Canal Data
Discharge of Canal = 6800 Cusec 192.44 Cumec
Bed Width = 65 m
Side Slope = 1.5 H : 1 V 3 H:1V
FSD = 3.05 m
Bed Level of Canal = 160.003 m
FSL of Canal = 163.053 m
Drainage Data
Catchment Area = 2.50 Sq Km 2.5 Sq. km.
Ground Level = 161.686 m
Bed Level of Drainage = 161.386 m (NSL)
HFL of Drainage = 161.386+0.300 161.686 m (Assumed)
= 0.087 m
Uplift on the roof=U/s HFL-Loss of Entry-Level of Underside of roof slab
= 2.599 m of water
= 0.505 = 25.99 Kn/m2
�2/2�=
(Assuming Unit weight of water = 10 KN/M2)
The concrete slab is 0.5 m thick and will thus exert a downward load of 0.5 x 24 = 12 KN/m2
The balance of the uplift pressure i.e. 13.99 Kn/m2
has to be resisted by the reinforcement to be provided at the top in the roof slab.
The roof slab has to be designed for full canal water load (3.05m of water) + self weight
(including lining weight), when the drainage water is low and not exerting any uplift.
Suitable reinforcement at bottom of the slab may be provided for this downward free.
Total downword force = 3.05 m of water + Self weight of lining + Self weight of slab
= 46.1 Kn/m2
= 12.099 m
Horizontal length of D/S ramp joining the bed level at a slope of 5:1
= 20.165 m
The residual seepage head at a point `b' in the centre of the first barral has been
calculated by Bligh's theory:
The total length of drainage floor = 135.464 m
The seepage line abc will traverse creep length as follows:
ab = Half of the barral span = 1.5 m
bc = Half of the total Drainage length= 67.732 m
Total length = 69.232 m
R= 1.36 m
Provide depth of cut offs for scour holes of 1.5 R on both sides
Depth of U/S��cutoff
�ℎ� ����ℎ �����below HFL [= �/� ]1/3, assuming f2.05
(�)=0.47 = 0.9m
R.L. of bottom of U/S cutoff = 159.993 m
Actually provided D/S cut off upto 1 m below bottom of floor
= 155.853 m
Length of U/S protection (i.e. 400 mm thick apron)
= 2 [ R L of U/S bed - R L of bottom of U/S cutoff]
= 3m
Say 3m
Similarly, length of d/s protection (i.e. 400 m thick apron)
= 2 [ R L of D/S bed - R L of bottom of D/S cutoff]
= 11.066 m
Say 11 m
the pitching may be supported by 0.4 m wide and 1 m deep toe walls
24.645 Km.
EP
WP
WP
F A 500 B EP
2 500
500 500
3 3
E 500 C
D
UPLIFT FORCE
Earth Pressure :
Load calculation
Unit weight of concrete = 25 KN/m3
Thickness of top slab = 0.5 m
Thickness of bottom slab = 0.5 m
Thickness of wall = 0.5 m
Cantilever projection of wall = 0.5 m
Thickness of liner = 0.15 m
Length of box = 79.799 m
Total Span = 7.5 m
Self weight of top slab = 7481.2 KN
Self weight of outer wall = 3990 KN
Self weight of inner wall = 1995 KN
Self weight of bottom raft = 7481.2 KN
Weight of cantilever projection = 997.49 KN
Weight of soil in cantilever projec = 3250 KN
Weight of water = 15418 KN
Self weight of liner = 1154.5 KN
Self weight of soil beside wall = 13838 KN Area = 51.73 one side+Area =40.52 othe
Weight of sand filling = 3493.9 KN
Uplift force due to water = 5984.9 KN
Check for stability
Total Vertical force = 59098 KN
Uplift force = 5984.9 KN
Vertical force/Uplift force = 9.8745 >1.2 OK
ec =
cmin+dia/2
72 mm
R =b-2*cmin-dia
R 856 mm
As required = 50.00 x
180 x 0.89
As required = 34.00 x
180 x 0.89
1.22 x 1000
As required = 43.00 x
180 x 0.89
As required = 45.00 x
180 x 0.89
= 167.1 <
(As = ) 2094.4 mm 2
as top steel
(As = ) 2094.4 mm 2
as bottom steel
(As = ) 2094.4 mm 2
as top steel
0.0012
500000 mm2
300 mm2
2094.4 mm 2
as wall steel