1. PRODUCT STORAGE TANK SHALL BE PROVIDED WITH SEMI FIXED
13. INSTALLATION OF ALL FIRE PROTECTION SYSTEM TO BE FOAM SYSTEM IN COMPLIANCE WITH SAES-B-018.
SUPERVISED BY REGISTERED FIRE PROTECTION ENGINEER. 2. BLOCK VALVE(S) IN THE LATERAL AND RISER TO BE CAR-SEAL
14. LATERALS SHALL RUN INDEPENDENTLY FOR EACH TANK OPEN (CSO).
AND TERMINATE AT ROAD ON OR OUTSIDE DYKE AS PER 3. PRODUCT STORAGE TANK SHALL BE PROVIDED WITH SEMI FIXED
SAES-B-018. FOAM SYSTEM IN COMPLIANCE WITH SAES-B-018 SECTION .7
15. THE RING SUPPLY PIPING TO THE MULTIPLE OUTLET OPEN TOP FLOTING ROOF.
FOAM CHEMBER SHALL BE INSTALLED ABOVE THE 4. TANKS 38M AND OVER IN DIAMETER SHALL HAVE MULTIPLE FIXED
WIND GIRDER. FOAM CHAMBER AND DEFLECTORS LOCATED AT INTERVAL NOT TO
16. ANY FOAM SYSTEM PIPING THAT RUNS U/G OR PASSES EXCEED 24.4M, EQUALLY SPACED AROUND ENTIRE TANK SHELL
THROUGH A DYKE WALL SHALL BE PROTECTED AGAINST (SEE FIG. 2, SAES-B-018).
CORROSSION IN ACCORDANCE WITH SAES-H-002. 5. RISER, LATERAL AND DISTRIBUTION PIPING (MINIMUM 75 MM OR
17. LATERALS SHALL BE INSTALLED ABOVE GROUND WITH A 3 -INCH NPS) SHALL BE GALVANIZED CARBON STEEL, SCH 40
SLOPE OF 1 IN 100 TOWARDS DYKE. PIPING SIZED TO PROVIDE A PRESSURE BETWEEN THE GAUGE
18. DUST CAPS SHALL BE PROVIDED FOR COUPLINGS OF ALL PRESSURE 70 PSIG TO 100 PSIG AT EACH FOAM CHAMBER BASED
HOSE CONNECTIONS. ON AN INLET PRESSURE OF APPROXIMATELY 150 PSI .
19. ALCOHOL RESISTANT FOAM IS NOT REQUIRED TO BE 6. THE CAPACITY OF THE FOAM SYSTEM SHALL BE BASED ON
USED IN THIS SYSTEM. 0.5 GPM/FT2 OF FOAM SOLUTION PER AREA BETWEEN THE FOAM
20. FOAM RISER SHALL BE LOCATED MINIMUM 7.5 M AWAY DAM AND TANK SHELL.
FROM MAIN I/L / O/L PIPING CONNECTIONS TO THE TANK. 7.FIXED FOAM DISCHARGE OUTLET SHALL BE DESIGNED TO DELIVER
21. A MESH SCREEN WITH 12 MM OPENING SHALL BE INSTALLED FULLY ASPIRATED FOAM TO THE ANNULAR SEAL AREA OF OPEN
OVER FOAM MAKER AND DEFLECTOR OPENING TO PREVENT TOP FLOATING ROOF STORAGE TANK FOR FIRE PROTECTION.
BIRD FROM NESTING IN THE DEFLECTOR OR FOAM CHAMBER. 8. ALL FOAM MAKING EQUIPMENT SHALL BE LISTED AS PER UL 162.
9. FOAM BACK BOARD TO BE PROVIDE AS PER SAES-B-018, 7.8.
10. FOAM SYSTEM TO BE HYDROSTATICALLY TESTED AS PER
SAES-B-018. THE HYDROTEST PRESSURE ARE SHOWN IN NMR.
11. TWO 2½ INCH MALE HOSE CONNECTION SHALL BE ACCESSIBLE
FROM TOP STAIRWAY PLATFORM AS SHOWN ON FIGURE
3 OF SAES-B-018. THE FIGURE ILLUSTRATION IS SHOWN IN NMR.
12. DRAWINGS AND SUPPORTING HYDRAULIC DESIGN STUDY
CALCULATION OF ALL FIRE PROTECTION SYSTEM SHALL BE
CERTIFIED BY A REGISTERED FIRE PROTECTION ENGINEER &
SUBMITTED TO THE CHIEP FIRE PREVENTION ENGINEER OR
HIS REPRESENTATIVE FOR REVIEW AND APPROVAL.
BY VENDOR.
LEGEND
PIPING MATERIAL INSTRUMENT DEFINITION & SYMBOLS SAES-J-004
5" STORZ. SPECIFICATION SAES-L-005
AC/AFO -AIR TO CLOSE/ VE
CONNECTION -VIBRATION ELEMENT
AIR FAILURE OPEN VS -VIBRATION SWITCH
AC/AFS -AIR TO CLOSE/AIR VT -VIBRATION TRANSMITTER
PROCESS LINE
6" FAILURE STEADY XL -PILOT LIGHT
INSTRUMENT AO/AFC -AIR TO OPEN/ (NOT FOR MOTOR)
2 1/2" MALE AIR LINE AIR FAILURE CLOSE XS -LIMIT SWITCH
4"-FW -2085-1CG0U HOSE CONNECTION INSTRUMENT
AO/AFS -AIR TO OPEN/AIR ZV -SAFETY SHUTDOWN VALVE
(NOTE-11) 6" ELECTRICAL LINE
FAILURE STEADY
AOV -AIR OPERATED VALVE DATA LOGGER POINT
FOAM CHAMBER F-FLOW P-PRESS.

INPUTS
AT -ANALYZER TRANSMITTER
8 NOS. (TYP) 4" DT -DENSITY TRANSMITTER
L-LEVEL T-TEMP.
3/4"

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
X-MISC. A-ALARM
REDUCER ESD -EMER. SHUTDOWN SYSTEM
LOCAL PANEL
FC - FLOW CONTROLLER
SPECTACLE MOUNTED INSTR.
FV -FLOW CONTROL VALVE
4" 6"-FW -1870-1LE0U PLATE-OPEN FCV -FLOW CONTROL VALVE
LOW POINT (SELF-ACTUATED)
BOARD MOUNTED
INSTRUMENT
DRAIN 6" SPECTACLE FE -FLOW ELEMENT
PLATE-CLOSED FG -FLOW SIGHT GLASS
R/G

6"x4"
STATUS LIGHTS
4"-FW -1871-1CG0U 3/4" GATE VALVE FHV -FLOW MANUAL CONT. VALVE XL R=RED, G=GREEN
FHTD -FLOW MANUAL TRANSDUCER PILOT LIGHT (DO NOT
6" GLOBE VALVE
GASOLINE 91 FIC -FLOW INDICATOR CONTROLLER USE FOR MOTOR STATUS)
CHECK VALVE FM -FLOW METER
(PHASE-1) FO -RESTRICTION ORIFICE MOTOR STATUS
LOW POINT DRAIN PILOT LIGHT
6"x4" DYKE WALL PLUG VALVE FQI -FLOW TOTALIZER INDICATOR
X40-D-0002C 3/4" BALL VALVE
FR -FLOW RECORDER
LOCAL MOUNTED
CAR-SEAL VALVE FT -FLOW TRANSMITTER
ML
INSTRUMENT
OPEN (CSO) DOUBLE DISC FY -FLOW RELAY
LOW POINT DRAIN GATE VALVE HIC -HAND INDICATOR CONTROLLER MOUNTED BEHIND
ANGLE VALVE HS -HAND SWITCH LOCAL PANEL
LA -LEVEL ALARM
LV -LEVEL CONTROL VALVE RACK MOUNTED
PRESS. RELIEF VALVE
4"-FW -2084-1CG0U LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
(SELF-ACTUATED)
LG -LEVEL GAUGE GLASS ELECTRICAL
LIC -LEVEL INDICATOR CONTROLLER SUPPLY REQUIRED
VACUUM RELIEF VALVE
LI -LEVEL INDICATOR
LR -LEVEL RECORDER INSTRUMENT
LS -LEVEL SWITCH AIR SUPPLY REQUIRED
M MOTOR OPERATED
LT -LEVEL TRANSMITTER
VALVE H
LTD -LEVEL TRANSDUCER HIGH LOW
ML -MOTOR STATUS LIGHT L
P MOV -MOTOR OPERATED VALVE
PISTON OPERATED NA -ANNUNCIATOR TWO PEN RECORDER
VALVE PB -PUSHBUTTON
PC -PRESSURE CONTROLLER FF
CONTROL VALVE PV -PRESS. CONTROL VALVE FOUNDATION
PCV -PRESS. CONTROL VALVE FIELDBUS INSTRUMENT

(SELF ACTUATED)
BALL TYPE PDC -PRESS. DIFF. CONTROLLER DISTRIBUTED CONTROL/SHARED
P
CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
(DCS) DISTRIBUTED CONTROL
S INDICATOR CONTROLLER SYSTEM, OPERATOR ACCESSIBLE
SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN CONTROL ROOM
INDICATOR SWITCH (DCS) DISTRIBUTED CONTROL
PDT -PRESS. DIFF. TRANSMITTER
VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
PDTD -PRESS. DIFF. TRANSDUCER IN CONTROL ROOM
CLOSED
PG -PRESSURE GAGE
PI (DCS) DISTRIBUTED CONTROL
-PRESSURE INDICATOR
FOAM CHAMBER PIC -PRESS. INDICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
IN FIELD
PR -PRESSURE RECORDER
PIV POST INDICATOR VALVE PS -PRESSURE SWITCH
PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
A / G ABOVE GROUND PX -PRESSURE POINT INTERCONNECTING LOGIC
U / G UNDER GROUND PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
RTD -RESIST. TEMP. DETECTOR
(PLC) PROGRAMMABLE LOGIC
SI -SPEED INDICATOR
CONTROLLER, NORMALLY
SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
TV -TEMP. CONTROL VALVE (PLC) PROGRAMMABLE LOGIC
TCV -TEMP. CONTROL VALVE CONTROLLER FUNCTION,
(SELF-ACTUATED) CAN BE NORMALLY
DISPLAYED ON CRT
FOAM CHAMBER 2 1/2" Ø TE -TEMP. ELEMENT
TSO -TIGHT SHUT OFF TG
8 NOS. (TYP) (TYP) -THERMOMETER LOCAL DCS OR AUXILIARY
S.C. - SAMPLE CONN. THS -TEMP. HAND SWITCH DCS LOCATION NORMALLY
HEADER TO FOAM TI -TEMP. INDICATOR ACCESSIBLE TO OPERATOR
S -DRAIN TO
CHAMBERS PRESSURE SEWER TR -TEMP. RECORDER
(PLC) PROGRAMMABLE LOGIC
TS -TEMP. SWITCH
CONTROLLER I/O POINT
WIND GRIDER 6" X 4" 6" X 4" OWS -OILY WATER SEWER TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
(HANDRAIL REQUIRED, CAR-SEAL VALVE (6") D -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
BUT NOT SHOWN) OPEN (CSO) V -VENT TW -THERMOWELL

2 1/2" INCH MALE REFERENCE DRAWINGS


HOSE CONNECTION LETTER IDENTIFICATION OF LINES AE-036204
(NOTE-11) PIPING SYMBOLS AB-036227
5" STORZ.
EQUIPMENT SYMBOLS AB-036305
CONNECTION 4"
4" INSTRUMENT SYMBOLS AC-036950
PIPING LAYOUT INDEX NA
4"
PLOT PLAN VA-163583.001
PROCESS FLOW DIAGRAM NA
HYDROSTATIC TEST DIAGRAM NA
6" 6"
DRAWING CONTROL FOR J.O. 10-02399-0005 GEN-D0001
6" INSTRUMENT INSTALLATION SCHEDULES NA
6" SLOPE LATERAL TOWARD
PIPING & INSTRUMENT NA
THE LOW POINT DRAIN
PIPING & INSTRUMENT NA
3/4" 3/4" 3/4"

LOW POINT LOW POINT LOW POINT DRAIN


DRAIN DRAIN
DIKE
SEMI FIXED FOAM SYSTEM DESIGN DATA WALL
DESIGN BASIS NFPA 11, SAES-B-017 & 018
FINISHED REVISION VALIDATION
CLASSIFICATION CLASS 1 FLAMMABLE LIQUID ( GASOLINE 91) GRADE LEVEL
THIS REVISION NO. 0F1 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
DIAMETER OF TANK (D1) 55 METER REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02399-0005-001
CIRCUMFERENCE OF TANK 172.7 METER
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FOAM CHAMBER SPACING 24.4 METER (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
NUMBER OF FOAM CHAMBERS 7.077 NOS. VKG ASH SAY AHG
10/15/2018 10/15/2018 10/15/2018 10/15/2018
NUMBER OF FOAM CHAMBERS PROVIDED 8.0 NOS. DATE REVISION DESCRIPTION
REV.NO.
DISTANCE OF FOAM DAM FROM SHELL (D2) 0.6 METER 0F1 10/15/2018 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


AREA OF APPLICATION ( RIM SEAL) 1103.08 FT² THIS REVISION IS NOT TO BE USED FOR
10-02399-0005 CONSTRUCTION UNTIL CERTIFIED AND DATED
DESIGN DENSITY 0.5 GPM/SQ.FT
DESIGN FLOW THEORETICAL 552 GPM
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
FLOW AS PER HYDRAULIC CALCULATION PIPING & INSTRUMENTATION DIAGRAM PID
705.88 GPM
WITH HOSE STREAM ALLOWANCES
SEMI FIXED FOAM SYSTEM-STORAGE TANKS
TYPE OF FOAM 3% FLUORO PROTIEN
YANBU DISTRIBUTION HUB
YANBU SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

X40 A VA-163770 004 0F1