Technical Site Survey Report

For Stage VII

Project: Mobitel Stage-VII


Region Colombo Central
Site ID: ZBIY09
Site Name: Peragasmula Junction
Huawei Engineer: Mr. Chamikara
Sub Contractor name: Sierra Constructions (Pvt.) Limited
Sub Contractor Engineer: Mr. Suneth
Survey Date: 6th November 2012

412145663.xlsx
l Site Survey Report
For Stage VII

412145663.xlsx
1. Current Information
Site Type ✘ 2G 900 2G 1800
1.1 Site Basic Information
Survey Item Survey Contents
Site address: AGA Land, Peelahena, Dapillagoda, Agalawtta.
Site locatin information
Coordinates Latitude: 6º 32' 06.5''
Owner : Mr.H.L. Chinthaka Operator:
Site Owner Information
Telephone: ( 034-5721581 ), Mobile phone:
Name Mr. sarath
Mobitel regional leader
Telephone: n/a
Equipment room location
Roof top
✘ Greenfield
Building Floor No(Excluding Ground Floor):
Other
Site environment checking
Distance of Manual Transport required, (Flat land, Rocky land, or Hill), if the distance is
>50m
Hand Carry to Rooftops
Is there any evidence of flooding near the site? Ie water stained,wall.
Any Special Delivery System Required?
The Distance to the Site from Colombo
Access Restriction Yes ✘ No
Access on 7 Day ✘ Yes No
Twenty-four hours ✘ Yes No
Prior appointment for access ( person to be informed before site access )
No ✘ Yes
Contact person: Mr. sarath
Site access information
Site access key ✘ Mobitel Access Key
Parking space available Yes ✘

Equipment delivery to its position by ✘ Hand


Safe access to all equipment parts & antennas (lifeline systems, fall arrest systems, anchors.)
✘ Yes No
If NO, please specify missing items:
Some information is unusual,please remark here:
Remarks

1.2 Site Existing Information


Meter Cubical Meter Cubical installed ✘ Yes
SPD Is Meter To ACPDB length > 20m? ✘

✘ AC
Voltage: 230 V
Armod cable length from MC to ACPDB 19
Armod cable dimension 4 x 6 mm²
Additional space for Huawei ACPDB: Yes
Existing Total Breaker Qty: 2
Power supply Existing Total Breaker capacity: 40 A
Power supply
Additional breaker Qty: 0
Additional Breaker capacity:
Spare AC outlet Qty for test equipment: No

✘ Three phase Single phase
If more than 1 BTS present, Are the AC power cable laid in the same path?
If No, please specify the power cable length in path 2:
Avaible ECB Qty (Outdoor): 5
Spare ECB holesQty(Outdoor): Please see below
ECB
Required ECB Qty (Outdoor): No
Gap between available ECBs of the tower: 33m
Tower Type: ✘ Self Support tower (SST)
Monopole Tower
Tower Tower Leg Qty 3LEGS ✘ 4LEGS
Tower Height: 60
Qty of spare antenna poles : 5
Transmission Equipment type ✘ MW

Remarks Spare ECB details: Top - 5, Middle - 5, 90bend - 2, Down - 4

1.3 Existing GSM System information


System 1 Type
✘ GSM 900 BTS Qty
Ericsson 2207
2206
Huawei 3012
3012AE
3900
Existing equipment information ✘
3900A
ZTE 8900
8900A
Rack Qty 2
DRFU Qty 6
DTRU Qty 0
Indoor ✘ Outdoor
Frequency ✘ 900MHz
Ant. Type ✘ Single Band
Spare port Type 900MHz
Spare port condition Good Bad
Antenna Sector 1 Sector 2
Azimuth (º) 110
E M E
Downtilt (º)
0 2 0
Height (m) 60 60
Jumper (Ant.) Length (m) 3 3
Jumper connector type to Ant
IF use TMA
TMA
TMA TMA Qty
Type
Type 7/8" 7/8"
Feeder connector type Din Din
Length (m) 80 80
Jumper (BS) Length (m) 3 3
1.4 Existing UMTS 2100 Antenna, Feeder, TMA and RF information
UMTS 2100 BTS Qty
Huawei DBS 3800
DBS 3900
Existing equipment

BTS 3900
information ZTE 8900
8900A
Rack Qty 1
Indoor ✘ Outdoor
Share with Other System? ✘

Frequency 900MHz
Ant. Type Single Band
Spare port QTY 900MHz
Spare port condition Good Bad
Antenna
Sector 1 Sector 2
Azimuth (º)
E M E
Downtilt (º)
3 2 3
Height (m) 60
Jumper (Ant.) Length (m)
Jumper connector type to RRU
Fiber from RRU to BBU Length (m)
Remarks

1.5 Existing MW Information


IDU Qty. 1 Dimension:(No.of U)
Detail description of each unit: Huawei RTN 620
IDU Installed in: 19''Sevice Rack
IDU Information DCDB switch for IDU ✘ Yes
E1 connecter type at end point: BNC (L)
Link type SDH
IF cable type ✘ 75 Ω
Patch Panel ✘ Yes
Mounting Type Pole Mounting
MW Antenna Ant Qty: 1
Does Antenna mounting with ODU?

Remarks MW link has 1 + 1 config

2. New Huawei equipment information


Site Type 2G 900 ✘ 2G 1800
2.1 Site information
Equipment Type
Expansion Type
Enough Space for BBU installation in BTS cabinet? ( BBU installation sites only)
Enough Space for BBU installation in NodeB cabinet? ( BBU installation sites only)
Existing MW IDU relocation necessary ( BBU installation sites only)
Separate Rack installation necessary for MW IDU ( BBU installation sites only)
DRFU removal necessary
Existing feeder dismantling necessary?
Existing Antenna dismantling necessary?
Space Checking Need Site acquisition(Just for outdoor sites)?
Enough vertical cable space?
Need Extention Bars for Vertical Ladder
Enough Space for Extention Bars
Extension Bars (Provide The Drawing)
Enough horizontal cable space for fiber & power
Need extention ladder from tower to cabinet?
Enough Space for Ant?(Include Sectoral & MW)
Need additional Ant-mount?
Enough space for mount Huawei RRU
In case of "No" for the above requirement,specify solution:
Comments

Need aditional ECBs for Tower


ECB
ECB interconnected ground cable Lenghth(35mm 2) :
CEB supply AC power available?
AC Phase:
MC To ACDB Power Cable Length (4X16mm2):
2.2 GSM Solution
GSM System 1
GSM 900 Qty
BTS3012
BTS3012A
BTS
Huawei TP48200
Configuration
DBS3900
3900
3900A
Equipment Base Need Additional Steel Frame? ✘ No
Can share existing antennas ✘ No
Antenna Band New Ant.
900MHz Cell1
Antenna and TMA ✘ 1800MHz Cell2
2100MHz Cell3
TMA Need TMA? No
Need NSBT? No

Jumper Length from Antenna To RRU/TMA (m)


Feeder, Jumper etc. Fibre Length (m)
Feeder, Jumper etc.
Jumper Length from Feeder/NSBT To BTS (m)
If have TMA,Jumper Length from TMA To Feeder (m)
ACPDB To BTS Power Cable Length (4X6mm2): N/A
SPD Ground Cable Length (25 mm ):
2
N/A
Battety Cabinet Ground Cable Length (25 mm ):
2
N/A
BTS/BBU Ground Cable Length (25mm ): 2
2m
Cable & Pipe
SPD Pole Ground Cable Length (35 mm2): N/A
GI Pipe from Meter to BTS N/A
PVC Pipe from the BTS to RRU (fiber & Power)
E1 cable Lenghth: 5m

Remarks PVC for fibre 1/2 inch 80 x 3 = 240m PVC for power 1 1/4 inch 10x3 = 30m.
3G

2' 06.5'' Longitude: 80º 10' 17.1'' Altitude: 101


Mobitel
Mobile phone: n/a

Equipment installation cabinet:


Shelter
Building
✘ Outdoor Cabinet

), if the distance is Flat land Rocky land 1km of Hill


Floors No.
Yes ✘ No
Crane Boomtruck 4WD
< 50km 50<D<150km 85km
Please specify:
If No,Please specify:
If No,Please specify:

Telephone: 714720073

No Landlord Key Other Access Key


No
Lift Crane Other(mention in remarks)
arrest systems, anchors.)

NO
No ` YES
DC
Voltage: V
Spare breaker Qty:
Breaker/Per capacity: A
Rectifier Qty.

Rectifier 1Type out Put Amperage:


Rectifier 2 Type out Put Amperage:
Battery Type and capacity:
Battery Type and capacity:

✘ Yes No

Available ECB Qty (Indoor): N/A


Spare ECB holes Qty(Indoor): N/A
Required ECB Qty (Indoor): N/A

Guyed Mast tower (GMT) Pole

Tower Leg type: Anguar ✘ Tubular

Optical transceiver

DCS 1800 BTS Qty


Ericsson 2207
2206
Huawei 3012
3012AE
3900
3900A
ZTE 8900
8900A
Rack Qty
DRFU Qty
DTRU Qty
Indoor Outdoor
1800MHz 2100MHz
Dual Band Tri Band
1800MHz 2100MHz
With Dust Cap Without Dust Cap
Sector 3
170 310
ME M Can Ajust the tilt No
2 0 0 ✘ Elec ✘ Mech
60
3
Din or N Type Din
Input Yes or No
7/8" Input 1/2",7/8"or 1 1/4"
Din Din or N Type
80
3
ZTE 8900
8900A

Indoor Outdoor
No Yes If yes,Please specify:
✘ 1800MHz 2100MHz
✘ Dual Band Tri Band
1800MHz 2100MHz
With Dust Cap Without Dust Cap
Sector 3

M E M Can Ajust the tilt


2 3 0 ✘
Elec ✘
Mech
60 60

✘ In NodeB/BTS Rack TX Cabinet


No

BNC (S) SMB SMZ
PDH

120 Ω
No If Yes,Qty :
Wall Mounting ✘ Tower Mounting Other

✘ Yes No

MW link has 1 + 1 configuration.

3G

Indoor ✘ Outdoor
With BBU ✘ Without BBU
n sites only) Yes No ✘ N/A

tion sites only) Yes No ✘ N/A
Yes No ✘ N/A
Yes No ✘ N/A
✘ Yes No Qty: 3
Yes ✘
No Qty:
Yes ✘
No Qty:
Yes ✘
No

Yes No
Yes ✘ No
Yes No
No Yes Qty:
✘ Yes No
Yes ✘ No

Yes No
No ✘ Yes Qty: 3
✘ Yes No

✘ No Yes Qty:

✘ Yes No
3 Phase ✘ 1 Phase

✘ DCS1800 Qty
BTS3012
BTS3012A
Huawei TP48200
DBS3900
3900
3900A
Yes If Yes,Qty:
Yes System Type :
Ant.type Ant. Height Azimuth Tilt(°)
DCS antenna 60 110 2
DCS antenna 60 170 2
DCS antenna 60 310 2
Yes If Yes,Qty:
Yes If Yes,Qty:
Cell1 Cell 2 Cell 3
3 3 3
80 80 80
N/A N/A N/A

Alarm cable Length: 5m

= 30m.
3. Photos List
NO. Necessary photoes must provided: If taken
1 Overall Site View Yes
2 Panoramic Photo(45Deg per)( Should be over lap) Yes
3 Exiting Tower View Yes
4 Existing Room/Cabinet inside (can have several photos to cover the place) Yes
5 Existing Equipment detail Inlook (close and inside veiw of the equipment) Yes
6 Existing Equipment detail Outlook (take with proper distance to fit to the hard copy) Yes
7 Existing Rectifier Rack inside Yes
8 Existing RF antenna (all operator) (need to check the space to installe antennas) Yes
9 Existing vertical cable ladder Yes
10 Existing horizontal cable ladder Yes
11 Location for Huawei Equipment( if can pre-installation)(Proposed Location) Yes
12 All ECB connection ponit (Should be clearly visible) Yes
13 Cable Entry Port Photo(To be taken parralally to horiziontal) Yes
Image Name
Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawtta Overall Site Vi


Mobitel Project — Phase 7

Peragahamula
Site ID ZBIY09 Site Name
Junction
Panoramic Photos (Ante

90°

180°

270°
Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta Panoramic Photos (Gro

90°

180°

270°
Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta Tower view


Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta Existing Equipmen


Mobitel Project — Phase 7

Peragahamula
Site ID ZBIY09 Site Name
Junction
Existing Equipment De
Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta Existing Rectifier Ra


Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta Existing RF Ante


Mobitel Project — Phase 7

Peragahamula
Site ID ZBIY09 Site Name
Junction
Existing Vertical Cab
Mobitel Project — Phase 7

Site ID Site Name Agalawatta Existing Horizontal ca


Mobitel Project — Phase 7

Peragahamula
Site ID ZBIY09 Site Name
Junction
Location for Huawei E
Mobitel Project — Phase 7

Site ID KLAGA2 Site Name Agalawatta All ECB Connection


hase 7

Overall Site View


hase 7

Panoramic Photos (Antenna Height)

45°

135°

225°

315°
hase 7

Panoramic Photos (Ground Level)

45°

135°

225°

315°
hase 7

Tower view
hase 7

Existing Equipment Inlook


hase 7

Existing Equipment Detail Outlook


hase 7

Existing Rectifier Rack Inside


hase 7

Existing RF Antenna
hase 7

Existing Vertical Cable Ladder


hase 7

Existing Horizontal cable ladder


hase 7

Location for Huawei Equipment


hase 7

All ECB Connection Points


3. Drawing
NO. Necessary Layouts must provided:
1 Exsting Equipment Layout
2 Proposed Equipment Layout
3 Exsting Antenna Location Layout
4 Proposed Antenna Location Layout ( With RRU)
5 Proposed BBU Layout ( BBU installation sites only)
Layout Name
No Material Requirment Qty Unit(Box/m/Pcs)
BBU with All cards(GTMU,
1
UELP, UPEU, UEIU etc)
2 Optical Transcivers 3 Pcs
3 RRU 900 0
4 RRU 1800 3 Pcs
5 Optical Fiber 3 x 80 m
6 Fiber Clamps (6 in 1) 70 Pcs
7 E1 Cable 1x5 m
8 RRU DC power cable 3 x 80 m
9 Antenna -900 0
10 Antenna - 1800 3 Pcs
11 Antenna - Dual band 0
12 Antenna - Triple-band 0
13 GSM Antennae brackets 0
14 RRU Brackets 3 Pcs
15 GSM Antenna pole 0
16 Extension Bar 0
17 Ant Jumper Cable 3 Pcs
18 Insulation tapes 4 Box
19 Bonding tapes 4 Box
20 PVC pipes 180 m
21 GI pipes 0
22 Flexible GI Pipes 15 m
23 Installation Accessories 1 Set
24 ECB 0
25 DC Cable(25 sqmm) Blue 0
26 DC Cable (25 sqmm) Black 0
27 DC Cable (16mm) Black 0
28 DC Cable(16mm) Blue 0
29 Ground cable 25 sqmm 0
30 Green outdoor cable 35 sqmm 0
31 4×6mm2 power cord 0
32 4×16mm2 power cord 0
33 BBU Power cable 5 m
34 Alarm Cable 5 m