T+G Installation procedure

Time 1 3 2 1 2
cement turbine front pasderal lower casing
1 inspection 2 foundation 3 plateform 4 and rear 5 connection
cement flating and checking pasderal fix
foundation fix shim centering location
plate leveling
1. including centering
front,middle,and rear ca
centering, leveling

time 2 1 1 2

stator of checking bottom bearing leveling bottom bear


6 generator 7 center of 8 fixed location 9 /centering 10 fine check
fix loaction turbine and turbine for centering an
and generator lower leveing
centering casing

2 1 2 1
install rotor of install sealing install rotor remove rotor
11 generator 12 plate and 13 than check 14 from lower
and roughly check seperator gap,centering,f casing
centering /leveling of than check ornt bearing
#4 bearing centering and rear
bearing

2 2 2 2
connect rear upper remove upper install install rotor to
casing ,tight 1/2~2/3 casing and turn seperator , bottom casing
bolt and check the gap over the upper sealing and than check
between upper and casing check the sealing
botmm gap,perellel and seperator
connect rear upper remove upper install install rotor to
15 casing ,tight 1/2~2/3 16 casing and turn 17 seperator , 18 bottom casing
bolt and check the gap over the upper sealing and than check
between upper and casing check the sealing
botmm gap,perellel and seperator

5 1 5 1
install upper install back centering recover the
19 casing tight 20 upper casing 21 coupling 22 bearing 23
1/2 bolt and cover
check gap,
contact area

30 3
25 oil 26 clean
circulation bearing and
install back

8
27 insulation of
cover
re
total time
9
lower casing
connection

front,middle,and rear casing


centering, leveling

1 7

bottom bearing
fine check
centering and
leveing

6
remove rotor
from lower
casing

8
install rotor to
bottom casing
than check
the sealing
and seperator
install rotor to
bottom casing
than check
the sealing
and seperator

2 5 19
stator adjust excitor
centering 24 installation
and gap

49 8 57

33

90
Duration
No. Work Description
(Days)

1 Inspection of Cement Foundation (Including Centering) 1


cement foundation leveling and fix shim plate
2 3
turbine plateform checking centering leveling
3 2
front pasderal and rear pasderal fix location
4 1
Lower Casing connection (front,middle,and rear cylinder) / (centering, leveling)
5 2
stator of generator fix loaction and centering
6 2
checking center of turbine and generator
7 1

8 bottom bearing fixed location 1


turbaine bottom cyclinder
9 2
bottom bearing fine check centering and leveing
10 1
install rotor of generator
11 and roughly check centering /leveling of #4 bearing 2
install sealing plate and seperator than check centering
12 1
install rotor than check gap,centering,fornt bearing
13 2
remove rotor from turbine lower casing
14 1
connect rear upper cylinder ,tight 1/2~2/3 bolt and check the gap between upper
15 and bottom 2
remove upper cylinder and turn over the turbine upper casing
16 2
install seperator ,sealing and check gap,perellel
17 2
install rotor to bottom cylinder than check the sealing and seperator
18 2
install upper cylinder tight 1/2 bolt and check gap, contact area
19 5
install back upper cylinder
20 1
centering coupling
21 5
recover the bearing cover
22 1
stator adjust centering and gap
23 2
excitor installation
24 5
oil circulation
25 30
clean bearing and install back
26 3

27 insulation of turbine 8

90