direction of the sqm 1,120 604.00 676,480
Engineer in-charge.
-
1.2.4.5 Supplying, fitting and fixing solid Marble stone curb of approved quality, texture rm 200 8,021.00 1,604,200
& size over cement mortar (1:2) including cutting and grinding the stone setting in
position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.
-
1.2.5 Sanitary Ware -

Page 141 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
1.2.5.1 Supplying fitting and fixing European type glazed porcelain toilet of best quality set 71 45,919.00 3,271,729
including all internal fittings and accessories as plastic seat cover, flush tank ,
spray hose , plastic connection pipe with brass coupling, etc. and preparing the
base with cement concrete and with wire net or rods, if necessary , in all floors
including making holes wherever required and mending good the damages and
fitting fixing complete with all necessay fittings and connection as per direction of
the Engineer in-charge.

-
1.2.5.2 Supplying, fitting and fixing basin of best quality with all fittings and accessories set 72 59,724.00 4,270,266
including making holes wherever required , fitting in position on the counter and
mending good the damages and supplying fitting fixing the same in position with
C.I brackets, including supplying faucet ,Waste , Bottle trap, stop valve etc. all
complete as per direction of the Engineer-in -charge.

-
1.2.5.3 Supplying, building, fitting and fixing built up shower/ Bath-tubs with 300 mm set 68 35,485.00 2,395,238
height x 100 mm thick side, Mosaic tiles finishing and all fittings and accessories
as Bath mixing valve including making holes in walls and mending good the
damages etc. all complete as per direction of the Engineer in-charge.

- -
1.2.5.4 Supplying, fitting and fixing bidet of best quality with all fittings and accessories set 1 30,359.00 30,359
all complete as per direction of the Engineer-in -charge.
- -
1.2.5.5 Supplying, fitting and fixing sink of best quality with all fittings and accessories set 15 2,494.00 37,410
all complete as per direction of the Engineer-in -charge.
-
1.2.5.6 Supplying fitting and fixing rain shower of best quality with all fittings and set 68 35,224.00 2,377,620
accessories including making holes in walls and mending good the damages etc.
all complete as per direction of the Engineer in-charge.
- -
1.2.5.7 Supplying fitting and fixing hand shower of best quality with all fittings and set 68 -
accessories including making holes in walls and mending good the damages etc.
all complete as per direction of the Engineer in-charge.
-

Page 142 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
1.2.5.8 Supplying fitting and fixing 600x600x69 mm Stainless Steel (Chrome) towel rack set 68 7,411.00 500,243
of best quality with all fittings and accessories including making holes in walls
and mending good the damages etc. all complete as per direction of the Engineer
in-charge.
-
1.2.5.9 Supplying fitting and fixing Chrome soap holder shelf of best quality with all set 68 1,264.00 85,320
fittings and accessories including making holes in walls and mending good the
damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.5.10 Supplying, fitting and fixing Chrome Double paper holder of best quality each 68 2,310.00 155,925
including making holes in walls and mending good the damages etc. all complete
as per direction of the Engineer in-charge.
-
1.2.5.11 Supplying, fitting and fixing Chrome hook of best quality including making holes each 68 1,509.00 101,858
in walls and mending good the damages etc. all complete as per direction of the
Engineer in-charge.
- -
1.2.6 Doors & Windows -
1.2.6.1 Wood Doors -
(a) Supplying and making door frames with seasoned wood of required size -
including painting two coats of coaltar to the surface in contact with wall, fitted
and fixed in position finished with sand papering mending good the damages if
any. (All sizes of wood are finished)
1) Burma Teak wood cum 11 118,750.00 1,306,250
- -
(b) Supplying, fitting and fixing of door frame with 38 mm x 38 mm x 6 mm M.S. rm 68 128.00 8,640
angle, fixing 250 mm long 6 Nos. of iron clamps of same size (with one end
bifurcated) with the vertical members of the frame, fixing the frame in wall with
1:2:4 cement concrete, mending good damages, fixing 6 Nos. of Stainless steel
hinges w/ball bearing with the vertical members of the frame for double leaf
shutter, painting all iron faces 2 coats over a coat of priming with enamel paint of
approved colour and quality, all complete including cutting, sizing, welding etc.
as per plan and direction of the Engineer in-Charge.

Page 143 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
(Running metre of the door frame will be considered towards measurement) -
- -
(c) Supplying, making and fixing of Burma Teak wood door panel to hardwood sqm 740 30,000.00 22,200,000
frames including all accessories ving card lock, eye viewer, bolt, pivot, floor
spring, door closer etc. finished with sand papering complete as per design and
drawing and direction of the Engineer -in-charge and standard practice.

- -
(d) Stain finishing of best quality to door frame and panels including cleaning sqm 2,200 701.00 1,542,200
finishing and polishing with sand paper and necessary scaffolding etc. all
complete in all floors.
- -
1.2.6.2 Tempered Glass Sliding Doors -
(a) Supplying. Fitting and fixing of tempered glass sliding doors composed of -
touchened glass sliding door gear with single leaf sliding door of 10.38 mm thick
Lami-lite laminated glass and two fixed panels including all accesories complete
in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,200 mm x 2,150mm sqm 720 13,393.00 9,642,960


2) iron monagery , lock set ,handle(for 304 set) set 152 28,738.00 4,368,176
- -
(b) Supplying. Fitting and fixing of tempered glass sliding doors composed of -
fixed 8 mm thick clear Tuff-lite tempered glass panel sealed with transparent
sealant and 8mm thick sliding clear Tuff-lite tempered glass panel including all
accesories etc. as per drawing and direction of the Engineer in-charge.

1) size : 1,900 mm x 1,600mm sqm 450 9,151.00 4,117,950


2) iron monagery , lock set ,handle(for 296 set) set 148 28,738.00 4,253,224
-
1.2.6.3 Aluminium Windows -

Page 144 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
(a) Supplying, fitting and fixing of Aluminium composite sliding windows with -
fixed partition having wall frame, section of all Aluminium members will be
anodized to Aluminium Bronze/Silver colour with a coat not less than 15
micrones in thickness and density of 4mg per square cm etc. including all
accessories etc. keeping provision for fitting laminated glass panel including
neoprene, sealant etc. complete in all respect as per drawing and direction of the
Engineer in-charge.

1) size : 1,800 mm x 3,500mm sqm 1,010 5,000.00 5,050,000


-
(b) Supplying, fitting and fixing in Aluminium window frame with distortion free sqm 925 9,375.00 8,671,875
laminated tempered glass (Double glazed) foreign made and of approved quality
and shade including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

-
1.2.7 Curtain -
1.2.7.1 Supplying, fitting and fixing 3 lines, fire retardant Scotch guard curtain including set 146 70,343.00 10,234,907
plywood and Garzan wood frame curtain pelmet and all fittings, connections,
supports,and mending good the damages etc. all complete as per Design,
Specification and direction of the Engineer in-charge.

-
1.2.8 Movable Furniture -
1.2.8.1 Supplying and placing custom sofa, love seat (king bed room) and mending good each 101 34,004.00 3,417,402
the damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.8.2 Supplying and placing sofa (suites) and mending good the damages etc. all each 15 51,441.00 771,615
complete as per direction of the Engineer in-charge.
-
1.2.8.3 Supplying and placing sofa accent pillows and mending good the damages etc. all each 122 3,139.00 381,389
complete as per direction of the Engineer in-charge.
-
1.2.8.4 Supplying and placing sofa pillows and mending good the damages etc. all each 122 3,488.00 423,792
complete as per direction of the Engineer in-charge.

Page 145 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
-
1.2.8.5 Supplying and placing coffee table 600x600 mm and mending good the damages each 101 17,089.00 1,717,445
etc. all complete as per direction of the Engineer in-charge.
-
1.2.8.6 Supplying and placing coffee table 450x450 mm and mending good the damages each 54 12,875.00 695,250
etc. all complete as per direction of the Engineer in-charge.
-
1.2.8.7 Supplying and placing coffee table 1200x600 mm and mending good the damages each 15 34,333.00 514,995
etc. all complete as per direction of the Engineer in-charge.
-
1.2.8.8 Supplying and placing antique end table 500mm diameter and mending good the each 22 12,468.00 274,296
damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.8.9 Supplying and placing dining table 2140x950 mm (suites) and mending good the each 5 73,586.00 367,930
damages etc. all complete as per direction of the Engineer in-charge.

-
-
-
Sub total - 125,908,678
-
-
-
-
-
-
-
2 GUEST ROOM CORRIDORS -
2.1 GENERAL -
2.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 104,625.00 104,625
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the
Engineer-in-charge.

Page 146 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
- -
2.2 INTERIOR AND FF&E WORKS -
2.2.1 Ceiling -
2.2.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by sqm 1,510 926.00 1,398,260
mechanical hot press with cement plaster paste and fixed to wooden frame finish
at 600 mm x 600 mm in grid, suspended from ceiling maintaining straight lines
and desired finished level at bottom face with vertical wooden strut as required
in/c making holes in slabs, or beams by electric drill machine and mending good
the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as
per drawing design and direction ot the Engineer in-charge.

-
2.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coast sqm 487 54.00 26,298
of primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.
-
2.2.1.3 Emulsion painting of approved quality and color to ceilings two coats over a coast sqm 1,270 54.00 68,580
of primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.
- -
2.2.2 Trim & Moulding -
2.2.2.1 Supplying, fitting and fixing Burma Teak wood beading (100 mm) of approved m 2,440 915.00 2,232,600
quality and shape to ceiling including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the
Engineer in-charge.
- -
2.2.2.2 Supplying, fitting and fixing Burma Teak wood base moulding (100 mm height) of m 1,150 575.00 661,250
approved quality and shape including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the
Engineer in-charge.
- -
2.2.3 Wall & Wall Finishing -

Page 147 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
2.2.3.1 Supplying and installing Vinyl wall covering, allegory, 52/54" wide including sqm 1,650 1,648.00 2,719,200
cleaning the surface and necessary scaffolding etc. all complete in all floors.

- -
2.2.3.2 Supplying and installing Vinyl wall covering, allegory, 52/54" wide including sqm 800 1,648.00 1,318,400
cleaning the surface and necessary scaffolding etc. all complete in all floors.

-
2.2.3.3 Supplying, fitting and fixing Burma Teak wood panel of approved quality and sqm 602 3,749.00 2,256,898
shape including costing of fitting, fixing all necessary accessiories etc. complete in
all respect as per drawing and direction of the Engineer in-charge.

- -
2.2.4 Floor & Floor Finishing -
2.2.4.1 Supplying, laying and fitting Fire proof Carpeting of approved pattern and color sqm 715 2,485.00 1,776,775
including brass L strip around border, underlays, in proper way and finishing
with care etc. all complete as per design and direction of the Engineer in-charge.

- -
2.2.4.2 Supplying and laying Fire proof Axminister carpeting of approved pattern and sqm 344 2,485.00 854,840
color including brass L strip around border, underlays in proper way and
finishing with care etc. all complete as per direction of the Engineer in-charge.

- -
2.2.4.3 Supplying and laying Fire proof Axminister carpeting of approved pattern and sqm 251 2,485.00 623,735
color including underlays in proper way and finishing with care etc. all complete
as per direction of the Engineer in-charge.
- -
2.2.4.4 Supplying and laying Fire proof Axminister carpeting of approved pattern and sqm 120 2,485.00 298,200
color including underlays in proper way and finishing with care etc. all complete
as per direction of the Engineer in-charge.
- -
2.2.5 Lighting fixtures -

Page 148 of 273


GUEST ROOMS AND RELATED FACILITIES
BILL OF QUANTITIES
BILL NO.3.1 - GUEST ROOMS AND RELATED FACILITIES
2.2.5.1 Supplying, fitting and fixing of decorative wallsconce, metal shade, 280mm set 168 6,365.00 1,069,320
wx290mm hx 110mm projection including all accessroies, supports, fittings as per
Design, Technical Specification and instruction of the Engineer, complete in all
respect.
- -
2.2.5.2 Supplying, fitting and fixing of recessed downlights including all accessroies, set 568 1,726.00 980,368
supports, fittings as per Design, Technical Specification and instruction of the
Engineer, complete in all respect.
- -
Sub total 16,389,349

Page 149 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner


1 LOBBY BAR & LOUNGE
1 GENERAL
Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 93,000 93,000
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-charge.

1.2 INTERIOR AND FF&E WORKS


1.2.1 Ceiling
1.2.1.1 Supplying fitting and fixing of 12 mm thick Gypsum board laminated by mechanical hot sqm 75 1,545 115,855
press with metal LG stud frame in natural anodized finish at 600 mm x 600 mm in grid,
suspended from ceiling by 12 SWG double ply wire fixed to the ceiling by rowel plug, screws,
hooks, nails etc. maintaining straight lines and desired finished level at bottom face with
vertical wooden strut as required in/c making holes in slabs, or beams by electric drill
machine and mending good the damages, if any, during execution of the work in/c cost of all
materials accessories scaffoldings, labour for installation, screws, nails, etc all complete as per
drawing design and direction ot the Engineer in-charge.

-
1.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of primer sqm 280 86 24,217
or sealer including cleaning, sand papering the surface and necessary scaffolding etc. all
completerin all floors.
-
1.2.2 Wall & Wall Finishing -
1.2.2.1 Supplying, fitting and fixing Granite stone wall of approved quality, texture & size over 20 sqm 177 6,417 1,135,809
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in
position keeping horizontal and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface and finishing etc. complete in all respect.

Page 150 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
1.2.2.2 Supplying, fitting and fixing wood screen of approved quality and shape including costing of sqm 40 3,348 133,920
fitting, fixing all necessary accessiories etc. complete in all respect as per drawing and
direction of the Engineer in-charge.

1.2.2.3 Supplying, fitting and fixing Gypsum board panel of approved quality and shape including sqm 335 1,481 496,237
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per drawing
and direction of the Engineer in-charge.

-
1.2.2.4 Emulsion painting of approved quality and color to walls and columns two coats over a coat sqm 441 86 38,142
of primer or sealer including cleaning, sand papering the surface and necessary scaffolding
etc. all completerin all floors.
-
1.2.3 Skirting & Nosing -
1.2.3.1 Supplying, fitting and fixing Granite stone base of approved quality, texture & size over 20 rm 67 1,088 72,903
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in
position keeping horizontal and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface and finishing etc. complete in all respect.

-
1.2.3 Floor & Floor Finishing -
1.2.3.1 Supplying and laying Fire proof Dhurrie-Bangladeshi pattern carpeting including sqm 27 4,952 133,711
underlayments in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.
-
1.2.3.2 Supplying and laying Fire proof Dhurrie-Bangladeshi pattern carpeting including sqm 27 4,952 133,711
underlayments in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.
-
1.2.3.3 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 mm sqm 120 6,138 736,560
thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in position
keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting
and grinding the top surface and finishing etc. complete in all respect.

Page 151 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
1.2.3.4 Supplying, fitting and fixing Granite stone border of approved quality, texture & size over 20 sqm 70 6,180 432,590
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in
position keeping horizontal and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface and finishing etc. complete in all respect.

-
1.2.4 Movable Furniture -
1.2.4.1 Supplying and placing lounge chair 800x800x700 mm and mending good the damages etc. all each 13 39,060 507,780
complete as per direction of the Engineer in-charge.
-
1.2.4.2 Supplying and placing sofa, 2000x800x700 mm and mending good the damages etc. all each 2 8,450,910 16,901,820
complete as per direction of the Engineer in-charge.
-
1.2.4.3 Supplying and placing antique coffee table, 900mm diameterx460mm and mending good the each 2 78,399 156,798
damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.4 Supplying and placing antique coffee table, 1200x1200x430mm and mending good the each 1 163,885 163,885
damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.5 Supplying and placing coffee table, hexagonal shaped 600x600x450mm and mending good each 6 59,009 354,051
the damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.6 Supplying and placing coffee table, rectangular shaped 600x600x450mm and mending good each 1 29,504 29,504
the damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.7 Supplying and placing console 2000x360x720mm and mending good the damages etc. all each 1 55,730 55,730
complete as per direction of the Engineer in-charge.
-

Page 152 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
1.2.4.8 Supplying and placing antique credenza, 1800x500x760mm and mending good the damages each 1 163,885 163,885
etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.9 Supplying and placing antique dining table, 1200mm diameterx710mm and mending good each 1 260,865 260,865
the damages etc. all complete as per direction of the Engineer in-charge.

-
1.2.4.10 Supplying and placing dining chair 21.25"x26"x39" and mending good the damages etc. all each 2 24,887 49,774
complete as per direction of the Engineer in-charge.
-
1.2.4.11 Supplying and placing area rug, 2800x3000mm and mending good the damages etc. all each 1 274,815 274,815
complete as per direction of the Engineer in-charge.
-
1.2.4.12 Supplying and placing lounge chair 27"x35"x39" and mending good the damages etc. all each 6 81,942 491,654
complete as per direction of the Engineer in-charge.
-
1.2.4.13 Supplying and placing table lamp 28" and mending good the damages etc. all complete as per each 2 24,859 49,718
direction of the Engineer in-charge.
-
1.2.4.14 Supplying and placing area rug, 6200x2300mm and mending good the damages etc. all each 3 155,775 467,325
complete as per direction of the Engineer in-charge.
-
1.2.5 Lighting fixtures & Electrical Accessories -
1.2.5.1 Supplying, fitting and fixing of decorative lighting ,0.4m diameterx 0.8m height, 236x60W as set 1 30,284,520 30,284,520
per Design, Technical Specification and instruction of the Engineer, complete in all respect.

-
1.2.5.2 Supplying, fitting and fixing of decorative ceiling fixture 1.2m diameterx1.2m height with set 4 237,387 949,549
8x150W E27 ceramic lampholders , 1.2m diameterx1.2m deep as per Design, Technical
Specification and instruction of the Engineer, complete in all respect.

Page 153 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
1.2.5.3 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, set 26 2,748 71,452
fittings as per Design, Technical Specification and instruction of the Engineer, complete in all
respect.
-
1.2.5.4 Supplying, fitting and fixing aircon grill and mending good the damages etc. all complete as each -
per drawing and direction of the Engineer in-charge.
-
1.2.5.5 Supplying, fitting and fixing of single recepticle as per Design, Technical Specification and set 14 853 11,937
instruction of the Engineer, complete in all respect.
-
1.2.5.6 Supplying, fitting and fixing of telephone outlet as per Design, Technical Specification and set -
instruction of the Engineer, complete in all respect.
Sub total 0 54,791,714
2 PACIFIC LOUNGE - CLUB FLOOR LOUNGE -
2 GENERAL -
- - -
2.2 Plywood -
2.2.1 Supplying, fitting and fixing 25 mm thick Plywood board flooring of approved quality and sqm 85 2,372 201,578
pattern as per drawing and direction of the Engineer in-charge.

-
2.3 INTERIOR AND FF&E WORKS -
2.3.1 Ceiling -
2.3.1.1 Supplying fitting and fixing of 9 mm thick gypsum board laminated by mechanical hot press sqm 92 1,325 121,923
with cement plaster paste and fixed to wood frame suspended from ceiling maintaining
straight lines and desired finished level at bottom face with vertical wooden strut as required
in/c making holes in slabs, or beams by electric drill machine and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per drawing design and
direction ot the Engineer in-charge.

Page 154 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.1.2 Supplying fitting and fixing of 9 mm thick water proof gypsum board laminated by sqm 8 1,330 10,639
mechanical hot press with cement plaster paste and fixed to wood frame suspended from
ceiling maintaining straight lines and desired finished level at bottom face with vertical
wooden strut as required in/c making holes in slabs, or beams by electric drill machine and
mending good the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as per drawing
design and direction ot the Engineer in-charge.

-
2.3.1.3 Acrylic Emulsion painting of approved quality and color to exposed ceilings two coats over a sqm 84 86 7,265
coat of primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

-
2.3.1.4 Supplying and installing wall covering Luxe Permier wall Deluxe including cleaning the sqm 12 4,952 59,427
surface and necessary scaffolding etc. all complete in all floors.

-
2.3.1.5 Supplying, fitting and fixing Burma Teak wood ceiling with 6mm strip joint and Semi-Gross sqm 58 1,576 91,428
& Mull Polyurethane finished of approved quality and shape including costing of fitting,
fixing all necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

-
2.3.1.6 Supplying, fitting and fixing 10mm thick MDF.board ceiling on metal stud suspension of sqm 11 999 10,987
approved quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

-
2.3.2 Wall & Wall Finishing -
2.3.2.1 Supplying and installing Vinyl wall covering PS 8100-LB including cleaning the surface and sqm 101 2,631 265,728
necessary scaffolding etc. all complete in all floors.

Page 155 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.2.2 Supplying, fitting and fixing 15x15mm thick Mosaic stone on 10 mm thick white cement sqm 34 2,790 94,860
morta base and raking out the joints with white cement including laying stones in proper
way and finishing with care etc. all complete as per direction of the Engineer in-charge.

-
2.3.2.3 Supplying and installing Vinyl wall covering PS 8098-LB including cleaning the surface and sqm 35 2,631 92,084
necessary scaffolding etc. all complete in all floors.

-
2.3.2.4 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical hot sqm 135 1,479 199,625
press with cement plaster paste and fixed to Garzan wood frame maintaining straight lines as
required in/c making holes on walls and beams by electric drill machine and mending good
the damages, if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per drawing design and
direction ot the Engineer in-charge.

-
2.3.3 Moulding -
2.3.3.1 Supplying, fitting and fixing 15x75 mm Burma Teak wood base board with Polyurethane rm 84 907 76,167
finished of approved quality and shape including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the Engineer in-
charge.
-
2.3.3.2 Supplying, fitting and fixing 15x150 mm Burma Teak wood ceiling moulding with paint of rm 78 1,546 120,561
approved quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

-
2.3.3.3 Supplying, fitting and fixing 15x110 mm Burma Teak wood ceiling moulding with paint of rm 2 1,258 2,517
approved quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

Page 156 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.3.4 Supplying, fitting and fixing 15x55 mm Burma Teak wood ceiling moulding with paint of rm 17 837 14,229
approved quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

-
2.3.3.5 Supplying, fitting and fixing 150x250 mm , 20 mm thick Marble baseboard on 15 mm thick rm 15 1,083 16,252
white cement mortar and raking out the joints with white cement including cutting and
laying stones in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.
-
2.3.3.6 Supplying, fitting and fixing 35x35 mm Burma Teak wood moulding with Polyurethane rm 378 670 253,109
finished of approved quality and shape including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the Engineer in-
charge.
-
2.3.3.7 Supplying, fitting and fixing 15x85 mm Burma Teak wood ceiling moulding with paint of rm 3 982 2,946
approved quality and shape including costing of fitting, fixing all necessary accessiories etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

-
2.3.4 Counter -
2.3.4.1 Supplying, fitting and fixing 20mm thick Crema Marfil Marble Polish finished counter of sqm 1 10,463 10,463
approved quality, texture & size over white cement mortar including cutting and grinding
the stone setting in position keeping horizontal and vertical alignment correct, filling the
joints with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

-
2.3.4.2 Supplying, fitting and fixing 20mm thick Baron Cuba Granite Polish finished counter of sqm 1 13,336 13,336
approved quality, texture & size over white cement mortar including cutting and grinding
the stone setting in position keeping horizontal and vertical alignment correct, filling the
joints with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

Page 157 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.5 Floor & Floor Finishing -
2.3.5.1 Supplying and laying Burama Teak wood floor finishing in proper way and finishing with sqm 80 6,598 527,868
care etc. all complete as per direction of the Engineer in-charge.

-
2.3.5.2 Supplying, fitting and fixing stair composed of Burma teak wood treads and risers on 20 mm ls 1 138,570 138,570
thick ply wood with Acrylic finished with 20mm thick carpet hand made as per design ,
drawings and direction ot the Engineer in-charge.

-
2.3.5.3 Supplying, fitting and fixing 20mm thick Crema Marfil Marble Polish finished floor of sqm 23 10,463 240,638
approved quality, texture & size over white cement mortar including cutting and grinding
the stone setting in position keeping horizontal and vertical alignment correct, filling the
joints with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

-
2.3.5.4 Supplying, fitting and fixing 20mm thick Baron Cuba Granite Polish finished floor on 20mm sqm 21 13,336 280,060
thick plywood of approved quality, texture & size over white cement mortar including
cutting and grinding the stone setting in position keeping horizontal and vertical alignment
correct, filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

-
2.3.5.5 Supplying, fitting and fixing 20mm thick Baron Cuba Granite Polish finished floor of sqm 5 11,300 56,498
approved quality, texture & size over white cement mortar including cutting and grinding
the stone setting in position keeping horizontal and vertical alignment correct, filling the
joints with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

Page 158 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.5.6 Supplying, fitting and fixing 20mm thick Red Africa Granite Polish finished floor of sqm 4 8,496 33,982
approved quality, texture & size over white cement mortar including cutting and grinding
the stone setting in position keeping horizontal and vertical alignment correct, filling the
joints with white cement, cutting and grinding the top surface and finishing etc. complete in
all respect.

-
2.3.5.7 Supplying, laying and fitting 8mm thick Fire proof Carpet tile of approved pattern and color sqm 19 2,148 40,818
in proper way and finishing with care etc. all complete as per design and direction of the
Engineer in-charge.
-
2.3.5.8 Supplying, laying and fitting 20 mm thick Fire proof Carpet flooring of approved pattern and sqm 13 4,952 64,379
color including underlayments in proper way and finishing with care etc. all complete as per
design and direction of the Engineer in-charge.

-
2.3.6 Doors -
2.3.6.1 Glass Door 12.5 mm thick -
Supplying. Fitting and fixing of 12.5 mm thick temperate safety glass and 35mm thick wood -
panel bird eye, semi gross & mall Polyurethane finished door including all accesories like
hinge,handel, lock sets, glass fitting etc. complete in all respect as per drawing and direction
of the Engineer in-charge.

1) size : 1660 mm x 2350mm sqm 2


-
2.3.6.2 Wood Doors -
(a) Supplying and making door frames with seasoned wood of required size including -
painting two coats of coaltar to the surface in contact with wall, fitted and fixed in position
finished with sand papering mending good the damages if any. (All sizes of wood are
finished)
1) Burma Teak wood cum 1 50,118 50,118
-

Page 159 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
(b) Supplying, fitting and fixing of door frame with 38 mm x 38 mm x 6 mm M.S. angle, fixing rm 48 739 35,489
250 mm long 6 Nos. of iron clamps of same size (with one end bifurcated) with the vertical
members of the frame, fixing the frame in wall with 1:2:4 cement concrete, mending good
damages, fixing 6 Nos. of Stainless steel hinges w/ball bearing with the vertical members of
the frame for double leaf shutter, painting all iron faces 2 coats over a coat of priming with
enamel paint of approved colour and quality, all complete including cutting, sizing, welding
etc. as per plan and direction of the Engineer in-Charge.

(Running metre of the door frame will be considered towards measurement) -


-
(c) Supplying, making and fixing of Burma Teak wood louver door panel to hardwood sqm 12 19,251 231,012
frames including all accessories ving card lock, eye viewer, bolt, pivot, floor spring, door
closer etc. finished with sand papering complete as per design and drawing and direction of
the Engineer -in-charge and standard practice.

(d) Supplying, making and fixing of architrave as per design and drawing and direction of sqm 5 1,395 6,975
the Engineer -in-charge and standard practice.
-
(e) Supplying, making and fixing of Burma Teak wood door panel with 6mm thick glass bird sqm 1 19,558 19,558
eye to frames including all accessories ving card lock, eye viewer, bolt, pivot, floor spring,
door closer etc. finished with sand papering complete as per design and drawing and
direction of the Engineer -in-charge and standard practice.

(f) Semi-Gross and Mall Polyurethane finishing of best quality to door frame and panels sqm 40 698 27,900
including cleaning finishing and polishing with sand paper and necessary scaffolding etc. all
complete in all floors.
-
2.3.7 Plumbing Fixture & Bath Accessories -

Page 160 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.7.1 Supplying fitting and fixing European type glazed porcelain auto flush toilet of best quality set 2 66,235 132,469
including all internal fittings and accessories as plastic seat cover, automatic flush valve ,
spray hose , plastic connection pipe with brass coupling, etc. and preparing the base with
cement concrete and with wire net or rods, if necessary , in all floors including making holes
wherever required and mending good the damages and fitting fixing complete with all
necessay fittings and connection as per direction of the Engineer in-charge.

-
2.3.7.2 Supplying, fitting and fixing under counter lavatory including making holes wherever set 2 23,380 46,760
required , fitting in position on the counter and mending good the damages and supplying
fitting fixing the same in position with C.I brackets, including supplying faucet ,Waste , Bottle
trap, stop valve etc. all complete as per direction of the Engineer-in -charge.

-
2.3.7.3 Supplying fitting and fixing European type glazed porcelain auto flush urinals of best set 1 73,517 73,517
quality including fitting, fixing the same in position after making holes in walls and floor,
providing plastic waste pipe with brass coupling upto grading below, automatic flush valve
and mending good the damages etc. all complete as per direction of the Engineer in-charge.

-
2.3.7.4 Supplying fitting and fixing towel ring Wallmack of best quality with all fittings and set 2 2,065 4,129
accessories including making holes in walls and mending good the damages etc. all complete
as per direction of the Engineer in-charge.

-
2.3.7.5 Supplying, fitting and fixing paper holder of best quality including making holes in walls and each 2 3,543 7,087
mending good the damages etc. all complete as per direction of the Engineer in-charge.

-
2.3.7.6 Supplying, fitting and fixing door bumper with hook (Chrome color) of best quality each 2 1,032 2,065
including making holes in walls and mending good the damages etc. all complete as per
direction of the Engineer in-charge.
-
2.3.8 Movable Furniture -

Page 161 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.8.1 Supplying and placing sitter settee new easy and mending good the damages etc. all each 2 68,634 137,268
complete as per direction of the Engineer in-charge.
-
2.3.8.2 Supplying and placing arm chair new easy and mending good the damages etc. all complete each 3 35,433 106,299
as per direction of the Engineer in-charge.
-
2.3.8.3 Supplying and placing arm chair new tiny and mending good the damages etc. all complete each 7 19,251 134,757
as per direction of the Engineer in-charge.
-
2.3.8.4 Supplying and placing DI-CT wooden leg coffee table and mending good the damages etc. all each 2 25,808 51,615
complete as per direction of the Engineer in-charge.
-
2.3.8.5 Supplying and placing Ele side table and mending good the damages etc. all complete as per each 3 20,786 62,357
direction of the Engineer in-charge.
-
2.3.8.6 Supplying and placing Ele dinning arm chair and mending good the damages etc. all each 25 24,413 610,313
complete as per direction of the Engineer in-charge.
-
2.3.8.7 Supplying and placing dinning chair mom lipao and mending good the damages etc. all each 5 45,756 228,780
complete as per direction of the Engineer in-charge.
-
2.3.8.8 Supplying and placing dinning table 1500x1500 mm and mending good the damages etc. all each 4 15,206 60,822
complete as per direction of the Engineer in-charge.
-
2.3.8.9 Supplying and placing dinning table 750x900 mm and mending good the damages etc. all each 4 10,630 42,520
complete as per direction of the Engineer in-charge.
-
2.3.8.10 Supplying and placing vase, Violet color fiberglass and mending good the damages etc. all each 1 9,123 9,123
complete as per direction of the Engineer in-charge.
-
2.3.8.11 Supplying and placing vase, Charcoal color fiberglass and mending good the damages etc. all each 2 18,805 37,609
complete as per direction of the Engineer in-charge.
-

Page 162 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.8.12 Supplying and placing Coffee table tiny dinning table with 9mm thick clear glass bevelled all each 2 16,740 33,480
around on top and mending good the damages etc. all complete as per direction of the
Engineer in-charge.
-
2.3.8.13 Supplying and placing meeting and dinning table 1250x300 mm and mending good the each 1 9,765 9,765
damages etc. all complete as per direction of the Engineer in-charge.

-
2.3.8.14 Supplying and placing side table tiny dinning table with 9mm thick clear glass bevelled all each 1 16,740 16,740
around on top and mending good the damages etc. all complete as per direction of the
Engineer in-charge.
-
2.3.8.15 Supplying and placing desk chair mom and mending good the damages etc. all complete as each 1 16,740 16,740
per direction of the Engineer in-charge.
-
2.3.8.16 Supplying and placing desk S-Pan with 9mm thick clear glass bevelled all around under each 1 32,085 32,085
computer monitor stand and mending good the damages etc. all complete as per direction of
the Engineer in-charge.
-
2.3.8.17 Supplying and placing console table Econo console and mending good the damages etc. all each 1 253,890 253,890
complete as per direction of the Engineer in-charge.
-
2.3.8.18 Supplying and placing service station channel and mending good the damages etc. all each 1 43,524 43,524
complete as per direction of the Engineer in-charge.
-
2.3.8.19 Supplying, fitting and fixing mirror and mending good the damages etc. all complete as per each 2 5,580 11,160
drawing and direction of the Engineer in-charge.
-
2.3.9 Built-in Furniture -
2.3.9.1 Supplying, fitting and fixing wood panel with 6mm strip joint ( 47mm thick ) of approved sqm 30 101,835 3,055,050
quality and shape including costing of fitting, fixing all necessary accessiories complete in all
respect as per drawing and direction of the Engineer in-charge.

Page 163 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
2.3.9.2 Supplying, fitting and fixing 35x47 mm wood frame bird eye with 6mm thick wood venior sqm 28 10,184 285,138
panel for drapery pocket of approved quality and shape including costing of fitting, fixing all
necessary accessiories complete in all respect as per drawing and direction of the Engineer in-
charge.
-
2.3.9.3 Supplying fitting and fixing of 12 mm thick gypsum board panel on 35mmx75mm metal stud sqm 11 1,289 14,179
frame all complete as per drawing design and direction ot the Engineer in-charge.

-
2.3.9.4 Supplying, fitting and fixing buffet counter (lounge) of approved quality and shape including set 1 106,997 106,997
costing of fitting, fixing all necessary accessiories complete in all respect as per drawing and
direction of the Engineer in-charge.

-
2.3.9.5 Supplying, fitting and fixing buffet counter (dining) of approved quality and shape including set 1 188,325 188,325
costing of fitting, fixing all necessary accessiories complete in all respect as per drawing and
direction of the Engineer in-charge.

-
2.3.9.6 Supplying, fitting and fixing decorative column with 6mm strip joint of approved quality and sqm 8 5,580 44,640
shape including costing of fitting, fixing all necessary accessiories complete in all respect as
per drawing and direction of the Engineer in-charge.

-
2.3.9.7 Supplying, fitting and fixing 100mm diameter wood hand rail bird eye ,Semi-Gross & Mall rm 10 54,405 544,050
Polyurethane finished and 27mm thick clacking glass panel of approved quality and shape
including costing of fitting, fixing all necessary accessiories complete in all respect as per
drawing and direction of the Engineer in-charge.

-
2.3.9.8 Supplying, fitting and fixing 100mm diameter wood hand rail bird eye ,Semi-Gross & Mall rm 9 53,940 485,460
Polyurethane finished and 27mm thick clacking glass panel with wood moulding of
approved quality and shape including costing of fitting, fixing all necessary accessiories
complete in all respect as per drawing and direction of the Engineer in-charge.

Page 164 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
2.3.9.9 Supplying, fitting and fixing banquet seat of approved quality and shape including costing of set 1 107,880 107,880
fitting, fixing all necessary accessiories complete in all respect as per drawing and direction of
the Engineer in-charge.
2.3.9.10 Supplying, fitting and fixing flower bed & stair railnig with 6mm strip joint of approved ls 1 124,062 124,062
quality and shape including costing of fitting, fixing all necessary accessiories complete in all
respect as per drawing and direction of the Engineer in-charge.

2.3.10 Drapery -
2.3.10.1 Supplying, fitting and fixing heavy curtain LP63/O1 Lopez, black out 506/01 and timber slim set 8 LS 648,648
line blind (25mm, 3mm thick) EL 50-C Col. Tiger eyes as per design , drawings and direction
ot the Engineer in-charge.
2.3.11 Stair -
2.3.11.1 Cancelled ls 1
2.3.12 Lighting fixtures & Electrical Accessories -
2.3.12.1 Supplying, fitting and fixing wall bracket and mending good the damages etc. all complete as set 9 3,767 33,899
per drawing and direction of the Engineer in-charge.
2.3.12.2 Supplying, fitting and fixing Halogen up lights for stair and mending good the damages etc. ls 1 2,455 2,455
all complete as per drawing and direction of the Engineer in-charge.

2.3.12.3 Supplying, fitting and fixing Halogen up lights lights for raised timber deck and mending ls 1 2,483 2,483
good the damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.4 Supplying, fitting and fixing Halogen down light and mending good the damages etc. all set 48 1,646 79,013
complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.5 Supplying, fitting and fixing Halogen wall wahser and mending good the damages etc. all set 5 1,646 8,231
complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.6 Supplying, fitting and fixing concealed fluorescent light (1m length) and mending good the set 1 1,535 1,535
damages etc. all complete as per drawing and direction of the Engineer in-charge.

Page 165 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
2.3.12.7 Supplying, fitting and fixing concealed fluorescent light (4m length) and mending good the set 2 6,975 13,950
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.8 Supplying, fitting and fixing concealed fluorescent light (15.m length) and mending good the set 1 26,896 26,896
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.9 Supplying, fitting and fixing concealed fluorescent light (17m length) and mending good the set 1 30,523 30,523
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.10 Supplying, fitting and fixing concealed fluorescent light (18m length) and mending good the set 1 32,225 32,225
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.11 Supplying, fitting and fixing concealed fluorescent light (20m length) and mending good the set 1 35,852 35,852
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.12 Supplying, fitting and fixing white Alabaster ceiling lamp 900x586 mm and mending good set 4 52,592 210,366
the damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.13 Supplying, fitting and fixing white Alabaster ceiling lamp 1195x1025 mm and mending good set 1 80,650 80,650
the damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
2.3.12.14 Supplying, fitting and fixing table lamp and mending good the damages etc. all complete as set 3 16,322 48,965
per drawing and direction of the Engineer in-charge.
-
2.3.12.15 Supplying, fitting and fixing post lamp white Alabaster and mending good the damages etc. set 4 10,174 40,697
all complete as per drawing and direction of the Engineer in-charge.

Page 166 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
2.3.12.15 Supplying, fitting and fixing single recepticle and mending good the damages etc. all set 20 1,051 21,018
complete as per drawing and direction of the Engineer in-charge.

-
-
-
-
2.4 ARCHITECTURAL WORKS -
2.4.1 Roofing -
2.4.1.1 Supplying. Fitting and fixing of metal sheet roofing fitted and fixed to MS sections complete sqm 130 1,009 131,177
in all respect as per drawing and direction of the Engineer in-charge.

-
2.4.1.2 Supplying. Fitting and fixing GS gutter complete in all respect as per drawing and direction rm 18 1,581 28,458
of the Engineer in-charge.
-
2.4.1.3 Supplying. Fitting and fixing fin complete in all respect as per drawing and direction of the rm 40 19,530 781,200
Engineer in-charge.
-
2.4.2 Wall & Wall Finishing -
2.4.2.1 Supplying. Fitting and fixing of Laminated curtain glass wall with Aluminium frame sqm 107 16,508 1,766,303
complete in all respect as per drawing and direction of the Engineer in-charge.

-
2.4.3 Aluminium Doors -

Page 167 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
(a) Supplying, fitting and fixing of Aluminium composite swing doors with fixed partition as -
per the U.S. Architectural Aluminium Manufacturere's Association (AAMA) standard
specification having wall frame ( size 2"x4"), section of all Aluminium members will be
anodized to Aluminium Bronze/Silver colour with a coat not less than 15 micrones in
thickness and density of 4mg per square cm etc. including all accessories hinge,handel, locks,
floor spring, door closer, rib glass, glass fitting etc. keeping provision for fitting 8 mm thick
reflective glass panel and 6mm reflective glass transom including neoprene, sealant etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 900mm sqm 2 3,744 7,488


-
(b) Supplying, fitting and fixing in Aluminium door frame with distortion free 8 mm thick sqm 1 2,446 2,446
reflective glass foreign made and of approved quality and shade including costing of fitting,
fixing all necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

-
2.4.5 Aluminium Windows -
(a) Supplying, fitting and fixing of Aluminium composite sliding windows with fixed -
partition as per the U.S. Architectural Aluminium Manufacturere's Association (AAMA)
standard specification having wall frame, section of all Aluminium members will be
anodized to Aluminium Bronze/Silver colour with a coat not less than 15 micrones in
thickness and density of 4mg per square cm etc. including all accessories handel, locks,bolts
etc. keeping provision for fitting laminated glass panel including neoprene, sealant etc.
complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 1,800 mm x 3,500mm sqm 25 5,971 149,265


-
(b) Supplying, fitting and fixing in Aluminium window frame with distortion free laminated sqm 23 8,370 192,510
tempered glass foreign made and of approved quality and shade including costing of fitting,
fixing all necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

Page 168 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
2.4.6 Miscellaneous -
2.4.6.1 Supplying. Fitting and fixing handrail complete in all respect as per drawing and direction of rm 17 3,385 57,548
the Engineer in-charge.
-
2.4.5 AIRCONDITIONING, ELECTRICAL & SANITARY WORKS -
2.4.5.1 (Referred to respective Bills of System Works) -
Sub total 0 14,973,436
3 AIRLINE CREW LOUNGE, BALL ROOM LOUNGE & PRAYER ROOMS -
3 GENERAL -
3.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 186,000 186,000
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-charge.

-
3.1.2 Closing existing openings where if necessary including brick up, plastering and keeping ls 1 25,389 25,389
provision for following construction/finishing processes, etcs all complete and instruction of
the Engineer-in-charge.
-
3 INTERIOR AND FF&E WORKS -
3.2.1 Ceiling -
3.2.1.1 Supplying fitting and fixing of 9 mm thick gypsum board laminated by mechanical hot press sqm 210 1,330 279,279
with cement plaster paste and fixed to wood frame suspended from ceiling maintaining
straight lines and desired finished level at bottom face with vertical wooden strut as required
in/c making holes in slabs, or beams by electric drill machine and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per drawing design and
direction ot the Engineer in-charge.

Page 169 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.1.2 Supplying fitting and fixing of 9 mm thick water proof gypsum board laminated by sqm 26 1,330 34,577
mechanical hot press with cement plaster paste and fixed to wood frame suspended from
ceiling maintaining straight lines and desired finished level at bottom face with vertical
wooden strut as required in/c making holes in slabs, or beams by electric drill machine and
mending good the damages, if any, during execution of the work in/c cost of all materials
accessories scaffoldings, labour for installation, screws, nails, etc all complete as per drawing
design and direction ot the Engineer in-charge.

-
3.2.1.3 Emulsion painting of approved quality and color to exposed ceilings two coats over a coat of sqm 236 86 20,412
primer or sealer including cleaning, sand papering the surface and necessary scaffolding etc.
all completerin all floors.
-
3.2.1.4 Supplying fitting and fixing of wood ceiling with 6mm strip joint maintaining straight lines sqm 31 6,138 190,278
and desired finished level at bottom face with vertical wooden strut as required in/c making
holes in slabs, or beams by electric drill machine and mending good the damages, if any,
during execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per drawing design and direction ot the
Engineer in-charge.

-
3.2.1.5 Supplying fitting and fixing of MDF. Board ceiling, painted maintaining straight lines and sqm 4 879 3,515
desired finished level at bottom face with vertical wooden strut as required in/c making
holes in slabs, or beams by electric drill machine and mending good the damages, if any,
during execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per drawing design and direction ot the
Engineer in-charge.

-
3.2.2 Wall & Wall Finishing -
3.2.2.1 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sqm 233 86 20,152
sealer including cleaning, sand papering the surface and necessary scaffolding etc. all
completerin all floors.
-

Page 170 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.2.2 Supplying and installing natural weave (premierwall deluxe) wall covering including sqm 53 4,757 252,118
cleaning the surface and necessary scaffolding etc. all complete in all floors.

-
3.2.2.3 Supplying, fitting and fixing wood panel with 6mm. Strip joint all complete as per direction sqm 10 2,641 26,412
of the Engineer in-charge.
-
3.2.2.4 Supplying, fitting and fixing mosaic stones on 10 mm thick cement mortar base and raking sqm 11 664 7,303
out the joints with white cement including finishing with care etc. all complete as per
direction of the Engineer in-charge.
-
3.2.2.5 Supplying, fitting and fixing wood panel with 6mm. Strip joint all complete as per direction sqm 2 2,790 5,580
of the Engineer in-charge.
-
3.2.2.6 Supplying, fitting and fixing glass panel with frost film all complete as per direction of the sqm 1 10,304 10,304
Engineer in-charge.
-
3.2.3 Moulding -
3.2.3.1 Supplying, fitting and fixing wood base board of approved quality and shape including rm 33 240 7,918
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per drawing
and direction of the Engineer in-charge.

-
3.2.3.2 Supplying, fitting and fixing ceiling moulding 15x150mm of approved quality and shape rm 14 335 4,687
including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

-
3.2.3.3 Supplying, fitting and fixing ceiling moulding 15x110mm of approved quality and shape rm 7 223 1,562
including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

Page 171 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.3.4 Supplying, fitting and fixing ceiling moulding 15x55mm of approved quality and shape rm 7 195 1,367
including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

-
3.2.3.5 Supplying, fitting and fixing 150x250mm 20 mm thick Crema Farfil Marble baseboard on 15 rm 10 2,930 29,295
mm thick cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying stones in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

-
3.2.3.6 Supplying, fitting and fixing would moulding 35x35mm approved quality and shape rm 1 698 698
including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

-
3.2.4 Floor & Floor Finishing -
3.2.4.1 Supplying and laying Burama Teak wood floor on deck in proper way and finishing with sqm 37 10,002 370,080
care etc. all complete as per direction of the Engineer in-charge.

-
3.2.4.2 Supplying, laying and fitting Fire proof Carpet flooring of approved pattern and color sqm 88 4,707 414,192
including underlayments in proper way and finishing with care etc. all complete as per
design and direction of the Engineer in-charge.

-
3.2.4.3 Supplying, fitting and fixing mosaic stones on 10 mm thick cement mortar base and raking sqm 82 664 54,442
out the joints with white cement including finishing with care etc. all complete as per
direction of the Engineer in-charge.
-
3.2.4.4 Supplying and laying 100x1500mm 15mm thick timber floor in proper way and finishing sqm 29 5,055 146,582
with care etc. all complete as per direction of the Engineer in-charge.

Page 172 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.4.5 Supplying, fitting and fixing 500x500mm 20 mm thick Black Africa Granite polish finished sqm 6 5,906 35,433
flooring of approved quality, texture & size on wall over 30 mm thick cement
mortarincluding cutting and grinding the stone setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

-
3.2.4.6 Supplying, fitting and fixing 500x500mm 20 mm thick Black Africa Granite polish finished sqm 6 5,906 35,433
flooring of approved quality, texture & size on wall over 30 mm thick cement
mortarincluding cutting and grinding the stone setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

-
3.2.4.7 Supplying, fitting and fixing 500x500mm 20 mm thick Black Africa Granite polish finished sqm 5 5,906 29,528
flooring of approved quality, texture & size on wall over 30 mm thick cement
mortarincluding cutting and grinding the stone setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

-
3.2.4.8 Supplying, fitting and fixing 500x500mm 20 mm thick Black Africa Granite polish finished sqm 3 5,906 17,717
flooring of approved quality, texture & size on wall over 30 mm thick cement
mortarincluding cutting and grinding the stone setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

-
3.2.4.9 Supplying, laying and fitting 500x500 mm 8mm thick Dot Com Modular Fire proof Carpet sqm 26 2,093 54,405
tile of approved pattern and color including underlayments in proper way and finishing with
care etc. all complete as per design and direction of the Engineer in-charge.

-
-
3.2.5 Doors -

Page 173 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
(a) Supplying and making door frames with seasoned wood of required size including -
painting fitted and fixed in position finished with sand papering mending good the damages
if any. (All sizes of wood are finished)

1)Burma Teak wood cum 1 50,081 50,081


-
(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) with the rm 15 205 3,069
vertical members of the frame, fixing the frame in wall mending good damages, fixing
Stainless steel hinges w/ball bearing with the vertical members of the frame for leaf shutter,
all complete as per plan and direction of the Engineer in-Charge.

(Running metre of the door frame will be considered towards measurement) -


-
(c) Supplying, making and fixing solid Burma Teak wood door panel plywood finish with sqm 7 11,160 78,120
wood inlay to hardwood frames including all accessories knob, pivot, handel, floor spring,
door closer etc. finished with sand papering complete as per direction of the Engineer -in-
charge and standard practice.

-
(d) Painting to door and window frames and shutters paint/ of best quality and approved -
colour. Over a coat of priming including cleaning finishing and polishing with sand paper
and necessary scaffolding etc. all complete in all floors.

1)Hard wood sqm 18 84 1,507


-
3.2.6 Plumbing Fixture & Bath Accessories -
3.2.6.1 Supplying fitting and fixing European type glazed porcelain auto flush toilet of best quality set 1 62,171 62,171
including all internal fittings and accessories as plastic seat cover, automatic flush valve ,
spray hose , plastic connection pipe with brass coupling, etc. and preparing the base with
cement concrete and with wire net or rods, if necessary , in all floors including making holes
wherever required and mending good the damages and fitting fixing complete with all
necessay fittings and connection as per direction of the Engineer in-charge.

Page 174 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.6.2 Supplying, fitting and fixing basin on the granite counter including making holes wherever set 2 31,668 63,337
required , fitting in position on the counter and mending good the damages and supplying
fitting fixing the same in position with C.I brackets, including supplying faucet ,Waste , Bottle
trap, stop valve etc. all complete as per direction of the Engineer-in -charge.

-
3.2.6.3 Supplying fitting and fixing European type glazed porcelain auto flush urinals of best set 1 71,638 71,638
quality including fitting, fixing the same in position after making holes in walls and floor,
providing plastic waste pipe with brass coupling upto grading below, automatic flush valve
and mending good the damages etc. all complete as per direction of the Engineer in-charge.

-
3.2.6.4 Supplying fitting and fixing soap holder of best quality with all fittings and accessories set 1 3,557 3,557
including making holes in walls and mending good the damages etc. all complete as per
direction of the Engineer in-charge.
-
3.2.6.5 Supplying, fitting and fixing paper holder of best quality including making holes in walls and each 1 3,557 3,557
mending good the damages etc. all complete as per direction of the Engineer in-charge.

-
3.2.6.6 Supplying, fitting and fixing hook of best quality including making holes in walls and each 1 3,557 3,557
mending good the damages etc. all complete as per direction of the Engineer in-charge.

-
3.2.7 Movable Furniture -
3.2.7.1 Supplying and placing 2 Sitter Settee Pano sofa PAN-3S and mending good the damages etc. each 1 97,901 97,901
all complete as per direction of the Engineer in-charge.

-
3.2.7.2 Supplying and placing armchair virtual and mending good the damages etc. all complete as each 3 23,464 70,392
per direction of the Engineer in-charge.
-
3.2.7.3 Supplying and placing coffee table and mending good the damages etc. all complete as per each 1 21,874 21,874
direction of the Engineer in-charge.
-

Page 175 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.2.7.4 Supplying and placing side table checker and mending good the damages etc. all complete as each 2 22,394 44,789
per direction of the Engineer in-charge.
-
3.2.7.5 Supplying and placing dining armchair and mending good the damages etc. all complete as each 11 23,734 261,070
per direction of the Engineer in-charge.
-
3.2.7.6 Supplying and placing dining game table (900x900 mm. 750mm. Ht.) and mending good the each 3 11,509 34,526
damages etc. all complete as per direction of the Engineer in-charge.

-
3.2.7.7 Supplying and placing vase (violet color fibreglass) and mending good the damages etc. all each 1 8,450 8,450
complete as per direction of the Engineer in-charge.
-
3.2.7.8 Supplying and placing vase (charcoal color fibreglass) and mending good the damages etc. each 1 17,577 17,577
all complete as per direction of the Engineer in-charge.
-
3.2.7.9 Supplying and placing Gi side table and mending good the damages etc. all complete as per each 1 22,394 22,394
direction of the Engineer in-charge.
-
3.2.7.10 Supplying and placing game table (750x900mm. 750mm. Ht.) and mending good the each 1 9,947 9,947
damages etc. all complete as per direction of the Engineer in-charge.

-
3.2.7.11 Supplying and placing Desk Chair Mom and mending good the damages etc. all complete as each 1 15,624 15,624
per direction of the Engineer in-charge.
-
3.2.7.12 Supplying and placing Desk S-Pan and mending good the damages etc. all complete as per each 1 32,364 32,364
direction of the Engineer in-charge.
-
3.2.7.13 Supplying and placing Console table and mending good the damages etc. all complete as per each 1 25,389 25,389
direction of the Engineer in-charge.
-
3.2.7.14 Supplying and placing service station and mending good the damages etc. all complete as per each 1 43,943 43,943
direction of the Engineer in-charge.

Page 176 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
3.2.8 Built-in Furniture -
3.2.8.1 Supplying, fitting and fixing wood veneer panel including costing of fitting, fixing all set 3 12,416 37,247
necessary accessiories complete in all respect as per drawing and direction of the Engineer in-
charge.
-
3.2.8.2 Supplying, fitting and fixing wood panel with 6mm strip joint (3250mm width 47mm thick) set 1 20,832 20,832
including costing of fitting, fixing all necessary accessiories complete in all respect as per
drawing and direction of the Engineer in-charge.

-
3.2.8.3 Supplying, fitting and fixing wood frame (drapery pocket) including costing of fitting, fixing set 4 8,333 33,331
all necessary accessiories complete in all respect as per drawing and direction of the Engineer
in-charge.
-
3.2.8.4 Supplying, fitting and fixing Gypsum board panel including costing of fitting, fixing all set 1 3,460 3,460
necessary accessiories complete in all respect as per drawing and direction of the Engineer in-
charge.
-
3.2.8.5 Supplying, fitting and fixing buffet counter including costing of fitting, fixing all necessary set 1 103,509 103,509
accessiories complete in all respect as per drawing and direction of the Engineer in-charge.

-
3.2.8.6 Supplying, fitting and fixing book shelf including costing of fitting, fixing all necessary set 1 44,175 44,175
accessiories complete in all respect as per drawing and direction of the Engineer in-charge.

-
3.2.8.7 Supplying, fitting and fixing wood panel with 6mm strip joint including costing of fitting, set 1 10,797 10,797
fixing all necessary accessiories complete in all respect as per drawing and direction of the
Engineer in-charge.
-
3.2.8.8 Supplying, fitting and fixing wood panel with 6mm strip joint (1660mm width 47mm thick) set 1 21,762 21,762
including costing of fitting, fixing all necessary accessiories complete in all respect as per
drawing and direction of the Engineer in-charge.

Page 177 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
3.2.8.9 Supplying, fitting and fixing lavatory counter and mirror including costing of fitting, fixing set 1 62,729 62,729
all necessary accessiories complete in all respect as per drawing and direction of the Engineer
in-charge.
-
3.2.8.10 Supplying, fitting and fixing handrail of approved quality and shape including costing of rm 8 4,185 33,480
fitting, fixing all necessary accessiories complete in all respect as per drawing and direction of
the Engineer in-charge.
-
3.2.9 Stair -
3.2.9.1 Supplying, fitting and fixing stair composed of Burma teak wood top trails, treads and risers, ls 1 144,434 144,434
cast iron blaster as per design , drawings and direction ot the Engineer in-charge.

-
3.2.10 Drapery -
3.2.10.1 Supplying, fitting and fixing heavy curtain Lopez blackout 506/01 and mending good the set 3 LS 1,887,656
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.10.2 Supplying, fitting and fixing timber slim line blind(25mm. 3mm thick) and mending good the set 3 LS 2,869,308
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.11 Lighting fixtures & Electrical Accessories -
3.2.11.1 Supplying, fitting and fixing wall bracket 60w and mending good the damages etc. all each 3 2,883 8,649
complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.2 Supplying, fitting and fixing Halogen up light and mending good the damages etc. all each 10 2,511 25,110
complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.3 Supplying, fitting and fixing Halogen down light and mending good the damages etc. all each 12 1,674 20,088
complete as per drawing and direction of the Engineer in-charge.

Page 178 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
3.2.11.4 Supplying, fitting and fixing Halogen wall washer and mending good the damages etc. all each 5 1,674 8,370
complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.5 Supplying, fitting and fixing concealed fluorescent light (26m length) and mending good the set 1 45,589 45,589
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.6 Supplying, fitting and fixing concealed fluorescent light (5m length) and mending good the set 1 8,221 8,221
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.7 Supplying, fitting and fixing concealed fluorescent light (4m length) and mending good the set 1 6,529 6,529
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.8 Supplying, fitting and fixing concealed fluorescent light (2m length) and mending good the set 1 3,143 3,143
damages etc. all complete as per drawing and direction of the Engineer in-charge.

-
3.2.11.9 Supplying and fitting ceiling lamp and mending good the damages etc. all complete as per each 1 23,194 23,194
drawing and direction of the Engineer in-charge.
-
3.2.11.10 Supplying and fitting ceiling table lamp and mending good the damages etc. all complete as each 2 15,220 30,441
per drawing and direction of the Engineer in-charge.
-
3 STRUCTURAL WORKS -
3.3.1 Piling Work -

Page 179 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.3.1.1 Boring/ Drilling for cast in situ pile upto the required depth and dia with minimum 6 m long -
temporary steel casing, true to vertical, providing bentonite slurry and maintaining water
level in the hole, washing the hole for at least 30 minutes clear the hole and make the hole
ready for steel cage and concreting , all complete as per design and struction of the Engineer-
in-charge.

500 mm dia -
1) Upto 18 m rm 119 377 44,821
1) Add extra cost for each additional metre beyond 18 metre up to 30 metre rm 46 15 684
-
3.3.1.2 Casting of cast in situ bored pile with reinforced cement concrete works to give a minimum cum 33 5,319 175,516
Cylinder crushing strength of 21 Mpa concrete from a machine mixed typical batch with fresh
Portland cement type 1 (conforming to ASTM C150 latest edition) best quality coarse Sylhet
sand (minimum F.M.2.5 and 20 mm down) graded crushed stone chips including cost of
breaking chips, screening through proper sieves, cleaning and washing thoroughly,
centering, shuttering with M.S. sheet and steel form, placing of reinforcement cage in
position, mixing the aggregates with mixer machine, casting in steel forms, compacting by
Mechanical vibrators and tapered rods and curing for 28 days, Welding, curing etc. complete
in all respects, as per design, drawing and direction of the Engineer in-charge (excluding the
cost of reinforcements and its fabrication but including the cost of all other materials).

(Measurement will be given from bottom of pile cap or cut off level) -
-
3.3.1.3 Labour for breaking head of cast in situ bored pile/precast pile upto required length by any cum 1 1,054 1,054
means and removing the dismantled materials such as concrete to a safe distance including
scraps and removing concrete from steel/M.S. Rods preparation and making.

-
3.3.1.4 Conducting static load test for the cast in situ / precast pile providing required scaffolding -
,bracing, jacks, pressure test guage, kentledge and other plants and equipment as per
standard practice and procedures submission of load test report and charts.

1) For 95 tonne load per test 1 57,893 57,893

Page 180 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
-
3.3.1.5 Supplying, fabrication and fixing to details as per design deformed/round bar reinforcement -
in insitu bore pile concrete in accordance with ASTM A615 or equal in/c. straightening and
cleaning rust, if any, bending & binding in position in/c. supply of G.I

1) SR 24 round bar with minimum fy = 235 Mpa quintal 4 4,208 16,833


2) SD 40 deformed bar with minimum fy = 390 Mpa/276 Mpa quintal 12 4,362 52,340
-
3.3.2 Earth Work -
3.3.2.1 Earth work in excavation of all kinds of soils of foundation trenches including leveling, -
ramming and preparing the base, bailing out water and shoring if necessary, providing
center line and bench mark pillars, removing the spoils etc. to a lead not exceeding 60 m.

1) Upto 1.50 m depth and lead beyond 60 m cum 77 35 2,721


-
3.3.2.2 Earth filling in foundation trenches and plinth in 150 mm layer with earth avail-able within cum 63 38 2,402
90 m of the building site, watering, leveling and consolidating each layer upto finished level.

-
3.3.2.3 Sand filling in foundation trenches and plinth with coarse sand having minimum F.M.-1.20 cum 1 379 379
layers including leveling watering and consolidating each layer upto finished level.

-
3.3.3 Concrete Work -
3.3.3.1 50 mm thick lean concrete course to give a minimum Cylinder strength of 13.5 Mpa concrete sqm 11 3,915 43,068
with cement, sand (F.M. 1.2), picked jhama chips, in/c breaking chips, screening, centering,
shuttering, casting and curing.
-

Page 181 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.3.3.2 Reinforced cement concrete works to give a minimum Cylinder strength of 28 Mpa concrete -
from a machine mixed typical batch with fresh Portland cement type 1 (conforming to ASTM
C150 latest edition), best quality coarse Sylhet sand (minimum F.M. 2.5 and 20 mm down)
graded crushed stone chips including cost of breaking chips, screening through proper
sievers, cleaning and washing thoroughly, centering, shuttering with M.S. sheet and steel
form, placing of reinforcement cage in position, mixing the aggregates with mixer machine,
casting in steel forms, compacting by Mechanical vibrators and tapered rods and curing for
28 days etc all complete as per direction of the Engineer in charge (Excluding the cost of
reinforcements and its fabrication)

In Individual and continuous footing of column, raft and floor slab at cum 7 5,101 35,707
plinth level. -
-
In Foundation beam cum 7 5,450 38,149
-
In pedestal, column, capital lift wall and wall: -
-
1) Below Plinth level and in Ground Floor cum 4 7,254 29,016
2) Second Floor cum 4 7,273 29,090
3) Third Floor cum 1 7,305 7,305
-
In Tee Beam, Ell Beam, Rectangular Beam etc. (Exposed breadth and width of ribs to be -
measured only).
-
1) Ground Floor cum 24 6,687 160,481
2) Second Floor cum 12 6,705 80,464
3) Third Floor cum 5 6,738 33,689
-
In roof slab of all types, cantilever slab and drop panels (excluding floor slab of ground -
floor at plinth level).
1) Ground Floor cum 11 6,417 70,587
2) Second Floor cum 21 6,445 135,343
3) Third Floor cum 3 6,468 19,404
-

Page 182 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.3.4 Reinforcing Steel -
3.3.4.1 Supplying, fabrication and fixing to details as per design deformed/round bar reinforcement -
in concrete in accordance with ASTM A615 or equal in/c. straightening and cleaning rust, if
any, bending & binding in position in/c. supply of G.I. Wires etc. comp

(1) SR 24 round bar with minimum fy = 235 Mpa quintal 10 4,213 42,129
(2) SD 40 deformed bar with minimum fy = 390 Mpa/276 Mpa quintal 174 4,362 758,936
-
3.3.5 Structural Steel -
3.3.5.1 Mild steel works in roof truss, supplying and fabrication of mild steel sections, as per design, quintal 5 5,509 27,547
hoisting , fitting and fixing in position with bolts and nuts or rivets or welded and providing
two coats of anticorrosive paint over a prime coat of red oxide paint (measurement to be
given for solid steel section only).

-
3 ARCHITECTURAL WORKS -
3.4.1 Roofing -
3.4.1.1 Supplying, fitting and fixing Skylight roofing w/steel frame all complete as per drawing and sqm 24 16,973 407,340
direction of the Engineer in-charge.
-
3.4.2 Ceiling -
3.4.2.1 Supplying, fitting and fixing of Aluminium cladding ceiling with frame as per the U.S sqm 11 4,325 47,570
Architectural aluminium Manufacturer's Association (AAMA) standard specification with all
aluminium members will be anodized to Aluminium Bronze / Silver colour with a coat not
less than 15 micrones in thickness and density of 4mg per square cm etc. complete in all
respect as per drawing and direction fo the Engineer in-charge.

-
3.4.3 Wall & Wall Finishing -
3.4.3.1 90 mm thick Concrete block wall in cement mortar ( 1: 4 ) and making bond with connected -
walls in/c necessary scaffolding, raking out joints, cleaning and curing at least for 7 days in
all floors.( F.M. of sand = 1.2)
1) Second Floor sqm -
2) Third Floor sqm 17 2,344 39,841
-

Page 183 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.4.3.2 Minimum 12mm thick cement plaster (1:6) to wall inner surface, finishing the corner and -
edges in/c washing of sand cleaning the surface, scaffolding and curing at least for 7 days
etc. all complete as per direction of the Engineer in charge.

1) Second Floor sqm -


2) Third Floor sqm 34 2,130 72,410
-
3.4.3.3 Painting to walls and columns two coats with Acrylic paint of best quality and approved sqm -
colour over a coat of priming including cleaning finishing and polishing with sand paper and
necessary scaffolding etc. all complete in all floors.

-
3.4.3.4 Supplying and setting 25 mm thick Granite wall tiles stair riser of approved quality, texture sqm 5 4,929 24,645
& size on handrail wall over 20 mm thick cement mortar (1:2) including cutting and grinding
the Granite tiles setting in position keeping horizontal and vertical alignment correct, filling
the joints with white cement, cutting and grinding the top surface and finishing etc. complete
in all respect.

-
3.4.3.5 Supplying, fitting and fixing of Aluminium cladding wall and canopy with frame as per the sqm 50 3,050 152,520
U.S Architectural aluminium Manufacturer's Association (AAMA) standard specification
with all aluminium members will be anodized to Aluminium Bronze / Silver colour with a
coat not less than 15 micrones in thickness and density of 4mg per square cm etc. complete in
all respect as per drawing and direction fo the Engineer in-charge.

-
3.4.3.6 Supplying, fitting and fixing 12"x12" Ceramic wall tiles on 20 mm thick cement mortar (1:3) sqm 16 897 14,344
base and raking out the joints with white cement including cutting and laying tiles in proper
way and finishing with care etc. all complete as per direction of the Engineer in-charge.

-
3.4.4 Skirting & Nosing -

Page 184 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
3.4.4.1 Supplying, fitting and fixing Granite tiles skirting on 20 mm thick cement mortar (1:3) base rm 23 1,032 23,743
and raking out the joints with white cement including cutting and laying tiles in proper way
and finishing with care etc. all complete as per direction of the Engineer in-charge.

-
3.4.5 Floor & Floor Finishing -
3.4.5.1 Supplying, fitting and fixing 25 mm thick Granite floor tiles of approved quality, texture & sqm 135 5,906 797,243
size on wall over 20 mm thick cement mortar (1:2) including cutting and grinding the Granite
tiles setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

-
3.4.5.2 Supplying, fitting and fixing 12"x12" Ceramic floor tiles on 20 mm thick cement mortar (1:3) sqm 7 897 6,276
base and raking out the joints with white cement including cutting and laying tiles in proper
way and finishing with care etc. all complete as per direction of the Engineer in-charge.

-
3.4.6 Doors -
3.4.6.1 Tempered Glass Doors 10 mm thick -
Supplying. Fitting and fixing of 10 mm thick tempered glass swing doors with fixed partition -
including all accesories like hinge,handel, locks, floor spring, door closer, rib glass, glass
fitting etc. complete in all respect as per drawing and direction of the Engineer in-charge.

1) size : 2,300 mm x 1,700mm sqm 13 6,138 79,794


-
3.4.6.2 Wood Doors -
(a) Supplying and making door frames with seasoned wood of required size including -
painting fitted and fixed in position finished with sand papering mending good the damages
if any. (All sizes of wood are finished)

1)Hard wood cum - 50,081 -


-

Page 185 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) with the rm 13 182 2,367
vertical members of the frame, fixing the frame in wall mending good damages, fixing
Stainless steel hinges w/ball bearing with the vertical members of the frame for leaf shutter,
all complete as per plan and direction of the Engineer in-Charge.

(Running metre of the door frame will be considered towards measurement) -


-
(c) Supplying, making and fixing solid wood door panel plywood finish with wood trim to sqm 3 2,790 8,370
hardwood frames including all accessories knob, pivot, handel, floor spring, door closer etc.
finished with sand papering complete as per direction of the Engineer -in-charge and
standard practice.
-
(d) Supplying, making and fixing louver wood door panel plywood finish with wood trim to sqm 2 5,746 11,492
hardwood frames including all accessories knob, pivot, handel, floor spring, door closer etc.
finished with sand papering complete as per direction of the Engineer -in-charge and
standard practice.
-
(e) Painting to door and window frames and shutters paint/ of best quality and approved -
colour. Over a coat of priming including cleaning finishing and polishing with sand paper
and necessary scaffolding etc. all complete in all floors.

1)Hard wood sqm 6 84 502


-
3.4.6.3 Clear Tempered Glass Windows 10 mm thick -
Supplying. Fitting and fixing of 12 mm thick tempered glass windows with fixed partition -
including all accesories like rib glass, glass fitting etc. complete in all respect as per drawing
and direction of the Engineer in-charge.

1) size : 3,000 mm x 5,000mm sqm 8 6,119 48,955


2) size : 6,000 mm x 10,000mm sqm 60 6,119 367,164
3) size : 2,500 mm x 2,500mm sqm 7 6,119 42,836
3) size : 3,000 mm x 5,000mm sqm 8 6,119 48,955
- - -
3.4.7 Miscellaneous -
3.4.7.1 Supplying and applying water proofing system on roof slab as per drawing and direction of sqm 32 1,744 55,800
the Engineer in-charge.

Page 186 of 273


LOUNGES
BILL OF QUANTITIES
BILL NO.3.2 - LOUNGES
- - -
3.4.7.2 Supplying. Fitting and fixing of GS handrail with temper glass 10mm thick, manding good all sqm -
damages, finishing etc. complete in all respect as per drawing and direction of the Engineer
in-charge.
-
3.4.7.3 Supplying, fitting and fixing Teak wood bench of approved quality and pattern complete in ls -
all respect as per drawing and direction of the Engineer in-charge.

3.5 AIRCONDITIONING, ELECTRICAL & SANITARY WORKS


(Referred to respective Bills of System Works)

Sub total 12,881,268

Page 187 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner


1 BALL ROOM
1.1 GENERAL
Demolising existing structure/finishings where if necessary including breaking, ls 1 111,600.00 111,600
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-
charge.

- - -
1.2 INTERIOR AND FF&E WORKS -
1.2.1 Ceiling -
1.2.1.1 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 480 86.49 41,515
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all complete in all floors.

- - -
1.2.1.2 Supplying and installing Paper back gold leaf ceiling covering, imperial gold leaf , sqm 210 2,636.55 553,676
40" width including cleaning the surface and necessary scaffolding etc. all complete
in all floors.

- - -
1.2.2 Wall & Wall Finishing -
1.2.2.1 Supplying and installing custom fabric wall covering including cleaning the surface sqm 193 2,636.55 508,854
and necessary scaffolding etc. all complete in all floors.
- - -

Page 188 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
1.2.2.2 Supplying, fitting and fixing Burma Teak wood panel of approved quality and shape sqm 95 5,998.50 569,858
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

-
1.2.2.3 Supplying. Fitting and fixing movable walls including all accesories complete in all sqm 123 LS 10,597,171
respect as per design, specification, drawing and direction of the Engineer in-
charge.

1.2.3 Skirting & Nosing -- - -


1.2.3.1 Supplying, fitting and fixing Burma Teak wood base moulding of approved quality m 45 1,083.00 48,735
and shape including costing of fitting, fixing all necessary accessiories etc. complete
in all respect as per drawing and direction of the Engineer in-charge.

1.2.4 Floor & Floor Finishing -- - -


1.2.4.1 Supplying and laying Fire proof Axminister carpeting of approved pattern and color sqm 414 5,201.25 2,153,318
including underlayments in proper way and finishing with care etc. all complete as
per direction of the Engineer in-charge.

1.2.4.2 Supplying and laying Fire proof Axminister carpeting of approved pattern and color sqm -
12 -
5,201.25 -
62,415
including underlayments in proper way and finishing with care etc. all complete as
per direction of the Engineer in-charge.

1.2.5 Furniture -- - -

Page 189 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
1.2.5.1 Supplying, fitting and fixing wood carved panels of approved quality and design set 6 80,370.00 482,220
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

1.2.6 Lighting fixtures & Electrical Accessories -- - -


1.2.6.1 Supplying, fitting and fixing of decorative chandelier,3m diameterx0.96m height with set 18 2,422,500.00 43,605,000
18x60W as per Design, Technical Specification and instruction of the Engineer,
complete in all respect.

-
1.2.6.2 Cancelled -

-
1.2.6.3 Supplying, fitting and fixing cold cathode tube lighting (22 m length) and mending set 9 210,900.00 1,898,100
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

-
1.2.6.4 Supplying, fitting and fixing down light and mending good the damages etc. all each 46 2,821.50 129,789
complete as per drawing and direction of the Engineer in-charge.
-
1.2.6.5 Supplying, fitting and fixing aircon grill and mending good the damages etc. all each -
complete as per drawing and direction of the Engineer in-charge.
- - -

Page 190 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
1.2.6.6 Supplying, fitting and fixing of single recepticle as per Design, Technical set 5 870.96 4,355
Specification and instruction of the Engineer, complete in all respect.
-
1.2.7 Wood Doors -
1.2.7.1 (a) Supplying and making door frames with seasoned wood of required size -
including painting two coats of coaltar to the surface in contact with wall, fitted and
fixed in position finished with sand papering mending good the damages if any. (All
sizes of wood are finished)

1)Burma Teak wood cum 1 51,205.00 51,205


- - -
(b) Supplying, fitting and fixing of door frame with 38 mm x 38 mm x 6 mm M.S. rm 110 201.40 22,154
angle, fixing 250 mm long 6 Nos. of iron clamps of same size (with one end
bifurcated) with the vertical members of the frame, fixing the frame in wall with 1:2:4
cement concrete, mending good damages, fixing 6 Nos. of Stainless steel hinges
w/ball bearing with the vertical members of the frame for double leaf shutter,
painting all iron faces 2 coats over a coat of priming with enamel paint of approved
colour and quality, all complete including cutting, sizing, welding etc. as per plan
and direction of the Engineer in-Charge.

(Running metre of the door frame will be considered towards measurement) -


- - -

Page 191 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
(c) Supplying, making and fixing of Burma Teak wood door panel to hardwood sqm 65 11,400.00 741,000
frames including all accessories ving card lock, eye viewer, bolt, pivot, floor spring,
door closer etc. finished with sand papering complete as per design and drawing
and direction of the Engineer -in-charge and standard practice.

- - -
(d) Stain finishing of best quality including cleaning finishing and polishing with sand sqm 185 3,348.75 619,519
paper and necessary scaffolding etc. all complete in all floors.
Sub total 0 62,200,482
2 PREFUNCTION AREA ( FOR BALL ROOM ) -
2 GENERAL -
2.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 80,750.00 80,750
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-
charge.

2 INTERIOR AND FF&E WORKS -- - -


2.2.1 Ceiling -
2.2.1.1 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 235 88.35 20,762
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completer in all floors.

2.2.2 Wall & Wall Finishing -- - -


2.2.2.1 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 140 88.35 12,369
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completer in all floors.

- - -
Page 192 of 273
BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
2.2.2.2 Supplying, fitting and fixing Gypsum board panel of approved quality and shape sqm 140 1,513.16 211,842
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

2.2.2.3 Supplying, fitting and fixing Granite stone wall of approved quality, texture & size sqm -
130 -
5,042.60 -
655,538
over 20 mm thick cement mortar (1:2) including cutting and grinding the Granite tiles
setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface and finishing etc. complete
in all respect.

-
2.2.3 Skirting & Nosing -
2.2.3.1 Supplying, fitting and fixing Granite stone base of approved quality, texture & size rm 33 5,042.60 166,406
over 20 mm thick cement mortar (1:2) including cutting and grinding the Granite tiles
setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface and finishing etc. complete
in all respect.

- - -
2.2.4 Floor & Floor Finishing -
2.2.4.1 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 85 5,042.60 428,621
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

Page 193 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
-
2.2.4.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 sqm 45 5,042.60 226,917
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting
in position keeping horizontal and vertical alignment correct, filling the joints with
white cement, cutting and grinding the top surface and finishing etc. complete in all
respect.

-
2.2.4.3 Supplying and laying Fire proof Contemporary Dhurrie pattern carpeting including sqm 63 9,148.50 576,356
underlayments in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

-
2.2.5 Movable Furniture -
2.2.5.1 Supplying and placing Feature table 1800 diameterx 760 mm and mending good the each 1 267,900.00 267,900
damages etc. all complete as per direction of the Engineer in-charge.

-
2.2.5.2 Supplying and placing area rug, Dhurrie pattern 5900 x 6200 mm and mending each 1 1,224,972.75 1,224,973
good the damages etc. all complete as per direction of the Engineer in-charge.

-
2.2.5.3 Supplying and placing area rug, Tufted carpet 5900 x 6200 mm and mending good each 1 1,224,972.75 1,224,973
the damages etc. all complete as per direction of the Engineer in-charge.

Page 194 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
-
2.2.6 Lighting fixtures & Electrical Accessories -
2.2.6.1 Supplying, fitting and fixing of decorative chandelier,1.5m diameterx0.60m height set 3 861,341.25 2,584,024
with 18x60W as per Design, Technical Specification and instruction of the Engineer,
complete in all respect

2.2.6.2 Supplying, fitting and fixing down light and mending good the damages etc. all each -
24 -
2,821.50 -
67,716
complete as per drawing and direction of the Engineer in-charge.

2.2.6.3 Supplying, fitting and fixing of single recepticle as per Design, Technical set -5 -
822.40 -
4,112
Specification and instruction of the Engineer, complete in all respect.
-
2.2.6.4 Supplying, fitting and fixing aircon grill and mending good the damages etc. all each -
complete as per drawing and direction of the Engineer in-charge.
Sub total 0 7,753,258
3 SERVICE PANTRY (BALL ROOM) -
3 ARCHITECTURAL WORKS -
3.1.1 Ceiling -

Page 195 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
3.1.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical sqm 20 1,512.40 30,248
hot press with cement plaster paste and fixed to wood frame suspended from
ceiling maintaining straight lines and desired finished level at bottom face with
vertical wooden strut as required in/c making holes in slabs, or beams by electric
drill machine and mending good the damages, if any, during execution of the work
in/c cost of all materials accessories scaffoldings, labour for installation, screws,
nails, etc all complete as per drawing design and direction ot the Engineer in-
charge.

3.1.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm -
20 -
88.35 -
1,767
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completerin all floors.

-
3.1.2 Wall & Wall Finishing -
3.1.2.1 Brick wall of width half brick with 1st class bricks in cement mortar ( 1: 4 ) and -
making bond with connected walls in/c necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use and washing out
sand curing at least for 7 days in all floors ( F.M. of sand = 1.2)

1) Ground Floor sqm 41 321.86 13,196


-
3.1.2.2 Minimum 12mm thick cement plaster (1:6) to wall inner/outer surface, finishing the -
corner and edges in/c washing of sand cleaning the surface, scaffolding and curing
at least for 7 days etc. all complete as per direction of the Engineer in charge.

Page 196 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
1) Ground Floor sqm 69 323.95 22,353
-
3.1.2.3 Painting to walls and columns two coats with Acrylic paint of best quality and sqm 79 86.74 6,852
approved colour over a coat of priming including cleaning finishing and polishing
with sand paper and necessary scaffolding etc. all complete in all floors.

-
3.1.2.4 Supplying, fitting and fixing glazed ceramic wall tiles on 20 mm thick cement mortar sqm 20 5,035.00 100,700
(1:3) base and raking out the joints with white cement including cutting and laying
tiles in proper way and finishing with care etc. all complete as per direction of the
Engineer in-charge.

-
3.1.3 Skirting & Nosing -
3.1.3.1 Supplying, fitting and fixing Burma Teak wood skirting with paint of approved quality rm 9 441.75 3,976
and shape including costing of fitting, fixing all necessary accessiories etc. complete
in all respect as per drawing and direction of the Engineer in-charge.

-
3.1.3.2 Supplying, fitting and fixing glazed ceramic tiles skirting 4" height on 20 mm thick rm 10 187.15 1,872
cement mortar (1:3) base and raking out the joints with white cement including
cutting and laying tiles in proper way and finishing with care etc. all complete as per
direction of the Engineer in-charge.

Page 197 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
3.1.4 Floor & Floor Finishing -
3.1.4.1 Cancelled -

3.1.4.2 Supplying, fitting and fixing non-slip ceramic floor tiles on 20 mm thick cement sqm 21 889.20 18,673
mortar (1:3) base and raking out the joints with white cement including cutting and
laying tiles in proper way and finishing with care etc. all complete as per direction of
the Engineer in-charge.

- - -
3.1.5 Aluminium Doors -
3.1.5.1 (a) Supplying, fitting and fixing of Aluminium composite swing doors with fixed -
partition as per the U.S. Architectural Aluminium Manufacturere's Association
(AAMA) standard specification having wall frame ( size 2"x4"), section of all
Aluminium members will be anodized to Aluminium Bronze/Silver colour with a coat
not less than 15 micrones in thickness and density of 4mg per square cm etc.
including all accessories hinge,handel, locks, floor spring, door closer, rib glass,
glass fitting etc. keeping provision for fitting 8 mm thick reflective glass panel and
6mm reflective glass transom including neoprene, sealant etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

1) size : 2,050 mm x 900mm sqm 3 3,823.75 11,471


-

Page 198 of 273


BALL ROOM & PREFUNCTION
BILL OF QUANTITIES
BILL NO.3.3- BALL ROOM & PREFUNCTION
3.1.5.2 (b) Supplying, fitting and fixing in Aluminium door frame with distortion free 8 mm sqm 2 2,503.25 5,007
thick reflective glass foreign made and of approved quality and shade including
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

-
Sub total 0 216,114

Page 199 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner


1 MEETING ROOMS
1.1 GENERAL
Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 36,270.00 36,270
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-
charge.

- -
1.2 INTERIOR AND FF&E WORKS
1.2.1 Ceiling
1.2.1.1 Supplying fitting and fixing of 12 mm thick Gypsum board laminated by mechanical sqm 543 1,543.80 838,283
hot press with metal LG stud frame in natural anodized finish at 600 mm x 600 mm in
grid, suspended from ceiling by 12 SWG double ply wire fixed to the ceiling by rowel
plug, screws, hooks, nails etc. maintaining straight lines and desired finished level at
bottom face with vertical wooden strut as required in/c making holes in slabs, or
beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per drawing design and direction ot the
Engineer in-charge.

Page 200 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
1.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 543 85.56 46,459
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completer in all floors.

1.2.2 Wall & Wall Finishing


1.2.2.1 Supplying and installing Vinyl wall covering, siam silk, 54" wide including cleaning the sqm 1,356 2,016.24 2,734,021
surface and necessary scaffolding etc. all complete in all floors.

1.2.3 Movable Wall


1.2.3.1 Supplying, fitting and fixing movable walls of approved quality and shape including sqm 156 lS 4,257,792
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

1.2.4 Skirting & Nosing


1.2.4.1 Supplying, fitting and fixing Burma Teak wood base of approved quality and shape rm 380 990.45 4,257,792
including costing of fitting, fixing all necessary accessiories etc. complete in all
respect as per drawing and direction of the Engineer in-charge.

1.2.5 Floor & Floor Finishing

Page 201 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
1.2.5.1 Supplying and laying Fire proof Axminister carpeting including underlayments in sqm 890 4,924.35 4,382,672
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

1.2.6 Movable Furniture


1.2.6.1 Supplying and placing lounge chair 34"x331/4"x30" and mending good the damages each 12 72,093.60 865,123
etc. all complete as per direction of the Engineer in-charge.

1.2.6.2 Supplying and placing custom cabinet 3200x600x760mm and mending good the each 2 70,828.80 141,658
damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.3 Supplying and placing table 72"x18"x30" and mending good the damages etc. all each 4 17,134.32 68,537
complete as per direction of the Engineer in-charge.

1.2.6.4 Supplying and placing stacking chair,18"x231/2"x35" and mending good the damages each 168 6,119.40 1,028,059
etc. all complete as per direction of the Engineer in-charge.
-
1.2.6.5 Supplying and placing table, 30"x72"x30" and mending good the damages etc. all each 7 23,253.72 162,776
complete as per direction of the Engineer in-charge.

1.2.6.6 Supplying and placing custom cabinet, 3650x600x760mm and mending good the each 1 80,789.10 80,789
damages etc. all complete as per direction of the Engineer in-charge.

Page 202 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
1.2.6.7 Supplying and placing sectional sofa 331/4"x30"x261/2" (C shape)and mending good each 1 321,268.50 321,269
the damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.8 Supplying and placing sectional sofa 331/4"x30"x261/2" (C shape) and mending good each 1 413,059.50 413,060
the damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.9 Supplying and placing sectional sofa 331/4"x30"x261/2" (L shape) and mending good each 1 -
321,268.50 -
321,269
the damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.10 Supplying and placing antique coffee table, hexagonal shaped 1500mm each 3 -
232,537.20 -
697,612
diameterx450mm and mending good the damages etc. all complete as per direction
of the Engineer in-charge.

1.2.6.11 Supplying and placing custom cabinet 2400x600x760mm and mending good the each 9 -
53,121.60 -
478,094
damages etc. all complete as per direction of the Engineer in-charge.

1.2.6.12 Supplying and placing armless long chair, 23"x30"x32" and mending good the each 8 -
55,074.60 -
440,597
damages etc. all complete as per direction of the Engineer in-charge.
- -
1.2.6.13 Supplying and placing round table and mending good the damages etc. all complete each 6 24,477.60 146,866
as per direction of the Engineer in-charge.

1.2.6.14 Supplying and placing square table and mending good the damages etc. all complete each 3 39,776.10 119,328
as per direction of the Engineer in-charge.

1.2.7 Lighting fixtures & Electrical Accessories


Page 203 of 273
FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
1.2.7.1 Cancelled

supplying,fitting and fixing of decorative ceiling 0.85mdiameter*1.0mheight set 3 56,497.50 169,493


with 6*150we27 ceramic lamp holder,1.2m diameter 1.2m deep as dedign
1.2.7.2 Supplying, fitting and fixing cold cathode tube lighting (20 m length) and mending set 4 177,072.00 708,288
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

1.2.7.3 Cancelled

1.2.7.4 Supplying, fitting and fixing cold cathode tube lighting (21 m length) and mending set 3 184,884.00 554,652
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

1.2.7.5 Cancelled

1.2.7.6 Supplying, fitting and fixing cold cathode tube lighting (24 m length) and mending set 1 208,320.00 208,320
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

Page 204 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS

1.2.7.7 Cancelled

1.2.7.8 Supplying, fitting and fixing cold cathode tube lighting (30 m length) and mending set 4 255,192.00 1,020,768
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

1.2.7.9 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, set 55 2,587.26 142,299
fittings as per Design, Technical Specification and instruction of the Engineer,
complete in all respect.

1.2.7.10 Supplying, fitting and fixing aircon grill and mending good the damages etc. all each
complete as per drawing and direction of the Engineer in-charge.

1.2.7.11 Supplying, fitting and fixing of single recepticle as per Design, Technical Specification set 55 852.62 46,894
and instruction of the Engineer, complete in all respect.

1.2.7.12 Supplying, fitting and fixing of telephone outlet as per Design, Technical Specification set
and instruction of the Engineer, complete in all respect.

Page 205 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
1.2.8 Wood Doors
1.2.8.1 (a) Supplying and making door frames with seasoned wood of required size including
painting fitted and fixed in position finished with sand papering mending good the
damages if any. (All sizes of wood are finished)

1)Burma Teak wood cum 1 50,080.50 50,081

1.2.8.2 (b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) rm 103 182.09 18,756
with the vertical members of the frame, fixing the frame in wall mending good
damages, fixing Stainless steel hinges w/ball bearing with the vertical members of
the frame for leaf shutter, all complete as per plan and direction of the Engineer in-
Charge.

(Running metre of the door frame will be considered towards measurement)

1.2.8.3 (c) Supplying, making and fixing Burma Teak wood door panel to hardwood frames sqm 58 11,160.00 647,280
including all accessories knob, pivot, handel, floor spring, door closer etc. finished
with sand papering complete as per direction of the Engineer -in-charge and
standard practice.

1.2.8.4 (d) Stain finishing to door frame and shutters stain of best quality and including sqm 154 1,095.08 168,642
cleaning finishing and polishing with sand paper and necessary scaffolding etc. all
complete in all floors.

Sub total 25,573,797


2 PREFUNCTION AREA ( FOR MEETING ROOM )

Page 206 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
2.1 GENERAL
2.1.1 Demolising existing structure/finishings where if necessary including breaking, ls 1 26,040.00 26,040
cutting, detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-
in-charge.

- -
2.2 INTERIOR AND FF&E WORKS
2.2.1 Ceiling
2.2.1.1 Supplying fitting and fixing of 12 mm thick Gypsum board laminated by mechanical sqm 410 1,543.80 632,958
hot press with metal LG stud frame in natural anodized finish at 600 mm x 600 mm in
grid, suspended from ceiling by 12 SWG double ply wire fixed to the ceiling by rowel
plug, screws, hooks, nails etc. maintaining straight lines and desired finished level at
bottom face with vertical wooden strut as required in/c making holes in slabs, or
beams by electric drill machine and mending good the damages, if any, during
execution of the work in/c cost of all materials accessories scaffoldings, labour for
installation, screws, nails, etc all complete as per drawing design and direction ot the
Engineer in-charge.

2.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of sqm 410 86.49 35,461
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completer in all floors.

2.2.2 Wall & Wall Finishing

Page 207 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
2.2.2.1 Emulsion painting of approved quality and color to walls two coats over a coat of sqm 400 86.49 34,596
primer or sealer including cleaning, sand papering the surface and necessary
scaffolding etc. all completer in all floors.

- -
2.2.3 Skirting
2.2.3.1 Supplying, fitting and fixing Burma Teak wood base moulding (100 mm height) of rm 110 920.70 101,277
approved quality and shape including costing of fitting, fixing all necessary
accessiories etc. complete in all respect as per drawing and direction of the Engineer
in-charge.

2.2.4 Floor & Floor Finishing


2.2.4.1 Supplying and laying Fire proof Axminister carpeting including underlayments in sqm 410 4,756.95 1,950,350
proper way and finishing with care etc. all complete as per direction of the Engineer
in-charge.

2.2.5 Movable Furniture


2.2.5.1 Supplying and placing antique coffee table, hexagonal shaped 1500mm each 5 60,210.53 301,053
diameterx450mm and mending good the damages etc. all complete as per direction
of the Engineer in-charge.

2.2.5.2 Supplying and placing lounge chair 34"x331/4"x30" and mending good the damages each 20 69,717.45 1,394,349
etc. all complete as per direction of the Engineer in-charge.
- -
2.2.6 Lighting fixtures & Electrical Accessories

Page 208 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
2.2.6.1 Cancelled

2.2.6.2 Supplying, fitting and fixing cold cathode tube lighting (10 m length) and mending set 2 -
88,536.00 -
177,072
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

2.2.6.3 Cancelled - -

2.2.6.4 Supplying, fitting and fixing cold cathode tube lighting (17 m length) and mending set 1 -
153,636.00 -
153,636
good the damages etc. all complete as per drawing and direction of the Engineer in-
charge.

2.2.6.5 Supplying, fitting and fixing of decorative ceiling fixture 0.85m diameterx1m height set 3 -
56,544.00 -
169,632
with 6x150W E27 ceramic lampholders , 1.2m diameterx1.2m deep as per Design,
Technical Specification and instruction of the Engineer, complete in all respect.

2.2.6.6 Supplying, fitting and fixing of decorative ceiling fixture 1.2m diameterx1.2m height set 3 -
226,083.00 -
678,249
with 8x150W E27 ceramic lampholders , 1.2m diameterx1.2m deep as per Design,
Technical Specification and instruction of the Engineer, complete in all respect.

Page 209 of 273


FUNCTION ROOMS
BILL OF QUANTITIES
BILL NO.3.4 - FUNCTION ROOMS
2.2.6.7 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, set 8 2,587.26 20,698
fittings as per Design, Technical Specification and instruction of the Engineer,
complete in all respect.

2.2.6.8 Supplying, fitting and fixing aircon grill and mending good the damages etc. all each
complete as per drawing and direction of the Engineer in-charge.

2.2.6.9 Supplying, fitting and fixing of single recepticle as per Design, Technical set 6 850.95 5,106
Specification and instruction of the Engineer, complete in all respect.

2.2.6.10 Supplying, fitting and fixing of telephone outlet as per Design, Technical set
Specification and instruction of the Engineer, complete in all respect.

Sub total 5,680,476

Page 210 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
BoQ ITEM AMOUNT
NO. DESCRIPTION UNIT QTY RATE TAKA
TAKA
Note : All material samples shall be approved by owner
1 FRONT DESK
1.1 GENERAL
1.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 4,650.00 4,650
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-
charge.

1.2 INTERIOR AND FF&E WORKS


1.2.1 Built-in Furniture
1.2.1.1 Supplying, fitting and fixing Burma Teak wood concierge desk (front desk) composed of set 6 196,695.00 1,180,170
wood framing and face with stained finishing, granite top, Terracotta tiles inset, stone base,
etc. including costing of fitting, fixing all necessary accessiories complete in all respect as
per drawing and direction of the Engineer in-charge.

- -
1.2.2 Wall & Wall Finishing
1.2.2.1 Supplying, fitting and fixing Granite stone wall of approved quality, texture & size over 20 sqm 3 4,936.44 14,809
mm thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in
position keeping horizontal and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface and finishing etc. complete in all respect.

Page 212 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS

1.2.3 Skirting, Nosing & Moulding


1.2.3.1 Supplying, fitting and fixing Granite stone base of approved quality, texture & size over rm 13 992.31 12,900
cement mortar i/c cutting and grinding the stibes setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top
surface and finishing etc. complete in all respect.

1.2.4 Lighting fixtures & Electrical Accessories - -


1.2.4.1 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, set 13 2,762.10 35,907
fittings as per Design, Technical Specification and instruction of the Engineer, complete in
all respect.

Sub total 1,248,437


2 BUSINESS CENTER
2.1 GENERAL
2.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 45,942.00 45,942
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-charge.

2.2 INTERIOR AND FF&E WORKS - -


2.2.1 Ceiling

Page 213 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
2.2.1.1 Supplying fitting and fixing of Acoustic ceiling tiles with T-bar grid suspended from ceiling sqm 247 934.65 230,859
maintaining straight lines and desired finished level at bottom face and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories
scaffoldings, labour for installation, screws, nails, etc all complete as per drawing and
direction ot the Engineer in-charge.

2.2.1.1 Emulsion painting of approved quality and color to ceilings two coats over a coat of primer sqm 247 86.49 21,363
or sealer including cleaning, sand papering the surface and necessary scaffolding etc. all
completer in all floors.

2.2.2 Wall & Wall Finishing


2.2.2.1 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sqm 430 86.49 37,191
sealer including cleaning, sand papering the surface and necessary scaffolding etc. all
completer in all floors.

2.2.3 Skirting & Nosing


2.2.3.1 Supplying, fitting and fixing Burma Teak wood base of approved quality and shape including rm 118 460.35 54,321
costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

2.2.4 Floor & Floor Finishing

Page 214 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
2.2.4.1 Supplying and laying Fire proof Axminister carpeting including underlayments in proper way sqm 94 5,091.75 478,625
and finishing with care etc. all complete as per direction of the Engineer in-charge.

2.2.4.2 Supplying, fitting and fixing Slate green tiles of approved quality, texture & size over 20 mm sqm 66 5,644.17 372,515
thick cement mortar (1:2) including cutting and grinding the Granite tiles setting in position
keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting
and grinding the top surface and finishing etc. complete in all respect.

2.2.5 Movable Furniture


2.2.5.1 Supplying and placing task chair 261/2"x163/4"x45" and mending good the damages etc. all each 16 22,947.75 367,164
complete as per direction of the Engineer in-charge.

2.2.5.2 Supplying and placing lounge chair 34"x331/4"x30" and mending good the damages etc. all each 4 72,121.50 288,486
complete as per direction of the Engineer in-charge.

2.2.5.3 Supplying and placing workstation 61"height and mending good the damages etc. all each 3 78,678.00 236,034
complete as per direction of the Engineer in-charge.

2.2.5.4 Supplying and placing cabinet 1200x630x760mm and mending good the damages etc. all each 1 42,617.25 42,617
complete as per direction of the Engineer in-charge.

Page 215 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
2.2.5.5 Supplying and placing antique coffee table 600x600x600mm and mending good the each 1 65,565.00 65,565
damages etc. all complete as per direction of the Engineer in-charge.

2.2.5.6 Supplying and placing task chair 23"x17"x333/4" and mending good the damages etc. all each 4 78,678.00 314,712
complete as per direction of the Engineer in-charge.

2.2.5.7 Supplying and placing conference table 72"x36"x28-1/2" and mending good the damages each 1 118,017.00 118,017
etc. all complete as per direction of the Engineer in-charge.

2.2.5.8 Supplying and placing table 42"diameterx28-1/2" and mending good the damages etc. all each 1 78,678.00 78,678
complete as per direction of the Engineer in-charge.

2.2.6 Lighting fixtures & Electrical Accessories


2.2.6.1 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, set 31 2,762.10 85,625
fittings as per Design, Technical Specification and instruction of the Engineer, complete in
all respect.

2.2.6.2 Supplying, fitting and fixing aircon grill and mending good the damages etc. all complete as each
per drawing and direction of the Engineer in-charge.

2.2.6.3 Supplying, fitting and fixing of single recepticle as per Design, Technical Specification and set 16 852.62 13,642
instruction of the Engineer, complete in all respect.

Page 216 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS

2.2.6.4 Supplying, fitting and fixing of telephone outlet as per Design, Technical Specification and set
instruction of the Engineer, complete in all respect.

2.2.6.7 Doors
(a) Supplying and making door frames with seasoned wood of required size including
painting fitted and fixed in position finished with sand papering mending good the damages
if any. (All sizes of wood are finished)

1) Burma Teak wood cum 1 50,127.00 50,127

(b) Supplying, fitting and fixing of door frame of same size (with one end bifurcated) with the rm 40 182.09 7,284
vertical members of the frame, fixing the frame in wall mending good damages, fixing
Stainless steel hinges w/ball bearing with the vertical members of the frame for leaf shutter,
all complete as per plan and direction of the Engineer in-Charge.

(Running metre of the door frame will be considered towards measurement)


(c) Supplying, making and fixing Burma Teak wood glazed door shutters having styles, rails sqm 14 2,526.81 35,375
and glass panes fitted and fixed with wooden batten to hardwood frames including all
accessories knob, pivot, handel, floor spring, door closer etc. finished with sand papering
complete as per direction of the Engineer -in-charge and standard practice.

Page 217 of 273


OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
(d) Painting to door frame and shutters paint of best quality and approved colour over a
coat of priming including cleaning finishing and polishing with sand paper and necessary
scaffolding etc. all complete in all floors.

1)Mahogany wood sqm 44 83.70 3,683


Sub total 2,947,825
3 RETAIL SPACES
3.1 GENERAL
3.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, ls 1 16,740.00 16,740
detaching, removing, cleaning, patching, keeping provision for following
construction/finishing processes, etcs all complete and instruction of the Engineer-in-charge.

3.2 INTERIOR AND FF&E WORKS - -


3.2.1 Ceiling
3.2.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical hot sqm 258 1,481.49 382,224
press with cement plaster paste and fixed to wooden frame finish at 600 mm x 600 mm in
grid, suspended from ceiling maintaining straight lines and desired finished level at bottom
face with vertical wooden strut as required in/c making holes in slabs, or beams by electric
drill machine and mending good the damages, if any, during execution of the work in/c cost
of all materials accessories scaffoldings, labour for installation, screws, nails, etc all
complete as per drawing design and direction ot the Engineer in-charge.

- -
Page 218 of 273
OTHERS
BILL OF QUANTITIES
BILL NO.3.5 - OTHERS
3.2.2 Wall & Wall Finishing
3.2.2.1 Emulsion painting of approved quality and color to walls and columns two coats over a coat sqm 470 86.49 40,650
of primer or sealer including cleaning, sand papering the surface and necessary scaffolding
etc. all completerin all floors.

Sub total 439,615

Page 219 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

Note : All material samples shall be approved by owner

1 CORRIDORS
1.1 GENERAL
1.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, detaching, ls 1 29,760.00 29,760
removing, cleaning, patching, keeping provision for following construction/finishing processes,
etcs all complete and instruction of the Engineer-in-charge.

1.2 INTERIOR AND FF&E WORKS


1.2.1 Ceiling
1.2.1.1 Supplying fitting and fixing of 12 mm thick gypsum board laminated by mechanical hot press with sqm 470 1,478.70 694,989
cement plaster paste and fixed to wooden frame finish at 600 mm x 600 mm in grid, suspended from
ceiling maintaining straight lines and desired finished level at bottom face with vertical wooden strut
as required in/c making holes in slabs, or beams by electric drill machine and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories scaffoldings, labour
for installation, screws, nails, etc all complete as per drawing design and direction ot the Engineer in-
charge.

1.2.1.1 Emulsion painting of approved quality and color to gypsum board ceilings two coats over a coat of sqm 470 86.49 40,650
primer or sealer including cleaning, sand papering the surface and necessary scaffolding etc. all
completerin all floors.

Page 220 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
1.2.1.3 Emulsion painting of approved quality and color to exposed ceilings two coats over a coat of primer or sqm 350 86.49 30,272
sealer including cleaning, sand papering the surface and necessary scaffolding etc. all completerin all
floors.

1.2.2 Wall & Wall Finishing


1.2.2.1 Supplying, fitting and fixing Burma Teak wood screen of approved quality and shape including costing sqm 314 15,211.08 4,776,279
of fitting, fixing all necessary accessiories etc. complete in all respect as per drawing and direction of
the Engineer in-charge.

1.2.2.2 Supplying, fitting and fixing Gypsum board panel of approved quality and shape including costing of sqm 130 1,481.30 192,570
fitting, fixing all necessary accessiories etc. complete in all respect as per drawing and direction of the
Engineer in-charge.

1.2.2.3 Supplying, fitting and fixing Granite stone wall of approved quality, texture & size over 20 mm thick sqm 62 4,929.00 305,598
cement mortar (1:2) including cutting and grinding the Granite tiles setting in position keeping
horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the
top surface and finishing etc. complete in all respect.

1.2.2.4 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sealer sqm 700 86.49 60,543
including cleaning, sand papering the surface and necessary scaffolding etc. all complete in all floors.

1.2.2.5 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sealer sqm 300 86.49 25,947
including cleaning, sand papering the surface and necessary scaffolding etc. all completer in all floors.

1.2.3 Skirting, Nosing & Moulding

Page 221 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
1.2.3.1 Supplying, fitting and fixing Granite stone base of approved quality, texture & size over 20 mm thick rm 230 990.45 227,804
cement mortar (1:2) including cutting and grinding the Granite tiles setting in position keeping
horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the
top surface and finishing etc. complete in all respect.

1.2.3.3 Supplying, fitting and fixing Burma Teak wood base moulding (100 mm height) of approved quality m 90 1,367.10 123,039
and shape including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

1.2.4 Floor & Floor Finishing


1.2.4.1 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 mm thick cement sqm 440 6,584.40 2,897,136
mortar (1:2) including cutting and grinding the Granite tiles setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

- -
1.2.4.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over 20 mm thick cement sqm 272 6,584.40 1,790,957
mortar (1:2) including cutting and grinding the Granite tiles setting in position keeping horizontal and
vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface and
finishing etc. complete in all respect.

- -
1.2.4.3 Supplying and laying Fire proof Axminister carpet border including underlays in proper way and sqm 22 3,715.35 81,738
finishing with care etc. all complete as per direction of the Engineer in-charge.

1.2.4.4 Supplying and laying Fire proof Axminister carpeting including underlays in proper way and finishing sqm 100 3,715.35 371,535
with care etc. all complete as per direction of the Engineer in-charge.

Page 222 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
1.2.5 Movable Furniture
1.2.5.1 Supplying and placing lounge chair and mending good the damages etc. all complete as per direction each 12 36,716.40 440,597
of the Engineer in-charge.

1.2.5.2 Supplying and placing table lamp and mending good the damages etc. all complete as per direction of each 10 23,253.72 232,537
the Engineer in-charge.

1.2.5.3 Supplying and placing custom console and mending good the damages etc. all complete as per each 6 91,791.00 550,746
direction of the Engineer in-charge.

1.2.5.4 Supplying and placing mirror 1000x1100 mm and mending good the damages etc. all complete as per each 6 25,701.48 154,209
direction of the Engineer in-charge.

1.2.6 Built-in Furniture


1.2.6.1 Supplying, fitting and fixing fountain in plaza composed of terra cotta water vessel at top, Granite top, ls 1 520,149.00 520,149
terracotta tiles, ceramic tiles finishings, flush recessed uplight and mending good the damages etc. all
complete as per design, drawings and direction of the Engineer in-charge.

1.2.7 Lighting fixtures & Electrical Accessories


1.2.7.1 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, fittings as per set 110 2,587.26 284,599
Design, Technical Specification and instruction of the Engineer, complete in all respect.

- -
1.2.7.2 Cancelled

- -
1.2.7.3 Supplying, fitting and fixing cold cathode tube lighting (15 m length) and mending good the damages set 2 138,012.00 276,024
etc. all complete as per drawing and direction of the Engineer in-charge.

- -

Page 223 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
1.2.7.4 Cancelled

- -
1.2.7.5 Supplying, fitting and fixing cold cathode tube lighting (21 m length) and mending good the damages set 1 184,884.00 184,884
etc. all complete as per drawing and direction of the Engineer in-charge.

- -
1.2.7.6 Supplying, fitting and fixing aircon grill and mending good the damages etc. all complete as per each
drawing and direction of the Engineer in-charge.

- -
1.2.7.7 Supplying, fitting and fixing of decorative ceiling fixture with 8xE27 ceramic lampholders , 1.2m set 6 91,791.00 550,746
diameterx1.2m deep as per Design, Technical Specification and instruction of the Engineer, complete in
all respect.

- -
1.2.7.8 Supplying, fitting and fixing of single recepticle as per Design, Technical Specification and instruction set 19 805.08 15,297
of the Engineer, complete in all respect.

1.2.7.9 Supplying, fitting and fixing of telephone outlet as per Design, Technical Specification and instruction set
of the Engineer, complete in all respect.

Sub total 14,858,602


2 ELEVATOR LOBBIES
2.1 GENERAL
2.1.1 Demolising existing structure/finishings where if necessary including breaking, cutting, detaching, ls 1 13,020.00 13,020
removing, cleaning, patching, keeping provision for following construction/finishing processes, etcs all
complete and instruction of the Engineer-in-charge.

2.2 INTERIOR AND FF&E WORKS


2.2.1 Ceiling

Page 224 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
2.2.1.1 Supplying, fitting and fixing of 12 mm thick gypsum board laminated by mechanical hot press with sqm 193 1,478.70 285,389
cement plaster paste and fixed to wooden frame finish at 600 mm x 600 mm in grid, suspended from
ceiling maintaining straight lines and desired finished level at bottom face with vertical wooden strut
as required in/c making holes in slabs, or beams by electric drill machine and mending good the
damages, if any, during execution of the work in/c cost of all materials accessories scaffoldings, labour
for installation, screws, nails, etc all complete as per drawing design and direction ot the Engineer in-
charge.

- -
2.2.1.2 Emulsion painting of approved quality and color to ceilings two coats over a coat of primer or sealer sqm 160 86.49 13,838
including cleaning, sand papering the surface and necessary scaffolding etc. all completerin all floors.

- -
2.2.1.3 Emulsion painting of approved quality and color to ceilings two coats over a coat of primer or sealer sqm 114 86.49 9,860
including cleaning, sand papering the surface and necessary scaffolding etc. all completerin all floors.

- -
2.2.2 Trim & Moulding
2.2.2.1 Supplying, fitting and fixing Burma Teak wood trim (100 mm height) of approved quality and shape to m 500 1,367.10 683,550
ceiling including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

- -
2.2.2.2 Supplying, fitting and fixing Burma Teak wood trim (150 mm height) of approved quality and shape to m 196 1,674.00 328,104
ceiling including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

- -
2.2.2.3 Supplying, fitting and fixing Granite stone base of approved quality, texture & size over cement mortar rm 27 16,377.30 442,187
including cutting and grinding the stones setting in position keeping horizontal and vertical alignment
correct, filling the joints with white cements, cutting and grinding the top surface and finishing etc.
complete in all respect.

- -

Page 225 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
2.2.2.4 Supplying, fitting and fixing Burma Teak wood base moulding (100 mm height) of approved quality m 184 1,450.80 266,947
and shape including costing of fitting, fixing all necessary accessiories etc. complete in all respect as per
drawing and direction of the Engineer in-charge.

- -
2.2.2.5 Cancelled

-
2.2.3 Wall & Wall Finishing
2.2.3.1 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sealer sqm 68 86.49 5,881
including cleaning, sand papering the surface and necessary scaffolding etc. all completer in all floors.

- -
2.2.3.2 Supplying and installing Vinyl wall covering, siam silk, 54" wide including cleaning the surface and sqm 74 1,925.10 142,457
necessary scaffolding etc. all complete in all floors.

- -
2.2.3.3 Emulsion painting of approved quality and color to walls two coats over a coat of primer or sealer sqm 102 86.49 8,822
including cleaning, sand papering the surface and necessary scaffolding etc. all completer in all floors.

- -
2.2.3.4 Supplying and installing Vinyl wall covering, 52/54" wide including cleaning the surface and sqm 227 2,622.60 595,330
necessary scaffolding etc. all complete in all floors.

- -
2.2.3.5 Supplying and installing Vinyl wall covering, 52/54" wide including cleaning the surface and sqm 114 2,622.60 298,976
necessary scaffolding etc. all complete in all floors.

- -
2.2.4 Floor & Floor Finishing

Page 226 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
2.2.4.1 Supplying, fitting and fixing Granite stone of approved quality, texture & size over cement mortar sqm 51 6,584.40 335,804
including cutting and grinding the stones setting in position keeping horizontal and vertical alignment
correct, filling the joints with white cement, cutting and grinding the top surface and finishing etc.
complete in all respect.

- -
2.2.4.2 Supplying, fitting and fixing Granite stone of approved quality, texture & size over cement mortar sqm 7 6,584.40 46,091
including cutting and grinding the stones setting in position keeping horizontal and vertical alignment
correct, filling the joints with white cement, cutting and grinding the top surface and finishing etc.
complete in all respect.

2.2.4.3 Supplying and laying Fire proof Axminister carpet border including underlays in proper way and sqm 27 4,756.95 128,438
finishing with care etc. all complete as per direction of the Engineer in-charge.

- -
2.2.4.4 Supplying and laying Fire proof Axminister carpeting including underlays in proper way and finishing sqm 5 4,756.95 23,785
with care etc. all complete as per direction of the Engineer in-charge.

- -
2.2.4.5 Supplying and laying Fire proof Axminister carpeting including brass L strip around border, underlays sqm 100 4,756.95 475,695
in proper way and finishing with care etc. all complete as per direction of the Engineer in-charge.

- -
2.2.4.6 Supplying and laying Fire proof Axminister carpeting including brass L strip around border, underlays sqm 50 4,756.95 237,848
in proper way and finishing with care etc. all complete as per direction of the Engineer in-charge.

- -
2.2.4.7 Supplying, fitting and fixing Granite stone of approved quality, texture & size over cement mortar sqm 40 6,584.40 263,376
including cutting and grinding the stones setting in position keeping horizontal and vertical alignment
correct, filling the joints with white cement, cutting and grinding the top surface and finishing etc.
complete in all respect.

- -
2.2.5 Furniture

Page 227 of 273


PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
2.2.5.1 Supplying and placing lounge chair 800x800x700 mm and mending good the damages etc. all complete each 2 36,716.40 73,433
as per direction of the Engineer in-charge.

2.2.5.2 Supplying and placing table lamp 28" height and mending good the damages etc. all complete as per each 2 23,253.72 46,507
direction of the Engineer in-charge.
- -
2.2.5.3 Supplying and placing custom console 1800x600x760 mm and mending good the damages etc. all each 91,791.00
complete as per direction of the Engineer in-charge.

- -
2.2.5.4 Supplying and placing mirror with hammer brass frame 1000x1100 mm with hammer brass frame and each 1 23,253.72 23,254
mending good the damages etc. all complete as per direction of the Engineer in-charge.

- -
2.2.5.5 Supplying and placing antique console 3000x600x760 mm and mending good the damages etc. all each 1 244,776.00 244,776
complete as per direction of the Engineer in-charge.

- - -
2.2.5.6 Supplying and placing mirror with hammer brass frame 1100x1100 mm with hammer brass frame and each 25,701.48
mending good the damages etc. all complete as per direction of the Engineer in-charge.

- -
2.2.6 Lighting fixtures & Electrical Accessories
2.2.6.1 Supplying, fitting and fixing of recessed downlights including all accessroies, supports, fittings as per set 30 2,587.26 77,618
Design, Technical Specification and instruction of the Engineer, complete in all respect.

- -
2.2.6.2 Supplying, fitting and fixing concealed fluorescent light 2 rows (15m length) and mending good the set 1 39,060.00 39,060
damages etc. all complete as per drawing and direction of the Engineer in-charge.

- -
2.2.6.3 Supplying, fitting and fixing cold cathode tube lighting (15 m length) and mending good the damages set 1 138,012.00 138,012
etc. all complete as per drawing and direction of the Engineer in-charge.

- -
2.2.6.4 Supplying, fitting and fixing aircon grill and mending good the damages etc. all complete as per each
drawing and direction of the Engineer in-charge.

- -
Page 228 of 273
PUBLIC CIRCULATION SPACES
BILL OF QUANTITIES
BILL NO.3.6 - PUBLIC CIRCULATION SPACES
2.2.6.5 Supplying, fitting and fixing of single recepticle as per Design, Technical Specification and instruction set 16 852.62 13,642
of the Engineer, complete in all respect.

2.2.6.6 Supplying, fitting and fixing of telephone outlet as per Design, Technical Specification and instruction set
of the Engineer, complete in all respect.

2.2.7 Decoration of elevator cars


Supplying, fitting and fixing interior decoration for elevator cars as Acrylic paint finish on false ceiling, set 3 589,945.50 1,769,837
concealed cold cathode light at cove, recessed down lights, wood veneer rail paneling and selected
fabric padding on walls, polished brass rail guard, stone skirting, stone flooring with stone dot accent
inside cars and polished brass, brass etched finishing with polyurethane coating on surfaces of doors
and mending good the damages etc. all complete as per designs, drawings and direction of the
Engineer in-charge.

Sub total 7,031,537

Page 229 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

1 AIR CONDITIONING AND VENTILATION


1.1 Removal of Old FCU & AHU
1.1.1 Removing FCU & AHU (listed in specification) including all necessary
processes as detaching units, turned to HIL, stored as to be directed etc.
complete in all respect and instruction of the Engineer in charge.

- Hotel Guest Room System 598 465 278,070


- Old FCU in Various Rooms System 46 465 21,390
- Air Handling Units Changes -
AC-2 (Ductwork) System 2 93,000 186,000
AC-4 (Ductwork) System 2 130,200 260,400
AC-5 System 2 37,200 74,400
AC-6 System 2 55,800 111,600
AC-7 System 2 3,720 7,440
AC-8 System 2 5,580 11,160
AC-15 (Ductwork) System 2 5,580 11,160
AC-19 System 2 9,300 18,600
-
1.2 New Units Installation (Replacement) -
1.2.1 Providing, fitting and fixing of new FCU & AHU (listed in -
specification)including all accessories, fittings, connections etc. complete in
all respect as per Design, Technical Specification and instruction of the
Engineer in charge.
Hotel Guest Rooms -
Sinko Kogyo Brand : FCU 4 Unit 24 27,314 655,538
Sinko Kogyo Brand : FCU 3 Unit 76 23,948 1,820,010
Sinko Kogyo Brand : FCU 2 Unit 300 20,218 6,065,460
Sinko Kogyo Brand : FCU 1 Unit 198 18,600 3,682,800
Supply Air Grille Each 598 1,674 1,001,052
Return Air Grille Each -
Exhaust Air Grille Each 598 930 556,140
: Sky Bridge FCU 3 Unit 2 23,948 47,895

Page 230 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
: GM Office FCU 3 Unit 2 23,948 47,895
: Sales Office FCU 3 Unit 2 23,948 47,895
12000 BTUH Cooling Unit 2 20,218 40,436
: Front Manager FCU 3 Unit 2 23,948 47,895
: Conference Room FCU 3 Unit 2 23,948 47,895
New FCU 3 Unit 2 23,948 47,895
: Reservation FCU 3 Unit 2 23,948 47,895
: Finance FCU 3 Unit 4 23,948 95,790
: PABX Chilled Water FCU 1 Unit 2 18,600 37,200
DX System 46,000 BTUH System 2 148,800 297,600
: FCU Replacement Piping LS 2 279,000 558,000
: FCU Thermostat-Switch, New Each 620 3,999 2,479,380
: FCU Water Control Valve, New Each 620 4,464 2,767,680
: Riser Differential Pressure Bypass Valve, 3" Size @ Roof Floor System 2 46,500 93,000
-
New Coffee Shop -
: AHU 1 145,000 BTUH Unit 2 297,600 595,200
: AHU 2 118,000 BTUH Unit 2 297,600 595,200
: 2-way Water Control Valve Each 4 11,160 44,640
: Temperature Sensor, Room Each 4 7,440 29,760
: Water Valve Actuator Each 4 9,300 37,200
: Fan-Filter Unit Unit 2 27,900 55,800
- - -
GENERAL RESTURENT -
: Fan-Coil Unit, 45,000 Btuh Unit 8 66,030 528,240
: 2-way Water Control Valve Each 8 7,440 59,520
: Return Air Temp Sensor Each 8 7,440 59,520
: Water Valve Actuator Each 8 5,580 44,640
: Fan-Coil Unit, 24,000 Btuh Unit 4 46,500 186,000
-
Kitchen Fan-Coil Unit -
: KF-1 to KF-10 24,000 BTUH Unit 20 37,200 744,000
: KF-11, KF-12 24,000 BTUH Unit 4 27,900 111,600
: KF-13, KF-14 12,000 BTUH Unit 4 17,670 70,680
: KF-15, KF-16 8,000 BTUH Unit 4 11,160 44,640
: KF-17, KF-18 12,000 BTUH Unit 4 17,670 70,680
: KF-19, KF-20 12,000 BTUH Unit 4 17,670 70,680
Page 231 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
: KF-21 9,000 BTUH Unit 2 11,160 22,320
: KF-22 9,000 BTUH Unit 2 11,160 22,320
-
Public Area Fan-Coil Unit -
: PF-1 12,000 BTUH Unit 2 17,670 35,340
: PF-2 30,000 BTUH Unit 2 32,550 65,100
: PF-3 24,000 BTUH Unit 2 27,900 55,800
: PF-4 24,000 BTUH Unit 2 27,900 55,800
: PF-5 40,000 BTUH Unit 2 32,550 65,100
: PF-6 40,000 BTUH Unit 2 32,550 65,100
: PF-7 30,000 BTUH Unit 2 30,690 61,380
-
Meeting Room Fan-Coil Unit -
: FM-1 54,000 BTUH Unit 2 36,270 72,540
: FM-2 54,000 BTUH Unit 2 36,270 72,540
: FM-3 80,000 BTUH Unit 2 48,360 96,720
: FM-4 22,000 BTUH Unit 2 27,900 55,800
: FM-5 22,000 BTUH Unit 2 27,900 55,800
: FM-6 41,000 BTUH Unit 2 36,270 72,540
: FM-7 50,000 BTUH Unit 2 36,270 72,540
: FM-8 40,000 BTUH Unit 2 32,550 65,100
: FM-9 40,000 BTUH Unit 2 32,550 65,100
: FM-10 80,000 BTUH Unit 2 48,360 96,720
: FM-11 80,000 BTUH Unit 2 48,360 96,720
: LF - 1 to 3 12,000 BTUH (Laundry Offices) Unit 6 17,670 106,020
: LF-2 12,000 BTUH Unit 2 17,670 35,340
: LF-3 12,000 BTUH Unit 2 17,670 35,340
-
Fan-Coil Unit Accessories -
: 2-way Water Control Valve, Cv 3.50 (1-7.83 GPM, 1/2") Each 86 4,464 383,904
: 2-way Water Control Valve, Cv 6.20 (7.84-13.86 GPM, 3/4") Each 14 5,580 78,120
: 2-way Water Control Valve Cv 7.0, 16 GPM, 1" Each 6 7,998 47,988
: Room Thermostat-Switch Each 106 3,999 423,894
-
Piping (Supply & Return) -
: 8" dia. Seam Sch. 40 BSP m 44 2,632 115,804

Page 232 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
: 6" dia. Seam Sch. 40 BSP m 440 2,037 896,148
: 4" dia. Seam Sch. 40 BSP m 156 1,683 262,595
: 3" dia. Seam Sch. 40 BSP m 180 1,181 212,598
: 2 1/2" dia. Seam Sch. 40 BSP m 40 846 33,852
: 2" dia. Seam Sch. 40 BSP m 152 586 89,057
: 1 1/2" dia. Seam Sch. 40 BSP m 276 437 120,640
: 1 1/4" dia. Seam Sch. 40 BSP m 204 326 66,402
: 1" dia. Seam Sch. 40 BSP m 180 205 36,828
: 3/4" dia. Seam Sch. 40 BSP m 44 167 7,366
: 1/2" dia. Seam Sch. 40 BSP m 40 140 5,580
: 1/2 dia. Copper Tube LS 2 93,000 186,000
: Adapters LS 2 74,400 148,800
: Fittings LS 2 186,000 372,000
-
Connection of New Pipe at Headers LS 2 37,200 74,400
-
Valves -
: Gate Valve 6", 125-lb. Each -
4" Each -
-
: Butterfly Valve -
8" Size (@ Headers) Each 4 22,320 89,280
6" Size (Sectionalizing) Each 12 15,029 180,346
4" Size Each - 8,742
3" Size (Bypass) Each 8 6,956 55,651
-
: Balancing Valve -
2" Size Each 4 17,949 71,796
1" Size Each 6 8,630 51,782
3/4" Size Each 14 7,496 104,941
1/2" Size Each 706 7,496 5,292,035
-
: Ball Valve -
2" Size Each 8 1,860 14,880
1" Size Each 12 837 10,044
3/4" Size Each 28 698 19,530
1/2" Size Each 1,412 567 801,028
Page 233 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
3" Pressure Differential @ New Risers System 2 46,500 93,000
: Aeroflex Pipe Insulation (Supply & Return) -
8" dia. Pipe m 44 2,465 108,438
6" dia. Pipe m 440 1,897 834,768
4" dia. Pipe m 156 1,404 219,071
3" dia. Pipe m 180 1,237 222,642
2 1/2" dia. Pipe m 40 1,088 43,524
2" dia. Pipe m 152 512 77,748
1 1/2" dia. Pipe m 276 428 118,073
1 1/4" dia. Pipe m 204 400 81,580
1" dia. Pipe m 180 288 51,894
3/4" dia. Pipe m 44 242 10,639
1/2" dia. Pipe m 120 214 25,668
: Aeroflex Glue & Joint Seal Tape LS 2 7,440 14,880
: Hard Aeroflex Support Bearing (4"-8" dia.) LS 2 13,950 27,900
Fan-coil Unit Support LS 2 31,992 63,984
Supply & Return Pipe Support LS 2 46,500 93,000
Electrical Wiring -
: AHU LS 2 139,500 279,000
: New FCU LS 2 199,950 399,900
-
1.3 Diffuser Replacement -
1.3.1 Removing existing diffusers and replacing with power paint coated -
Aluminium diffusers complete in all respect as per Design, Technical
Specification and instruction of the Engineer in charge.

: Main Lobby Each 24 4,650 111,600


: Front Office Lobby Each 20 3,720 74,400
: Ball Room Each 72 3,906 281,232
: Pre-Function Each 20 3,534 70,680
: Corridor Each 22 3,534 77,748
Pressure Gauge (Coffee Shop AHU) Each 4 3,255 13,020
Thermometer (Coffee Shop AHU) Each 4 5,208 20,832
-
1.4 VENTILATION -

Page 234 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
1.4.1 Providing, fitting and fixing of ventilation system including all accessories -
as fittings, connections etc. complete in all respect as per Design, Technical
Specification and instruction of the Engineer.

: Hood No.1 Unit 2 305,505 611,010


: Hood No.2 Unit 2 463,140 926,280
: Hood No.3 Unit 2 155,310 310,620
: Hood No.4 Unit 2 511,500 1,023,000
: Hood No.5 Unit 2 465,000 930,000
: Confectionary Hoods (by other) -
: JHARNA Hood (by other) -
: Staff Canteen Hood (by other) -
: Ventilator Cassette (by other) -
: CIAO Hood Unit 2 167,400 334,800
: Hood No.4 Ductwork, Rerouted LS 2 74,400 148,800
: Hood No.5 Ductwork, Exhaust Fan connection to outside LS 2 65,100 130,200
: In-line Centrifugal Fan, CFM 7950 (Production Kitchen) Unit 8 146,940 1,175,520
: In-line Centrifugal Fan, CFM 9600 (Hood No.5) Unit 2 164,610 329,220
: In-line Centrifugal Fan, CFM 800 Unit 2 39,060 78,120
: In-line Centrifugal Fan, CFM 5000 Unit 2 119,970 239,940
: In-line Centrifugal Fan, CFM 6000 Unit 2 128,340 256,680
: Fan-Filter Unit (Production Kitchen) Unit 4 93,000 372,000
: Staff Canteen Fan 12" Unit 2 2,790 5,580
: Staff Canteen Blower 21" Each 2 79,050 158,100
: Staff Canteen Blower 15" Each 2 65,100 130,200
: CIAO Hood Fan, 16 1/2" Blower Each 2 69,750 139,500
: CIAO Exhaust Fan Oscillating Fan Each 8 2,790 22,320
1000 CFM Wall-mounted Each 2 1,395 2,790
: Grilles - -
- Production Kitchen Each 2 186,000 372,000
- Baker Room Each 6 7,440 44,640
- Staff Canteen Each 6 7,440 44,640
- CIAO Each 2 6,510 13,020
-
-
-
1.5 DUCTWORK -
Page 235 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
1.5.1 Providing, fitting and fixing of duckwork including all accessories as -
fittings, connections etc. complete in all respect as per Design, Technical
Specification and instruction of the Engineer.

: Reroute Meeting Rooms Exhaust Ductwork LS 2 186,000 372,000


: Reroute Kitchen General Exhaust Ductwork LS 2 139,500 279,000
: Reroute Existing SF-2 Duct @ Hood No.4 & No.5 Connections LS 2 65,100 130,200
: Hood No.5 New Exhaust Duct & Grille LS 2 83,700 167,400
: Reroute Ductwork: Existing Exhaust Fan No.6 LS 2 74,400 148,800
-
: Coffee shop -
- Ductwork LS 2 301,432 602,863
- Diffuser, square Each 16 29,760 476,160
linear, 5-Slot, 18 Ft Each 4 55,800 223,200
- Return Air Grille Each 2 46,500 93,000
(Outside Air Grille existing) -
-
: Jharna -
- Ductwork, Diffuser LS 2 334,800 669,600
: FCU DUCTWORK Ground Floor LS 2 377,115 754,230
2nd Floor LS 2 728,785 1,457,570
: Ductwork, Diffusers for Kitchen FCU, Others LS 2 279,000 558,000
-
-
-
1.6 HEALTH CLUB -
1.6.1 Providing, fitting and fixing of Airconditioning , Ventilation System and -
Duck works including all accessories, fittings, connections, etc. complete in
all respect as per Design, Technical Specification and instruction of the
Engineer.

: FAN-COIL UNIT -
HC1 42,000 BTUH Each 2 32,550 65,100
HC2 42,000 BTUH Each 2 32,550 65,100
HC3 140,000 BTUH Each 2 133,362 266,724
HC4 38,000 BTUH Each 2 32,550 65,100

Page 236 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
HC5 38,000 BTUH Each 2 32,550 65,100
HC6 38,000 BTUH Each 2 32,550 65,100
HC7 18,000 BTUH Each 2 23,250 46,500
IN-LINE FAN 15: Size, 3,400 CFM Unit 2 93,000 186,000
-
FANS -
- CF 16" Wall-mounted Each 2 1,488 2,976
- EF-1 6" Size, Glass-mounted Each 2 1,860 3,720
- EF-2 8" Size, 280 CFM, Wall-mounted Each 2 2,232 4,464
- EF-3 10" Size, 440 CFM, Wall-mounted Each 2 2,418 4,836
- EF-4 Ceiling Exhaust Unit 2 4,278 8,556
- EF-5 6" Size, Glass Panel-mounted Each 2 2,325 4,650
- SF-1 230 CFM, Chamber, Grille System 2 5,022 10,044
- SF-2 230 CFM, Duct Supply System 2 6,324 12,648
- OF Oscillating Fan Each 8 3,906 31,248
- OA Register 16"x8" Each 2 1,674 3,348
-
FCU Ductwork, Diffusers, Grilles LS 2 542,283 1,084,566
Pipe with Insulation LS 2 218,736 437,472
Valve LS 2 124,862 249,724
Controls LS 2 83,514 167,028
Hangers, Support, Test LS 2 11,160 22,320
-
1.7 SPORTS BAR -
1.7.1 Providing, fitting and fixing of Airconditioning , Ventilation System and -
Duck works including all accessories, fittings, connections, etc. complete in
all respect as per Design, Technical Specification and instruction of the
Engineer.

Fan-coil Units, 120,000 BTUH, 4000 CFM, 4-R, 14-F Unit 6 154,380 926,280
Ductwork, Round Diffuser, Linear Diffusers, Grille LS 2 489,757 979,513
Pipe with Insulation LS 2 70,736 141,472
Valve LS 2 87,327 174,654
Controls LS 2 184,977 369,954
Hangers, Support LS 2 37,200 74,400
Test LS 2 5,580 11,160
-
Page 237 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
Training Room 2nd Floor -
Providing, fitting and fixing of Airconditioning , Ventilation System and -
Duck works including all accessories, fittings, connections, etc. complete in
all respect as per Design, Technical Specification and instruction of the
Engineer.

: FCU, Suspended Concealed, 24,000 BTUH System 2 31,620 63,240


: Ductwork LS 2 22,320 44,640
: 1 1/2" Pipe W/Insulation (Tapped from New 8" Pipe) LS 2 9,300 18,600
: Electrical & Control LS 2 5,580 11,160
-
PIE & EDUCATION -
FCU 24,000 BTUH System 2 68,820 137,640
-
BALCONY -
FCU 24,000 BTUH System 8 68,820 550,560
-
-
-
1.9 AIR CONDITIONERS -
1.9.1 Providing, fitting and fixing of Airconditioners including all accessories, -
fittings, connections, etc. complete in all respect as per Design, Technical
Specification and instruction of the Engineer.

Airline Crew Lounge -


Split air-cooled DX System,below ceiling FCU 60,000 BTUH Cooling System 4 113,460 453,840
-
Meeting Room Lounge -
Chilled-Water FCU under ceiling, 30,000 BTUH cooling Unit 6 113,460 680,760
Chilled-Water FCU with ductwork, 30,000 BTUH cooling System 2 34,410 68,820
-
Prayer Room -
Male, CHW Fan-Coil unit, 20,000 BTUH cooling with duct work System 2 26,970 53,940
Male, CHW Fan-Coil unit, 12,000 BTUH cooling with duct work System 2 26,970 53,940
16-inch diameter Oscillating Fan Each 6 2,790 16,740
-

Page 238 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
CIAO Dining Room -
Split air-cooled DX System,in the room Floor standing FCU 60,000 BTUH System 6 227,850 1,367,100
-
Pan Pacific Lounge and Dining -
FCU in Room Nos. 834,835 & 836 relocated Each 4 930 3,720
Split air-cooled DX System,in the room Floor standing FCU 60,000 BTUH System 6 227,850 1,367,100
-
Squash Court and Waiting area -
Split air-cooled DX system, suspended FCU, 24,000 BTUH cooling System 8 68,820 550,560
Wall-mounted Exhaust Fan 180 CFM Each 4 1,860 7,440
-
1.10 MISCELLANEOUS -
1.10.1 Providing, fitting and fixing of mirror defogging complete in all respect as -
per Design, Technical Specification and instruction of the Engineer.

- Guest Room Toilet Mirror Defogging Each 562 13,160 7,395,639


Sub total 0 72,055,358
2 ELEVATORS -
2.1 Removing existing elevators including all materials and equipment and -
turn over them to HIL etc. complete in all respect and instruction of the
Engineer in charge.
Removal of Passenger Elevator (3) LS 3 2,000,000 6,000,000
Removal of Service Elevator (1+1) LS 2 1,500,000 3,000,000

2.2 Seven pair escalators Pair 7 9,285,714 65,000,000


-
2.3 Providing, fitting and installing new elevators including all necessary as -
elevator machines,cars , controls, etc. renovating/improving machine
rooms complete in all respect as per Design, Technical Specification and
instruction of the Engineer.

Renovation of Passenger Elevator Machine Rooms LS 3 930,000 2,790,000


New Passenger Elevators, Group Control System 6 8,409,990 50,459,940
New 1000 kg Service Elevator, 2-Door with Firemens' Control System 2 8,323,500 16,647,000
New 1600 kg Service Elevator System 2 9,114,000 18,228,000
-

Page 239 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
Improving Machine Rooms LS 2 279,000 558,000
-
Refurbishing "Low Rise" Elevator LS 2 744,000 1,488,000
-
MIMIC BOARD (5 Elevators) LS 2 279,000 558,000
-
Split Type A/C for Controller System 4 111,600 446,400
-
Sub total 0 165,175,340
-
-
3 FIRE PROTECTION & SPRINKLER SYSTEM -
3.1 Providing, fitting and fixing of Fire Protection and Sprinkler System -
including all accessories, fittings, connections, etc. and all necessary
processes as testing, commissioning as per Design, Technical Specification
and instruction of the Engineer, complete in all respect.

-
- Motor-Driven Fire Pump, Complete Set 2 1,683,300 3,366,600
- Automatic Suction Filling Set 2 134,850 269,700
- Jockey Pump Set 2 280,860 561,720
-
- Fire Hose Cabinet Set -
- Fire Department Connection Set 2 85,560 171,120
- Monitoring Status Indicator in Control Room Set 2 260,400 520,800
-
- Sprinkler Head -
Side Wall, Quick Response (301+6) EA 614 632 388,294
Pendent EA 2,488 484 1,203,197
Up-right -
-
- Floor Control Valve -
6" System 8 19,195 153,562
4" System 20 17,763 355,260
3" System 2 14,229 28,458
-

Page 240 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
- Fire Pump Flow Test meter 140% Range EA 2 66,960 133,920
-
- Main Valve Supervisory Switch EA 4 11,160 44,640
-
: ASTM A-53, SCH.40, Seam Pipe -
- 6" Dia. m. 800 2,018 1,614,480
- 4" Dia. m. 960 1,683 1,615,968
- 3" Dia. m. 840 1,181 992,124
- 2 1/2" Dia. m. 340 846 287,742
- 2" Dia. m. 640 586 374,976
- 1 1/2" Dia. m. 860 437 375,906
- 1 1/4" Dia. m. 1,800 326 585,900
- 1" Dia. m. 5,480 205 1,121,208
-
: Fittings (Flange, Couple, Threaded) LS 2 3,921,382 7,842,764
-
: Valves 250-lb. Class -
-
: Butterfly, 6" Size EA 4 12,499 49,997
4" Size EA 6 9,207 55,242
3" Size EA 8 7,533 60,264
: Gate, 6" Size, OS&Y Rising Stem EA 6 40,678 244,069
2 1/2" Size EA 2 22,320 44,640
2" Size EA 4 6,919 27,677
-
: Drains LS 2 7,440 14,880
-
: Testing LS 2 13,950 27,900
-
: Pressure Gauge EA 2 3,283 6,566
-
: Automatic Air Vent EA 8 5,580 44,640
-
: Check Valve -
- 6" Size EA 2 31,620 63,240
- 2" Size EA 2 10,230 20,460
-
Page 241 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
-
: Flexible Pipe, Stainless Steel -
- 6" Size EA 2 16,740 33,480
- 2" Size EA 2 5,580 11,160
-
: Flange -
- 6" Size EA 16 4,185 66,960
- 4" Size EA 2 3,720 7,440
- 3" Size EA 2 2,976 5,952
- 2" Size EA 8 2,232 17,856
- 1 1/2" Size EA 8 2,046 16,368
-
: Hanger, Support, Clamp LS 2 111,600 223,200
-
: Painting LS 2 18,600 37,200
-
: Testing LS 2 7,440 14,880
-
: Signs LS 2 11,160 22,320
-
: Portable Fire Extinguisher EA -
-
Sprinkler Systems -
-
Health Club and Sports Bar -
-
: 3" Floor Control Valve System 4 16,935 67,741
: Sprinkler Head, Pendent Type Each 204 484 98,654
Side Wall Type Each 34 632 21,502
-
Pipe, Seam, Sch. 40 BSP -
-
: 6" dia. Between Buildings m 22 2,018 44,398
: 4" dia. Riser m 18 1,683 30,299
: 3" dia. m 166 1,181 196,063
-
Branches and Fittings LS 2 511,500 1,023,000
Page 242 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
-
Valve 3" Butterfly Each 4 6,956 27,826
2 1/2" Gate Each 4 3,906 15,624
3/4" AAV Each 2 5,580 11,160
-
Testing LS 2 9,300 18,600
Signs LS 2 9,300 18,600
Painting LS 2 7,440 14,880
-
2nd FLOOR BACK OF HOUSE -
: Sprinkler Head, Pendent EA 176 484 85,114
: Service Valves W/Flow Switch, 4" Size, 3" Size EA 4 18,600 74,400
: Service Valve EA -
: Pipe LS 2 215,342 430,683
: Fittings LS 2 154,845 309,690
: Painting LS 2 7,440 14,880
: Hangers, Supports, Clamps LS 2 13,950 27,900
: Test LS 2 5,580 11,160
-
-
GROUND FLOOR BACK OF HOUSE -
: Sprinkler Heads EA 272 484 131,539
: Service Valves W/Flow Switch, 4" EA 4 18,600 74,400
: Service Valve EA -
: Pipes LS 2 164,954 329,908
: Fittings LS 2 186,846 373,693
: Hangers, Support, Clamps LS 2 13,950 27,900
: Painting LS 2 7,440 14,880
: Test LS 2 5,580 11,160
Sub total 0 26,630,383
4 STEAM & CONDENSATE PIPING FOR SUPPLYING POOL HEATING -
4.1 Providing, fitting and fixing of Steam & Condensate piping works including -
all accessories, fittings, connections, etc. and all necessary processes as per
Design, Technical Specification and instruction of the Engineer, complete in
all respect.

Page 243 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
-
ASTM A-53 Grade B, Sch. 40, Seamless Steam Pipe -
- 2 1/2" dia. Pipe in boiler room m. 28 1,209 33,852
- 2 1/2" dia. Pipe in trench m. 260 1,209 314,340
- 2 1/2" Expansion loop System -
ASTM A-53 Grade B, Sch. 40, Seam Codensate Pipe -
- 2" dia. Pipe in boiler room m. 32 586 18,749
- 2" dia. Pipe in trench m. 260 586 152,334
-
Steam Pipe Insulation, 64 kg/m3 Density -
Fiberglass with ALU Foil (Half Split) (Micro Cover) -
- 2" (50 mm) thick for 2 1/2" Steam Pipe m. 306 595 182,131
- 1" (25 mm) thick for 2" dia. Condensate Pipe m. 292 372 108,624
-
Valves, 150 lb Class -
- 2 1/2" Globe, Flange, Steam Each 4 13,950 55,800
- 2" Gate, Threaded, Condensate Each 4 1,860 7,440
- 1" Ball, Condensate drain Each 2 744 1,488
Y- Strainer, 2" Size (Condensate) Each 2 9,300 18,600
Pressure Gauge -
- Steam (at end of the line) Each 2 3,906 7,812
- Condensate at both ends Each 4 3,906 15,624
Pipe from trench to calorifier (steam trap) LS 2 37,200 74,400
Steam pipe expansion absorption LS 2 139,500 279,000
-
PIPE TRENCH -
- Concrete Work -
: Site Preparation LS 2 232,500 465,000
: Concrete Pouring m3 102 6,696 682,992
- Pipe Support LS 2 93,000 186,000
- Checkered Plate m2 180 1,209 217,620
- Steam Pipe Base Clamp (78) LS 2 93,000 186,000
- Condensate Pipe Base (78) LS 2 46,500 93,000
Sub total 0 3,100,806
-

Page 244 of 273


MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
5 NATURAL GAS PIPING WORKS 0
5.1 Providing, fitting and fixing of Natural Gas Piping works including all 0
accessories, fittings, connections, etc. and all necessary processes as per
Design, Technical Specification and instruction of the Engineer, complete in
all respect.
0
Connection of New Pipe (Seamless Sch. 40 BSP) to Existing Main LS 2 18,600 37,200
0
Gas Meter with Shut-off Valves, Filter Accessories LS 2 46,500 93,000
0
Pipe, ASTM A-53, Grade B, Sch. 40, Seamless Pipe 0
- 3" Dia. m 76 1,674 127,224
- 2 1/2" Dia. m 28 1,395 39,060
- 2" Dia. m 114 1,209 137,826
- 1 1/2" Dia. m 110 884 97,185
- 1 1/4" Dia. m 0 744 -
- 1" Dia. m 20 419 8,370
- 3/4" Dia. m 20 326 6,510
- 1/2" Dia. m 40 288 11,532
- 2" Dia. Wrapped Pipe Underground m 86 1,674 143,964
Fittings LS 2 46,500 93,000
Pipe Support/Clamp LS 2 37,200 74,400
Painting LS 2 7,440 14,880
Valves 0
Ball 0
- 3" Size EA 2 5,580 11,160
- 2" Size EA 10 2,344 23,436
- 1 1/2" Size EA 4 1,767 7,068
- 1 1/4" Size EA 0 1,423 -
- 1" Size EA 4 837 3,348
- 3/4" Size EA 6 698 4,185
- 1/2" Size EA 94 558 52,452
0
Pressure Regulator W/Accessories 0
- For Kitchen Mains System 2 55,800 111,600
- For 20-25 psi Supply EA 12 8,370 100,440
- For 0.5-1 psi Supply EA 12 7,905 94,860
Page 245 of 273
MECHANICAL SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.1- MECHANICAL SYSTEM WORKS
0
Pressure Relief Valve EA 8 4,650 37,200
0
Emergency Shut-off Valve with hand-reach linkage EA 2 69,750 139,500
Pressure Gauge EA 12 2,325 27,900
Leak Detector W/Alarm System 12 27,900 334,800
Tightness Testing, Adjustment LS 2 18,600 37,200
Pipe Clamps, Pipe Supports, Painting LS 2 37,200 74,400
Service Fee for Application & Inspection of Gas Piping Installation LS 2 46,500 93,000

Sub total 2,036,700

Page 246 of 273


ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

1 HIGH VOLTAGE
1.1 Supplying, providing, fitting Automatic Line Voltage Regulator,5000 set 1 13,094,400.00 13,094,400
kVA,11kV +/- 15% Taps on primary side as per Design, Technical
Specification and instruction of the Engineer, complete in all respect.

LOW VOLTAGE

1 Circuit Breaker 1 - 3P,250 AT,250 AF set 1 20,088.00 20,088


2 Conduit
- IMC 2" m 40 249.24 9,970
- IMC 2 1/2" m 20 403.62 8,072
- IMC 3" m 120 487.32 58,478
3 Cable
- THW 10 sq.mm m 40 38.13 1,525
- THW 16 sq.mm m 60 57.66 3,460
- THW 35 sq.mm m 130 122.76 15,959
- THW 70 sq.mm m 20 235.29 4,706
- THW 95 sq.mm m 40 318.99 12,760
- THW 120 sq.mm m 90 382.23 34,401

HOTEL
Supplying, providing, fitting and fixing of Electrical system works as per
Design, Technical Specification and instruction of the Engineer, complete in
all respect.
GROUND FLOOR
1 Panel Board
- L1A set 32 70,828.80 2,266,522
- L1B set 32 49,401.60 1,580,851
- L1C set 32 41,664.00 1,333,248
- AP set 32 69,638.40 2,228,429
- AP1 set 32 49,401.60 1,580,851

Page247 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- AP2 set 32 43,449.60 1,390,387
2 Lighting Fixture - -
- Type 'FD1' set 256 3,673.50 940,416
- Track Light set -
- LT18 set -
- Recess Downlight set -
- Wall Washer set -
- StripLlight set -
3 Switch & Outlet -
- 1- Way switch 16A 250 V' set 96 247.38 23,748
- Duplex Receptacle 2P + E,16 A 250 V set 3,424 520.80 1,783,219
- Safety switch non fused 30A,600v ,3P,SN,NEMA 3R Enclosure set 32 7,266.09 232,515
- Safety switch non fused 100A,600v ,3P,SN,NEMA 3R Enclosure set 32 16,860.90 539,549
4 Conduit -
- IMC 1/2" m 151,840 63.24 9,602,362
- IMC 3/4" m 3,008 86.49 260,162
- IMC 1" m 4,608 116.25 535,680
- IMC 1 1/4" m 2,304 149.73 344,978
- IMC 2" m 9,280 250.17 2,321,578
- IMC 3" m 16,640 487.32 8,109,005
5 Cable -
- THW 2.5 sq.mm m 152,544 9.30 1,418,659
- THW 4 sq.mm m 320,320 14.88 4,766,362
- THW 6 sq.mm m 25,344 24.18 612,818
- THW 10 sq.mm m 23,104 38.13 880,956
- THW 16 sq.mm m 3,840 57.66 221,414
- THW 25 sq.mm m 8,960 87.42 783,283
- THW 35 sq.mm m 19,200 122.76 2,356,992
- THW 50sq.mm m 21,760 177.63 3,865,229
- THW 120sq.mm m 15,360 382.23 5,871,053
- THW 150 sq.mm m 51,200 495.69 25,379,328
SPORT BAR -
1 Panel Board -
-B set 4 54,758.40 219,034
2 Lighting Fixture -
Page248 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- Downlight set -
- Wall Bracket set -
- Halogen Downlight set -
- Halogen wallwasher set -
- Picture lamp set -
3 Switch & Outlet -
- Light Switch 1P,250 V,10 A set 0 247.38 -
-Manual motor starter set 16 1,953.00 31,248
- Single Powerpoint set 28 465.00 13,020
- Junction Box set 20 148.80 2,976
- Floor Mounted Junction Box set 4 279.00 1,116
4 Conduit -
- IMC 1/2" m 2,560 63.24 161,894
- IMC 3/4" m 200 86.49 17,298
- IMC 3" m 240 487.32 116,957
5 Cable -
- THW 2.5 sq.mm m 2,560 9.30 23,808
- THW 4 sq.mm m 5,520 14.88 82,138
- THW 6sq.mm m 200 24.18 4,836
- THW 16 sq.mm m 240 57.66 13,838
- THW 120 sq.mm m 960 382.23 366,941
-
HEALTH CLUB -
1 Panel Board -
-H set 4 52,675.20 210,701
2 Lighting Fixture -
- Downlight set -
- Halogen Downlight set -
- Halogen Wallwasher set -
-
-
3 Switch & Outlet -
- Light Switch 1P,250 V,10 A set 0 247.38
-Fan Switch set 12 223.20 2,678
-Manual motor starter set 28 1,953.00 54,684
- Single powerpoint set 60 465.00 27,900

Page249 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- Single Receptacle set 12 465.00 5,580
4 Conduit -
- IMC 1/2" m 6,460 63.24 408,530
- IMC 3/4" m 48 86.49 4,152
- IMC 2 1/2 " m 240 403.62 96,869
5 Cable -
- THW 2.5 sq.mm m 6,360 9.30 59,148
- THW 4 sq.mm m 13,116 14.88 195,166
- THW 6 sq.mm m 48 24.18 1,161
- THW 10 sq.mm m 240 38.13 9,151
- THW 50 sq.mm m 960 177.63 170,525

EXTERIOR LIGHTING -
1 Panel Board -
- FL1 4 30,801.60 123,206
- FL2 4 30,801.60 123,206
2 Lighting Fixture -
- FL01 , 250W HPS/F Floodlight set 112 10,921.92 1,223,255
- FL02 , 400 W MH/F Floodlight set 16 12,097.44 193,559
- FL01 , 400W HPS/VN Floodlight set 8 11,561.76 92,494
-
-
3 Switch & Outlet -
- Light Switch 1P,250 V,10 A set - 247.38
4 Conduit -
- IMC 3/4" m 1,080 86.49 93,409
- IMC 1 1/4" m 400 149.73 59,892
5 Cable -
- THW 2.5 sq.mm m 1,080 9.30 10,044
- THW 4 sq.mm m 2,160 14.88 32,141
- THW 6 sq.mm m 400 24.18 9,672
- THW 16 sq.mm m 800 38.13 30,504
-
KITCHEN 0
Page250 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
0
MAINPREPARATION AND PRODUCTION KITCHEN 0
1 Panel Board 0
- LP1 set 4 114,427.20 457,709
2 Lighting Fixture 0
- Type 'FD1' set 248 3,673.50 911,028
3 Switch & Outlet 0
- 1- Way switch 16A 250 V' set 52 247.38 12,864
- Receptacle Outlet 220/50/1N+E/15A,ROW set 124 520.80 64,579
- Receptacle Outlet 220/50/1N+E/15A,ROF set 12 2,176.20 26,114
- Outlet 220/50/1N+E,32AEOC set 12 744.00 8,928
- Receptacle Outlet 380/50/3N+E,16A,ROW set 8 1,368.96 10,952
- Outlet 380/50/3N+E/,32A,EOC set 20 930.00 18,600
- Outlet 380/50/3N+E/,125A,EOW set 4 4,185.00 16,740
4 Conduit 0
- IMC 1/2" m 6,880 63.24 435,091
- IMC 3/4" m 160 86.49 13,838
- IMC 1 1/2" m 200 186.00 37,200
- IMC 3" m 400 487.32 194,928
5 Cable -
- THW 2.5 sq.mm m 6,880 9.30 63,984
- THW 4 sq.mm m 13,760 14.88 204,749
- THW 16 sq.mm m 464 57.66 26,754
- THW 25 sq.mm m 280 87.42 24,478
- THW150 sq.mm m 1,600 495.69 793,104
NEW MEETING PANTRY 0
1 Panel Board 0
- LP2 set 4 37,944.00 151,776
2 Lighting Fixture 0
- TYPE 'FD1' set 220 3,673.50 808,170
3 Switch & Outlet 0
- 1- Way switch 16A 250 V' set 28 247.38 6,927
- Receptacle Outlet 220/50/1N+E/15A,ROW set 32 520.80 16,666
4 Conduit 0
- IMC 1/2" m 1,560 63.24 98,654
- IMC 11/2" m 200 186.00 37,200

Page251 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
5 Cable -
- THW 2.5 sq.mm m 1,560 9.30 14,508
- THW 4 sq.mm m 3,200 14.88 47,616
- THW 6 sq.mm m 200 24.18 4,836
- THW 35 sq.mm m 800 122.76 98,208
AIRLINE CREW LOUNGE 0
1 Panel Board 0
- LP3 set 4 36,604.80 146,419
2 Lighting Fixture 0
- Type 'FD1' set 36 3,673.50 132,246
3 Switch & Outlet 0
- 1- Way switch 16A 250 V' set 20 247.38 4,948
- Receptacle Outlet 220/50/1N+E/15A,ROW set 12 520.80 6,250
- Safety switch non fused 30A,600v ,3P,SN,NEMA 3R Enclosure set 8 7,266.09 58,129
4 Conduit 0
- IMC 1/2" m 480 63.24 30,355
- IMC 3/4" m 160 86.49 13,838
- IMC 1 1/4" m 360 149.73 53,903
5 Cable m -
- THW 2.5 sq.mm m 480 9.30 4,464
- THW 4 sq.mm m 1,120 14.88 16,666
- THW 6 sq.mm m 1,640 24.18 39,655
- THW 16 sq.mm m 1,440 57.66 83,030
GENERAL -
1 Panel Board -
- LP4 set 4 52,526.40 210,106
2 Switch & Outlet -
- 1- Way switch 16A 250 V' set 4 247.38 990
- Receptacle Outlet 220/50/1N+E/15A,ROW set 28 520.80 14,582
- Receptacle Outlet 220/50/1N+E/15A,ROF set 4 2,176.20 8,705
- Outlet 220/50/1N+E,32A,EOC set 4 744.00 2,976
- Outlet 380/50/3N+E/,32A,EOW set 8 930.00 7,440
3 Conduit -
- IMC 1/2" m 2,160 63.24 136,598
- IMC 3/4" m 240 86.49 20,758
- IMC 2" m 200 250.17 50,034
Page252 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
4 Cable -
- THW 2.5 sq.mm m 2,080 9.30 19,344
- THW 4 sq.mm m 4,400 14.88 65,472
- THW 6sq.mm m 800 24.18 19,344
- THW 10 sq.mm m 520 38.13 19,828
- THW 50 sq.mm m 800 177.63 142,104

-
SPORT BAR -
1 Panel Board -
- LP5 set 4 38,464.80 153,859
2 Lighting Fixture -
- Type 'DA2' set 68 1,125.30 76,520
3 Switch & Outlet -
- Receptacle Outlet 220/50/1N+E/15A,ROW set 36 520.80 18,749
- Outlet 380/50/3N+E/,32A,EOW set 4 930.00 3,720
4 Conduit -
- IMC 1/2" m 200 63.24 12,648
- IMC 3/4" m 200 86.49 17,298
- IMC 2" m 48 250.17 12,008
5 Cable -
- THW 2.5 sq.mm m 1,800 9.30 16,740
- THW 4 sq.mm m 3,600 14.88 53,568
- THW 6 sq.mm m 3,200 24.18 77,376
- THW 10 sq.mm m 200 38.13 7,626
- THW 50 sq.mm m 200 177.63 35,526
-
SHOW KITCHEN -
1 Panel Board -
- LP6 set 4 58,032.00 232,128
2 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 4 247.38 990
- Receptacle Outlet 220/50/1N+E/15A,ROW set 52 520.80 27,082
- Receptacle Outlet 220/50/1N+E/15A,ROF set 56 2,176.20 121,867
- Outlet 220/50/1N+E,32A,EOF set 8 930.00 7,440

Page253 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- Outlet 220/50/1N+E,32A,EOC set 4 744.00 2,976
3 Conduit -
- IMC 1/2" m 6,080 63.24 384,499
- IMC 3/4" m - 86.49
- IMC 1" m 48 116.25 5,580
- IMC 2" m 200 250.17 50,034
4 Cable -
- THW 2.5 sq.mm m 6,080 9.30 56,544
- THW 4 sq.mm m 11,920 14.88 177,370
- THW 6 sq.mm m 1,040 24.18 25,147
- THW 10 sq.mm m 200 38.13 7,626
- THW 50 sq.mm m 800 177.63 142,104
-
PANPACIFIC LOUGE -
1 Panel Board -
- LP7 set 4 44,044.80 176,179
2 Lighting Fixture -
- TYPE 'FD1' set 32 3,673.50 117,552
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 8 247.38 1,979
- Receptacle Outlet 220/50/1N+E/15A,ROW set 40 520.80 20,832
- Receptacle Outlet 220/50/1N+E/15A,ROF set 4 2,176.20 8,705
- Outlet 220/50/1N+E,32A,EOC set 4 744.00 2,976
- Outlet 380/50/3N+E,32A,EOW set 8 930.00 7,440
4 Conduit -
- IMC 1/2" m 120 63.24 7,589
- IMC 3/4" m 80 86.49 6,919
- IMC 2" m 400 250.17 100,068
5 Cable -
- THW 2.5 sq.mm m 1,200 9.30 11,160
- THW 4 sq.mm m 2,400 14.88 35,712
- THW 6 sq.mm m 800 24.18 19,344
- THW 10 sq.mm m 400 38.13 15,252
- THW 50 sq.mm m 1,600 177.63 284,208
-
MAIN KITCHEN -

Page254 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
1 Panel Board -
- LP8 set 4 107,433.60 429,734
2 Lighting Fixture -
- Type 'FD1' set 136 3,673.50 499,596
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 32 247.38 7,916
- Receptacle Outlet 220/50/1N+E/15A,ROW set 120 520.80 62,496
- Receptacle Outlet 220/50/1N+E/15A,ROF set 20 2,176.20 43,524
- Outlet 220/50/1N+E,32A,EOC set 4 744.00 2,976
- Outlet 220/50/1N+E,32A,EOF set 12 930.00 11,160
- Outlet 220/50/1N+E,63AEOF set 8 1,395.00 11,160
- Outlet 380/50/3N+E,63A,EOW set 4 1,636.80 6,547
- Outlet 380/50/3N+E,125A,EOW set 8 4,185.00 33,480
4 Conduit -
- IMC 1/2" m 5,280 63.24 333,907
- IMC 3/4" m 1,200 86.49 103,788
- IMC 1 1/2" m 800 186.00 148,800
- IMC 2" m 400 250.17 100,068
- IMC 3" m 400 487.32 194,928
5 Cable -
- THW 2.5 sq.mm m 5,280 9.30 49,104
- THW 4 sq.mm m 10,560 14.88 157,133
- THW 6 sq.mm m 800 24.18 19,344
- THW 10 sq.mm m 1,000 38.13 38,130
- THW 16 sq.mm m 1,280 57.66 73,805
- THW 35 sq.mm m 640 122.76 78,566
- THW 150 sq.mm m 1,600 495.69 793,104
-
BANGUET PANTRY -
1 Panel Board -
- LP9 set 4 58,032.00 232,128
2 Lighting Fixture -
- Type 'FC1' set - 1,748.40
- Type 'FD1' set 108 3,673.50 396,738
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 16 247.38 3,958

Page255 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- 3- Way Switch 16A 250 V' set 8 330.15 2,641
- Receptacle Outlet 220/50/1N+E/15A,ROW set 32 520.80 16,666
- Outlet 220/50/1N+E,63A,EOW set 16 1,116.00 17,856
4 Conduit -
- IMC 1/2" m 1,800 63.24 113,832
- IMC 3/4" m - 86.49 -
- IMC 1 1/4" m 400 149.73 59,892
- IMC 1 1/2" m 240 186.00 44,640
- IMC 2" m 240 250.17 60,041
- IMC 2 1/2" m 360 403.62 145,303
5 Cable -
- THW 2.5 sq.mm m 1,800 9.30 16,740
- THW 4 sq.mm m 3,600 14.88 53,568
- THW 6 sq.mm m 120 24.18 2,902
- THW 10 sq.mm m 800 38.13 30,504
- THW 16 sq.mm m 840 57.66 48,434
- THW 25 sq.mm m 400 87.42 34,968
- THW 35 sq.mm m 480 122.76 58,925
- THW 95 sq.mm m 1,440 318.99 459,346
-
POOL DECK - CIAO RESTAURANT -
1 Panel Board -
- LP10 set 4 33,033.60 132,134
2 Lighting Fixture -
- Type 'FD1' set 8 3,673.50 29,388
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 0 247.38
- Receptacle Outlet 220/50/1N+E/15A,ROW set 20 520.80 10,416
4 Conduit -
- IMC 1/2" m 440 63.24 27,826
- IMC 1 1/2" m 240 186.00 44,640
5 Cable -
- THW 2.5 sq.mm m 440 9.30 4,092
- THW 4 sq.mm m 880 14.88 13,094
- THW 6 sq.mm m 240 24.18 5,803
- THW 25 sq.mm m 960 87.42 83,923

Page256 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
STAFF CANTEEN -
1 Panel Board -
- LP11 set 4 47,467.20 189,869
2 Lighting Fixture -
- Type 'FD1' set 20 3,673.50 73,470
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 4 247.38 990
- Receptacle Outlet 220/50/1N+E/15A,ROW set 24 520.80 12,499
- Receptacle Outlet 220/50/1N+E/15A,ROF set 4 2,176.20 8,705
- Outlet 220/50/1N+E,32A,EOC set 8 744.00 5,952
- Outlet 220/50/1N+E,63A,EOW set 4 1,116.00 4,464
- Outlet 380/50/3N+E,63A,EOW set 4 1,636.80 6,547
4 Conduit -
- IMC 1/2" m 244 63.24 15,431
- IMC 1 1/4" m 60 149.73 8,984
- IMC 1 1/2" m 60 186.00 11,160
- IMC 2" m 200 250.17 50,034
5 Cable -
- THW 2.5 sq.mm m 1,724 9.30 16,033
- THW 4 sq.mm m 3,448 14.88 51,306
- THW 6 sq.mm m 60 24.18 1,451
- THW 10 sq.mm m 440 38.13 16,777
- THW 16 sq.mm m 120 57.66 6,919
- THW 50 sq.mm m 800 177.63 142,104
NEW PANTRY -
1 Panel Board -
- LP12 set 4 107,136.00 428,544
2 Lighting Fixture -
- Type 'FC1' set 4 1,748.40 6,994
- Type 'FD1' set 116 3,673.50 426,126
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 32 247.38 7,916
- Receptacle Outlet 220/50/1N+E/15A,ROW set 68 520.80 35,414
- Receptacle Outlet 220/50/1N+E/15A,ROF set 12 2,176.20 26,114
- Outlet 220/50/1N+E,32A,EOC set 8 744.00 5,952
- Receptacle Outlet 380/50/3N+E,16A,ROW set 16 1,368.96 21,903

Page257 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- Outlet 380/50/3N+E,32A,EOC set 8 930.00 7,440
- Outlet 380/50/3N+E,63A,EOW set 4 1,636.80 6,547
- Outlet 380/50/3N+E,125A,EOW set 4 4,185.00 16,740
4 Conduit -
- IMC 1/2" m 4,344 63.24 274,715
- IMC 3/4" m 160 86.49 13,838
- IMC 1 1/4" m 60 149.73 8,984
- IMC 2 1/2" m 140 403.62 56,507
5 Cable -
- THW 2.5 sq.mm m 4,344 9.30 40,399
- THW 4 sq.mm m 8,688 14.88 129,277
- THW 6 sq.mm m 60 24.18 1,451
- THW 10 sq.mm m 200 38.13 7,626
- THW 16 sq.mm m 140 57.66 8,072
- THW 50 sq.mm m 200 177.63 35,526
- THW95 sq.mm m 320 318.99 102,077
-
NEW CAIO -
1 Panel Board -
- LP13 set 4 43,375.20 173,501
2 Lighting Fixture -
- Type 'FD1' set 92 3,673.50 337,962
3 Switch & Outlet -
- 1- Way Switch 16A 250 V' set 12 247.38 2,969
- Fan Switch set 8 223.20 1,786
- Manaul Motor Starter set 4
- Receptacle Outlet 220/50/1N+E/15A,ROW set 28 520.80 14,582
- Receptacle Outlet 220/50/1N+E/15A,ROF set 4 2,176.20 8,705
- Outlet 220/50/1N+E,32A,EOC set 4 744.00 2,976
- Outlet 380/50/3N+E,63A,EOW set 4 1,636.80 6,547
4 Conduit -
- IMC 1/2" m 520 63.24 32,885
- IMC 3/4" m 240 86.49 20,758
- IMC 1 1/4" m 40 149.73 5,989
- IMC 2" m 240 250.17 60,041
5 Cable -
Page258 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- THW 2.5 sq.mm m 240 9.30 2,232
- THW 4 sq.mm m 3,280 14.88 48,806
- THW 6 sq.mm m 280 24.18 6,770
- THW 10 sq.mm m 880 38.13 33,554
- THW 50 sq.mm m 960 177.63 170,525
-
MEETING LOUNGE -
1 Conduit -
- IMC 1/2" m 640 63.24 40,474
2 Cable -
- THW 2.5 sq.mm m 640 9.30 5,952
- THW 4 sq.mm m 1,280 14.88 19,046
-
PRAYER ROOM -
1 Switch & Outlet -
- Fan Switch set 16 223.20 3,571
2 Conduit -
- IMC 1/2" m 440 63.24 27,826
3 Cable -
- THW 2.5 sq.mm m 440 9.30 4,092
- THW 4 sq.mm m 880 14.88 13,094
TENNIS COURT -
1 Switch & Outlet -
- Fan Switch set 12 223.20 2,678
2 Conduit - -
- IMC 1/2" m 120 63.24 7,589
3 Cable -
- THW 2.5 sq.mm m 120 9.30 1,116
- THW 4 sq.mm m 240 14.88 3,571
SQUASH COURT -
1 Switch & Outlet -
- Fan Switch set 4 223.20 893
2 Conduit -

Page259 of 273
ELECTRICAL WORKS
BILL OF QUANTITIES
BILL NO.4.2 - ELECTRICAL WORKS
- IMC 1/2" m 120 63.24 7,589
3 Cable -
- THW 2.5 sq.mm m 120 9.30 1,116
- THW 4 sq.mm m 240 14.88 3,571
PUMP ROOM -
1 Conduit -
- IMC 2 1/2" m 240 403.62 96,869
2 Cable -
- THW 35 sq.mm m 240 122.76 29,462
- THW 70sq.mm m 960 235.29 225,878
SEWAGE PUMP STATION -
1 Conduit -
- IMC 1" m 240 116.25 27,900
2 Cable -
- THW 6 sq.mm m 240 24.18 5,803
- THW 10sq.mm m 960 38.13 36,605

Sub total for Bill No. 11 Carried forward to Summary 116,379,272

Page260 of 273
BILL OF QUANTITIES
BILL NO.4.3 - TELECOMMUNICATION & CONTROL SYSTEM
BoQ ITEM RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

1 Fire Alarm System

Providing, fitting, fixing and installation of Fire alarm system as per Design,
Technical Specification and instruction of the Engineer, complete in all
respect.
1.1 Fire Alarm Control Panel,Multiplex type ,2-Loops set 1 421,755.00 421,755
1.2 Fire Alarm Graphic each 1 172,050.00 172,050
1.3 Computer with Software and Printer set 1 189,720.00 189,720
1.4 Detector Module each 4 9,067.50 36,270
1.5 Control Module each 4 7,905.00 31,620
1.6 Monitor Module each 4 7,068.00 28,272
1.7 Photoelectric Smoke Detector each 246 4,451.91 1,095,170
1.8 Photoelectric Smoke Detector Addressable Type each 100 114,855.00 11,485,500
1.9 Rate of Rise Heat Detector each 1,002 1,422.90 1,425,746
1.10 Manual Pull Station with Key Switch each 4 3,301.50 13,206
1.11 Fire Alarm Bell 6" Diameter each 4 3,301.50 13,206
1.12 Fire Alarm Telephone Jack each 4 799.80 3,199
1.13 Twist pair #14 AWG ( signal loop cable ) m 1,500 88.35 132,525
1.14 1.5 sq.mm. THW Cable ( Sensor , manual pull switch) m 5,000 6.05 30,225
1.15 2.5 sq.mm. Fire Retardiative Cable ( For Bell ) m 3,500 34.41 120,435
1.16 Twist pair #16AWG shield*(telephone cable) m 2,500 69.75 174,375
1.17 3/4" EMT Coduit each 1,200 172.05 206,460
1.18 2" IMC Coduit each 650 611.94 397,761
1.19 Acessories ls 1 162,750.00 162,750

SUB-TOTAL 1 16,140,245
2 Telephone System

Providing, fitting, fixing and installation of Telephone system as per


Design, Technical Specification and instruction of the Engineer, complete in
all respect.
2.1 IP PABX with hotel function 1,200 rooms set 1 4,929,000.00 4,929,000

Page 261 of 273


BILL OF QUANTITIES
BILL NO.4.3 - TELECOMMUNICATION & CONTROL SYSTEM
4 Nos. Operator console unit, Voice mail, call accounting system,
2.2 Hotel Management Software, and set 1 1,162,500.00 1,162,500
MDF with ligthening arrestor
2.3 Telephone Cabinet each 1 34,177.50 34,178
2.4 Telephone Outlet Wall Mounted each 238 474.30 112,883
2.5 Telephone Outlet each 810 1,116.00 903,960
2.6 200 Pairs 0.65 AP Cable m 180 1,581.00 284,580
2.7 20 Pairs 0.65 TPEV Cable m 400 155.31 62,124
2.80 30 Pairs 0.65 TPEV Cable m 250 147.87 36,968
2.9 75 Pairs 0.65 TPEV Cable m 200 703.08 140,616
2.1 150 Pairs 0.65 TPEV Cable m 100 1,162.50 116,250
2.11 Core Switch each 2 3,720,000.00 7,440,000
2.12 Distribution Switch each 1 2,046,000.00 2,046,000
2.13 Access Switch each 7 558,000.00 3,906,000
2.14 Indoor Fiber Optics 12 cores m 450 232.50 104,625
2.16 UTP CAT 6 box 10 10,230.00 102,300
2.17 UTP Patch panel CAT 6/48 port set 15 14,880.00 223,200
2.18 RACK 19" 27U each 25 33,480.00 837,000
2.19 IP phone for executive set 10 23,250.00 232,500
2.2 IP phone standard set 1,150 13,950.00 16,042,500
2.21 Base station for cellular phone station
2.22 Cellular phone set 60 9,300.00 558,000
2.23 Accessories each 1 186,000.00 186,000
SUB-TOTAL 2 21,381,983
3 PA System

Providing, fitting, fixing and installation of PA system as per Design,


Technical Specification and instruction of the Engineer, complete in all
respect.
3.1 Digital Announcer each 1 46,830.15 46,830
3.2 Compact Disc Player each 5 15,066.00 75,330
3.3 Double Cassettte Tape each 1 19,302.15 19,302
3.4 Remote Microphone each 2 3,059.70 6,119
3.5 Program Distributor each 1 14,242.95 14,243
3.6 Electronic Chime & Siren 2 tone each 2 5,189.40 10,379
3.7 Pre Amplifier each 10 11,978.40 119,784

Page 262 of 273


BILL OF QUANTITIES
BILL NO.4.3 - TELECOMMUNICATION & CONTROL SYSTEM
3.8 Power Amplifier 360W. each 6 27,900.00 167,400
3.9 Power Amplifier 240W. each 3 23,291.85 69,876
3.10 Power amplifier 500W each 2 19,297.50 38,595
3.11 30 W. Fasion Speaker each 6 5,459.10 32,755
3.12 3 W.Ceiling Speaker each 1,133 779.34 882,992
3.13 6 W.Ceiling Speaker each 39 1,134.60 44,249
3.14 30 W Clear Horn Speaker each 9,581.79
3.15 15 W Clear Horn Speaker each 4,791.36
3.16 3 W. Attenuator each 488.25
3.17 30 W. Attenuator each 646.35
3.18 Cabinet Rack High 2M. each 12 24,621.75 295,461
3.19 1x2c VTF Cable 2.5 Sq.mm m 1,500 29.76 44,640
3.20 1x2C VTF cable 1.5 Sq.mm m 3,000 25.11 75,330
3.21 3/4" EMT' Conduit each 750 172.05 129,038
3.22 3" IMC each 120 1,404.30 168,516
3.23 Accessories ls 1 172,050.00 172,050

SUB-TOTAL 3 2,412,889
4 Sound System for Ball Room

Providing, fitting, fixing and installation of Sound system for ball room as
per Design, Technical Specification and instruction of the Engineer,
complete in all respect.
4.1 Power amplifier 500 watt X 2 each 1 50,220.00 50,220
4.2 Loud speaker 15 inches 2 ways each 4 10,695.00 42,780
4.3 Mixer 12 channels each 1 36,270.00 36,270
4.4 Equalizer stereo multiplex each 1 19,530.00 19,530
4.5 Micro phone each 4 4,185.00 16,740
4.6 Speaker for monitor 250 watt each 2 5,766.00 11,532
4.7 Power amplifier for monitor each 1 26,040.00 26,040
4.8 Monitor each 1 18,600.00 18,600
4.9 Accessories each 1 37,200.00 37,200
4.10 Conference set
4.11 Micro phone set for Chair Person set 1 33,480.00 33,480
4.12 Micro phone for attendee set 12 23,250.00 279,000
4.13 Controller set set 1 79,050.00 79,050

Page 263 of 273


BILL OF QUANTITIES
BILL NO.4.3 - TELECOMMUNICATION & CONTROL SYSTEM
SUB-TOTAL 4 650,442

Page 264 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BoQ IT RATE AMOUNT
NO. DESCRIPTION UNIT QTY TAKA TAKA

PLUMBING SYSTEM FOR HIGH RISE BUILDING


1 Plumbing System
1.1 Supplying, fitting and fixing of Plumbing system Cold water pipe (GSP SCH#40 ASTM A-53)
as per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1/2 " m 2,910 223.20 649,512


dia. 3/4 " m 1,710 297.60 508,896
dia. 1 " m 4,125 418.50 1,726,313
dia. 1 1/4 " m 276 558.00 154,008
dia. 1 1/2 " m 159 664.95 105,727
dia. 2 " m 81 874.20 70,810
Fitting,hanger & support for cold water pipe ls 3 320,850.00 962,550
-
1.2 Supplying, fitting and fixing of Plumbing system Hot water pipe w/ insulation (copper type -
L)as per Design, Technical Specification and instruction of the Engineer, complete in all
respect.

I.D. 1/2 " m 5,985 395.25 2,365,571


I.D. 3/4 " m 660 516.15 340,659
I.D. 1 " m 438 655.65 287,175
I.D. 1 1/4 " m 84 1,023.00 85,932
Fitting,hanger & support for hot water pipe ls 3 304,110.00 912,330
-
-
1.3 Supplying, fitting and fixing of Soil,waste & vent pipes (pvc. DWV ASTM D2665,D2949) as -
per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1 1/2 " m 510 111.60 56,916


dia. 2 " m 5,826 171.12 996,945
dia. 2 1/2 " m - 254.82

Page 265 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
dia. 3 " m 234 332.94 77,908
dia. 4 " m 3,444 446.40 1,537,402
dia. 5 " m 72 662.16 47,676
Fitting,hanger & support for soil,waste &vent pipes ls 3 266,910.00 800,730
-
1.4 Supplying, fitting and fixing of Floor cleanout (cast iron) as per Design, Technical Specification -
and instruction of the Engineer, complete in all respect.

dia. 2 " pcs. 6 818.40 4,910


dia. 2 1/2 " pcs. - 874.20
dia. 3 " pcs. 27 990.45 26,742
dia. 4 " pcs. 675 1,106.70 747,023
dia. 5 " pcs. 6 1,348.50 8,091
-
1.5 Supplying, fitting and fixing of Cleanout (cast iron) as per Design, Technical Specification and -
instruction of the Engineer, complete in all respect.

dia. 2 " pcs. 9 288.30 2,595


dia. 2 1/2 " pcs. - 339.45
dia. 3 " pcs. 9 372.00 3,348
dia. 4 " pcs. 15 446.40 6,696
dia. 5 " pcs. 3 599.85 1,800
-
1.6 Supplying, fitting and fixing of Floor drain/shower drain (cast iron) as per Design, Technical -
Specification and instruction of the Engineer, complete in all respect.

dia. 2 " pcs. 1,371 725.40 994,523


dia. 3 " pcs. - 837.00
-
-
1.7 Supplying, fitting and fixing of Gate valve as per Design, Technical Specification and -
instruction of the Engineer, complete in all respect.

dia. 3/4 " pcs. 39 576.60 22,487


dia. 1 " pcs. 18 790.50 14,229
dia. 1 1/4 " pcs. 21 1,004.40 21,092

Page 266 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
dia. 1 1/2 " pcs. 3 1,302.00 3,906
dia. 2 " pcs. 12 2,139.00 25,668
dia. 2 1/2 " pcs. 3 8,928.00 26,784
-
1.8 Painting,testing ,commissionning&trainning ls 3 74,400.00 223,200
-
1.9 Relocate exiting pipe and connection between new pipe to existing pipe ls 3 148,800.00 446,400
-
1.10 Miscellaneous ls -
-
Sub total 0 14,266,553
LOW RISE BUILDING(HEALTH CLUB &SPORT BAR) 0
1 Plumbing System -
1.1 Supplying, fitting and fixing of Plumbing system Cold water pipe (GSP SCH#40 ASTM A-53) -
as per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1/2 " m 105 223.20 23,436


dia. 3/4 " m 186 297.60 55,354
dia. 1 " m 6 418.50 2,511
dia. 1 1/4 " m 51 558.00 28,458
dia. 1 1/2 " m 90 664.95 59,846
dia. 2 " m 33 874.20 28,849
Fitting,hanger & support for cold water pipe ls 3 20,460.00 61,380
-
1.2 Supplying, fitting and fixing of Plumbing system Hot water pipe w/ insulation (copper type -
L)as per Design, Technical Specification and instruction of the Engineer, complete in all
respect.

I.D. 1/2 " m 15 395.25 5,929


I.D. 3/4 " m 189 516.15 97,552
I.D. 1 " m 99 655.65 64,909
I.D. 1 1/4 " m 15 864.90 12,974
I.D. 2 " m 21 1,450.80 30,467
Fitting,hanger & support for hot water pipe ls 3 21,390.00 64,170
-

Page 267 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
-
1.3 Supplying, fitting and fixing of Soil,waste & vent pipes (pvc. DWV ASTM D2665,D2949) as -
per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1 1/2 " m 66 11.16 737


dia. 2 " m 222 171.12 37,989
dia. 2 1/2 " m - 254.82 -
dia. 3 " m 72 332.94 23,972
dia. 4 " m 255 446.40 113,832
Fitting,hanger & support for soil,waste &vent pipes ls 3 18,135.00 54,405
-
1.4 Supplying, fitting and fixing of Floor cleanout (cast iron) as per Design, Technical Specification -
and instruction of the Engineer, complete in all respect.

dia. 3 " pcs. 9 990.45 8,914


dia. 4 " pcs. 12 1,106.70 13,280
-
1.5 Supplying, fitting and fixing of Floor drain/shower drain (cast iron) as per Design, Technical -
Specification and instruction of the Engineer, complete in all respect.

dia. 2 " pcs. 36 725.40 26,114


dia. 4 " pcs. 15 837.00 12,555
-
-
1.7 Supplying, fitting and fixing of Gate valve as per Design, Technical Specification and -
instruction of the Engineer, complete in all respect.

dia. 3/4 " pcs. 15 576.60 8,649


dia. 1 " pcs. 3 790.50 2,372
dia. 1 1/4 " pcs. - 1,004.40 -
dia. 1 1/2 " pcs. 3 1,302.00 3,906
dia. 2 " pcs. 6 2,139.00 12,834
-
1.8 Painting,testing ,commissionning&trainning ls 3 14,880.00 44,640
-

Page 268 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
1.9 Relocate exiting pipe and connection between new pipe to existing pipe ls 3 74,400.00 223,200
-
1.10 Miscellaneous ls -
Sub total 0 1,123,232
-
NEW CIAO BUILDING 0
1 Plumbing System -
1.1 Supplying, fitting and fixing of Plumbing system Cold water pipe (GSP SCH#40 ASTM A-53) -
as per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1/2 " m 45 223.20 10,044


dia. 3/4 " m 81 297.60 24,106
dia. 1 " m - 418.50
dia. 1 1/4 " m 12 558.00 6,696
dia. 1 1/2 " m - 664.95
dia. 2 " m - 874.20
Fitting,hanger & support for cold water pipe ls 3 4,185.00 12,555
-
1.2 Supplying, fitting and fixing of Plumbing system Hot water pipe w/ insulation (copper type -
L)as per Design, Technical Specification and instruction of the Engineer, complete in all
respect.

I.D. 1/2 " m 30 395.25 11,858


I.D. 3/4 " m 78 516.15 40,260
I.D. 1 " m 15 655.65 9,835
I.D. 1 1/4 " m - 864.90
Fitting,hanger & support for hot water pipe ls 3 6,231.00 18,693
-
-
1.3 Supplying, fitting and fixing of Soil,waste & vent pipes (pvc. DWV ASTM D2665,D2949) as -
per Design, Technical Specification and instruction of the Engineer, complete in all respect.

dia. 1 1/2 " m 18 111.60 2,009


dia. 2 " m 93 171.12 15,914

Page 269 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
dia. 2 1/2 " m - 254.82
dia. 3 " m 36 332.94 11,986
dia. 4 " m 18 446.40 8,035
dia. 5 " m - 662.16
Fitting,hanger & support for soil,waste &vent pipes ls 3 3,813.00 11,439
-
1.4 Supplying, fitting and fixing of Floor cleanout (cast iron) as per Design, Technical Specification -
and instruction of the Engineer, complete in all respect.

dia. 2 " pcs. -


dia. 2 1/2 " pcs. -
dia. 3 " pcs. -
dia. 4 " pcs. 3 1,106.70 3,320
dia. 5 " pcs. -
-
1.5 Supplying, fitting and fixing of Floor drain/shower drain (cast iron) as per Design, Technical -
Specification and instruction of the Engineer, complete in all respect.

dia. 2 " pcs. 3 725.40 2,176


dia. 3 " pcs. -
-
1.6 Painting,testing ,commissionning&trainning ls 3 11,160.00 33,480
-
1.7 Relocate exiting pipe and connection between new pipe to existing pipe ls 3 7,440.00 22,320
-
1.8 Miscellaneous ls -
-
Sub total 0 244,725
0
1 Sewerage System -
1.1 Supplying, fitting and fixing of Sewage pipes (pvc. DWV ASTM D2665,D2949) as per Design, -
Technical Specification and instruction of the Engineer, complete in all respect.

dia. 4 " m 60 446.40 26,784


dia. 6 " m 150 874.20 131,130
Fitting, support for sewage pipe ls 3 15,810.00 47,430

Page 270 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
-
1.2 Supplying, fitting and fixing of Sewage pressure pipes (HDPE PN6 DIN 8074) as per Design, -
Technical Specification and instruction of the Engineer, complete in all respect.

dia. 6 " m 300 837.00 251,100


Fitting, support for sewage pressure pipe ls 3 25,110.00 75,330
-
1.3 Sewage Manhole set 18 13,950.00 251,100
-
1.4 Sewage pump station as per Design, Technical Specification and instruction of the Engineer, set 3
complete in all respect.
-
1.5 Sewage submersible pump 70 cu.m/hr TDH 12 m.(including valve, sets 9 297,600.00 2,678,400
controller and accessories) -
-
1.6 Grease trap sets 15 23,250.00 348,750
-
1.7 Painting,testing ,commissionning&trainning ls 3 74,400.00 223,200
-
1.80 Relocate exiting pipe ls 3 37,200.00 111,600
-
1.90 Miscellaneous ls -
Sub total 0 4,144,824
HEAT EXCHANGER FOR SWIMMING POOL 0
1 Equipment -
1.1 Supplying, fitting and fixing of Sanitary system works equipment as per Design, Technical -
Specification and instruction of the Engineer, complete in all respect.

Hot water supply pump for Swimming Pool 162 cu.m/hr TDH 30 m.(incl. valve, sets 6 325,500.00 1,953,000
controller and accessories) -
-
1.2 Condensate return pump 3 cu.m/hr TDH 30 m.(incl. valve,controller and accessories) sets 6 37,200.00 223,200
-
1.3 Steam-Water Heat Exchanger Capacity 1,500,000 BTUH sets 3 669,600.00 2,008,800
-
1.4 Piping,fitting,valve ,controller and accessories ls 3 232,500.00 697,500

Page 271 of 273


PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
BILL OF QUANTITIES
BILL NO.4.4 - PLUMBING, SANITARY & SEWAGE SYSTEM WORKS
-
1.5 Painting,testing ,commissionning&trainning ls 3 52,080.00 156,240

Sub total 5,038,740

Page 272 of 273


Scale of universe