Beruflich Dokumente
Kultur Dokumente
Time 1 3 2 1 2
cement turbine front pasderal lower casing
1 inspection 2 foundation 3 plateform 4 and rear 5 connection
cement flating and checking pasderal fix
foundation fix shim centering location
plate leveling
1. including centering
front,middle,and rear ca
centering, leveling
time 2 1 1 2
2 1 2 1
install rotor of install sealing install rotor remove rotor
11 generator 12 plate and 13 than check 14 from lower
and roughly check seperator gap,centering,f casing
centering /leveling of than check ornt bearing
#4 bearing centering and rear
bearing
2 2 2 2
connect rear upper remove upper install install rotor to
casing ,tight 1/2~2/3 casing and turn seperator , bottom casing
bolt and check the gap over the upper sealing and than check
between upper and casing check the sealing
botmm gap,perellel and seperator
connect rear upper remove upper install install rotor to
15 casing ,tight 1/2~2/3 16 casing and turn 17 seperator , 18 bottom casing
bolt and check the gap over the upper sealing and than check
between upper and casing check the sealing
botmm gap,perellel and seperator
5 1 5 1
install upper install back centering recover the
19 casing tight 20 upper casing 21 coupling 22 bearing 23
1/2 bolt and cover
check gap,
contact area
30 3
25 oil 26 clean
circulation bearing and
install back
8
27 insulation of
cover
re
total time
9
lower casing
connection
1 7
bottom bearing
fine check
centering and
leveing
6
remove rotor
from lower
casing
8
install rotor to
bottom casing
than check
the sealing
and seperator
install rotor to
bottom casing
than check
the sealing
and seperator
2 5 19
stator adjust excitor
centering 24 installation
and gap
49 8 57
33
90
Duration
No. Work Description
(Days)
27 insulation of turbine 8
90