The Agenda
Project: What & Why
Project Management: What & Why
Project Management Context
Project Phases
Project Life Cycle
Project Stake Holders
Organizational Structures & Influence on Projects
Lessons Learned
Project Life cycle, Product Life Cycle
Stake Holder
Stakeholder management
Organizational structure
Matrix >> Strong, Weak, Balanced
Functional Organization
Projectized
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
What is a project?
A project is a temporary endeavor undertaken to
create a unique product, service, or result.
• Temporary
has a definite beginning and a definite end, not ongoing
efforts.
Ceases when objectives have been attained.
Team disbanded upon completion.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Why project?
Projects are implemented to achieve Organization
Strategic Plan. Operations are ongoing and repetitive to
sustain the business.
Organizational Needs,
Customer Request,
Technological advancement,
Legal Requirements.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
What is Project Management?
Skills
Knowledge Techniques
Project Activities
Project Requirements
Project management is the application of knowledge, skills,
tools and technique to project activities to meet project
requirements.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Advantages of Using Formal Project Management
Better control of financial, physical, and human resources
Changing any one factor will also change at least one other factor…
For example, shortening the Schedule will likely increase cost or reduce
scope/quality
7
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Management Context
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Portfolios and Portfolio Management
Portfolio - A collection of
projects, programs, sub-portfolios
and operations managed as a
Portfolio Management group to achieve strategic benefits
Program - A structured
grouping of related projects
Program Management
designed to produce clearly
identified business value
9
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Programs and Program Management
A Program is a group of related projects.
Management is coordinated because:
they may use the same resources,
the results of one project feed into another, or
they are parts of a larger "project that has been broken
down to smaller projects".
ADVANTAGES
Decreased risk
Economies of Scale
Improved Management
10
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Management Office (PMO)
An organizational entity
that centralizes and
coordinates the
management of projects.
Responsibility of a PMO
can range from providing
project management
support functions to
actually being
responsible for the direct
management of a project.
11
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Functions of a PMO
• A PMO performs a number of functions, for example:
Managing shared resources across projects.
Project Management Process/Methodology: Develop and
implement a consistent and standardized processes.
Coaching, mentoring, training and oversight.
Developing and managing project policies, procedures,
templates and other shared documentation (Organizational
Process Assets).
Monitoring compliance with PM standards, policies,
procedures and templates.
Project management software tools: Select and maintain
project management tools for use by employees. Also
manage the Project Management Knowledge base.
12
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
The Project Life Cycle
All projects are divided into phases, and all projects,
large or small, have a similar life cycle structure.
At a minimum, project will have a beginning or initiation
phase, an intermediate phase or phases, and an ending
phase.
All the collective phases, the project progresses
through in concert are called the project life cycle.
Construction: Feasibility > Planning > Design > Production > Turnover > Startup
IT Project: Requirement > Design > Program > Test > Implement
13
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Management Lifecycle
Starting the Project Organizing and Preparing Carrying Out The Work Closing the Project
INITIATING
G
NIN
G
CO
N G
TI
N
TR
CU
O
X E
LL
E
IN
Project Closed
Plan Acceptance
TIME
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Typical Construction Life Cycle
Full Operation
100%
Installation
Substantially
complete
Percentage Complete
Major
Contracts
Let
Project
“GO”
decision
16
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
What is the Role of a Project Manager?
• Definition:
“The Project Manager is the person
assigned by the performing organization
to lead the team that is responsible for
achieving the project objectives.”
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Manager Responsibilities & Competencies
Project Managers accomplish work through the project
team and key stakeholders
Successful Project Managers balance knowledge,
experience, ethics and a number of interpersonal skills:
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Teams
Project Teams
The Project Team typically includes the project manager and the
group of individuals who act together in performing the work of the
project to achieve its objectives
Traditional Project Team Roles:
Project Management Staff
Project Staff
Business Partners
Projectized Organization.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Functional Organization
21
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Projectized Organization
22
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Weak Matrix Organization
23
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Balanced Matrix Organization
24
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Strong Matrix
Completed Schedules ,
Processes and Procedures
risk data , & earned value data
26
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Lessons Learned (Postmortem)
28
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Framework Management Questions
Answer 4:
A project is a temporary endeavor undertaken to create a unique
product, services or result. Temporary means that every project
has definite beginning and definite end.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q2: Project Managers have least power in which
organization structure?
1. Matrix
2. Functional
3. Projectized
4. Balanced
Answer 2:
In classic functional organization each employee has one clear
superior. Staff members are grouped by specialty such as
production, marketing, engineering. Functional organizations still
have projects but the perceived scope of the project is limited
to the boundaries of the function.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Management Processes
In 1999 Plan-do-check-act cycle was defined by
Shewhart and modified by Deming.
Initiating Planning
Processes Processes Coordinating
people and other
resources
Controlling Executing
Processes Processes
Product
Status Reports Deliverables
Progress Report Controlling Executing Change
Quality Report Processes Processes Request
Change Management Issues
Issue Management
Closing Testing
Processes
Product, Process & Vendor Evaluations Process
Acceptance Documents
Ongoing Cross
Project Improvements
Legal Contract & Budget Closure
Green International - India | Kuwait | Qatar www.greenintl.net
Improvement©2010-2018 All Rights Reserved
33
Project Management Framework
10 Knowledge Areas
core functions
Stakeholder
Management
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Scope Management
Scope refers to all the work involved in creating the productsof the
project and the processesused to create them
Product scope
The features and functionsthat are to be included in your
products or service or result of the project.
Completion is measured against the requirements.
Project Scope
The work that must be done to deliver the product scope or
product of the project.
Completion is measured against the plan.
To ensure a successful project, both product and project
scope must be well integrated.
35
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Scope Management
Project Scope Management includes the processes required to ensure that the
project includes all the work required, and only the work required, to successfully
complete the project.
Managing the project scope is primarily concerned with defining and controlling
what is and is not included in the project.
36
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Defining & Controlling Scope
Scope definition is primarily concerned with, what is and
is not included in the project.
37
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Scope Statement
Product scope description: Progressively elaborates the characteristics of
the product, service, or result described in the project charter and
requirements documentation.
Deliverables: Any unique and verifiable product, result, or capability to
perform a service that is required to be produced to complete a process,
phase, or project. Deliverables also include ancillary results, such as
project management reports and documentation. These deliverables may
be described at a summary level or in great detail.
Acceptance criteria: A set of conditions that is required to be met before
deliverables are accepted.
Project exclusions: Identifies what is excluded from the project. Explicitly
stating what is out of scope for the project helps manage stakeholders'
expectations and can reduce scope creep.
38
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Work Breakdown Structure (WBS)
Create WBS is the process of subdividing project deliverables and
project work into smaller, more manageable components.
The Work Breakdown will smooth the way for estimating project
cost, time, schedule resources, and determining quality control
later in the planning process.
39
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Work Breakdown Structure (WBS)
Networking
Scheduling
Measurement Costing
WBS Risk
Control
Analysis
Organizational
Staffing
Structure
40
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Work Breakdown Structure (WBS)
41
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
42
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Work Breakdown Structure (WBS)
44
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Control Scope
Control Scope is the process of monitoring the status of the project
and product scope and managing changes to the scope baseline.
Important aspects of project scope control include determining the cause and
degree of variance relative to the scope baseline and deciding whether
corrective and preventive action is required.
Variance analysis: Is used to compare the baseline to the actual results and
determine if the variance is within the threshold amount or if corrective or
preventive action is appropriate.
Trend analysis: examines project performance over time to determine if
performance is improving or deteriorating.
47
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Importance of Project Schedules
Managers often cite delivering projects on
time as one of their biggest challenges.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Define Activities…Tools & Techniques
Decomposition: Decomposing the Project Work Packages
Decomposition is a technique used for dividing and
subdividing the project scope and project deliverables
into smaller, more manageable parts.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Define Activities…Tools & Techniques
Rolling wave planning:
Rolling wave planning is an iterative planning technique in which the
work to be accomplished in the near term is planned in detail, while
work further in the future is planned at a higher level.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Define Activities…Outputs
Activity List:
An activity list is a tabulation of activities to be included
on a project schedule that includes:
The activity name
An activity identifier or number
A brief description scope of work for each activity
The primary output of decomposing the work is the
activity list, which is a description of each activity in
sufficient detail to ensure that project team members
understand what work is required to be completed.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Define Activities…Outputs
Milestone List:
A milestone is a significant point or event in a project.
A milestone list identifies all project milestones and
indicates whether the milestone is mandatory, such as
those required by contract, or optional, such as those
based on historical information.
Milestones have zero duration because they represent a
significant point or event.
Milestones are useful tools for setting schedule goals and
monitoring progress.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
How Network Diagram helps you?
It helps to justify your time estimate for the
project.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
What is a Network Diagram?
A network diagram is a schematic display of the
logical relationships among, or sequencing of,
project activities.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Create Network Diagram
Like Precedence
Diagramming Method
Required 4 Relations
FS/SS/FF/SF
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities…Tools & Techniques
Arrow Diagramming Method (ADM)
ADM is a method of constructing a project schedule
network diagram that uses arrows to represent activities
and connects them at nodes to show their dependencies.
This technique is also called activity-on-arrow (AOA) and,
although less prevalent than Precedence Diagramming
Method PDM, it is still used in teaching schedule network
theory and in some application areas.
ADM uses only finish-to-start dependencies and can
require the use of (dummy) relationships called dummy
activities, which are shown as dashed lines, to define all
logical relationships correctly. Since dummy activities are
not actual schedule activities, they are given a zero value
duration.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities…Tools & Techniques
Arrow Diagramming
B
Method (ADM): 4
This method of A G
3 2
constructing a project C D
network diagram is also 5 1
called … E
F
Activity-on-Arrow
4
3 ADM
(AOA) and, although
less prevalent than Rule: Only one connecting
PDM, is still the arrow between nodes.
technique of choice in The dummy ensures correct
some application areas precedent relationships.
Dummies have 0 effort.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities…Tools & Techniques
1. Precedence Diagramming Method (PDM)
A B C
Start D E Finish
See
Following
pages>>>
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities…Tools & Techniques
Dependency Determination and Integration:
Mandatory Dependencies: These dependencies are the
natural order of activity.
Example: You can’t begin building your house until your foundation
is in place. These relationships are also called hard logic.
Discretionary dependencies: These dependencies are
the preferred order of activities. It is defined by the
project management team.
Example: A painting project typically allows the primer and the
paint to be applied within hours of each other. Due to the expected
high humidity during the project, however, all of the building will be
completely primed before the paint can be applied.
These relationship are also known as soft logic, preferred logic,
or preferential logic.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Dependency Determination .... Continues
External dependencies: As its name implies, these are
dependencies outside of the project’s control.
Example: The delivery of equipment from a vendor, the deliverable
of another project, or the decision of a committee, lawsuit, or
expected new law.
Internal dependencies: Internal dependencies involve a
precedence relationship between project activities and
are generally inside the project-team's control.
For example; if the team cannot test a machine until they
assemble it, this is an internal mandatory dependency. The
project management team determines which dependencies are
internal during the process of sequencing the activities.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Sequence Activities…Tools & techniques
Leads and Lags
A (DU=4) FINISH-TO-START (FS) (conventional) activity A
must finish before B can start
B(DU=3)
FS 0
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Network Diagram…showing activity sequencing
A B C
Start D E Finish
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Estimating - Things to know
Padding is not an acceptable project management
practice.
Estimating must be kept realistic through the life of the project by re-
estimating and reviewing them periodically.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Estimate Activity Durations
The Activity Duration Estimating process attempts to
estimate the work effort, resources, and number of work
periods needed to complete each schedule activity.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Padding
In real word you often hear from the team member the
following
I have no idea how long
it will take .
I do not even know what
I am being asked to do.
So what I do I say?
This is an example of padding. I will take my best
Padding is a unprofessional guess and double it!
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Estimation Accuracy
The classes of estimates their accuracy % are as follows:
• Rough Order or Magnitude (ROM) (-50% to +100%)
• Order of Magnitude (-25% to +75%)
• Budgetary (-10% to +25%)
• Definitive (-05% to +10%)
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Estimate Activity Durations… Tools & Tech
Heuristics:
A heuristic mean a rule of thumb.
Example of heuristic is the 80/20 rule.
This rule is applied to quality suggests that 80 percent of
quality problems are caused by 20 percent of potential
sources of problems.
A schedule heuristic might be - Design work is always 15
percent of the total project length.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Estimate Activity Durations… Tools & Tech
Three-Point Estimating:
Three-point estimates are based on determining three types of
estimates:
Most likely. The duration of the schedule activity, given the
resources likely to be assigned, their productivity, realistic
expectations of availability for the schedule activity,
dependencies on other participants, and interruptions.
Optimistic. The activity duration is based on a best case
scenario of what is described in the most likely estimate.
Pessimistic. The activity duration is based on a worst-case
scenario of what is described in the most likely estimate.
More accurate activity duration estimate is often obtained by
using an average of the three estimated durations.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
PERT Calculations
The Optimistic Time (a):
Is the minimum time an activity
could take (the situation, where
every thing does well).
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development
The difference between a time estimate and a schedule
is that the schedule is calendar based.
The Schedule Development process means everything
you need to do to develop a finalized schedule that is
bought in to, approved, realistic and formal.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development…Tools & Techniques
Critical Path method:
Critical Path
The critical path is the longest duration path
through a network diagram and determine the
shortest time to complete the project.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development…Tools & Techniques
How the Critical Path helps the project manager?
Helps prove how long the project will take
Helps the project manager determine where to focus
his/her project management efforts
Provide vehicle to compress the schedule during the
project planning
Provides vehicle to determine which activities have
float and can therefore be delayed without delaying the
project
TIP: The easiest way to find the critical path is to identify all
paths through the network diagram and add the activity
durations along each path. The path with the longest duration is
the critical path.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development …Tools & Techniques
Float (slack)
Project managers should be familiar with the concept of float.
Total float (slack): Total float is the amount of time an
activity can be delayed without delaying the project end date
This is the key type of float.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development …Tools & Techniques
Float (slack)
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development …Tools & Techniques
Test your knowledge!
Can there be more than one critical path?
Yes, you can have two, three or more critical paths.
Do you want to be there?
No, it increases risk.
How much float does the critical path have?
Generally the critical path should have zero float.
Can there be negative float?
Yes, it shows you are behind.
Would you leave the project with a negative float?
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Compression
Fast Tracking
With fast tracking, activities that would normally be done in
sequence are allowed to be done in parallel or with some
overlap.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Crashing Vs Fast Tracking
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule development…Outputs
Project Schedule:
The Project Schedule will detail the start and finish date
as well as the resource assignments for each activity.
The project schedule should be approved and signed off
by stakeholders and functional managers.
This assures that they have read the schedule, understand
the dates and resource commitments, and will likely
cooperate.
The schedule can be displayed in a variety of ways:
Project Schedule Network Diagram
Gantt Charts/ Bar Charts
Milestone Charts See following slides>>>
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Project Schedule Network Diagram
It is a weak planning tool, but they are effective tools for progress
reporting/ track progress and control.
Bar Charts are not project management plans
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Milestone Chart
These are similar to bar charts, but they are only show major events.
Milestones have no duration; they are simply the completion of
activities.
Milestone charts are good tools for reporting to management and the
customer.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Schedule Development …Outputs
Schedule Baseline:
A schedule baseline is a specific version of the project
schedule developed from the schedule network analysis
having start and finish date.
It is accepted and approved by the project management
team.
The schedule baseline is a component of the project
management plan.
Remember that schedule baseline can only be changed by
formally approved changes.
Meeting the schedule baseline is one of the measures of project
success.
90
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Control Schedule…Tools & Techniques
Performance Reviews:
Performance reviews measure, compare, and analyze
schedule performance such as actual start and finish
dates, percent complete, and the remaining duration for
the work in progress.
If Earned Value Technique (EVT) is utilized the SV (Scope
Value) and the SPI (Schedule Performance Index) are
used to assess the magnitude of schedule variations.
Other techniques such as Trend Analysis, critical path
method, critical chain method also being utilized.
An important part of schedule control is to decide if the
schedule variations require corrective actions.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q1: Since you are in the preliminary stages of your project,
you estimate that your project will most probably last 1
year. However, optimistic scenario is that it will get
over within 6 months and pessimistic scenario is 18
months. This kind of estimate is also called:
1. Defensive
2. Capital Cost
3. Order of Magnitude
4. Feasibility
Answer is 3:
The classes of estimates their accuracy % are as follows:
• Rough Order or Magnitude (ROM) (-50% to +100%)
• Order of Magnitude (-25% to +75%)
• Budgetary (-10% to +25%)
• Definitive (-05% to +10%)
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q2: The difference of a milestone chart as compared
with a bar chart when making presentation to top
management is that unlike bar charts, milestones:
1. Show activity start and end dates.
2. Show dependencies among tasks.
3. Only identify the scheduled start or completion of a
major deliverables, and not all the tasks.
4. Show supporting details.
Answer is 3:
Milestones charts as shown are similar to bar charts, but only
identify the scheduled start or completion of major
deliverables and key external interfaces.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q3: In schedule development, mathematical analysis
often produces a preliminary early-start schedule
that shows peaks and valleys in the resource
requirements. Resource Leveling done to take care of
this issue may result in all the following except:
1. Increase in project duration
2. Utilization of weekends, extended hours or multiple shifts
3. Productivity increases by using different technologies
and/or methodologies.
4. Reduction in project cost
Answer is 4:
As different techniques like crashing, fast tracking, resource
reallocating etc. are being considered for Resource Leveling,
there is a real potential for the costs to increase.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q4: Float is the amount of time an activity can be
delayed without delaying the project finish date. It
can also be called:
1. Slack
2. Free Float
3. Path Float
4. None of the above
Answer is 1:
Float : also called Slack.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q5: You got news that because of bad weather, your
shipment has got delayed by 2 weeks. What should
be the first step that you take.
1. Fast Track the project to ensure that the project schedule is
not delayed.
2. Review the performance reports to determine which planned
dates have not been met, and the impact on critical path.
3. Try to get additional supplies from an alternative location as
soon as possible.
4. Take corrective action to minimize the impact because of the
delay.
Answer is 2:
Performance report provide information on schedule performance, such as
which planned dates have been met and which have not. Since performance
reports are used to track project execution, they should be consulted first
when there is delay in the project to determine the potential impacts.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q6: If the number of critical path in the project
increases, but the duration of the project remains
same, what is the impact on the project?
1. Crashing will be required to complete project on time.
2. Fast tracking will be required to complete project on
time.
3. Risk of the project increases.
4. None of the above.
Answer is 3:
If the number of critical paths increases for the project, delay in
any one of the critical paths has the potential for delaying the
project. So, the risk of the project (in meeting the project schedule)
increases.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q7: All the following are benefits of fast tracking a
project EXCEPT.
Answer is 2:
Fast Tracking can result in rework and increased risk.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
Arrow diagramming method (ADM) is a network diagramming technique in which
activities are represented by arrows. ADM is also known as the Activity-On-Arrow (AOA)
method. It has been used long time to determine the critical path and identify resource
problems and feasible solutions when the approximate duration and resource
requirement of all the activities of network diagram are known.
There are two main elements of the Arrow Diagramming Method(ADM) which are arrows
and nodes. One arrow represents one activity to be performed.
The tail of the arrow is the start of the activity, the head of the arrow is the end of the activity
and the length of the arrow is the duration of the activity.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
In the forward pass, we calculate the Start Dates of all the nodes. In the backward pass,
the end node’s Start Date will be its Finish Date and the backward pass proceeds by
subtracting the durations of the activities leading to the end node from the end node’s
Finish Date to arrive at the Finish Dates for the preceding nodes.
The following example shows a simple Activity on Arrow Diagram.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
Step 2 : Backward Pass Calculation
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
Step 3 : Float Calculation for Each Activity
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Arrow Diagramming Method Example
Step 4 : Identifying the critical path
The critical path is the longest path in the network diagram and total float of critical
path is zero. As shown in the schema above, critical path is marked red.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q8: Find the total float of activity D for the project
A. 1
B. 3
C. 9
D. 2
A (12) END
E (9)
START H (6)
F (12)
Answer is :
Forward pass determines ES & EF and backward pass
determines LS & LF.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q9: Activity on arrow diagram is shown below. Find the
duration of the project
A. 32 Days
B. 35 days
C. 26 Days
D. 40 Days
START
A (12) E (9)
H (6)
END
F (12)
Answer is :
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q10: The forward pass in project network calculations
determines the
Answer is E:
Forward pass determines ES & EF and backward pass
determines LS & LF.
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q11: TQM stands for:
A. Tool Quality Management
B. Test Quality Manager
C. Total Quality Management
D. Total Quality Manager
Answer is C:
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q12: All of the followings are true about work
packages except:
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q13: If specification is in conflict with a note on the
drawings, which statement is correct?
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q14: The advantages of design and build contractual
arrangement is
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q15: Ashgal is
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q16: While working on the final stages of job, you
notice that a small clause of contract has been
violated accidentally. What should you do?
A. Tell the client about the discrepancy and ask
him/her/them what to do
B. Look for a loophole in the contract that would
enable you to avoid re-doing the work
C. Don’t worry about it; let your boss or client to
worry about it later. If it is important, they will
address the subject
D. Fire the person who caused the contract
violation
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q17: The following table shows the activities, durations, and their
dependency for a construction project. Select the critical path
from the following
Activity Duration Dependency A. Start-A-E-H-Finish
Start 0 None B. Start-C-E-H-Finish
A 3 Start C. Start-B-D-I- Finish
B 4 Start D. Start-B-D-G-finish
C 2 Start
D 2 B
E 5 A,C
F 1 B
G 6 D,F
H 11 E
I 8 D,F
Answer is A
Finish 0 G,H,I
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q18: Variance from project specifications is called
A. Report
B. Requirement
C. Defect
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q19: Splitting project to tasks and estimate time and
resources required to complete each task is called
A. Project scheduling
B. Project
Optimization
C. Project Control
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q20: which one of the engineering characteristics can
best explain the following concept? Base your
decision on reason rather than making assumptions
A. Quantitative
thinking
B. Interpersonal skill
C. Honesty
D. Logical thinking
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q21: Inspections are also called
A. A product review
B. Audits
C. Walkthroughs
D. Al answers are true
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q22: Which one of the following represent an activity
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q23: In the activity on arrow network with durations
shown, based on end of day calculations for starts
and finishes. The early start of activity N is most
nearly
D (8)
A. 16
B. 21
C. 23 START
B (6) F (4) J (8) L (3) N (2)
D. 24
H (7)
Answer is
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q24: Before development of any site, construction
companies work on site set up to ensure
Answer is E
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q25: which of the estimate listed would occur last in a
project time line?
A. Rough order of magnitude
B. Square foot estimate
C. Definitive estimate
D. Assemblies estimate
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q28: Correct the following statements
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q29: Both architect and engineer make use of the cost
estimate of the project
A. For site selection
B. For designing of the project
C. For choosing alternatives
D. All answers are true
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q30: The first step of scope definition is to:
Answer is E
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q31: The sustainable development involves:
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q32: Following successor relationships are available for
a project. Find the early start of activity E?
Answer is
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q33: Construction work should begin:
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q34: What type of bond guarantees that if a
contractor goes broke on a project, the surety will
pay the necessary amount to complete the work
A. Bid Bond
B. Performance Bond
C. Advance payment guarantee Bond
D. Payment bond
E. Acceptance Bond
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q35: A formal CPM analysis for a projects shows the
planned costs to date are $85,000 and the
accounting department reports charges to the job
of $95,000 to date is $70,000, the cost and
schedule status of the project are most nearly:
A. Ahead of schedule and over budget
B. Behind schedule and over budget
C. Ahead of schedule and under budget
D. Behind schedule and under budget
Answer is
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q36: The process of identifying and evaluating
contractors for a bid list is called
A. Prequalification
B. Forecasting
C. Fast tracking
D. None of the above
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q37: During which of the following categories, you are
more likely to find status reports, many changes,
and the creation of forecasts?
A. Concept
B. Initiation
C. Planning
D. Execution
E. Closure
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q38: The highest element in the hierarchical break
down of the WBS is
A. Work package
B. Sub deliverables
C. Cost account
D. Major deliverables
E. The project
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q39: Which of the following is least bothered as a
constraint to the project?
A. Time
B. People
C. Cost
D. Performance
E. Both B & D are not typical constraints
Answer is E
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q40: Which of the following would not be classified as
an opportunity to do a project?
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q41: The term fast track means -----
A. Design/Build
B. Construction starts before the design is
complete
C. Cost plus fixed fee
D. None of the above
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q42: Which of the following requires a change order?
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q43: Final as-built drawings are submitted to ------
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q44: which of the following characteristics is not
typical of a project manager?
A. Managing a temporary activity
B. Posses in depth technical knowledge
C. Managing a non-repetitive activity
D. Manages independently of the formal
organization
E. Provides a direct link to the customer
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q45: The architect of a project visits the site and
notices a very low quality of works in the
application of gypsum board materials
A. Stop the work
B. Call the owner and inform him of this poor
quality of work
C. Tell the dry wall worker about his observations
D. Inform the general contractors superintendent
that the work has been rejected
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q46: The immediate --------must be completed
before the next activity can start in the project
network
A. Critical activities
B. Burst activities
C. Predecessor activities
D. Successor activities
E. None of the above
F. All of the above
Answer is C
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q47: What does a change order change?
1. The scope of project
2. The time of completion
3. The cost of project
4. The design of project
5. Any change in the work
Select one
A. 1 & 2
B. 2&3
C. 2,3 & 4
D. 5
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q48: The municipality wishes to build an exhibition and
convention center. Which location is most
desirable?
A. Near an airport
B. Adjacent to public bus routes
C. Convenient to busy pedestrian routes
D. In a satellite location away from urban
core
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q49: What is / are the most important components of
sustainability?
A. Economical
B. social
C. Environmental
D. All are equally important
Answer is D
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q50: Which of the following choices is not one of the
stages of a project life cycle?
A. Concept
B. Initiation
C. Planning
D. Execution
E. Delivery/Closure
Answer is A
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q51: The activity on node network shown below describes a
project consisting of 8 tasks A-H. Each node indicates
activity duration in weeks. All the relationships are finish to
start. The minimum time to complete the project is:
A. 15 Weeks
B. 16 Weeks
C. 17 weeks
D. 18 weeks
Answer is
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q52: The critical path in a project network is the:
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q53: Of the following engineering disciplines, who would
be best suited to design and operate an automobile
factory
A. Petroleum Engineer
B. Mechanical Engineer
C. Civil Engineer
D. Chemical Engineer
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
Q54: Of the following engineering disciplines, who would
be best suited to design and operate an automobile
factory
A. Petroleum Engineer
B. Mechanical Engineer
C. Civil Engineer
D. Chemical Engineer
Answer is B
Green International - India | Kuwait | Qatar www.greenintl.net ©2010-2018 All Rights Reserved
THANK YOU