I.

Project Profile
Project Title: Building A Cemented Fence at The Back Portion Of the Main Campus of
Aurora National High School.
Proponent: Binrawaha R. Ismael
STEM Student
Implementing Unit: AHHS STEM STUDENTS

Project Site: Aurora National High School Main Campus


Project Duration: May – February 2020
Total Project Cost:
Project Brief Executive Summary:
FENCE a structure like wall built outdoors usually of wood or metal that separates two
areas or prevents people or animals from entering or leaving.

Aurora National High School, once it built the fence, can avail the following :
1. Students Safety- make the students safe from danger to the outside of the
campus.
2. Students should not escape – it is important for the school that the students
should be in the campus while class hours.
3. Avoiding Stolen property – we can mitigate the the crime ( steal) because our
school is prone of this crime.

II. PROJECT PROPOSAL PROPER


Rationale:
Aurora National High School is located in Balide, Aurora, Zamboanga Del Sur. The
Back portion of the main campus, is compose of mahogany tree and other trees that are
grown in that area of the school.
Due to its unique location, the students can easily escape from the campus, and the
problem of this is when the students get an accident or the students are involving of bad
activities outside the campus while class hours.
Recently, the students won’t enter to the gate instead they step into the back area
of the main campus because it can easily access and there is no difficulty in entering to
the main campus.
One way to combat this problem is to build a fence on the back portion of the main
campus. Fence are use all over the world to keep things safe. Due to the intelligence of
the students and the proposed location of the of the fence, a fence made of cement and
hollowblock is the best option.
Project Description :

 Project and plan approval


Fencing are a long term investment. Well-built fence should last from 10-25 years.
Planning is the key to good fencing.
 Price and purcahse of materials
After the project approved, the next tasj was to price and purchase the materials
to complete the project.
 Planning and building fence assymbly
As stated earlier, fencing are a costly investment. The location and arrangements
may affect production effiency, so it makes sense to plan before you build. As
such, prior to build the fence, all the builds needed to be planned out.
Objectives:
The objectives of the project is to design and build a cemented fence for ANHS
Main Campus by:

 Designing and building a 16’x5’ each block of cemented fence for ANHS Main
Campus on engineer.
 Contacting ANHS faculting and Staff regularly to confitm that the project is on
the appropriate timeline.
 Making the students Safe from any danger.
Significance:
The importance of this project is to increase security at ANHS Main Campus. This
project will benefit the school because they will have increased security and
accountability of the school. They will also not have to put in the time and effort
developing and building fences. Themselves, saving money in the process.
 Project and plan approval
Fencing are a long term investment. Well-built fence should last from 10-25 years.
Planning is the key to good fencing.
 Price and purcahse of materials
After the project approved, the next tasj was to price and purchase the materials
to complete the project.
 Planning and building fence assymbly
As stated earlier, fencing are a costly investment. The location and arrangements may
affect production effiency, so it makes sense to plan before you build. As such, prior to
build the fence, all the builds needed to be planned out.
Project Component/Strategies of Implementation:

Project Component Strategies Of Implementation

Gathering needs Close consultation DPWH experts

Fund sourcing Presentation to ANHS faculty and staff, LGU-Aurora, DEPED.

Purchasing of Materials Preparation of Fund and then purchase the needs

Installing/ constructing With the engineer and workers procured and mode
available, the construction will commence immediately.

The following activities shall be undertaken leading to the fruition of the project:

2020
May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb.
Gathering of Needed X
Submission/approval of X
proposal
Procurement of X
materials
Installation/construction X
Full operation X

Estimated Budget:

1.Facilitates
Qty. UnitS Description Unit cost Total cost

250 Sacks Cement 250 62,500


2,500 CMU Hollow block 15 37,500
5,000 Metal (kabilya)
Sand
Gravel
Workers