Beruflich Dokumente
Kultur Dokumente
Width
8.100
0.950
9.050
Width
8.100
1.650
9.750
Width
8.100
2.450
10.550
Tr. excvn.
length
6.000
Less col.st
2/0.250
0.500
6.500
depth
0.400
AP1
2/ 1.2 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
1.2 on earth
0.05 0.14 & m3 0.14
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
2/ 1.2 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
1.2 [(ln No. 4)
0.25 0.72 [& m3 0.72
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn
2/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.25 0.16 stump m3 0.16
AP1
5/ 1.4 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
1.4 on earth
0.05 0.49 & m3 0.49
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
5/ 1.4 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
1.4 [(ln No. 4)
0.25 2.45 [& m3 2.45
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn
2/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.25 0.16 stump m3 0.16
Blinding and Concrete col. bases
AP3
5/ 2.2 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
2.2 on earth
0.05 1.21 & m3 1.21
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
5/ 2.2 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
2.2 [(ln No. 4)
0.35 1.69 [& m3 1.69
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn
5/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.15 0.07 stump m3 0.07
Concreating – Removal of excavated material
W.B.L.F.F. (cont’d)
AP3 stump
gth.
5/0.250 1.75
12/12 1.87 269.28 [16 mm Dia.b.t. steel. in strt. & bent bars in m 269.28
[isol.com.stump
Links
gth.
width 0.200
Less
conc. cov 2/0.010 0.02
4/0.180
=0.720
Add
hooks 24/0.008 0.192
0.912
W.B.L.F.F. (cont’d)
4/ [
6/ 0.91 21.84 [8mm Dia. m. s reinft. in links in isol. col. Stump m 21.84
Steel Reinforcement – Blinding and Concrete
4/ 5.5 [
0.2 [Conc. Gr.C15 blindg. n.e. 100mm thk. Laid on 0.22
3
0.05 0.22 earth m
[
4/ 5.5 [
0.15 [Reinfd. In.situ conc Gr. C30/3 in grd.bm
0.40 1.32 [ m3 1.32
Steel Reinforcement – Formwork
4/ 4.8 19.2 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 19.2
[n.e. 500 mm high
4/ 5.6 22.4 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 22.4
[n.e. 500 mm high
4/ 8.8 35.2 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 8.8
[n.e. 500 mm high
4/4 5.5 44 [Fwk to grd.bm. exceed. 250mm & n.e. 500mm m 4.4
[high
Steel Reinforcement
Less
2 conc. cover 0.080
2/0.220 0.440
1.540
W.B.L.F.F. (cont’d)
grd.bm.
length
6.000
Less con. cov.
2/0.0050 0.100
5.900
Add 2 bends
2/0.300 0.600
6.500
length
6.000
Less
6 stumps 6/0.25 1.500
7.500
width
8.100
Less
6 stumps 6/0.25 1.500
9.600
W.B.L.F.F. (cont’d)
7.5 [Fillg. to make up lev.avg 150mm thk.w.h/c. of m2 72
9.6 72 [clean hard broken stones obtained off site
[&
[Polyethlene not less than 1000gauge horiz.d.p.m
[lapp.d 100mm at jts. Laid on h/c