LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY

TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

SR DSTE/LJN-2nd acting for and on behalf of The President of India invites E-Tenders against Tender No 7of2018 Closing Date/Time
01/04/2019 15:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not
allowed against this tender, and any such manual offer received shall be ignored.

Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.

1. NIT HEADER

Data replication impictorial form in Dy. SS/GKP office and on line simulation of data Logger
Name of Work panel status of DMG, GK & JEA station at GKP RRI and implementation of integration of
data logger at inter change point at Gorakhpur Cant.
Bidding type Normal Tender
Tender Type Open Bidding System Single Packet System
Tender Closing Date Time 01/04/2019 15:00 Date Time Of Uploading Tender 07/03/2019 13:51
Pre-Bid Required No Pre-Bid Query Date Time Not Applicable
Advertised Value 3996785.08 Tendering Section LJN DIV
Bidding Style Single Rate for Each Schedule Bidding Unit
Earnest Money (Rs.) 79900.00 Validity of Offer ( Days) 45
Tender Doc. Cost (Rs.) 3000.00 Period of Completion 180 Days
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 18/03/2019 No
allowed to bid
Ranking Order For Bids Lowest to Highest

2. SCHEDULE

S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule A-(Supply) 3445635.40
Below/Par
1 5.00 Numbers 23600.00 118000.00 AT Par 118000.00
1 Item Description:- Supply of external E-1 Converter (E-1 to serial) as per Item No.1 of technical spection
attached.
2 5.00 Pair 54303.60 271518.00 AT Par 271518.00
2 Item Description:- Supply of E-1 Extender Make Cygnus /Similar as per Item No.2 of technical spection
attached.
3 1.00 Numbers 28284.60 28284.60 AT Par 28284.60
3 Item Description:- Supply of External T-Port modem of Efftronics make as per Item No. 3 of technical spection
attached.
4 3.00 Numbers 157742.40 473227.20 AT Par 473227.20
4 Item Description:- Supply of Local Report System (LRS) with 48 inch LED Monitor printer, wire less mouse and
Keyboard as per Item No.4 of technical spection attached.
5 8.00 Numbers 23600.00 188800.00 AT Par 188800.00
5
Item Description:- Supply of external modem as per Item No.5 of technical spection attached.
6 3.00 Numbers 245628.80 736886.40 AT Par 736886.40
6
Item Description:- Supply of 2KVA UPS Online 6hrs backup as per Item No.6 of technical spection attached.
7 8.00 Pair 69620.00 556960.00 AT Par 556960.00
7
Item Description:- Supply of E1-LAN Extenders as per Item No.7 of technical spection attached.
8 8.00 Numbers 3540.00 28320.00 AT Par 28320.00
8
Item Description:- Supply of USB to SERIAL Converter as per Item No.8 of technical spection attached.
9 8.00 Numbers 1321.60 10572.80 AT Par 10572.80
9
Item Description:- Supply of HDMI Cable 10 meter length as per Item No.9 of technical spection attached.
10 8.00 Numbers 660.80 5286.40 AT Par 5286.40
10
Item Description:- Supply of USB to HDMI Converter as per Item No.10 of technical spection attached.
11 1.00 Numbers 184080.00 184080.00 AT Par 184080.00
11 Item Description:- Supply of data entry terminal for entry of train details of ASM and communicating the
information to CMU via Datalogger at station as per spefication as per Item No.11 of technical spection attached.

Pa g e 1 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

12 1.00 Numbers 35400.00 35400.00 AT Par 35400.00


12 Item Description:- Embedded software modification of data logger to communicate with the above device and
pass the information through the Data Logger network
13 1.00 Numbers 35400.00 35400.00 AT Par 35400.00
13
Item Description:- Supply of dual card E1 Converter for FEP as per Item No.12 of technical spection attached.
14 1.00 Numbers 147500.00 147500.00 AT Par 147500.00
14 Item Description:- Supply of Client PC (Dest top PC) as per RDSO guidline No. STS/Data Logger/Vol. XX dated
12.09.2011 as per Item No.13 of technical spection attached.
15 1.00 Numbers 11800.00 11800.00 AT Par 11800.00
15
Item Description:- Supply of Firewall Cybroam 100 ing as per Item No.14 of technical spection attached.
16 4.00 Numbers 153400.00 613600.00 AT Par 613600.00
16 Item Description:- Supply of MFEP with two dual card Modems as per IRS specification 99/2006 or latest as per
Item No.15of technical spection attached.

S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule B -( execution ) 551149.68
Below/Par
1 1.00 Numbers 11800.00 11800.00 AT Par 11800.00
1
Item Description:- Installation of LRS System as per Item No.16of technical spection attached.
2 1.00 Numbers 35400.00 35400.00 AT Par 35400.00
2
Item Description:- Station yard layout preparation and configuration of Gorakhpur station
3 1.00 Numbers 11800.00 11800.00 AT Par 11800.00
3
Item Description:- Networking Configuration at GKP Dy SS Office Gorakhour station yard
4 4.00 Numbers 17700.00 70800.00 AT Par 70800.00
4 Item Description:- Installation of Multi Port Front End Processor with Dual card modem as per IRS:S: 99/06 as
per Item No.17 of technical spection attached.
5 3.00 Numbers 17700.00 53100.00 AT Par 53100.00
5 Item Description:- Installation of Local Report system with 48 inch LED Monitor printer as per Item No.18 of
technical spection attached.
6 3.00 Numbers 11800.00 35400.00 AT Par 35400.00
6 Item Description:- Configuration and installation of online software for station as per Item No.19 of technical
spection attached.
7 1.00 Numbers 236000.00 236000.00 AT Par 236000.00
7 Item Description:- Preperation of station specific train arival and departure logics for Gorakhpur Cantt station
(Seven to ten road station) as per Item No.20 of technical spection attached.
8 1.00 Lumpsum 47200.00 47200.00 AT Par 47200.00
8
Item Description:- Training of staff at one interchange station as per Item No.21 of technical spection attached.
9 1.00 Numbers 49649.68 49649.68 AT Par 49649.68
9 Item Description:- Testing and commissioning of entire COA work as per Item No.23 of technical spection
attached.

3. ITEM BREAKUP

No item break up added

4. ELIGIBILITY CONDITIONS

Submission of Affidavit

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please submit notarized affidavit on a non-judicial stamp paper in the prescribed format
(please download format from the link given below) for verification / confirmation of the
documents submitted for compliance of eligibility/qualifying criteria. Non submission of Allowed
1 No No
properly filled affidavit in the prescribed format shall lead to summary rejection of your (Mandatory)
offer.
Click here to download the format for Affidavit

Pa g e 2 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

Standard Financial Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The tenderer must have received contractual payments in the previous three financial
years and the current financial year upto the date of opening of tender, at least 150% of
the advertised value of the tender. The tenderers shall submit Certificates to this effect
Allowed
1 which may be an attested Certificate from the concerned department / client and/or No No
(Mandatory)
Audited Balance Sheet duly certified by the Chartered Accountant etc.Certificate from
private individuals for whom such works are executed /being executed should not be
accepted.
No Technical and Financial credentials are required for tenders having value up to Rs 50
1.1 No No Not Allowed
lakh.

5. COMPLIANCE

Commercial-Compliance

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please furnish the list of personnel, organization available in hand and Allowed
1 No No
proposed to be engaged for the subject work. (Mandatory)
Furnish the list of plant & machinery available in hand (own)and proposed to Allowed
2 No No
be included (own and hired to be given separately) for the subject work. (Mandatory)
Furnish the List of Work completed in the last three financial year giving
description of work, organization for the time of award, date of award and date Allowed
3 No No
of schedule completion of work. Date of actual start, actual completion date (Mandatory)
and final value of contract should also be given.
Furnish the list of work in hand including description of work, contract value Allowed
4 No No
and approximate value of balance work yet to be done and date of award. (Mandatory)
Furnish the Audited balance sheet duly certified by the Chartered Accountant Allowed
5 No No
for last three years. (Mandatory)
At the time of submission of bid, if you have any special condition then upload
in scanned PDF copy. The Original special condition should be submitted to Allowed
6 No No
this office of Tender Section, DRM/signal/N. E. Railway, Lucknow Division with (Mandatory)
in 3 days after closing of the tender.
Please Submit your bank details i.e. Name of the bank along with bank branch Allowed
7 No No
code, Account Number, IFSC Code and PAN details. (Mandatory)
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
8 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The successful bidder shall have to submit a Performance Guarantee (PG)
within 21 (Twenty one) days from the date of issue of Letter of Acceptance
(LOA). Extension of time for submission of PG beyond 21 (Twenty one) days
and upto 60 days from the date of issue of LOA may be given by the
Authority who is competent to sign the contract agreement. However, a
1 No No Not Allowed
penal interest of 12% per annum shall be charged for the delay beyond
21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA.
Further, if the 60th day happens to be a declared holiday in the concerned
office of the Railway, submission of PG can be accepted on the next working
day.

Pa g e 3 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

The successful bidder shall submit the Performance Guarantee (PG) in any
of the following forms, amounting to 5% of the contract value:- (i)A deposit of
cash; (ii)Irrevocable Bank Guarantee; (iii)Government Securities including
State Loan Bonds at 5% below the market value; (iv)Deposit Receipts, Pay
Orders, Demand Drafts and Guarantee Bonds. These forms of Performance
Guarantee should be either of the State Bank of India or of any of the
2 Nationalized Banks; (v)Guarantee Bonds executed or Deposit Receipts No No Not Allowed
tendered by all Scheduled Banks; (vi)A Deposit in the Post Office Saving
Bank ; (vii)A Deposit in the National Savings Certificates; (viii)Twelve years
National Defence Certificates; (ix)Ten years Defence Deposits; (x)National
Defence Bonds and (xi)Unit Trust Certificates at 5% below market value or at
the face value whichever is less. Also FDR in favour of FA&CAO (free from
any encumbrance) may be accepted.
The performance Guarantee shall be released after the physical completion
of the work based on the completion certificate issued by the competent
2.1 No No Not Allowed
authority stating that the contractor has completed the work in all respect
satisfactorily .
All document related to Joint Venture/ Consortium MOU, duly notarized
should be uploaded at the time of submission of bid Original documents
3 No No Not Allowed
related to above should be submitted to the office of tender section,
DRM/S&T/NER, Lucknow within three working days of closing date.
The tenderer shall upload scanned copies of mandatory credentials such as
4 No No Not Allowed
experience, turn over Certificates and any other documents as applicable.
Bank Guarantees BGs to be submitted by suppliers/contractors should be
5 sent directly to be concerned authorities by issuing Bank under registered No No Not Allowed
POST A.D.
The Earnest Money deposited with the tender of successful tenderer will be
retained as part of security deposit which will be 5 percent of the value of
6 work awarded. The balance amount of security deposit will recovered on No No Not Allowed
account bill of the work @ 10 percent till it reached up to 5 percent of the
value of work including earnest money.
The contract shall be governed by the provision of GCC 2018 edition with up
7 No No Not Allowed
to date corrections thereto.
Rates are inclusive of all taxes / octroi, license fee, royalty charges etc.
8 legally leviable by state, Central Government and/or any other local No No Not Allowed
authority.
Income Tax, Cess and any other tax will be recovered as per extant
9 No No Not Allowed
instruction on the subject.
Tender Document Cost - All the tenderers/ contractors have to deposit
tender document cost as stipulated in the tender document through online
10 modes as permitted in IREPS application. Payment of Tender Document No No Not Allowed
Cost (TDC)in respect of e-Tendering, should be accepted through net
banking or payment gateway only.
Earnest Money - All the tenderers/ contractors have to deposit Earnest
Money Deposite as stipulated in the tender document through online modes
11 as permitted in IREPS application. Payment of Earnest Money(EMD)in No No Not Allowed
respect of e-Tendering, should be accepted through net banking or payment
gateway only.
INDIAN RAILWAY STANDARD GERNERAL CONDITION OF CONTRACT is
12 also available on the Indian Railways website. Tenderers are requested to No No Not Allowed
visit the website and be aware of the Terms and Conditions of GCC.
The authority for the acceptance of the tender will rest with the railway . It
shall not be obligatory on the said authority to accept the lowest tender or
13 any other tender and no tenderers shall demand any explanation for the No No Not Allowed
cause of rejection of his / their tender nor the railway under take to assign
reasons for declining to consider or reject any particular tender or tenders

Pa g e 4 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

The tenderer whether sole proprietor, a company or a partnership firm / joint


venture (JV) / registered society / registered trust etc if they want to act
through agent or individual partner(s), should submit along with the tender, a
copy of power of attorney duly stamped and authenticated by a Notary
Public or by Magistrate in favour of the specific person whether he/they be
14 partner(s) of the firm or any other person specifically authorizing him/them to No No Not Allowed
submit the tender, sign the agreement, receive money, co-ordinate
measurements through contractor's authorized engineer, witness
measurements, sign measurement books, compromise, settle, relinquish
any claim(s) preferred by the firm and sign "No Claim Certificate" and refer
all or any disputes to arbitration.
14.1 Participation of Partnership Firms in works tenders: No No Not Allowed
The Partnership Firms participating in the tender should be legally valid
14.1.1 No No Not Allowed
under the provisions of the Indian Partnership Act.
The partnership firm should have been in existence or should have been
formed prior to submission of tender. Partnership firm should have either
14.1.2 No No Not Allowed
been registered with the Registrar or the partnership deed should have been
notarized prior to date of tender opening as per the Indian Partnership Act.
Separate identity / name should be given to the partnership firm. The
partnership firm should have PAN / TAN number in its own name and PAN /
14.1.3 No No Not Allowed
TAN number in the name of any of the constituent partners shall not be
considered. The valid constituents of the firm shall be called partners.
Once the tender has been submitted, the constitution of the firm shall not be
allowed to be modified / altered / terminated during the validity of the tender
as well as the currency of the contract except when modification becomes
inevitable due to succession laws etc., in which case prior permission should
be taken from Railway and in any case the minimum eligibility criteria should
not get vitiated. The re-constitution of firm in such cases should be followed
by a notary certified Supplementary Deed. The approval for change of
constitution of the firm, in any case, shall be at the sole discretion of the
Railways and the tenderer shall have no claims what-so-ever. Any change in
the constitution of Partnership firm after opening of tender shall be with the
consent of all partners and with the signatures of all partners as that in the
14.1.4 Partnership Deed. Failure to observe this requirement shall render the offer No No Not Allowed
invalid and full EMD shall be forfeited. If any Partner/s withdraws from the
firm after opening of the tender and before the award of the contract, the
offer shall be rejected. If any new partner joins the firm after opening of
tender but prior to award of contract, his / her credentials shall not qualify for
consideration towards eligibility criteria either individually or in proportion to
his share in the previous firm. In case the tenderer fails to inform Railway
beforehand about any such changes / modification in the constitution which
is inevitable due to succession laws etc. and the contract is awarded to such
firm, then it will be considered a breach of the contract conditions liable for
determination of the contract under Clause 62 of General Conditions of
Contract.
A partner of the firm shall not be permitted to participate either in his
14.1.5 No No Not Allowed
individual capacity or as a partner of any other firm in the same tender.
One or more of the partners of the firm or any other person (s) shall be
designated as the authorized person (s) on behalf of the firm, who will be
authorized by all the partners to act on behalf of the firm through a "Power of
Attorney", specially authorizing him / them to submit & sign the tender, sign
the agreement, receive payment, witness measurements, sign measurement
14.1.6 No No Not Allowed
books, make correspondences, compromise / settle / relinquish any claim (s)
preferred by the firm, sign "No Claim Certificate", refer all or any dispute to
arbitration and to take similar such action in respect of the said tender /
contract. Such "Power of Attorney" shall be notarized / registered and
submitted along with the tender.
On issue of Letter of Acceptance (LOA) to the partnership firm, all the
guarantees like Performance Guarantee, Guarantee for various Advances to
14.1.7 No No Not Allowed
the Contractor shall be submitted only in the name of the partnership firm
and no splitting of guarantees among the partners shall be acceptable.
On issue of Letter of Acceptance (LOA), contract agreement with partnership
14.1.8 firm shall be executed in the name of the firm only and not in the name of No No Not Allowed
any individual partner

Pa g e 5 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

In case the Letter of Acceptance (LOA) is issued to a partnership firm, the


following undertakings shall be furnished by all the partners through a
notarized affidavit, before signing of contract agreement. (a)Joint and
several liabilities: The partners of the firm to which the Letter of Acceptance
(LOA) is issued, shall be jointly and severally liable to the Railway for
execution of the contract in accordance with General and Special Conditions
of the Contract. The partners shall also be liable jointly and severally for the
loss, damages caused to the Railway during the course of execution of the
contract or due to non-execution of the contract or part thereof. (b)Duration
of the partnership deed and partnership firm agreement: The partnership
14.1.9 deed/partnership firm agreement shall normally not be modified/altered/ No No Not Allowed
terminated during the currency of contract and the maintenance period after
the work is completed as contemplated in the conditions of the contract. Any
change carried out by partners in the constitution of the firm without
permission of Railway, shall constitute a breach of the contract, liable for
determination of the contract under Clause 62 of the General Conditions of
Contract. (c)Governing laws: The partnership firm agreement shall in all
respect be governed by and interpreted in accordance with the Indian laws.
(d)No partner of the firm shall have the right to assign or transfer the interest
right or liability in the contract without the written consent of the other
partner/s and that of the Railway.
The tenderer shall clearly specify that the tender is submitted on behalf of a
partnership firm. The following documents shall be submitted by the
partnership firm, with the tender: (a)A copy of partnership deed. (b)A copy of
Power of Attorney (duly registered as per prevailing law) in favour of the
individual to tender for the work, sign the agreement etc. and create liability
against the firm. (c)An undertaking by all partners of the partnership firm that
14.1.10 No No Not Allowed
they are not blacklisted or debarred by Railways or any other Ministry /
Department of the Govt. of India / any State Govt. from participation in
tenders / contracts as on the date of opening of bids, either in their individual
capacity or in any firm in which they were / are partners. Concealment /
wrong information in regard to above shall make the contract liable for
determination under Clause 62 of the General Conditions of Contract.
Technical and financial eligibility of the firm shall be adjudged based on
14.1.11 satisfactory fulfillment of the eligibility criteria laid down in Clause 10 of GCC No No Not Allowed
2018 edition by the partnership firm:
As per railway board's letter No.2012/CE-1/CT/0/20 Dt. 10.05.13, The
contractor shall also employ following qualified graduate Engineers/ qualified
diploma holder Engineers during execution of the work 1. One qualified
Engineer when cost of work to be executed is Rs.200 Lakh and above, and
2.One qualified Diploma Holder Engineer when cost of work to be executed
15 No No Not Allowed
is more than Rs.25 Lakh but less than Rs. 200 laks In case the contractor
fails to employ the engineer, as above, he , in terms of provision of clause
26A.2 to the general condition of contract , shall be liable to pay an amount
of Rs. 40000/- and Rs. 25000/- for each month or part thereof for the default
period for the provision
Security Deposit :-The earnest money deposited by the contractor with his
tender will be retained by the railway as part of security for the due and
faithful fulfillment of the contract by the contractor. The balance to make up
the security deposit , the rate for which are given below , may be deposited
16 by the contractor in cash or may be recovered by percentage deduction from No No Not Allowed
the contractor's " on account" bills. Provided also that in case of defaulting
contractor the railway may retain any amount due for payment to the
contractor on the pending " on account bills" so that the amounts so retained
may not exceed 10% of the total value of the contract
Unless otherwise specified in the special condition of contract , if any, the
security deposit/ rate of recovery/ mode of recovery shall be as under :- a.
The security deposit for each work should be 5 % of the contract value . b.
The rate of recovery should be at the rate of 10% of the bill amount till the
16.1 No No Not Allowed
full security deposit is recovered . c. Security deposit will be recovered only
from the running bill of the contract and no other mode of collecting SD such
as SD in the form of instruments like BG, FD etc. shall be accepted toward
security deposit.
The Security deposit, However shall be released only after the expiry of the
16.2 maintenance period and after passing the final b ill based on No claim No No Not Allowed
certificate.

Pa g e 6 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

CARE IN SUBMISSION OF TENDER :- Before submitting a tender, the


tenderer will be deemed to have satisfied himself by actual inspection of the
site and locality of the works, that all conditions liable to be encountered
17 during the execution of the works are taken into account and that the rates No No Not Allowed
he enters in the tender forms are adequate and all inclusive to accord with
the provisions in Clause-37 of the Standard General Conditions of Contract
for the completion of works to the entire satisfaction of the Engineer.
'Letter of Credit' as Mode of Payment in Works Tenders or Service Tenders
18 No No Not Allowed
having advertised cost of Rs 10 lakh or above
(i)Letter of Credit :- For all the tenders having advertised cost of Rs 10 lakh
or above, the contractor shall have the option to take payment from Railways
through a letter of credit (LC) arrangement. Authority Railway Board) No.
2018/CE-IJCT/9 New Delhi, Dated 04.06.2018 (ii) This option of taking
payment through LC arrangement has to be exercised in IREPS (Indian
Railway Electronic Procurement System - the e-application on which tenders
are called by Railways) by the tenderer at the time of bidding itself, and the
18.1 No No Not Allowed
tenderer shall affirm having read over and agreed to the terms and
conditions of the LC option. (iii) The option so exercised, shall be an integral
part of the bidder's offer. (iv) The above option of taking payment through
LC arrangement, once exercised by tenderer at the time of bidding, shall be
final and no change shall be permitted, thereafter, during execution of
contract. (v) In case tenderer opts for payment through LC, following shall be
the procedure to deal release of payment through LC: .
(e) The LC terms and conditions shall inter-alia indemnify and save harmless
the Railway from and against all losses, claims and demands of every nature
and description brought or recovered against the Railways by reason of any
act or omission of the contractor, his ,agents or employees, in relation to the
Letter of Credit (LC). All sums payable/borne by Railways on this account
shall be considered as reasonable compensation and paid by contractor. (f)
The LC terms and conditions shall inter-alia provide that Railways will issue a
Document of Authorisation (format enclosed as Annexure 2) after passing
18.2 the bill for completed work, to enable contractor to claim the authorized No No Not Allowed
amount from their bank. (g) The acceptable, agreed upon document for
payments to be released under the LC shall be the Document of
Authorisation. (h) The Document of Authorisation shall be issued by Railway
Accounts Office against each bill passed by Railways. (i) On issuance of
Document of Authorisation, a copy of Document of Authorisation shall be
posted on IREPS for download by the contractor. A digitally signed copy of
Document of Authorisation shall also be sent by Railway Accounts Office to
Railway's bank (Local SBI Branch). Contd.
(ii) The contractor shall take print out of the Document of Authorisation
available on IREPS and present his claim to his bank (advising Bank) for
necessary payments as per LC terms and conditions. The rI claim shall
comprise of copy of Document of A uthorisation, Bill of Exchange and Bill. (k)
The payment against LC shall be subject to verification from Railway's Bank
(Local SBI Branch). (I) The contractor's bank (advising bank) shall submit
the documents to the Railway's Bank (Local SBI Branch). (m) The railway's
bank (issuing bank) shall, after verifying the claim so received w.r.t. the
18.3 No No Not Allowed
digitally signed Document of Authorisation received from Railway Accounts
Office, release the payment to contractor's bank (advising bank) for crediting
the same to contractor's account. (n) Any number of bills can be dealt within
one I.C, provided the sum total of payments to contractor is within the
amount for which LC has been opened. (0) The LC shall be closed after the
release of final payment including P VC amount, if any, to the contractor. (p)
The release of performance guarantee or security deposit shall be dealt
directly by railway with the contractor i.e., not through LC.
System of verification of Tenderer's credentials:- (a) The tenderer shall
submit along with the tender document, documents in support of his/their
claim to fulfil the eligibility criteria as mentioned in the tender document.
Each page of the copy of documents/certificates in support of credentials
submitted by the tenderer shall be self attested/ digitally signed by the
19 No No Not Allowed
tenderer or authorized representative of the tendering firm. Self-attestation
shall include signature, stamp and date (on each page). Only those
documents which are declared explicitly by the tenderer as "documents
supporting the claim of qualifying the laid down eligibility criteria", will be
considered for evaluating his/their tender.

Pa g e 7 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

(b) The tenderers shall submit a notarized affidavit on a non-judicial stamp


paper stating that they are not liable to be disqualified and all their
statements/ documents submitted along with bid are true and factual
Standard format of the affidavit to be submitted by the bidder is enclosed as
Annexure on IREPS. Non submission of an affidavit by the bidder shall result
19.1 in summary rejection of his their bid. And it shall be mandatorily incumbent No No Not Allowed
upon the tenderer to identify, state and submit the supporting documents
duly self attested by which they/he is qualifying the Qualifying Criteria
mentioned in the Tender Document. It will not be obligatory on the part of
Tender Committee to scrutinize beyond the submitted document of tenderer
as far as his qualification for the tender is concerned.
c) The Railway reserves the right to verify all statements, information and
documents submitted by the bidder in his tender offer, and the bidder shall,
when so required by the Railway, make available all such information,
19.2 evidence and documents as may be necessary for such verification. Any No No Not Allowed
such verification or lack of such verification, by the Railway shall not relieve
the bidder of its obligations or liabilities thereunder nor will it affect any rights
of the Railway thereunder.
d) In case of any wrong information submitted by tenderer, the contract shall
be terminated, Earnest Money Deposit (EMD), Performance Guarantee (PG)
19.3 No No Not Allowed
and Security Deposit (SD) of contract forfeited and agency barred for doing
business on entire Indian Railways for 5 (five) years.
Partnership deeds Power of Attorney Etc. :- (i)The tenderer shall clearly
specify whether the tender is submitted on his own (Proprietary Firm) or on
behalf of a Partnership Firm / company / Joint Venture (JV) / Registered
Society / Registered Trust etc. The tenderer(s) shall enclose the attested
20 No No Not Allowed
copies of the constitution of their concern, and copy of PAN Card along with
their tender. Tender Documents in such cases are to be signed by such
persons as may be legally competent to sign them on behalf of the firm,
company, association, trust or society, as the case may be.
(ii)In case tenderer is other than sole proprietorship firm, following
20.1 No No Not Allowed
documents shall be submitted by the tenderer:
(a) Partnership Firm: The tenderer shall submit (i) a copy of Partnership
Deed and (ii) a copy of Power of Attorney (duly registered as per prevailing
20.1.1 No No Not Allowed
law) in favour of an individual to sign the tender documents and create
liability against the Firm.
(b) Joint Venture (JV): The tenderer shall submit documents as mentioned in
20.1.2 No No Not Allowed
Clause 17 of the Tender Form (Second Sheet).
(c) Company registered under Companies Act-2013: The tenderer shall
submit (i) the copies of MOA (Memorandum of Association) / AOA (Articles
of Association) of the company; and (ii) A copy of Authorization/Power of
20.1.3 No No Not Allowed
Attorney issued by the Company (backed by the resolution of Board of
Directors) in favour of the individual to sign the tender on behalf of the
company and create liability against the company.
(d) LLP (Limited Liability Partnership) Firm: If the tender is submitted on
behalf of a LLP Firm registered under LLP Act-2008, the tenderer shall
submit alongwith the tender- (i) a copy of LLP Agreement, (ii) a copy of
20.1.4 Certificate of Incorporation; and (iii) a copy of Power of No No Not Allowed
Attorney/Authorisation issued by the LLP Firm in favour of the individual to
sign the tender on behalf of the LLP Firm and create liability against the
Firm.
(e) Registered Society & Registered Trust: The tenderer shall submit (i) a
copy of the Certificate of Registration, (ii) Deed of Formation; and (iii) a copy
20.1.5 No No Not Allowed
of Power of Attorney in favour of the individual to sign the tender documents
and create liability against the Society/Trust.
(iii)If it is NOT mentioned in the submitted tender that tender is being
submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint
20.2 No No Not Allowed
Venture / Registered Company etc., then the tender shall be treated as
having been submitted by the individual who has signed the tender.
(iv)After opening of the tender, any document pertaining to the constitution
of Sole Proprietorship Firm / Partnership Firm / Registered Company/
20.3 No No Not Allowed
Registered Trust / Registered Society etc. shall be neither asked nor
considered, if submitted.

Pa g e 8 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

(v) A tender from JV / Partnership firm etc. shall be considered only where
20.4 No No Not Allowed
permissible as per the tender conditions.
(vi)The Railway will not be bound by any change in the composition of the
firm made subsequent to the submission of tender. Railway may, however,
20.5 No No Not Allowed
recognize such power of attorney and changes after obtaining proper legal
advice, the cost of which will be chargeable to the Contractor.

Special Conditions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 completion of work No No Not Allowed
(a) The entire work as per Schedule should be completed within a mentioned
1.1 period from the date of issue of letter of acceptance except for any delays due No No Not Allowed
to
1.2 (b) Non-supply of material by the Railway Administration if any. No No Not Allowed
(c) Decision not given by the Railway Administration on technical matter if
1.3 No No Not Allowed
referred to by the contractor.
1.4 (d) Hindrance created by any other departments. No No Not Allowed
(e) Due to any force major clause. The delay in completion of works which is
attributed by the contractor to the railway's cause mentioned above should be
advised in writing to the railway Engineer immediately by the contractor for
1.5 No No Not Allowed
rectification/investigation. If such advice in writing is not given, the delay will
not be accepted by the railway and no extension will be granted on this
account.
Extension of Time in Contracts: Subject to any requirement in the contract as
to completion of any portion or portions of the works before completion of the
whole, the Contractor shall fully and finally complete the whole of the works
comprised in the contract (with such modifications as may be directed under
conditions of this contract) by the date entered in the contract or extended
date in terms of the following clauses: (i)Extension due to Modification: If any
modifications have been ordered which in the opinion of the Engineer have
2 No No Not Allowed
materially increased the magnitude of the work, then such extension of the
contracted date of completion may be granted as shall appear to the Engineer
to be reasonable in the circumstances, provided moreover that the Contractor
shall be responsible for requesting such extension of the date as may be
considered necessary as soon as the cause thereof shall arise and in any
case not less than one month before the expiry of the date fixed for completion
of the works.
(ii)Extension for Delay not due to Railway or Contractor: If in the opinion of the
Engineer, the progress of work has any time been delayed by any act or
neglect of Railway's employees or by other Contractor employed by the
Railway under Sub-Clause (4) of Clause 20 of these Conditions or in executing
the work not forming part of the contract but on which Contractor's
performance necessarily depends or by reason of proceeding taken or
threatened by or dispute with adjoining or to neighbouring owners or public
authority arising otherwise through the Contractor's own default etc. or by the
delay authorized by the Engineer pending arbitration or in consequences of
the Contractor not having received in due time necessary instructions from the
Railway for which he shall have specially applied in writing to the Engineer or
his authorized representative then upon happening of any such event causing
3 delay, the Contractor shall immediately give notice thereof in writing to the No No Not Allowed
Engineer within 15 days of such happening, but shall nevertheless make
constantly his best endeavours to bring down or make good the delay and
shall do all that may be reasonably required of him to the satisfaction of the
Engineer to proceed with the works. The Contractor may also indicate the
period for which the work is likely to be delayed and shall be bound to ask for
necessary extension of time. The Engineer on receipt of such request from the
Contractor shall consider the same and shall grant such extension of time as
in his opinion is reasonable having regard to the nature and period of delay
and the type and quantum of work affected thereby. No other compensation
shall be payable for works so carried forward to the extended period of time;
the same rates, terms and conditions of contract being applicable as if such
extended period of time was originally provided in the original contract itself.

Pa g e 9 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

(iii)Extension for Delay due to Railways: In the event of any failure or delay by
the Railway to hand over the Contractor possession of the lands necessary for
the execution of the works or to give the necessary notice to commence the
works or to provide the necessary drawings or instructions or any other delay
4 caused by the Railway due to any other cause whatsoever, then such failure No No Not Allowed
or delay shall in no way affect or vitiate the contract or alter the character
thereof or entitle the Contractor to damages or compensation therefor, but in
any such case, the Railway may grant such extension or extensions of the
completion date as may be considered reasonable.
5 TIME TO BE ESSENCE OF THE CONTRACT: - No No Not Allowed
Extension of Time for delay due to Contractor: (i) With liquidated Damage
(LD): The time for the execution of the work or part of the works specified in
the contract documents shall be deemed to be the essence of the contract and
the works must be completed not later than the date(s) as specified in the
contract. If the Contractor fails to complete the works within the time as
specified in the contract for the reasons other than the reasons specified in
Clause 17 and 17-A, the Railway may, if satisfied that the works can be
completed by the Contractor within reasonable short time thereafter, allow the
Contractor for further extension of time (Proforma at Annexure-VII) as the
Engineer may decide. On such extension the Railway will be entitled without
prejudice to any other right and remedy available on that behalf, to recover
from the Contractor as agreed damages and not by way of penalty for each
week or part of the week, a sum calculated at the following rates of the
contract value of the works. For the purpose of this Clause, the contract value
of the works shall be taken as value of work as per contract agreement
including any supplementary work order/contract agreement issued. Provided
also, that the total amount of liquidated damages under this condition shall not
exceed 5% of the contract value or of the total value of the item or groups of
items of work for which a separate distinct completion period is specified in the
5.1 No No Not Allowed
contract. S.No.Duration of extension of time under Clause 17-BRate of Penalty
(i)Up to Twenty percent of original period of completion including period of
extension of DOC granted under Section 17A(i)As decided by Engineer,
between 0.01% to 0.10% of contract value for each week or part of the week
(ii)Above Twenty percent but upto Thirty percent of original period of
completion including period of extension of DOC granted under Section
17A(i)0.20% of contract value for each week or part of the week (iii)Above
Thirty percent but upto Forty percent of original period of completion including
period of extension of DOC granted under Section 17A(i)0.30% of contract
value for each week or part of the week (iv)Above Forty percent of original
period of completion including period of extension of DOC granted under
Section 17A(i)0.50% of contract value for each week or part of the week
Provided further, that if the Railway is not satisfied that the works can be
completed by the Contractor and in the event of failure on the part of the
contractor to complete the work within further extension of time allowed as
aforesaid, the Railway shall be entitled without prejudice to any other right or
remedy available in that behalf, to appropriate the contractor's Security
Deposit and rescind the contract under Clause 62 of these Conditions,
whether or not actual damage is caused by such default.
MEASUREMENT OF WORK- The measurement of quantities for the purpose
to the contractor shall be undertaken item-wise jointly by the representative of
6 No No Not Allowed
the engineer and the contractor in course of and on completion of works
included in Schedule attached hereto.
7 MODE OF PAYMENT: - No No Not Allowed
7.1 Payment for those items which involve both " Supply and Installation" : No No Not Allowed
(i) 80% of the cost of schedule item will be paid on receipt of materials at the
nominated stores depot duly inspected by inspecting authority subject to the
7.1.1 No No Not Allowed
furnishing of Inspection certificates, receipt certificate, Challans and all other
relevant documents as per rule.
7.1.2 (ii)10% of cost of schedule item will be paid after the installation of materials. No No Not Allowed
(iii) Balance 10% of the cost of material will be paid after the successful
7.1.3 commissioning of the work/part of work(i.e. commissioning of work at individual No No Not Allowed
station).
7.2 For those items involving "Supply only" : No No Not Allowed

Pa g e 10 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

(i) 90% of the cost of the material supplied will be paid on receipt of materials
7.2.1 at the nominated stores duly inspected by the inspecting authority subject to No No Not Allowed
furnishing of Inspection certificate.
(ii) Balance 10% of the cost of materials supplied will be paid after the
7.2.2 successful commissioning of the work/part of work(i.e. commissioning of work No No Not Allowed
at individual station).
7.3 For those items involving "Designing/Installation/Erection only": No No Not Allowed
7.3.1 (i) 90% of the cost will be paid after completion of activity/part of activity. No No Not Allowed
(ii) Balance 10% cost will be paid after the successful commissioning of the
7.3.2 No No Not Allowed
work/part of the work(i.e. commissioning of work at individual station)
No additional charges will be paid to the contractor for transporting to and from
7.4 No No Not Allowed
stores depot of Railway to the site of work including Railway material, if any.
Necessary RDSO, IRS/TEC/DOT specification/drawing, if any required shall be
7.5 No No Not Allowed
obtained by the tenderer at his own cost.
8 INSPECTION :- No No Not Allowed
a) Contractor shall submit call letter for inspection to consignee 7 ( Seven)
8.1 No No Not Allowed
days in advance with an intimation to Sr. DSTE, N.E. Railway , Lucknow,
b) Contractor shall produce all other related materials required for the work at
8.2 site at his own cost for inspection by authorized representative of engineer-in- No No Not Allowed
charge.
c) All the materials inspected and passed shall be marked suitably by the
inspecting official and are to be kept under contractor custody which will be
8.3 used for execution only. However, Railway reserves the right to reject any No No Not Allowed
materials, if found spoiled/damaged during transportation, for which the
contractor shall replace at his cost within 15 days of detection.
d) Any materials rejected by the inspecting official due to not being as per the
specification or not in proper condition, the same is to be removed by the
8.4 No No Not Allowed
contractor within 7 days at his cost. For this the decision of inspecting official
shall final and binding on the contractor.
All the materials / equipments to be supplied by the contractor shall be
inspected by the authority as specified in the technical specification or
8.5 schedule of each items . Inspection charges of RDSO/ RITES / any other No No Not Allowed
agency as advised by the inspecting authority / agency shall be borne by the
Railway .
In case RDSO/RITES/any other agency ,as specified in the technical
specification /schedule of quantity of each items, does not inspect an item on
8.6 account of small value or show inability to inspect the materials for any reason No No Not Allowed
, the same may be inspected by consignee or any other Railway
representative nominated by contract signing authority.
9 variation Clause No No Not Allowed
Unless otherwise specified in the special conditions of the contract, the
accepted variation in quantity of each individual item of the contract would be
9.1 No No Not Allowed
upto 25% of the quantity originally contracted, except in case of foundation
work.
The Contractor shall be bound to carry out the work at the agreed rates and
9.2 shall not be entitled to any claim or any compensation whatsoever upto the No No Not Allowed
limit of 25% variation in quantity of individual item of works.
In case an increase in quantity of an individual item by more than 25% of the
9.2.1 agreement quantity is considered unavoidable, then same shall be executed at No No Not Allowed
following rates
(a)Quantities operated in excess of 125% but upto 140% of the agreement
9.2.2 quantity of the concerned item, shall be paid at 98% of the rate awarded for No No Not Allowed
that item in that particular tender;
(b)Quantities operated in excess of 140% but upto 150% of the agreement
9.2.3 quantity of the concerned item shall be paid at 96% of the rate awarded for No No Not Allowed
that item in that particular tender;
(c)Variation in quantities of individual items beyond 150% will be avoided and
9.2.4 would be permitted only in exceptional unavoidable circumstances and shall No No Not Allowed
be paid at 96% of the rate awarded for that item in that particular tender.

Pa g e 11 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

Variation to quantities of Minor Value Item: The limit for varying quantities for
minor value items shall be 100% (as against 25% prescribed for other items).
A minor value item for this purpose is defined as an item whose original
agreement value is less than 1 % of the total original agreement value. (i)
Quantities operated upto and including 100% of the agreement quantity of the
concerned minor value item, shall be paid at the rate awarded for that item in
9.3 No No Not Allowed
that particular tender; (ii)Quantities operated in excess of 100% but upto 200%
of the agreement quantity of the concerned minor value item, shall be paid at
98% of the rate awarded for that item in that particular tender; (iii) Variation in
quantities of individual minor value item beyond 200% will be avoided and
would be permitted only in exceptional unavoidable circumstances and shall
be paid at 96% of the rate awarded for that item in that particular tender.
In case of earthwork, the variation limit of 25% shall apply to the gross quantity
9.4 of earthwork and variation in the quantities of individual classifications of soil No No Not Allowed
shall not be subject to this limit.
In case of foundation work, no variation limit shall apply and the work shall be
9.5 No No Not Allowed
carried out by the Contractor on agreed rates irrespective of any variation.
As far as SOR items are concerned, the limit of 25% would apply to the value
of SOR schedule as a whole and not on individual SOR items. However, in
9.5.1 case of NS items, the limit of 25% would apply on the individual items No No Not Allowed
irrespective of the manner of quoting the rate (single percentage rate or
individual item rate).
10 warranty No No Not Allowed
After The installation is placed in service by the railway , contractor shall be
10.1 responsible for the proper functioning of the system for a period of 12 months No No Not Allowed
( warranty period)
Due to analysis of failures , if design deficiency is pointed out by the railway ,
10.2 No No Not Allowed
the contractor shall rectify the deficiency at his own cost
All equipment and system supplied by the contractor shall be guaranteed
10.3 against all kind of latent/ patent defects for a period of 12 months from the No No Not Allowed
date of commissioning of system and placing it in service
During the period of warranty , the contractor shall remain responsible to
arrange replacement and for setting right at his own cost any equipment
supplied by him which is of defective manufacturing or design or becomes
10.4 No No Not Allowed
unworkable due to any cause what so ever . The decision of the railway
administration in this regard to direct the contractor to attend to any damage
or defect in work shall be final and binding on the contractor
If it becomes necessary for the contractor to replace or renew any defective
portion of the system under this clause the provisions of this clause shall apply
to the expiry of six months from the date of such replacement or renewal or
10.5 until the end of warranty period which ever may be later . If any defect is not No No Not Allowed
remedied with in reasonable time, the railway may proceed to do the work at
contractors risk & expense, but with out prejudice to any other rights which the
railway may have against the contractor in respect of such defect
Railway representative i.e. consignee of the system shall maintain a register
10.6 during warranty period about recording the failures & date and time of No No Not Allowed
reporting to the contractor
11 STAMP DUTY No No Not Allowed
Stamp duty shall be payable @ Rs. 70/- per thousand on security deposit if it is
in the form of NSC/FDR and if it is in the form of cash it will be @ 125/- per
thousand on thousand on security deposit . Till finalization of the special leave
petition by the supreme court , Before execution of contract agreement ,
11.1 No No Not Allowed
Tenderer will have to deposit the stamp duty of Rs. 100/- along with an
affidavit " if an order shall be passed by supreme court in above Special Leave
Petition in favour of Govt. then tenderer will have to deposit the balance stamp
duty in addition to Rs. 100/- against the appropriate head of the deptt.
Tenderer will ensure the genuineness of the stamp papers / stamps being
11.2 utilized . It will be the responsibility of the party entering into agreement with No No Not Allowed
the railway for its genuineness
12 Care in Submission of Tender: No No Not Allowed

Pa g e 12 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

(a)(i) Before submitting a tender, the tenderer will be deemed to have satisfied
himself by actual inspection of the site and locality of the works, that all
conditions liable to be encountered during the execution of the works are
12.1 taken into account and the rates he enters in the tender forms are adequate No No Not Allowed
and all inclusive to accord with the provisions in Clause-37 of the standard
general conditions of contract for the completion of works to the entire
satisfaction of the engineer.
(a)(ii) Tenderers will examine the various provisions of The Central Goods and
Services. Tax Act,2017(CGST)/ Integrated Goods and Services Tax Act,
2017(IGST)/ Union Territory Goods and Services Tax Act,2017(UTGST)/
12.2 respective state's State Goods and Services Tax Act (SGST) also, as notified No No Not Allowed
by Central/State Govt. and as amended form time to time and applicable taxes
before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC)
likely to be availed by then is duly considered while quoting rates.
(a)(iii) The successful tenderer who is liable to be registered under
CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details
required under CGST/IGST/UTGST/SGST Act to Railway immediately after the
12.3 No No Not Allowed
award of contract, without which no payment shall be released to the
contractor. The contractor shall be responsible for deposition of applicable
GST to the concerned authority.
(a)(iv) In case the successful tenderer is not liable to be registered under
CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST for
12.4 No No Not Allowed
his/their bills under reverse charge mechanism(RCM) and deposit the same to
the concerned authority.

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The amount as stipulated in tender document is herewith forwarded as
Earnest Money. Full value of the Earnest Money shall stand forfeited without
prejudice to any other right or remedies in case my/our tender is accepted and
if :- I/We do not submit the Performance Guarantee within the time specified in
1 No No Not Allowed
the Tender document; (b)I/We do not execute the contract documents within
seven days after receipt of notice issued by the Railway that such documents
are ready; and (c)I/We do not commence the work within fifteen days after
receipt of orders to that effect.
I/We have read the various conditions to tender attached hereto and agree to
abide by the said conditions. I/we have also agreed to keep this tender open
for acceptance for a period of 45 days in case of single packet and 60 days for
two packet system from the date fixed for opening the same and in default
2 thereof. I/We will be liable for forfeiture of my/our Earnest Money. I/We offer to No No Not Allowed
do work for North Eastern Railway, at the rates quoted in the attached
schedule and hereby bind myself/ourselves to complete the work in all
respects within the period of completion stipulated in the tender document,
from the date of issue of letter of acceptance of the tender.
I/We have read the various conditions attached/ referred to in this tender
3 No No Not Allowed
document and agree to abide by the said conditions.
I/We also hereby agree to abide by the INDIAN RAILWAYS STANDARD
GENERAL CONDITION OF CONTRACT, with all correction slip up to date and
to carry out the work according to the Special Condition of Contract and
4 No No Not Allowed
Specifications of material and works as laid down by Railway in the annexed
Special Condition/Specifications, Schedule of Rates with all correction slips up
to date for the present contract.
Until a formal agreement is prepared and executed, acceptance of this tender
shall constitute a binding contract between us subject to modifications, as may
5 No No Not Allowed
be mutually agreed to between us and indicated in the letter of acceptance of
my/our offer for this work.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if
any, quoted by us in the relevant fields of the Financial BID Page will only be
the ruling terms for deciding the inter se ranking, and any such condition
6 having financial repercussions, if quoted by us anywhere else including No No Not Allowed
attached documents shall not be considered for deciding inter se ranking.
However, Railways shall have the right to incorporate any such condition
quoted by us, in the contract, at their discretion, if contract placed on us.

Pa g e 13 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3


LUCKNOW-NER-DIVISION-S AND T/NORTH EASTERN RLY
TENDER DOCUMENT
Tender No: 7of2018 Closing Date/Time: 01/04/2019 15:00

7 I/We have visited the works site and I/We am/are aware of the site condition. No No Not Allowed

6. Documents attached with tender

S.No. Document Name Document Description


1 TechspechofCOA.pdf Tech spec of COA

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017.

Signed By: SATYA DEO PATHAK

Designation : Sr.DSTE2nd

Pa g e 14 o f 14 Ru n Da te/Time: 0 7/0 3/2 0 19 13:5 2 :0 3