TRANSMISSION DIVISION

OVERVIEW

Date:
July 2018
TRANSMISSION GRID NETWORK
TRANSMISSION GRID NETWORK
Asset Overview

66kV 132kV 275kV Total

7 35 3 45

SUBSTATION

66kV 132kV 275kV Total

Overhead 86.10km 2047.10km 598.1km 2731.3km

Underground 24.00km 103.24km - 127.24km


LINES
Submarine - 30km - 30km
Total tower = 2,888.54

66kV 132kV 275kV Total

Transformer 21 72 7 100

Compensator - 6 8 14

TRANSFORMER
ORGANIZATION STRUCTURE
Transmission Division
• Organization Structure
Southern Region Department
Regional Boundary JWS Grid Network

Main Power Station


Connected to
JWS Grid Networks
SESB
a. SJTP [75MW]
25MW X 3HT: 75MW
SJPT
b. [102.4MW]
30MW x 3GT: 90MW
12.4MW X 1 12.4M
ST: W
IP
P
a. KPSB [285mw]
95MW x 3GT: 285MW
b SPRE [100MW]
33MW x 2GT: 66MW
17MW x
2HRSG-GT: 34MW
562.4M
TRANSMISSION DIVISION
Area of Responsibility
DIVISIONAL INITIATIVES

Protection:
Transmission Radar Centre:
• Mini-SPS Labuan & SPS Tenom Pangi
• Set-up in each region
Competent Engineer: • Wide Area SPS
• LDS – DFR – RPMS – Alarm - MSO
• Ir Racheal Lim (275kV) • Protection Upgrading
• Ir Mohammad Fauzi Awang (132kV) • SESB Relay Acceptance List
• ILSS
Professional Engineer:
• Ir. Siti Jamilah Alias Slope Protection:
• Ir. Ahmad Ismail Assisted by IKRAM
• Ir. Christina Chong for the site risk
• Ir. Sudalli Sabtuahim Substations: audit, design &
• Hiew Zi Chuen (PASS) • Mobile Substation supervision
• Felix Ho (PASS IEM Interview) • Intensive CBM
• Fulbert Frederick (PASS Interview) • SF6 training workshop
• Nasrung Nurba (PASS Interview)

Lulus PJE Khas:


• Fauzillah Yakub
• Azrie Osman Live Maintenance:
• Steven Chang • Live Lines – 1 additional team
• Cornelius Lutam Transmission Lines: • Live Sub – 1 new team
• Willis Kassim • Install San-Earth
• Madorni Hee • Improve TFR
• Asri Nordin • Anti-Theftt Nut
• Jolly Madatang • Aerial CBM & patrolling by Heli
and Drone
Mengikuti PJE Khas: • ERS Tower