Beruflich Dokumente
Kultur Dokumente
OBRA
MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA
CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE REQUENA
CONTRATISTA : CONSORCIO AQUILES
SUPERVISOR DE OBRA : ING. JULIO VELA ALVARADO
RESIDENTE DE OBRA : ING. MOISES ENRIQUE DONAYRE MEDINA
VALOR REFERENCIAL S/ 1,659,255.86 Con IGV
PRESUPUESTO CONTRATADO S/ 1,659,255.86 Con IGV
FECHA DE INICIO REAL DE OBRA 8/23/2018
FECHA TÉRMINO CONTRACTUAL 11/21/2018
PLAZO DE EJECUCION 90 Dias Calendario
B.- REAJUSTES
FORMULA UNICA 2,675.94 10,394.46 13,070.40
PROGRAMADO EJECUTADO
No
PERIODO SOLES PORCENTAJE SOLES PORCENTAJE
VALORIZACION
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 23-Aug-18 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
1 31-Aug-18 91,645.97 91,645.97 5.52% 5.52% 95,915.51 95,915.51 5.78% 5.78%
2 30-Sep-18 235,657.96 327,303.93 14.20% 19.73% 295,938.95 295,938.95 17.84% 23.62%
3 31-Oct-18 543,337.43 870,641.35 32.75% 52.47%
4 21-Nov-18 788,614.50 1,659,255.86 47.53% 100.00%
TOTALES 1,659,255.86 391,854.46
100.00% 100.00%
90.00%
80.00%
AVANCE %
70.00%
60.00%
PROGRAMADO
52.47% EJECUTADO
50.00%
40.00%
30.00%
23.62%
20.00% 19.73%
10.00%
5.78%
5.52%
0.00%
21-Aug-18 GRAFICO 31-Aug-18
- AVANCE PROGRAMADO
30.09.18 VS. AVANCE
31.10.18EJECUTADO 21.11.18
76.38%
HOJA DE CALCULO
I.- DATOS
K =0.239*(Mr / Mo) + 0.224*(Cr / Co) + 0.180*(Ar / Ao) + 0.050*(Ar / Ao) + 0.084*(Mr / Mo) + 0.093*(Dr / Do) + 0.130*(Ir / Io)
M MANO DE OBRA INC. LEYES SOCIALES 47 0.239 100.000 582.52 582.52 0.239 602.11 0.247 0.000 0.000 0.000
C CEMENTO PORTLAND TIPO I 21 0.224 100.000 426.29 449.56 0.236 449.56 0.236 0.000 0.000 0.000
A AGREGADO FINO 04 0.180 100.000 360.57 365.28 0.182 365.28 0.182 0.000 0.000 0.000
A ACERO DE CONSTRUCCION CORRUGADO 03 0.050 100.000 475.87 512.37 0.054 525.48 0.055 0.000 0.000 0.000
M MAQUINARIA Y EQUIPO IMPORTADO 49 0.084 100.000 290.65 299.69 0.087 302.20 0.087 0.000 0.000 0.000
D DÓLAR(GENERAL PONDERADO) 30 0.093 100.000 462.02 481.37 0.097 483.02 0.097 0.000 0.000 0.000
III.- REAJUSTES
01 Valorización - Agosto.2018 Agosto.2018 1.027 91,645.97 95,915.51 91,645.97 95,915.51 Adelantada 2,474.44 2,589.72 2,589.72 Julio.2018
02 Valorización - Setiembre.2018 Setirmbre.2018 1.036 235,657.96 295,938.95 327,303.93 295,938.95 Adelantada 8,483.69 10,653.80 10,653.80 Agosto.2018
03 Valorización - Octubre.2018 Octubre.2018 0.000 788,614.50 1,115,918.43
04 Valorización - Noviembre.2018 Noviembre.2018 0.000 1,659,255.86 2,775,174.29
% Monto Imo Ima Imr Monto Máximo Monto Utilizable Deducción del Amortización del Total Amortizado Saldo por
I.U Insumo C.I Valorización Monto Valorizado Indice
Incidencia Otorgado (P. Base) (Pg. Adel) (Val.) Utilizable en la Valorización Mes Mes Hasta la Fecha Amortizar
VI.- RESUMEN
I.- VALORIZACION N° 02
Items Descripción Presupuesto N°01
A.- VALORIZACION 295,938.95
*.- Costo Directo 218,083.23
*.- Gastos Generales 8.00% 17,446.66
VALORIZACION DE OBRA Nº 02 - SETIEMBRE 2018
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
TOTAL : S/ 206,739.51
SENCICO S/ 612.67
GRAFICO DE EVOLUCION DE AMORTIZACIONES
ADELANTO DIRECTO
EVOLUCION DE AMORTIZACIONES
160,000.00
140,000.00
120,000.00
100,000.00
80,000.00
60,000.00
40,000.00
20,000.00 Amortización Mensual
0.00 Amortización Acumulada
Saldo por Amortizar
Tiempo (Meses)
VALORIZACION DE OBRA Nº 02 - SETIEMBRE 2018
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE REQUENA
CONTRATISTA : CONSORCIO AQUILES
RESIDENTE DE OBRA : ING. MOISES ENRIQUE DONAYRE MEDINA
INSPECTOR DE OBRA : ING. JULIO VELA ALVARADO
V.R 1,659,255.86 CON IGV
M.C 1,659,255.86 CON IGV
FECHA INICIO 8/23/2018
FECHA TÉRM. 11/21/2018
PLAZO EJEC. 90 DIAS CALENDARIO
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA DE 4.80 x 3.60 m. GIGANTOGRAFIA c/bast. de madera 2" x 2" und 1.00 1,554.63 1,554.63 1.00 1,554.63 100.00% - - 0.00% 1.00 1,554.63 100.00% - - 0.00%
01.02 ALQUILER DE ALMACEN Y OFICINA mes 3.00 500.00 1,500.00 0.25 125.00 8.33% 1.00 500.00 33.33% 1.25 625.00 41.67% 1.75 875.00 58.33%
01.03 POZA DE ALMACENAMIENTO DE AGUA DE 1.0 x 2.0 x 1.20 m., inc. Tarrajeo und 2.00 431.32 862.64 2.00 862.64 100.00% - - 0.00% 2.00 862.64 100.00% - - 0.00%
01.04 TRANSPORTE DE MATERIALES Y HERRAMIENTAS ton 503.98 160.00 80,636.80 300.00 48,000.00 59.53% 15.00 2,400.00 2.98% 315.00 50,400.00 62.50% 188.98 30,236.80 37.50%
01.05 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS vje 2.00 11,395.00 22,790.00 1.00 11,395.00 50.00% - - 0.00% 1.00 11,395.00 50.00% 1.00 11,395.00 50.00%
02 SEGURIDAD Y SALUD EN OBRA
02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD DURANTE EL TRABAJO glb 1.00 5,000.00 5,000.00 - - 0.00% 0.40 2,000.00 40.00% 0.40 2,000.00 40.00% 0.60 3,000.00 60.00%
02.02 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.00 2,775.00 2,775.00 - - 0.00% 0.40 1,110.00 40.00% 0.40 1,110.00 40.00% 0.60 1,665.00 60.00%
02.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 1,709.50 1,709.50 - - 0.00% 0.40 683.80 40.00% 0.40 683.80 40.00% 0.60 1,025.70 60.00%
02.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00 1,300.00 1,300.00 - - 0.00% 0.40 520.00 40.00% 0.40 520.00 40.00% 0.60 780.00 60.00%
02.05 CAPACITACION DE SEGURIDAD Y SALUD glb 1.00 5,000.00 5,000.00 - - 0.00% 0.40 2,000.00 40.00% 0.40 2,000.00 40.00% 0.60 3,000.00 60.00%
03 OBRAS PRELIMINARES -
03.01 LIMPIEZA DE TERRENO
TRAZO, NIVELES Y MANUAL m2 3,414.70 1.04 3,551.29 3,408.04 3,544.36 99.80% 6.66 6.93 0.20% 3,414.70 3,551.29 100.00% - - 0.00%
03.02 REPLANTEO m2 3,414.70 0.77 2,629.32 3,408.04 2,624.19 99.80% 6.66 5.13 0.20% 3,414.70 2,629.32 100.00% - - 0.00%
03.03 SEÑALIZACIONES DE SEGURIDAD DE OBRA m 629.88 4.09 2,576.21 629.88 2,576.21 100.00% - - 0.00% 629.88 2,576.21 100.00% - - 0.00%
03.04 DEMOLICION DE BUZON EXISTENTE m2 27.23 38.49 1,048.08 - - 0.00% - - 0.00% - - 0.00% 27.23 1,048.08 100.00%
04 MOVIMIENTO DE TIERRAS -
CORTES Y EXCAVACIONES
04.01
CORTE DE TERRENO A NIVEL DE SUB-RASANTE CON TRACTOR
04.01.01 m3 1,447.74 5.11 7,397.95 - - 0.00% 1,447.74 7,397.95 100.00% 1,447.74 7,397.95 100.00% - - 0.00%
CORTE DE TERRENO MANUAL EN VEREDA Y RAMPAS
04.01.02 m3 326.70 37.57 12,274.12 - - 0.00% - - 0.00% - - 0.00% 326.70 12,274.12 100.00%
SOBRE-EXCAVACION DEBAJO DE SUB-RASANTE
04.01.03 m3 2,759.36 10.78 29,745.90 - - 0.00% 1,241.00 13,377.98 44.97% 1,241.00 13,377.98 44.97% 1,518.36 16,367.92 55.03%
04.01.04 EXCAVACION MANUAL DE ZANJA PARA DRENAJE AUXILIAR m3 25.00 37.57 939.25 - - 0.00% 25.00 939.25 100.00% 25.00 939.25 100.00% - - 0.00%
04.01.05 EXCAVACION MANUAL DE ZANJA PARA ALCANTARILLA DE CRUCE m3 71.40 37.57 2,682.50 - - 0.00% - - 0.00% - - 0.00% 71.40 2,682.50 100.00%
04.01.06 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO m3 2.95 37.57 110.83 - - 0.00% - - 0.00% - - 0.00% 2.95 110.83 100.00%
EXCAVACION MANUAL DE ZANJA PARA CONEXION DE SUMIDERO
04.01.07 m3 1.33 37.57 49.97 - - 0.00% - - 0.00% - - 0.00% 1.33 49.97 100.00%
EXCAVACION MANUAL DE ZANJA PARA CUNETA
04.01.08 m3 109.89 37.57 4,128.57 - - 0.00% 109.89 4,128.57 100.00% 109.89 4,128.57 100.00% - - 0.00%
EXCAVACION MANUAL DE ZANJA PARA SARDINEL
04.01.09 m3 62.80 37.57 2,359.40 - - 0.00% 62.80 2,359.25 99.99% 62.80 2,359.25 99.99% 0.00 0.15 0.01%
ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA HASTA BOCACALLES
04.01.10 m3 5,526.25 18.79 103,838.24 - - 0.00% 3,463.71 65,083.13 62.68% 3,463.71 65,083.13 62.68% 2,062.54 38,755.10 37.32%
04.01.11 ELIMINACION DE MATERIAL EXCEDENTE A 2KM. CON VOLQUETE m3 5,526.25 11.12 61,451.90 - - 0.00% 3,463.71 38,516.47 62.68% 3,463.71 38,516.47 62.68% 2,062.54 22,935.43 37.32%
04.02 RELLENOS -
04.02.01 RELLENO EN SOBRE-EXCAVACION CON MATERIAL DE PRESTAMO A-3 (PAVIMENTO) Inc. Compactacion m3 2,759.36 58.38 161,091.44 - - 0.00% 1,241.00 72,449.58 44.97% 1,241.00 72,449.58 44.97% 1,518.36 88,641.86 55.03%
04.02.02 RELLENO EN ZANJA CON MATERIAL DE PRESTAMO A-3, inc. Compactación. (ALCANTARILLA) m3 98.00 58.38 5,721.24 - - 0.00% - - 0.00% - - 0.00% 98.00 5,721.24 100.00%
04.02.03 RELLENO CON MATERIAL PROPIO EN VEREDA, Inc. Compactacion. m3 45.35 42.27 1,916.94 - - 0.00% - - 0.00% - - 0.00% 45.35 1,916.94 100.00%
04.02.04 CAMA DE ARENA, e= 0.30 PARA TUBERIA DESAGUE Inclu. Compactado m3 9.06 96.27 872.21 - - 0.00% - - 0.00% - - 0.00% 9.06 872.21 100.00%
04.03 REFINE Y NIVELACIONES -
04.03.01 REFINE Y NIVELACION A NIVEL DE SUB-RASANTE m2 1,916.26 2.09 4,004.98 - - 0.00% 1,916.26 4,004.98 100.00% 1,916.26 4,004.98 100.00% - - 0.00%
04.03.02 REFINE Y NIVELACION EN ZANJA PARA ALCANTARILLA DE CRUCE m2 42.00 2.63 110.46 - - 0.00% - - 0.00% - - 0.00% 42.00 110.46 100.00%
04.03.03 REFINE Y NIVELACION DE TERRENO PARA VEREDAS Y RAMPAS m2 1,089.02 2.63 2,864.12 - - 0.00% - - 0.00% - - 0.00% 1,089.02 2,864.12 100.00%
05 PAVIMENTO RIGIDO -
05.01 CAPA DE ARENA ANTICONTAMINANTE A-3, E=0.10 M. m3 185.33 97.26 18,025.20 - 0.00% - - 0.00% - - 0.00% 185.33 18,025.20 100.00%
05.02 SUB-BASE DE PAVIMENTO CON MATERIAL A-2-4, E=0.15 M.Inc Compactacion m3 262.24 64.71 16,969.55 - - 0.00% - - 0.00% - - 0.00% 262.24 16,969.55 100.00%
05.03 BASE DE MORTERO 1:8 PARA PAVIMENTO RIGIDO E=0.10 m. m3 172.73 307.17 53,057.47 - - 0.00% - - 0.00% - - 0.00% 172.73 53,057.47 100.00%
05.04 LOSA DE RODADURA F´c=210 kg/cm2 E=0.20 m. m3 383.25 566.84 217,241.43 - - 0.00% - - 0.00% - - 0.00% 383.25 217,241.43 100.00%
05.05 UÑAS EN PAVIMENTO MORTERO F´c=210 kg/cm2 m3 52.84 561.84 29,687.63 - - 0.00% - - 0.00% - - 0.00% 52.84 29,687.63 100.00%
05.06 ENCOFRADO Y DESENCOFRADO DE LOSA DE RODADURA m2 506.22 23.43 11,860.73 - - 0.00% - - 0.00% - - 0.00% 506.22 11,860.73 100.00%
05.07 CURADO DE LOSA DE RODADURA, Durante 7 Dias - 4 Veces x Dia m2 1,916.26 1.80 3,449.27 - - 0.00% - - 0.00% - - 0.00% 1,916.26 3,449.27 100.00%
05.08 JUNTAS DE DILATACION DE 1" x 8" @ 9.00 m. m 209.94 12.37 2,596.96 -
VALORIZACION DE OBRA Nº 02 - SETIEMBRE 2018
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE REQUENA
CONTRATISTA : CONSORCIO AQUILES
RESIDENTE DE OBRA : ING. MOISES ENRIQUE DONAYRE MEDINA
INSPECTOR DE OBRA : ING. JULIO VELA ALVARADO
V.R 1,659,255.86 CON IGV
M.C 1,659,255.86 CON IGV
FECHA INICIO 8/23/2018
FECHA TÉRM. 11/21/2018
PLAZO EJEC. 90 DIAS CALENDARIO
EJECUCION DE OBRA
100.00%
100.00%
8 9 .3 1 %
100.00% 100.00%
100.00%
90.00% 100.00%
100.00%
6 0 .4 0 %
80.00%
70.00%
60.00%
5 1 .8 6 %
4 0 .0 0 %
50.00%
40.00%
30.00% AVANCE PROGRAMADO AVANCE EJECUTADO
20.00%
10.00%
0.00%
5 .6 1 %
0 .0 0 %
ACTIVIDADES
RELACION DE PARTIDAS Y METRADOS EJECUTADOS
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
01 OBRAS PROVISIONALES:
01.01 CARTEL DE OBRA DE 4.80 x 3.60 m. GIGANTOGRAFIA c/bast. de madera 2" x 2" 1.00 - 1.00 1.00 und 1.00 1.00 100.00% 0.00 0.00 0.00% 1.00 1.00 100.00% 0.00 0.00%
01.02 ALQUILER DE ALMACEN Y OFICINA 3.00 - 3.00 3.00 mes 0.25 0.25 8.33% 1.00 1.00 33.33% 1.25 1.25 41.67% 1.75 58.33%
01.03 POZA DE ALMACENAMIENTO DE AGUA DE 1.0 x 2.0 x 1.20 m., inc. Tarrajeo 2.00 - 2.00 2.00 und 2.00 2.00 100.00% 0.00 0.00 0.00% 2.00 2.00 100.00% 0.00 0.00%
01.04 TRANSPORTE DE MATERIALES Y HERRAMIENTAS 503.98 - 503.98 503.98 ton 300.00 300.00 59.53% 15.00 15.00 2.98% 315.00 315.00 62.50% 188.98 37.50%
01.05 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS 2.00 - 2.00 2.00 vje 1.00 1.00 50.00% 0.00 0.00 0.00% 1.00 1.00 50.00% 1.00 50.00%
03 OBRAS PRELIMINARES:
03.01 LIMPIEZA DE TERRENO MANUAL
Calle Buenos Aires Prog. 0+000 - 0+314.94 1.00 314.94 7.30 2,299.06
Vereda Proyectada:
Lado Izquierdo 1.00 294.76 1.50 442.14
Lado Derecho 1.00 309.97 1.50 464.96
Martillo A1 (Lado Izquierdo) = 120.59 m2 (Area Cad) 1.00 120.59 120.59
Martillo A2 (Lado Derecho) = 50.83 m2 (Area Cad) 1.00 50.83 50.83
boca calle Ca. San Juan Lado Izquierdo (Area=26.62 m2) 1.00 26.62 26.62
Rampas de 1.00 m x 1.50 m largo en Martillos 7.00 1.00 1.50 10.50
3,414.70 m2 3408.04 3,408.04 99.81% 6.66 6.66 0.20% 3414.70 3,414.70 100.00% 0.00 0.00%
Calle Buenos Aires Prog. 0+000 - 0+314.94 1.00 314.94 7.30 2,299.06
Vereda Proyectada:
Lado Izquierdo 1.00 294.76 1.50 442.14
Lado Derecho 1.00 309.97 1.50 464.96
Martillo A1 (Lado Izquierdo) = 120.59 m2 (Area Cad) 1.00 120.59 120.59
Martillo A2 (Lado Derecho) = 50.83 m2 (Area Cad) 1.00 50.83 50.83
boca calle Ca. San Juan Lado Izquierdo (Area=26.62 m2) 1.00 26.62 26.62
Rampas de 1.00 m x 1.50 m largo en Martillos 7.00 1.00 1.50 10.50
3,414.70 m2 3408.04 3,408.04 99.81% 6.66 6.66 0.20% 3414.70 3,414.70 100.00% 0.00 0.00%
03.03 SEÑALIZACIONES DE SEGURIDAD DE OBRA 2.00 314.94 629.88 629.88 m 629.88 629.88 100.00% 0.00 0.00 0.00% 629.88 629.88 100.00% 0.00 0.00%
04.02 RELLENOS:
04.02.01 RELLENO EN SOBRE-EXCAVACION CON MATERIAL DE PRESTAMO A-3 (PAVIMENTO) Inc. Compactacion
Ver Planilla de Movimiento de Tierra 2,759.36 2,759.36 2,759.36 m3 0.00 0.00 0.00% 1241.00 1,241.00 44.97% 1241.00 1,241.00 44.97% 1,518.36 55.03%
04.02.02 RELLENO EN ZANJA CON MATERIAL DE PRESTAMO A-3, Inc. Compactación. (ALCANTARILLA)
Ver Planilla de Movimiento de Tierra 98.00 98.00 98.00 m3 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 98.00 100.00%
05.12 PASADOR DE FIERRO CORRUGADO Ø 5/8" PARA JUNTA DE ARTICULACION LONGITUDINAL L=0.90 m. N° de Paño N° de pasadores x cada paño
Calle Buenos Aires Prog. 0+000 - 0+314.94; Cant = 314.94/3 = 104.98 104.98 5.00 524.90
Boca Calle:
Ca. San Juan Lado Izquierdo; Longitud Bocacalle = 11.57/3 = 3.86 3.86 5.00 19.30
544.20 und 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 544.20 100.00%
05.13 PASADOR DE FIERRO LISO Ø 5/8" PARA JUNTA DE CONTRACCION Y DILATACION L=0.50 m. N° Juntas 6/0.30 = 20
De Contraccion Calle Buenos Aires Prog. 0+000 - 0+314.94; Cantidad = (L/3 - L/9) =(314.94/3) - (314.94/9) = 104.98 - 34.99 = 6 69.99 20.00 1,399.80 1,399.80 und 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,399.80 100.00%
N° Juntas 6/0.30 = 20
De Dilatacion Calle Buenos Aires Prog. 0+000 - 0+314.94; Cantidad = L/9 =314,94/9 = 34.99 m 34.99 20.00 699.87 699.87 und 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 699.87 100.00%
05.14 ESPIGAS DE FIJACION CON TUBO PVC SAP 3/4" EN JUNTAS DE DILATACION N° Juntas 6/0.30 = 20
De Dilatacion Calle Buenos Aires Prog. 0+000 - 0+314.94; Cantidad = L/9 =314,94/9 = 34.99 m 34.99 20.00 699.87 699.87 und 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 699.87 100.00%
06.03 VEREDA e=0.10 m. MORTERO F'c=175 kg/cm2, acabado con bruña de canto y transversal
Lado Izquierdo 1.00 294.76 1.50 0.10 44.21
Lado Derecho 1.00 309.97 1.50 0.10 46.50
Martillo A1 (Lado Izquierdo) = 120.59 m2 (Area Cad) 1.00 120.59 0.10 12.06
Martillo A2 (Lado Derecho) = 50.83 m2 (Area Cad) 1.00 50.83 0.10 5.08
Uña Vereda (Área= 0.03 m2.) 2.00 604.73 0.03 36.28
Uña Martillo A1 = 120.59 m2 (Lado Izquierdo) (Area Cad) (Area = 0.03m2) 1.00 120.59 0.03 3.62
Uña Martillo A2 = 50.83 m2 (Lado Derecho) (Area Cad) (Area = 0.03m2) 1.00 50.83 0.03 1.52
Rampas de 1.00 m x 1.50 m largo -7.00 1.00 1.50 0.10 -1.05
148.23 m3 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 148.23 100.00%
RELACION DE PARTIDAS Y METRADOS EJECUTADOS
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
06.04 RAMPA e=0.10 m. MORTERO F'c=175 kg/cm2, acabado con bruña de canto y transversal
Rampas de 1.00 m x 1.50 m largo 7.00 1.00 1.50 0.10 1.05
Uñas en rampas perimetro = 5.00 m 7.00 5.00 0.03 1.05
2.10 m3 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.10 100.00%
Transversales:
Lado Izquierdo 98.25 3.00 0.10 29.48
Lado Derecho 103.32 3.00 0.10 31.00
Martillo A1 (Lado Izquierdo) = 120.59 m2 (Area Cad) 1.00 120.59 0.10 12.06
Martillo A2 (Lado Derecho) = 50.83 m2 (Area Cad) 1.00 50.83 0.10 5.08
491.88 m2 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 491.88 100.00%
07.01 ENTIBADO PARA PROTECCION DE EXCAVACION 1.00 2.00 20.00 2.00 80.00
En Alcantarilla Rectangular 80.00 m2 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 80.00 100.00%
07.11 TARRAJEO PULIDO EN PAREDES LATERALES Y FONDO DE ALCANTARILLA, con mortero 1:3
Losa Inferior:
En Alcantarilla de Cruce 1.00 20.00 1.20 24.00
Muros Laterales:
En Alcantarilla de Cruce 2.00 20.00 1.00 40.00
64.00 m2 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.00 100.00%
RELACION DE PARTIDAS Y METRADOS EJECUTADOS
OBRA : MEJORAMIENTO DE LA CALLE BUENOS AIRES, ENTRE CALLE REQUENILLO Y SAN JUAN DE LA CIUDAD DE REQUENA, DISTRITO DE REQUENA, PROVINCIA DE REQUENA – LORETO
08.02 SUMIDEROS:
08.02.01 CAMA DE ARENA e=0.30 m. PARA CONEXION DE SUMIDERO
Calle Buenos Aires con Calle Proyectada 1.00 1.00 5.55 0.40 0.30 0.67 0.67 m3 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.67 100.00%
10.00 VARIOS
10.01 REUBICACION DE POSTES DE LUZ 2.00 2.00 2.00 und 0.00 0.00 0.00% 2.00 2.00 100.00% 2.00 2.00 100.00% 0.00 0.00%
10.02 LEVANTAMIENTO DE LOSA SUPERIOR DE BUZON MORTERO F¨c=210 kg/cm2, e=0.15 m. Perimetro e=muro H promedio
Muro de Buzón 4.00 4.71 0.15 0.60 1.70
Construccion de Losa Superior 9.00 Area Cad 1.77 0.15 2.39
Construccion de Tapa de buzon -9.00 Area Cad 0.39 0.05 -0.18
3.91 m3 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.91 100.00%
98.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.10
28.50
16.40
0.00
0.00
0.00
0.00
16.25
16.25
0.00
0.00
0.00
4.25
4.25
0.00
0.00
0.00
0.00
0.00
0.00
2,759.36
0.00
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
69.80
88.05
106.30
106.30
106.30
57.10
57.10
106.30
106.30
106.30
109.25
109.25
106.30
106.30
106.30
106.30
106.30
52.51