Beruflich Dokumente
Kultur Dokumente
Division Ernakulam
Sub Division Muvattupuzha
Section Marady
MB No 126/17-18
Contractor Sri. Sunny EI
329/AEE/18-19-VELIYAMMARY-
MATTAPPADAM
Name of Work
GANAPATHYKADAVU ROAD
MARADY GP
Bill CC 1st and Final
Agriment no and Date 445/AEE/LSGD/2018-19 Dated 12/02/2019
Site Hand Over Date 2/13/2019
Measurement taken from 2/13/2019
Date of Final Measurement 2/27/2019
Date of bill 3/12/2019
Mesurement Starting Page 1
Measurement Ending Page 37
Project cost 1000000
Total Quoted Amount (Limited) 994192
Retension %
Tender below %
Date of bill to treaury
Copy and Paste from BOQ (PRICE Generated)
Sl. Item Description Quantity Units
No.
1.000 Detailed Estimate
1.001 3.5.1 : Excavation in Cutting in Soil by manual
means with lead upto 50 mExcavation for roadway
in soil using manual means for carrying of cut
earth to embankment site with a lift upto 1.5 m 161.753 cum
and lead upto 50 m as per Technical Specification
Clause 302.3
4000.00
-11027.442
-14227.977
-17428.512
-20629.047
-23829.582
-27030.117
-30230.652
-33431.187
-36631.722
-39832.257
-43032.792
-46233.327
-49433.862
-52634.397
-55834.932
-59035.467
-62236.002
-65436.537
-68637.072
-71837.607
-75038.142
-78238.677
-81439.212
-84639.747
-87840.282
-91040.817
-94241.352
-97441.887
-100642.422
-103842.957
-107043.492
-110244.027
-113444.562
-116645.097
-119845.632
-123046.167
-126246.702
-129447.237
-132647.772
-135848.307
-139048.842
-142249.377
-145449.912
-148650.447
K.P.W. FORM 28
GOVERNMENT OF KERALA, LOCAL SELF GOVERNEMNT DEPARTMENT
Section : Marady
(For Contractor:This form Provides (1) for Secured Advances and Payment for Measured Works)
Net -18020548
Dated Signature
B. REMARKS BY CHECKof officer preparing theOFFICER
MEASURING bill 3/12/2019
C.AUDIT SECTION
Checked again the calculation and verified the rate against the contract schedule
quantities against estimate provision and receipt and issue against sanctioed data.
Accountant Accountant
Witness ……………………………….
Since receipt as per Since issue Balance in hand
Issue Note
WBO
No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Note :- Col :- 4 If materials not provided for in the agreement are issued vide paragraph 359 recovery will have to be made at the issue rate or market rate at the time of
supply whichever may be greater and should include storage charges vide paragraph 350 of the K.P.W.A. Code
Col. 2 Vide paragraph 358 of the K.P.W.A. Code.
Note
1 Handing over site in this context would imply making available the site for the
contractor and his agents, workmen etc., to enter the site and carry on the work
entrusted to him.
2 This does not mean occupancy right in the normally accepted sense of the word.
3 In respect of maintenance work and works of additions and alterations to existing
structure, the contractor's right of entry to the site and carrying on the work should
be so exercised as not to cause hindrance or disturbance to the existing structures or
occupants / Traffic in case of road works thereof.
4 The Contractor should vacate the site and clear it of all debris etc., on completion of
the work or when the contract is terminated.
COMPLETION REPORT FOR WORKS
Name of the engineer and
1 2 3 4 5 6 7 8 9 10 14 15
Rs Ps Rs Ps Rs Ps From To
GANAPATHYKADAVU ROAD
Kannan A
VELIYAMMARY-
MATTAPPADAM
329/AEE/18-19-
MARADY GP
1000000
994192
5808
1 2/13/2019 2/27/2019 Eldhose Paul
Sreekala M
Chandran
Hereby certify that which the exceptions noted and explained above this work has been fully executed to the extent of the estimate in a substantial and
ry manner as regards materials and workmanship and that excluding trifling deviations sanction in the monthly deviation statements and the those explained above
corresponds in all respects with the sanctioned Plan and Estimates and is suitable to the purposes for which is intended.
Station: Marady
Date: 3/12/2019 Overseer Assistant Engineer Assistant Executive Engineer
Appendix 2100G
329/AEE/18-19-VELIYAMMARY-
: MATTAPPADAM
1 Name of Work
GANAPATHYKADAVU ROAD
MARADY GP
: 445/AEE/LSGD/2018-19 Dated
3 Contract Agreement No. and date
12/02/2019
4 Supplemental Agreement No. and dat : NA
Certified that the works as per the above contract agreement and supplemental agreements have
been completed in all respects 2/27/2019 The certificate does not however absolve the contractor
from any of the liabilities for which he is responsible as per terms of the contract.
Assistant Engineer
LSGD Section Marady